ML17342A833
| ML17342A833 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 07/28/1987 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8708060221 | |
| Download: ML17342A833 (5) | |
Text
r gl ACCESSION NBR FAC IL: 50-000 50-250 50-251 50-335 50-389 AUTH. NAME JULIANIC. A.
REC IP. NAME NOQDYI C. Q.
REGULATORY FORMATION DISTRIBUTION SY gM (RIDS) 8708060221 DOC. DATE: 87/07/28 NOTARIZED:
NO Generic Docket Turkey Point Planti Unit 3r Florida Power and Light C
Turkey Point Plant Unit 4I Florida Poeer and Light C
St.
Lucie Plantr Unit 1I Florida Poeer
& Light Co.
St.
Lucie Plantr Unit 2I Florida Poujer
& Light Co.
AUTHOR AFFILIATION Region 2I Office of Director RECIPIENT AFFILIATION Florida PouJer
& Light Co.
DOCKET 0 05000000 05000250 05000251 05000335 05000389
SUBJECT:
Advises that Rev 10 to topical GA assurance rept transmitted bg 870610 1tr
& 870707 clarification of Rev 10 continues to meet requirements of 10CFR50r App B
& acceptable.
DISTRIBUTION CODE:
IE4SD COPIES RECEIVED: LTR I
ENCL Q SIZE:
TITLE:
- 50. 54. a. 3 & 50. 55. f. 3 Change to SAR G* PY ogram NOTES:
RECIP IENT ID CODE/NAME PD2-2 LA TOURIQNYI E COPIES LTTR ENCL RECIPIENT ID CODE/NAME McDONALDID COPIES LTTR ENCL INTERNAL:
A LFMB REG FILE 02 0
1 NRR /DLPG/GAB RQN2 FILE 01 EXTERNAL:
DMB/DSS NRC PDR LPDR TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL wer w v, v
t erc',Rr
~
- r
~
~
July 28, 1987 F orida Power and Light Company
~
~
~
~
TTN:
Mr. C. 0.
Woody Group Vice President Nuclear Energy Department P. 0.
Box 14000 Juno Beach, FL 33408 Gentlemen:
SUBJECT:
FLORIDA POWER AND LIGHT (FPL) QUALITY ASSURANCE PROGRAM UPDATE Your letter dated June 10,
Revision 10, in accordance with 10 CFR 50.54(a).
This report provides the current quality assurance program description for Turkey Point and St. Lucie (Docket Nos. 50-250, 50-251, 50-335, and 50-389).
Your letter dated July 7, 1987, (L-87-283) provided clarifications to Revision 10 as discussed between FPL and NRC Region II personnel during a
telephone conversation conducted on July 1, 1987.
Our review of this information indicates that your quality assurance program continues to meet the requirements of 10 CFR 50 Appendix 8 and is therefore acceptable.
Please contact me if you have any questions concerning this letter.
We appreciate your timely submittal and prompt response to our questions regarding the information required by 10 CFR 50.54(a).
Sincerely, (ORIGINAL SIGNED BY C. A. JULIAN)
Caudle A. Julian, Chief Operations Branch Division of Reactor Safety cc: M N. Harris, Vice President St. Lucie Nuclear Plant 4:
M. Wethy, Vice President Turkey Point Nuclear Plant Q J. Baker, Plant Manager Turkey Point Nuclear Plant Q.
G. Boissy, Plant Manager St. Lucie Nuclear Plant W B. Harper, Site QA Superintendent k:
W. Bladow, Plant QA Superintendent
+ Arias, Jr., Regulatory and Compliance Supervisor bcc:
(See Page 2) 8708060221 870728 PDR
- DOC< 05000250 P
Florida Power and Light Company July 28, 1987 bcc:
Document Control Desk State of Florida INC Resident Inspector Turkey Point Nuclear Plant
~ Resident Inspector St. Lucie Nuclear Plant RII RII MRunyan:sh ABelisle 07/25/87 07/M/87 CAJu ian 07/g 87