Forwards IE Insp Repts 50-250/81-28 & 50-251/81-28 on 811116-20 & Notices of Violation & Deviation
ML17341A877
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/04/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17341A874 List:
References
NUDOCS 8202160684
Download: ML17341A877 (4)


See also: IR 05000250/1981028

Text

QEC O4

188t

Florida Power and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0.

Box 529100

Miami, FL

33152

Gentlemen:-

Subject:

Report

No

.

$0-250 81-

nd 50-251/81-28

This refers to the routine safety inspection

conducted

by Mr. M. Thomas of this

office on November 16-20,

1981, of activities authorized

by NRC Operating License

Nos.

DPR-31

and

DPR-41 for the Turkey Point facility.

Our preliminary findings

were discussed

with Mr. H.

E. Yaeger,

Site

Manager,

at the conclusion

of the

inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

During the inspection, it was

found that certain activities under your license

appear

to violate

NRC requirements.

This

item

and

references

to pertinent

requirements

are

listed

in

the

Notice

of Violation enclosed

herewith

as

Appendix A.

Elements

to

be

included

in

your

response

are

delineated

in

Appendix A.

During the inspection it was

found that certain activities

under your license

appeared

to

deviate

from

commitments

to

the

Commission

and

have

safety

significance.

This

item is identified in the

Notice of Deviation

enclosed

herewith

as

Appendix B.

Please

provide

us in writing within 30 days of your

receipt

of this letter

your

comments

including

a description

of corrective

actions that

have

been

or will be taken, corrective actions which will be taken

to avoid further deviations,

and the date your corrective actions were or will be

completed.

In accordance with 10 CFR 2.790(a),

a copy of this letter and the enclosures will

be placed

in the

NRC's Public

Document

Room unless

you notify this office, by

telephone,

within ten

days

of the

date

of this letter

and

submit written

application to withhold information contained therein within thirty days of the

date of this let'ter.

Such application

must

be consistent with the

requirements

of 2.790(b)(1).

202160M% 820205

R ADOCK 05O00250

'PDR

PDR

8

0

I( gf ~

P:"l"'A

WM4 C

J

'0

e

Florida Power and Light Company

0<<0<

tes>

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3.

Inspection Report Nos. 50-250/81-28

and 50-281/81-28

cc w/encl:

H. E. Yaeger, Site Manager

bcc w/encl:

NRC Resident Inspector

Document Management

Branch

State of Florida

Paul J. Kellogg, Chief

Reactor Projects

Branch 2

Division of Resident

and

Reactor Project Inspection

R I~I

Thomas:ht

1$/Q/81

RII

FJape

1>g /8

CEMurphy

ZI/g/81

/E

RII

KDLan

s

4.1/g/81

p.)i

PJKellogg

11)

/81

(vs>

0

4"

i(

<<)f

.$f

e

I

h

V