Text
REGULATORY CNFORMA'T ION DISTRIBUTION SYS 'EM,ORIDS)
ACCESSION NBR:811'208019?
DOC ~ DATE: 81/12/0?.
NOTARITZED:
NO FACIL:50-250 Turkey Point JPlanti
'Uni:t 3i Florida )Power.and Light
'50-251 Tur key Point TPl anti
,'Uni t 4i Florida ~Power.and Light
~C 05000251 AUTH ~ NAME AUTHOR A'F F ILI.ATION UHRIGi R ~'E ~
Florida IPower 8 Li'ght Co.
iRBCI:P ~ NAME RECIPIENT AFFILIATION EISENHUTiD,G, Di.vision of Licensing SUBJECT.:
Forwards steam generator water chemistry control 8
moniitoring programiaddressing listed subsections of Section Iisteam lgenerator repair programiof License DPR 31 'rogram consists of 12 o crating,procedures.
s
~ + 8((zne n(gg DISTRIBUTION CODE:
AOO I COPIES iRECEIVED:LTR ENCL.$
SIZE:.
$2 TITLE: General Distri'bution for after Issuance of Operating License NOTES:
RECIPIENT ID CODE/NAKE ACTION:
ORB 01 BC 01 INTBRNAL: ELD NRR/DHFS DEPY08 NRR/DL/DRAB OELD 11 REG FILE
'01
~COPIES LTTR ENCL 13 13 1
0 1
1 1
"0 1
'0 1
1
'RECIPIENT ID iCODE/NAME 06 I-E NRR/DL DIR NRR/DSI/RAB 0
ESS
'BR 10 F
LE
'04 TCOPIES LTiTR ENCL
'2 2
1 1
1 1
0 1
1 EXTERNAL ACRS 09 NRC 'PDR 0?
NTIS ib 16 1
1 1
1 l 'PDR NS I'C 03 05 1
1 1
1 TOTAL NUMBER 'OF COPIES REQUIRED:.L'TTR ~
ENCL
gi tl
- )
e C
l, 1
l
P.O. BOX 529100 MIAMI,F L 33152 yi>li/gi FLORIDAPOWER & LIGHTCOMPANY Office of Nuclear Reactor Regulation Attention:
Mr. Darr el 1 G. Eisenhut, Director Division of Licensing U.
S.
Nuclear Regulatory Commission Washington, D.
C.
20555 December 2,
1981 L-81-508
~
l (I,~i S
'ir~
Dear Mr. Eisenhut:
Re:
Turkey Point Units 3
8I 4 Docket Nos. 50-250 8 50-251 Steam Generator Seconder Water Chemi str Control Section I, Steam Generator Repair Program, of Facility Operating License DPR-31 requires that we submit a steam generator water chemistry control and monitoring program.
The attached information is provided to address the appropriate subsections of Section I:
I.(g)(i)
Requirement:
Identification of a sampling schedule for the critical parameters and of control points for these parameters for each mode of operation:
normal operation, hot startup, cold
- startup, hot shutdown, cold wet layup.
~Res once:
The attached Nuclear Chemistry Procedure NC-2 "Schedule for Periodic Test" identifies a sampling schedule for the critical parameters in the Turkey Point Unit 3 Secondary System Chemistry Program during normal operation.
During transients such as during shutdown/cooldown or heatup/startup, many of these parameters are monitored more frequently than indicated in Procedure NC-2.
A copy of a Nuclear Chemistry Department Instruction which provides instructions and guidance to the Chemistry Department for monitoring and treating the secondary plant duri ng a heatup or cold shutdown is attached.
Control parameters for the steam generator and secondary feed train are provided in the attached Turkey Point Unit 3 Chemistry Specifications Sheets.
Aooi S
(/(
Sii2080i92 SiiM02 PDR ADOCK 05000250 P
~PDR PEOPI.E... SERVING PEOPLE
gl I
II E
I+ ~
s Mr. Darrel 1 G.
Ei senhut, ector
,Page 2
I (g)(ii)
Requirement:
Identification of the procedures used to. measure the values of the critical parameters.
Response
I. (g)(iii)
I(g)(iv)
The attached Nuclear Chemistry Procedures NC-80, 81, 82, 83, 84, 87, 88, 93 and 97 are the procedues used to measure the values of these critical parameters.
Re uirement:
Identification of process sampling points.
Response
The attached drawing of the secondary system identifies the condensate, feedwater and steam generator sampling points.
Procedure for the recording and management of data.-
Response
I(g)(v) 8 (vi )
The attached Nuclear Chemistry Procedure NC-5 "Secondary Chemistry Documentation" identifies the recording and management of secondary chemi stry data.
~Re uirement::
Procedures defining corrective actions for off-control point chemistry conditions
- and, A procedure identifying (a) the authority>> responsible for the interpretation of the data and (8) the sequence and timing of administrative events required to initiate corrective action.
~Res ense:
The attached Off-Normal Operating Procedure 6108.4 "Condenser Leak Procedure
- Normal Power Operations" and the attached letter of instructions titled "Laboratory Policy for Out-of-Specification Conditions" identifies the authority responsible to initiate corrective action.
'h
~
'<<(l ky 1
0 I>
I H
~
II
- ~
Mr. Oarrell G. Eisenhut, rector Page 3
0 These specifications are in conformance with Westinghouse's recommendations.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/JEM/ras CC: