ML17341A889

From kanterella
Jump to navigation Jump to search
Releases Public Version of Emergency Procedure
ML17341A889
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/11/1982
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML17341A890 List:
References
NUDOCS 8202190086
Download: ML17341A889 (6)


Text

~Pa RfCI, Wp

~a*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 February 11, 1982 50-250/251 Turkey Point MEMORANDUM FOR:

Chief, Document Management

Branch, TIDC FROM:

SUBJECT:

Director, Divison of Rules and Records, ADM REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATION The submitter of the attached document has expressed no desire to withhold any information contained therein.

Therefore, this material may now be made publicly available.

Attachment:

As stated J.

M. Felton, Director Division of Rules and Records Office of Administration BECPtlIIPO EBl '8 lgege Cfog g

-tg mepIIatI~~>mme nnc ~">

'b rp/

,8202190086 8202ii

" 'PDR ADOCK 05000250

'F'

'~

i PDR" a"-

~

Ll

r'on r

r, r

~

~

r'y'

'.r X<nX I

I

FACIL:50 250 Turkey Point Plantg Unit 3i Florida Power.and Light C

50 251 Turkey Point

-.Pl anti Uni t 4i Florida Power and Lignt C

AUTH'APE AUTHOR AFFILIATION HAYSPJ ~ K'lor iaa Power 8 Light Co ~

REC IP ~ NAME RECIPIENT AFFILIATION DOCKET ¹ 05000250 05000251

SUBJECT:

Central Files version of Emergency Pr ocedure 20007'Loss of All AC Powers

OISTRISUTION COOE:

XOOSS COPIES 'RECEIllEO:LTR + ENCL L SIZE:

TITLE: Emerg Plan (CF Avail)

NOTES'ECIPIENT IO CODE/NAP'E ACTION':

ORB ¹1 BC INTERNAL:

/DRR 02 08 IE/OEP/EPOB Oo NRR/DS I/AEB REG FILES 07 COPIES I.TTR ENCL REC IP IENT ID CODE/NAP E GROTENHUIS R P 01 FERA REP 0 IV 09 IE/DEP D IR IE/OEP/EPLB 03 NRR/OS I/RA8 COPIES LTTR ENCL 0

TOTAL NUl}BER.OF COPIES HEwUlRED-'TTR pA ENCL 10

1.0 Title

LOSS OF ALI A.C.

POWER FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 AND 4 EMERGENCY PROCEDURE 20007 JANUARY 21 1982 i CB

]'/pe g

W AQ!2~

KCUQf ~VE "~

~C 2.0 A

royal and List of Effective Pa es:

2.1

~Aroval:

r> Il Change dated Approved by 1/21/82 Reviewed by PNSC Januar 21 1982 Plant Mgr.-Nuc

.as ~'

)9/Z-2.2 List of Effective Pa s:

~Pa e

Date 1

1/21/82 2

1/21/82 3

1/2)/82 4

1/21/82 5

1/21/82 6

1/21/82 7

1/21/82

~Pa e

8 9

10 11 12

.13 14 Date 1/21/82 1/21/82 1/21/82 1/21/82 1/21/82 1/21/82 1/21/82.

~Pa e

Date 15 1/21/82 16 1/21/82 17 1/21/82 18 1/21/82 19 1/21/82 20 1/21/82 21 1/21/82

~Pa e

Date 22 1/21/82 23 1/21/82 24 1/21/82 25 1/21/82 26 1/21/82 3.0

~pur ose:

This instruction verifies the proper response of available automatic protection systems following the loss of all A.C. power and specifies appropriate operator actions to:

3.1 Minimize RCS Inventory Loss 3.2 Maintain an Ultimate Heat Sink 3.3 Restore A.C. Power 8202i90089 8202ii PDR ADOleK 05000250 F

PDR 4.0 3.4 Recover the Plant following Restoration of Power

~Stoma:

The following are symptoms of a

Loss of All A.C. Power.

These symptoms should al 1 appear simul taneously.

4.1 Control Room Standard Lighting Off and Emergency Lighting On 4.2 Plant Safeguards Equipment Not Energized 4.3 Zero Voltage Indication on both 4KV Buses NOTE:

A loss of all A.C.

power is an UNUSUAL EVENT.

Notify the Nuclear Plant Supervisor.

~~o~

90 t

M IJ~

I