ML17340B283

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Re Environ Qualification of safety-related Electrical Equipment,Based on Util 800602, 0703 & 1031 Submittals.Rept Addresses Info Needed to Comply W/Nrc 801024 Order for Mod of License
ML17340B283
Person / Time
Site: Turkey Point  
Issue date: 05/21/1981
From: Varga S
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17340B284 List:
References
IEB-79-01B, IEB-79-1B, NUDOCS 8106010421
Download: ML17340B283 (12)


Text

~p,g REg(

c+

0 0

o~

IP UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 May 21, 1981 Docket Nos 5 -

0 a d 50-251 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100 Miami, Florida 33152

~~ ~~MB>06'/o gz+

4pe. &@

SUBJECT:

ENVIRONMENTAL, QUAlIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT RE:

Turkey Point Plant, Unit Nos.

3 and 4, License Nos.

DPR-31 and DPR-41 Reference (a) - Order for Modification of License Concerning the Environmental Qualification of Safety-Related Electrical Equipment dated October 24, 1980

'ear Dr. Uhrig:

This letter transmits the Safety Evaluation for the Environmental Qualification of Safety-Related Electrical Equipment at your facilities.

This evaluation was based on your-submittals dated June 2, 1980, July 3, 1980, October 31, 1980 and Feburary 27, 1981.

Our letter of February ll, 1981, which forwarded our prelimin-ary results; indicated that an item-.by-item re-evaluation would be required at a later date.

This safety evaluation identifies the specific information required by the staff and the actions, on your part, necessary to comply with Reference (a).

Me request that you provide the information identified in sections 3 and 4 of this Safety Evaluation to us within 90 days.

This Safety Evaluation addresses only the safety-related electrical equipment exposed to a harsh environment resulting from an accident (i.e., the IEB 79-01B review).

Reference (a) requires that all safety-related electrical equipment be qualified by June 30, 1982.

The NRC review effort for the equipment in mild environments will be addressed by separate correspondence.

Your response may present alternatives to the staff positions in the evaluation.

The staff will consider alternative approaches if these methods are within the DOR Guidelines or NUREG-0588, as appropriate.

For example, an acceptable alternative to the NRC staff's temperature criterion used for the service conditions (i.e. Section 3.3) must base that service condition on the FSAR analysis or other NRC approved analysis, provided that the specific analysis, together with reference to the previous NRC acceptance of that analysis, accompanies the 90 day response.

In addition, some of the information in the Safety Evaluation may require clarification.

Contact your project manager for assistance in these matters.

SioaoIO02 I

It remains your responsibility to assure that the qualification deadline is met for all safety-related electrical equipment.

The staff's review of your response to this letter should not delay any action which is required in order to meet the deadline.

Sincerely, even A. Varga, Gh Operating Reactor ranch 81 Division of Licens g

Enclosures:

1.

SER 2.

TER cc w/o encl:

See next page Oi

~

~

~

P,obert E. Uhrig Florida Power and Light Company cc:

Mr. Pobert Lo>>enstein, Esquire Lowenstein,

Newman, Re<s and A..e;rad 1025 Connecticut Avenue, N.k'.

Suite 1214 Washington, D. C.

20036

~ Environmental arid Urban Affairs Library Florida International University

Yiami, F 1 ori da 331 9

Mr. Norman A. Coll', Esquire.

S eel, Hector and Davis 1400 Southeast First National Barik Bui 1 di ng Miami, Florida 33131 Mr. Jack Shreve Office o,-the Pu"',ic Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator Depar.ment of Environmental Regulation Power Plant Siting Section State of Florida.

2609 Blair Stone Poad

'allahassee, Florida 32301 Nr. Henry Yaeger, Plant Yal<acer Turk ev P oi n.

P 1 a nt Florida Power and Light Company P. 0.

Box 013100 Miami, Florida, 33101 Honorable Dewey Knight Co nty Manager of Y<e='ropoliian Dade Coun.y Y'-r'lorida 33130 ureau o<

In.eraovern<men 21 Rel a fons

".0 Apal achee Parkwav Tallahassee, Florida 32304 Residen.

Inspector Turkey Point Nuclear Genera"ing Station U. S. Nuclear Regulatory Commission Post. Office Box 1207 Ho-<.

s ead, Florida 33030 Director, Criteria and S andards D'ivision

"= ice o

P,adiation Programs (ANR-450)

U. S. Environmental Protection Acency washington, D.

C.

20460 U. S. Environm ntal Protection Agency Region IV O-,fice nTT<N' S

COORD INATOR 3-'.":. Cour;land S:rect, ti.V.

Atlanta, Georg i a 3030S

w e'l

FLORIOA POWER II LIGHTCOMPANY April 4, 1981 Office of Management, Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D.

C.

20555 Gentlemen:

Attached are the March, 1981, Operating Summary Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. l.

Very truly yours, D. Schmidt Vice President Power Resources VTC/ddc t Pg $'p,IOE -~g

) qo~giss+

C~. O~'o~

~o cc:

Mr. James P. O'Reilly Robert Lowenstein, Esquire Pooe jlI PEOPLE... SERVING PEOPLE

SU OF OPERATING EXPERiENCE DOCKET NO.

50 250 Turkey Point Unit No.

3 DATE A ril 4, 1981 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH MARCH ',

19 8 1 Unit No.

3 was removed from service for scheduled refueling, maintenance, and inspections.

(Continued from previous month)

Refer to "Unit Shut-downs and Power Reductions" section of April, 1981, Operating Status'eport for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

Completed performance of Steam Generator Tube Inspection Program.

Installation of 40 new fuel assemblies in progress.

SUMMA E RATING E XP ERIE NCE DOCKET NO.

50 251 Turkey Point Unit No.

4 DATE A ril 4, 1981 COMPLETED BY V. T. Chilson REPORT MONTH MARCH 1981 TELEPHONE (305) 552-3824 Unit No.

4 operated at approximately 100% R.P.,

except for outage of March 22-29, 1981.

Refer to "Unit Shutdowns and Power Reductions" section of the March, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

Repaired and modified motor terminal box for reactor coolant pump No.

4A.

~

~

~, /

SUMMA OF OPERATING EXPERIENCE DOCKET NO-50 335 St. Lucie Unit No ~

DATE A ril 4, 1981 COMPLETED BY V. T. Chilson REPORT MONTH

.MARCH 1981 TELEPHONE (305) 552-3824 Unit, operated at approximately 100% R.P.

Refer to "Unit Shutdowns and Power Reductions" section of the April, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power

& Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and:NRC for additional information.