ML17341A860

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-250/81-26 & 50-251/81-26 on 811103-06 & Notice of Violation
ML17341A860
Person / Time
Site: Turkey Point  
Issue date: 12/02/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17341A858 List:
References
NUDOCS 8202050361
Download: ML17341A860 (4)


See also: IR 05000250/1981026

Text

DEC - 2 1981

Florida Power and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced Systems

and Technology

P.

O. Box 529100

Miami, FL

33152

Gentlemen:

Subject:

Report Nos. 50-250/81-26

and 50-251/81-26

This refers to the routine safety inspection

conducted

by Mr.

W.

P. Kleinsorge of

this office on

November 3-6,

1981,

of activities authorized

by

NRC Operating

License

Nos.

DPR-31

and

DPR-41 for the Turkey Point facility.

Our preliminary

findings were discussed

with Mr. J.

K. Hays, Plant Manager,

at the conclusion of

the inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

e

personnel,

and observations

by the inspector.

During the inspection, it was

found that certain activities under your license

appear

to violate

NRC requirements.

These

items

and references

to pertinent

requirements

are listed in the Notice of Violation enclosed

herewith

as Appen-

dix A.

Elements to be included in your response

are delineated

in Appendix A.

One

new unresolved

item is identified in the

enclosed

inspection

report.

This

item will be examined during subsequent

inspections.

In accordance

with

10

CFR 2.790(a),

a copy of thi s letter and the enclosure(s)

will be placed

in the NRC's Public Document

Room unless

you notify this office,

by telephone,

within ten

days of the date of this letter

and

submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application

must

be consistent with the requirements

of 2.790(b)(1).

The responses

directed

by this letter and the enclosures

are not subject to the

clearance

procedures

of the Office of Management

and Budget

as required

by the

Paperwork Reduction Act of 1980,

PL 96-511.

'20205036i

820i27

PDR

ADOCK 05000250

PDR

Florida Power and Light Company

DEC - 2 1981

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-250/81-26

and 50-251/81-26

cc w/encl:

H. E. Yaeger, Site Manager

bcc w/encl:

NRC Resident Inspector

Document Management

Branch

State of Florida

Paul J. Kellogg, Chief

Reactor Projects

Branch

2

Division of Resident

and

Reactor Project Inspection

RII

W

enore

'lpga( /81

ARHerdt

(J

1+i /81

RI+

ACEMurphy

1+3./81

RI I

PJKe (logg

11/

/81

e,

L(