Text
APPENDIX A NOTICE OF VIOLATION Florida Power and Light Company Turkey Point Unit 4 Docket No. 50-251 License No. DPR-41 As a result of the inspection conducted on November 16-20,
- 1981, and in accord-ance with the Interim Enforcement
- Policy, 45 FR 66754 (October 7, 1980),
the following violation was identified.
Technical Specification 6.8. 1 requires the licensee to establish and imple-ment procedures that meet the requirements and recommendations of ANSI N18.7-1972 and Appendix "A" of Regulatory Guide 1.33.
Contrary to the above, while the reactor head was removed for refueling, the licensee did not implement two procedures in accordance with the require-ments of ANSI N18.7-1972.
1Property "ANSI code" (as page type) with input value "ANSI N18.7-1972.</br></br>1" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process..
Operating Procedure 16200 requires items that could fall into the reactor to be kept off the manipulator crane and clear of the reactor cavity.
On November 17,
- 1981, miscellaneous, untethered tools and materials were observed on the manipulator crane.
2.
gual ity Procedure
- 2. 10 requir es material accountability to be applied when misplaced items could be detrimental to the safety function of a system.
On November 17,
- 1981, a system of material accountability had not been established for items entering the refueling area.
This is a Severity Level V Violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged viola-tion; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which wi 11 be taken to avoid further violations; and (5) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
Under the authority of Section 182 of the Atomic Energy Act of
- 1954, as amended, this response shall be submitted under oath or affirmation.