Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17355A3921999-07-27027 July 1999 Proposed Tech Specs 3.8.1.1,3.4.3 & 3.5.2,extending AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17355A3041999-04-26026 April 1999 Proposed Tech Specs Deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17355A2491999-03-0808 March 1999 Proposed Tech Specs Section 6.0,deleting Certain Requirements That Are Adequately Controlled by Existing Regulations,Other than 10CFR50.36 & TS ML17355A2411999-02-24024 February 1999 Proposed Tech Specs Page 3/4 7-15,removing Restrictions on Location at Which Temp of UHS May Be Monitored ML17354B1641998-10-27027 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor Position Into TS ML17354A8381998-03-12012 March 1998 Proposed Tech Specs Deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17354A7801998-02-0202 February 1998 Proposed Tech Specs Re Diesel Fuel Storage Sys ML17354A7621998-01-0909 January 1998 Proposed Tech Specs Sections 5.3.1 & 6.9.1.7,,allowing Implementation of Zirlo Fuel Rod Cladding ML17354A7321997-12-0404 December 1997 Proposed Tech Specs Section 6.9.1.7, COLR, Clarifying References 4 & 6 by Adding Best Estimate LOCA to COLR & Documenting re-analysis Performed as Result of Revs to Large Break LOCA Methodology ML17354A6161997-08-27027 August 1997 Proposed Tech Specs Page 6.2,allowing Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17354A4771997-04-24024 April 1997 Proposed Tech Specs Page 6-22 Re Large Break Loss of Coolant re-analysis ML17354A4221997-02-24024 February 1997 Proposed Tech Specs 6.9.1.7 Re COLR & Large Break Loss of Coolant Accident re-analysis ML17354A3741996-12-17017 December 1996 Proposed Tech Specs,Modifying TSs to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp ML17354A3521996-11-22022 November 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Sources & 3/4.8.1 Re AC Sources Operating Limiting Condition for Operation ML17354A2871996-10-0303 October 1996 Proposed Tech Specs Revising TS to Allow Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 ML17353A7991996-07-17017 July 1996 Proposed Tech Specs,Revising TSs to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Intervals Determined by performance-based Criteria ML17353A7111996-05-28028 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls. ML18008A0451996-05-10010 May 1996 Proposed Tech Specs Re Various Administrative Improvements ML17353A6781996-05-0909 May 1996 Proposed Tech Specs Re SBLOCA re-analysis ML17353A6521996-04-23023 April 1996 Proposed Tech Specs Re Accumulator Water Level & Pressure Channnel,Per NRC GL 93-05 ML17353A6581996-04-19019 April 1996 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6171996-03-21021 March 1996 Proposed Tech Specs,Revising TS Such That Requirements for Radiological Effluent Controls Relocated to Offsite Dose Calculation Manual or Process Control Program ML17353A6091996-03-20020 March 1996 Proposed TS 3/4.5.1,reflecting Removal of SRs & Operability Requirements for ECCS SI Accumulators That Concern Water Level & Pressure Channels ML17353A6001996-03-0505 March 1996 Proposed TS Sections 4.4.3.3 & 4.5.2,reducing Frequency of Surveillances & Insps in Accordance W/Gl 93-05,Items 6.6 & 7.5 ML17353A5031995-12-18018 December 1995 Proposed Tech Specs,Increasing Allowed Rated Thermal Power from 2,200 Mwt to 2,300 Mwt ML17353A4541995-11-22022 November 1995 Proposed Tech Specs Re Administrative Controls & Reviews ML17353A4511995-11-22022 November 1995 Proposed Tech Specs Pages 3/4 8-2 & 3/4 8-3 Re Edgs,Per GLs 93-05 & 94-01 ML17353A3971995-10-0404 October 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations ML17353A3831995-09-28028 September 1995 Proposed Tech Specs,Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17353A3531995-09-11011 September 1995 Proposed Tech Specs Re Edgs,Change to Testing Requirements, Per GLs 93-05 & 94-01 ML17353A2831995-07-26026 July 1995 Proposed Tech Specs 4.1.3.1.2,4.6.5.1,4.4.6.2.2,4.10.1.2 & Table 4.3-3 to Reduce Frequency of Testing,Per GL 93-05 ML17353A2801995-07-26026 July 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentation ML17353A2761995-07-26026 July 1995 Proposed Tech Specs,Adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT ML17353A2731995-07-26026 July 1995 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos ML17353A2701995-07-26026 July 1995 Proposed Tech Specs Re Rod Misalignment Requirement for Movable Control Assemblies ML17353A2671995-07-26026 July 1995 Proposed Tech Specs for Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels ML17353A2401995-06-19019 June 1995 Proposed Tech Specs Re TS SR 4.8.1.1.2.g.7 ML17352B1841995-05-23023 May 1995 Proposed Tech Specs Re Use of Changed Setpoint Presentation Format for RPS & ESFAS Instrumentation ML20083R1291995-05-0505 May 1995 Proposed Tech Specs Re Implementation of Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17352B0881995-03-30030 March 1995 Proposed Tech Specs SR 4.8.1.1.2.g.7,allowing Separation of 5-minute hot-start Test from 24-h EDG Test Run,Deleting Associated Footnote & Adding New TS SR 4.8.1.1.2.g.14 & Associated Footnote for Performance of Subj 5-minute Test ML17352B0041995-01-17017 January 1995 Proposed Tech Specs 6.9.1.7, COLR, Including Ref to Topical Rept NF-TR-95-01 Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters ML17352A8341994-10-20020 October 1994 Proposed TS 3/4.7.1.1 & Associated Bases,Addressing Max Allowable Reactor Thermal Power Operation W/Inoperable MSSVs ML17352A8281994-10-20020 October 1994 Proposed Tech Specs 4.8.1.1.2e & 4.8.1.1.2f,addressing EDG Fuel Oil Testing & TS 3.8.1.1,addressing Required Action in Event Diesel Fuel Oil Does Not Meet Diesel Fuel Oil Testing Program Limits ML17352A8311994-10-20020 October 1994 Proposed Tech Specs 3/4.4.9.1,reflecting Removal of Schedule for Withdrawal of Rv Matl Specimens ML17352A8381994-10-20020 October 1994 Proposed Tech Specs,Allowing Containment Personnel Airlock Doors to Be Opened During Core Alterations & Movement of Irradiated Fuel in Containment,Provided Certain Conditions Met ML17352A7321994-07-19019 July 1994 Proposed TS 3/4.7.1 & Associated Bases Addressing Operation at Reduced Power Levels W/Inoperable Main Steam Safety Valves ML17352A7291994-07-19019 July 1994 Proposed Tech Specs 4.8.1.1.2e & 4.8.2.2.2f Re EDG Fuel Oil Testing Program ML17352A7241994-07-19019 July 1994 Proposed Tech Specs Adding Rod Bank Insertion Limits & K(Z) Curves to COLR ML17352A5471994-04-19019 April 1994 Proposed TS 4.0.5a Re ISI & Testing Programs ML17352A5441994-04-19019 April 1994 Proposed Tech Specs Changing Containment Spray Sys Surveillance Requirements 1999-07-27
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17355A3921999-07-27027 July 1999 Proposed Tech Specs 3.8.1.1,3.4.3 & 3.5.2,extending AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17355A3581999-06-28028 June 1999 Cycle 18 Startup Rept. with 990628 Ltr ML17355A3041999-04-26026 April 1999 Proposed Tech Specs Deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17355A2491999-03-0808 March 1999 Proposed Tech Specs Section 6.0,deleting Certain Requirements That Are Adequately Controlled by Existing Regulations,Other than 10CFR50.36 & TS ML17355A2411999-02-24024 February 1999 Proposed Tech Specs Page 3/4 7-15,removing Restrictions on Location at Which Temp of UHS May Be Monitored ML17355A2011999-01-25025 January 1999 Cycle 17 Startup Rept. with 990125 Ltr ML17354B1641998-10-27027 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor Position Into TS ML20197C9661998-08-27027 August 1998 Rev 15 to Security Training & Qualification Plan ML17354A9471998-04-27027 April 1998 Rev 2 to Turkey Point Nuclear Plant Recovery Plan. ML17354A8381998-03-12012 March 1998 Proposed Tech Specs Deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17354A7801998-02-0202 February 1998 Proposed Tech Specs Re Diesel Fuel Storage Sys ML17355A2711998-01-30030 January 1998 Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point Plant,Units 3 & 4. ML17354A7621998-01-0909 January 1998 Proposed Tech Specs Sections 5.3.1 & 6.9.1.7,,allowing Implementation of Zirlo Fuel Rod Cladding ML17354A7321997-12-0404 December 1997 Proposed Tech Specs Section 6.9.1.7, COLR, Clarifying References 4 & 6 by Adding Best Estimate LOCA to COLR & Documenting re-analysis Performed as Result of Revs to Large Break LOCA Methodology ML17354A6161997-08-27027 August 1997 Proposed Tech Specs Page 6.2,allowing Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17354A4971997-05-0101 May 1997 Rev 1 to Turkey Point Nuclear Plant Recovery Plan. ML17354A4771997-04-24024 April 1997 Proposed Tech Specs Page 6-22 Re Large Break Loss of Coolant re-analysis ML17354A4221997-02-24024 February 1997 Proposed Tech Specs 6.9.1.7 Re COLR & Large Break Loss of Coolant Accident re-analysis ML17354A3741996-12-17017 December 1996 Proposed Tech Specs,Modifying TSs to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp ML17354A3521996-11-22022 November 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Sources & 3/4.8.1 Re AC Sources Operating Limiting Condition for Operation ML17354A2871996-10-0303 October 1996 Proposed Tech Specs Revising TS to Allow Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 ML17353A7991996-07-17017 July 1996 Proposed Tech Specs,Revising TSs to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Intervals Determined by performance-based Criteria ML17353A7111996-05-28028 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls. ML18008A0451996-05-10010 May 1996 Proposed Tech Specs Re Various Administrative Improvements ML17353A6781996-05-0909 May 1996 Proposed Tech Specs Re SBLOCA re-analysis ML17353A6521996-04-23023 April 1996 Proposed Tech Specs Re Accumulator Water Level & Pressure Channnel,Per NRC GL 93-05 ML17353A6581996-04-19019 April 1996 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6171996-03-21021 March 1996 Proposed Tech Specs,Revising TS Such That Requirements for Radiological Effluent Controls Relocated to Offsite Dose Calculation Manual or Process Control Program ML17353A6091996-03-20020 March 1996 Proposed TS 3/4.5.1,reflecting Removal of SRs & Operability Requirements for ECCS SI Accumulators That Concern Water Level & Pressure Channels ML17353A6001996-03-0505 March 1996 Proposed TS Sections 4.4.3.3 & 4.5.2,reducing Frequency of Surveillances & Insps in Accordance W/Gl 93-05,Items 6.6 & 7.5 ML17353A5801996-02-29029 February 1996 Plant Procedures & Training Matl Provided for Preparation of Licensing Exams for Reactor Operator Group Xvi & Senior Reactor Operator Upgrade. ML17353A6191996-02-15015 February 1996 Offsite Dose Calculation Manual for Gaseous & Liquid Effluents from Turkey Point Plant Units 3 & 4. ML17353A7631996-02-0808 February 1996 Conduct of Operations. ML17353A5031995-12-18018 December 1995 Proposed Tech Specs,Increasing Allowed Rated Thermal Power from 2,200 Mwt to 2,300 Mwt ML17353A4541995-11-22022 November 1995 Proposed Tech Specs Re Administrative Controls & Reviews ML17353A4511995-11-22022 November 1995 Proposed Tech Specs Pages 3/4 8-2 & 3/4 8-3 Re Edgs,Per GLs 93-05 & 94-01 ML17353A3971995-10-0404 October 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations ML17353A3831995-09-28028 September 1995 Proposed Tech Specs,Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17353A3531995-09-11011 September 1995 Proposed Tech Specs Re Edgs,Change to Testing Requirements, Per GLs 93-05 & 94-01 ML17353A7641995-08-23023 August 1995 Emergency & Off-normal Operating Procedure Usage. ML17353A2831995-07-26026 July 1995 Proposed Tech Specs 4.1.3.1.2,4.6.5.1,4.4.6.2.2,4.10.1.2 & Table 4.3-3 to Reduce Frequency of Testing,Per GL 93-05 ML17353A2801995-07-26026 July 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentation ML17353A2761995-07-26026 July 1995 Proposed Tech Specs,Adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT ML17353A2731995-07-26026 July 1995 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos ML17353A2701995-07-26026 July 1995 Proposed Tech Specs Re Rod Misalignment Requirement for Movable Control Assemblies ML17353A2671995-07-26026 July 1995 Proposed Tech Specs for Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels ML17353A2401995-06-19019 June 1995 Proposed Tech Specs Re TS SR 4.8.1.1.2.g.7 ML17352B1841995-05-23023 May 1995 Proposed Tech Specs Re Use of Changed Setpoint Presentation Format for RPS & ESFAS Instrumentation ML20083R1291995-05-0505 May 1995 Proposed Tech Specs Re Implementation of Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17352B0881995-03-30030 March 1995 Proposed Tech Specs SR 4.8.1.1.2.g.7,allowing Separation of 5-minute hot-start Test from 24-h EDG Test Run,Deleting Associated Footnote & Adding New TS SR 4.8.1.1.2.g.14 & Associated Footnote for Performance of Subj 5-minute Test 1999-07-27
[Table view] |
Text
TURKEY POINT UNITS 3 R 0 DOCKET NOS. 50-250 R 50-251 PROPOSED LICENSE AMENDMENT TITLE: Manual Bypass of Certain S.i. Signals ENCLOSURES:
- 1) Current Technical Specif ications
- 2) Proposed Technical Specifications
- 3) Operating Procedure 0205.2, Page 6 DESCRIPTION:
Technical S ecifications Table 3.5-2 Item 1.3 High differential pressure between any steam line and the steam line header - Add reference to an existing footnote which reads: This signal may be manually bypassed, when cooling down the reactor and RCS pressure is below 2000 psig.
Item 1.5 High steam flow in 2/3 steam lines with low TAyG or low steam line pressure - Add a footnote to read: This signal may be manually bypassed, when cooling down the reactor and TAyG is below 503oF.
The proposed revisions to Table-3.5-2 of the Technical Specifications are necessary to permit operational flexibility during normal plant cooldown/startup consistent with the NSSS vendor recommendations.
The automatic safety injection signal from low pressurizer pressure (2/3) can be manually blocked when the reactor coolant pressure is below 2000 psig and will automatically unblock above this pressure. This manual block shall not be used except during normal procedures for plant cooldown and startup.
The basis for the above is that when the reactor is shutdown and is to be cooled down and depressurized, the steam generator main steam isolation valves are normally closed. This brings steam header pressure to 0 psig. As the system is cooled via the steam dumps to atmosphere, the pressure in the steam generators is reduced. By design the output from the steam line header pressure transmitter is set such that the signal will not fall below that equivalent to 585 psig. Thus a safety injection would occur when steam generator pressure reaches 085 psig (100 psi Delta p) if the signal is not blocked. Currently, this signal is blocked simultaneously with blocking the Pressurizer Low Pressure signal (Table 3.5-2, Item 1.0).
The automatic safety injection signal from high steam flow coincident with either low steam line pressure or low T(avg) can be manually blocked when the reactor coolant average temperature is below 503oF and will automatically unblock above this temperature. This main block shall not be used except during normal procedures for plant cooldown and startup.
The basis for the above is that the reactor could not be cooled down and depressurized (without initiating safety injection) if this signal were not allowed to be blocked.
~ 840i.040353 05000250 PDR ADOCK 83i228 P , PDR T18:0
C I
('
ATTACHMENT I
~ TABLE 3.5-2 ENGINE=RED 5'F>>TY FUTURES ACTUATIOH 2 3 MIN. OP&AT% ACTION MIN- OEGREE IF CONDIYIOttS QF OPERABLE GF COLS% 1 OR 2 t(O..- 'Ng) IOtNL UNIT CHARNELS RHUHOANCY ~~t(NOT BE t' SAP=:.Y INJECTION Co1d Snut'd~
1.2 Hici: Contair:.ent ?ress'e. Cold Shutdown 1.3 Hi=h Qi-.iaren"ial Pr ssure bet~ n'any 5 ean Line and the Stem Lin Header 2- Cold Shutdown .
?r ssurizer Low Prmsuro"- Cold Shu>own Hi";". ="" a~ ricw in 2/3 1/1 i ne Cold Shutd~z in each
~
yi, ~ or ow Ste "Qi Vi
~ ~ <<5 r>>oc>>'~>>o
~ ~~ ~ >>4>>o 1:os
>>>> ~ ~I
~
+ ~ P ~
i
>>JR\i<<>>g
'ig>>it I 5 '<<ilail I I 2>> t ~ I ~ I '<<<<l' ~ r ~ ~ ~ ~ 4>> ~ rcl '<gsat
~ ~ ~ ~ I~ >> Ll ~ ~ 4 ~ ~ >>I ~ \ sa.
~ i<< i ~ Ay && \ ~ ~ ~
<<0
~
vAo .'C ~ ~ >> iC L"w-L"w Ste=-. ~en rator <c>> <<hu daven L vel ss "" VQ< ace (" 0 old Shv down n~e 5a Q' I'8 ion 4>> Trip o 5c:h .".ain Col d Sill'cwn Fe~water ?u'p Break rs Inis signal ".,ay 5e manually y ass+', ~~en =h ".
=or >s sh" d-.n and "". ssur ',s below 2000 psig Amendment Nos. 79 an 73
TABLE 3.5-2 ENGINEERED SAFETY FEATURES ACTUATION 2
MIN.
DEGREE OPERATOR ACTION MIN. OF IF CONDITIONS OF OPERABLE REDUN- COLUMN 1 OR 2 NO. FUNCTIONAL UNIT CHANNELS DANCY CANNOT BE MET
- 1. SAFETY IN3ECTION 1.1 Manual Cold Shutdown 1.2 High Containment Pressure Cold Shutdown 1.3 High Differential Pressure between any Steam Line and the Steam Line Header+ 1 ~ Cold Shutdown 18 Pressurizer Low Pressure" Cold Shutdown 1.5 High Steam Flow in 2/3 1/line Cold Shutdown Steam Lines with Low in each Tavg or Low Steam of 2 Line Pressure++ lines
- 2. CONTAINMENT SPRAY 2.1 High Containment Pressure 2 pel 1/set Cold Shutdown and High-High Containment set Pressure (coincident)
- 3. AUXILIARYFEEDWATER 3.1 Low-Low Steam Generator Hot Shutdown Level 3.2 Loss of Voltage (both OKV Cold Shutdown busses) 3.3 Safety Injection ( See 1 above -)
3.0 Trip of both Main Cold Shutdown Feedwater Pump Breakers This signal may be manually bypassed, when cooling down the reactor and RCS pressure is below 2000 psig.
This signal may be manually bypassed, when cooling down the reactor and Tavg is below 503oF.
\
AT tACH MF 6 i 3/18/83 RATING PROCEDURE 0205.2, PAGE REACTOR SHUTDOWN HOT SHUTDOWN TO COLO SHUTDOWN CONDITION INITIALS '.12 Block the high steam flow SI initiating signal after the permissive light LO Tavg BLOCK SI is illuminated. Permissive light STM LINE SAF INJ BLKO will light when signal is blocked.
8.13 Block. the low pressurizer pressure and the high steam line/header delta P SI initiating signals .r the permissive light SAFETY INJECT BLOCK TRIPPEO is illuminated. Permissive light SAFETY INJECT BLOCKEO will light when signal is blocked.
NOTES: I. The three SI initiating signals will be blocked simultaneous1y'if both permissive signals are present when the block swi tch i s turned to BLOCK.
- 2. The TAVG high steam flow signal will be unblocked automatically increases to 543'.
if
- 3. The low pressurizer pressure and high steam line header delta p signals will be unblocked automatically if the RCS pressure is increased high enough to unblock safety injection. (2000 psig).
- 4. The signals may be unblocked manually at any time by turning the block switch to UNBLOCK.
- 8. 14 Unlock and close the following 480 V breakers:
s 30532 (40733), MOV-*-865A Accumulator A to A cold leg 30631 (40532), IIOV-*-8658 Accumulator 8 to 8 cold leg 30733 (40631), MOV-*-865C Accumulator C to C cold leg
- 8. 15 When the RCS pressure is 1000 psig, close, lock or tag the following accumulator discharge valves:
MOV-*-865A Accumulator A to cold leg A CLOSED/LOCKED OR TAGGED MOV-*-8658 Accumulator 8 to cold leg 8 CLOSED/LOCKED OR TAGGED MOV-*-865C Accumulator C to cold leg C CLOSED/LOCKED OR TAGGED CAUTION: The accumulator valves must be closed prior to reaching 700 psig in the RCS to prevent the accumulators from discharging to the RCS.
8.16 Close, lock and tag the following valves to isolate the containment spray pumps:
- -891A A cont. spray pump i.solation CLOSED/LOCKED
- -8918 8 cont. spray pump isolation CLOSED/LOCKED 8.17 Unlock and close the following breakers,.then verify that the valves indicate closed on VPB.
30732 (40732) MOV-*-866A HH SI to Loop A Hot Leg 30621 (40621) MOV-*-8668 HH SI to.Loop 8 Hot Leg 8.18 Prior to cooling below 380' in RCS, verify closed the following SIS valves and tag the corresponding control switches on VP-B.
'MOV-*-843A HH SI stop to cold legs CLOSED MOV-*-8438 llH SI stop to cold legs CLOSED MOV-*-866A HH SI to loop A hot leg CLOSED MOV-*-8668 HH 'Sl to loop 8 hot leg- cLOsEP
STATE OF FLORIDA )
) ss.
COUNTY OF DADE )
J. W. Williams, Jr., being first duly swor n, deposes and says:
That he is Vice President of Florida Power 8 Light Company, the licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.
J. W. Williams, Jr.
Subscribed and sworn to before me this 08K th day of jt , 1983.
rate<
NOTARY PUBLIC, and for the County of Dade, State of Florida.
Hy commission expires:
~~ >A> OF TED<
Ec e BONDED THRQ GENERAL jNS, UNDERV/Rl TERS
/
C C
c~- rp A-,-'
"yi> ~ sill "I"