From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Williams J
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8407230336
Download: ML17346A429 (7)


Text

Docket Nos. 50-250 and 50-251 JUL i7 iSSC ISTRIBUTION w encl.

1:I~

DR LPDR Regulatory Files (016) ~

D.

G. McDonald, ORB-1 C. Parrish, ORB-1 R. Diggs, LFMB LFMB Reactor File LFMB Pending Check File LFMB R/F Florida Power S. Light Company ATTN:

Mr. J.

M. Mill";ams, Jr.

Vice President, Nuclear Energy Post Office Box 14000 Juno Beach, Florida 33408 Gentlemen:

lfe have completed a review of certain applications for license amendments and other approvals which your Company has filed with the Office of Nuclear Reactor Regulation (ONRR) for review in connection with Turkey Point Plant Unit Nos.

3 and 4.

As a result of this review, we find that fees pursuant to 10 CFR 170 have not been paid for several applications which were filed prior to June 20, 1984.

He also find that in a few instances the fees paid were not adequate.

Consequently, we have enclosed a list which shows the application dates, fees paid, fees that are applicable, and ONRR's fee determination on each of them.

Based on the ONRR staff's fee determinations, a total of $28.800 is due the USNRC for the applications on the 'list.

Therefore, you are requested to re-mit this amount to our office. If the ONRR staff's final reviews of Items 2

through 8 of the enclosed '1ist reveal that these fees are not appropriate, you will be notified and any necessary adjustments will be made.

Although you stated in your March 14 and April 4 applications (Items 2 and 5. respectively.

on the enclosed list) that a Class III fee ($4,000) and a Class I ($400) fee for each would be forwarded under separate cover,'hese fees have not been re-ceived by us.

In your application dated April 27, 1984 (Item 7), you stated that since the change is being made at the request of the Commission in accordance with the Draft Technical Evaluation Report (issued January 12, 1982),

a license fee is not provided with it.

Hhen applications are requested by the NRC to clarify or simplify the license or Technical Specifications (TS) for the convenience of the NRC and have minor safety significance, they are exempted from the fee requirements under the provisions of Footnote 2 of 10 CFR 170.22.

Although this information was requested by the NRC, it was not requested to clarify or simplify the license or TS for NRC's convenience but rather to assure the safe handling of heavy loads at the Turkey Point Plant.

Therefore, your April 27 application is subject to the fee provisions of 10 CFR 170.22 of the March 23, 1978 regulation.

8407230336 840717 PDR ADOCK 05000250 P

PDR

E

, '-4r Florida Power 8 Light Company JUL t7

>>8~

By letter dated February l. 1984, we informed your Company of the fee proce-dures regarding fire protection reviews and approvals by providing you with a copy of a letter we sent to.the Virginia Electric and Power Company dated December 5, 1983 for Surry Unit Nos.

1 and 2.

In that letter, we stated that the review and approval of alternate safe shutdown capability and any reviews which result in a denial of a request for your faci'lity are subject to fees'ursuant to 10 CFR 170.22.

The fees requested for Item 9 are consistent with the December 5 fee position for any reviews and approvals of fire protection

'equests filed prior to June 20, 1984.

Since the revised 10 CFR 170 became effective on June 20, 1984, these procedures have changed for applications fi'led on or after June 20, 1984.

For your information, a brief discussion of fees for applications for license amendments filed before and after June 20.

1984, is contained in the enclosures to this letter. If there are any ques-tions. call us on 301-492-7225.

Sincerely, o~ Qgooahy Wm. 0. 1CBer IIilliam0. Miller, Chief License Fee I1anagement Branch Office of Administration

Enclosures:

l.

List of Applications and Fees 2.

Revised Part 'l70 and Fee Assessment Information LFMB:.

LTre OFFICE P SVRN Oa p+

ys4

'M

~

~

~

R iggs-7I r4

)84 L'FMB:ADM Holloway isa LFMB:AD

~ WOMiller 7i igsis4 NRC FORM 318 (10.80) NPCM 0240 OFFICIAL RECORD COPY

II ' r P

C k

a P

I I'

1

e List of A lications and Fees Turke Point Plant Unit Nos.

3 and 4

Docket Nos.

50-250 and 50-251 A

lication Date 1.

9/10/82 (L-82-403)

Appendix I TS Review 2.

3/14/84 (L-84-71)

Spent fuel storage facility expansion 3.

3/30/84 (L-84-87)

Inservice Inspection Second 10 year Summary Program 4.

4/2/84 (L-84-90)

Inservice Inspection and Inservice Test Program TS changes 5.

4/4/84 (L-84-92)

Fuel Storage U-235 linear loading increase 6.

4/20/84 (L-84-107)

Proposed "C" bus design change 7.

4/27/84 (L-84-112)

TS changes re Control of heavy loads Fees Paid

$4,400 None None

$1,600 None None None Fees A

licable None

$4,400

$4,400

$4,400

$4,400

$4,400

$4,400 ONRR's Fee Determination and Action This application superseded a 4/17/79 application which superseded a 6/4/76 prefee application without a change in scope.

Approved by Amend-ment Nos.

103 and 97 on 4/23/84.

Single safety issue and duplicate unit.

Single safety issue and duplicate unit.

Single safety issue and duplicate unit.

Single safety issue and duplicate unit.

Single safety issue and duplicate unit.

Single safety issue and duplicate unit.

8.

5/3/84 (L-84-120) Unit 4 None Pressure vessel material fracture toughness analysis

$4,000 Single safety issue.

A lication Date Fees Paid Fees A

licable ONRR's Fee Determination and Action 9.

10/7/83 (L-83-516)

Alternate safe shutdown None

$4,400 Single safety issue and a

duplicate unit.

Approved by letter and SE dated 4/16/84.

Fees Applicable.........$ 34,800 Fees Paid...............$

6,000 Total Fees Due..........$ 28,800