ML17342A778
| ML17342A778 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 07/15/1987 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17342A779 | List: |
| References | |
| NUDOCS 8707240111 | |
| Download: ML17342A778 (3) | |
See also: IR 05000250/1987030
Text
July 15,
1987.
Docket Nos. 50-250,
50-251,
50-335,
and 50-389
License
Nos.
and
Florida Power and Light Company
4GTN:
Mr.
C.
O.
Woody
Group Vice President
Nuclear Energy Department
'.
0.
Box 14000
Juno
Beach,
FL
33408
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NOS. 50-250/87-30,
50-251/87-30,
50-335/87-13
AND 50-389/87-12
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
L. Mellen
on June
29 at Turkey Point,
and June
30 - July
1 at St.
Lucie.
The
inspection
included
a review of activities authorized for your Turkey Point and
St.
Lucie facilities.
At the conclusion
of the inspection,
the findings were
discussed
with
those
members
of your staff identified
in
the
enclosed
inspection report.
Areas
examined
during
the
inspection
are ,identified in the report.
Within
, these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Within the
scope of the inspection,
no violations or deviations
were
identified.
In
accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
I
Sincerely,
(ORIGINAL SIGNED
BY C. A. JULIAN)
Caudle
A. Julian, Chief
Operations
Branch
Division of Reactor Safety
8707240iii 8707i5
ADOCK 05000250
8
Florida Power
and Light Company
July 15,
1987
Enclosure:
NRC Inspection
Report
cc w/encl:
tk.
N. Harris, Vice President
St.
Lucie Nuclear Plant
W G. Boissy, Plant Manager
~B. Harper, Site gA Superintendent
W
M. Wethy, Vice President
urkey Point Nuclear Plant
. J.
Baker, Plant Manager
Turkey Point Nuclear Plant
W M. Bladow, Plant
gA Superintendent
tJ. Arias, Jr.,
Regulatory
and Compliance
Supervisor
bcg w/encl:
NAG Resident
Inspector
Turkey Point
PRC Resident
Inspector
St.
Lucie
Document Control
Desk
State of Florida
t
RII
LMellen:lb
07/I0/87
RII
ABelisle
07/I 0/87
RII
bolson
07/ip /87
o