05000250/LER-1981-002-01, /01T-0:on 810103,during Planned Shutdown,Boric Acid Flowpath from Boric Acid Tanks Found Obstructed.Caused by Reduced Temp Resulting from Failure of One Channel of Heat Tracing Circuit 21.Temp Setpoint Increased

From kanterella
(Redirected from ML17340A662)
Jump to navigation Jump to search
/01T-0:on 810103,during Planned Shutdown,Boric Acid Flowpath from Boric Acid Tanks Found Obstructed.Caused by Reduced Temp Resulting from Failure of One Channel of Heat Tracing Circuit 21.Temp Setpoint Increased
ML17340A662
Person / Time
Site: Turkey Point 
Issue date: 01/16/1981
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17340A661 List:
References
LER-81-002-01T, LER-81-2-1T, NUDOCS 8102030543
Download: ML17340A662 (2)


LER-1981-002, /01T-0:on 810103,during Planned Shutdown,Boric Acid Flowpath from Boric Acid Tanks Found Obstructed.Caused by Reduced Temp Resulting from Failure of One Channel of Heat Tracing Circuit 21.Temp Setpoint Increased
Event date:
Report date:
2501981002R01 - NRC Website

text

NRC FORM SSB IT 27l LICEillSEE EVENT REPORT U. S, NUCI.EAR REGULATORY COMMISSION 1

CON'T

~O 1

0 LoCKHSK TYP4 JO S ~ >>* ~

SK Qid 9

L:CKNSCK COOK I4 3

Q, LICKHSKNUM4 Cil SOUACC 40 dl OQCKETNUMSCA ',

ds 69 EVENT OESCRIPTION ANO PROBAELECONSEOUENCES Qlo 1

0 3 8 1'QQEO

1) li6f 8 1 Q9 KVKHTCATE I~

13 RKPOAT QA K

30 CONTROL SLCCIKI I

I I

Ql IPl. ASE PRINT OR TYP-ALLREOUIREO INPORMATIONI I

~ ii

~Q 3

the boric acid tanks as described in TS 3.6.b.4 was found to be obstructed.

The flow path was re-established in 1 hr.

33 min.

Public health and safety was not affected.

The alternate flow path from the Refueling 9

Water Storage Tank was operable throu hout this eriod.

Reference FSAR Sec.

9.2.2 Similar occurences were reported as AO 251-74-08, and LERs

~o a

251-77-11, 251-77-12, and 251<<79-1.

1 3

9

SYSTEM, C*VSC, CAVSC COMP.

VALVE COOS COOK SVSCOOC CCMPONCNT COOS, SVSCQOS SUS COOS

~0 LJS LJS~0 mO 2JO 1

4 9

In 12 Is ls I9 20 SKQVKNTI*l, OCCVRAEiIC4 AKPQAT REVISION LERIRO AEPOAT No COO E TYPE NO, Qlt AEKlllr ~1

~

~00 1

~~

~01

~Y

~

~0 21 32 11 24 24 21

~3 29 10 sl 22 ACTIOIl SUTUAli CFPC

~

SIIUTQOYlN Q

  • TTACNMKNT

'4PAlh4 PRUAECQMP.

COMPONENT TAKEN 1QTIcN cN PLANT METIIQQ lloUA$22 svd ITTKo FQAMsvd.

KVP LIER MANUFAcTILA 4

.MSL'JQ L'JS L'JS

" LJIi L'JO MQ ~S CAUSE OESCRIPTION ANO CORRECTIVE ACTIONS'Q23 The apparent cause of the obstruction was reduced temperature resulting from failure of one channel of heat tracing circuit no.

21.

The circuit.

'i was found to have 4 open sections and, a partial ground.

The root cause could not be determined.

The temperature set point on the remaining channel was increased.to re-establish flow.

Damaged channel was repaired.l 1

4,9 SACILI Y, 3 ~ ATUS "iPOWER OTIIEASTATUS Q D

0 2"

NA 1

3 9

I I l2 LCSS OP CA OAMAQK Q SACILITYQia

~ YPK QESCRIPTIQN EK LZJQ42 a

IO PUKLIC:TY Issvio SKSCR:>>:Q'i S

~IQ44 1

'0 iJAME OP PREPARER P.L. Pace METHOO OP O IS COY E4 Y

~is Qi ~9Qi

~AQQT 1

4 IO I'2 12 is ACTIVITY CONTENT AKLKAsio QS AKLKASC' AMOUNTOP ACTIVITY QSS Z

Q23

~ZQ24 NA 1

3 9

IO I I l4

+9 PSRSONNKL KXPOSUAKS EDQ LaJ aLaJQKS MQS 9

3 II I2 I3 PERSONNEL INJUAIKS a ~~Qo NA L~~OIIOS RELIC Q>E I'IR( USE ONI Y I Il 'l l 'ill 43

<305>

552-3801 OISCOV KAY OKSCRIPTICN S2 Operator Observat3.on SO 30 ao SXO S030

<", P'j~R ()

<, ')