Forwards Monthly Operating Rept Addendum for Jan,Feb,Mar & Apr 1998 for DC Cook Nuclear Plant,Unit 2.Addendum Is Necessary to Report Completion of Refueling Outage
ML17334B787
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/18/1998
From: Cooper D
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17334B788 List:
References
NUDOCS 9805270358
Download: ML17334B787 (4)


Text

CATEGORY 1

'e' REGULATORY INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:9805270358 DOC.DATE: 98/05/18 NOTARIZED: NO ,, DOCKET FACIL:50-316 .Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NMiE 'UTHOR AFFILIATION COOPER,D.E. Indiana Michigan Power Co:

RECIP.NAMFi RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards monthly operating rept addendum for Jan,Feb,Mar 5:

Apr 1998 for DC Cook Nuclear Plant, Unit 2.Addendum is C necessary to report completion of refueling outage.

A DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs) T NOTES: E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 STANG,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 '1 CENTER 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

4'l y) 1 / ~ I

American Electric Powe Cook Nuclear Plant One Cook Place Bndgman, Ml 49106 616 465 5901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 May 18, 1998 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report Addendum for the months of January, February, April, and May1998 are submitted.

The Addendum is necessary to report the completion of the refueling outage.

The unit remains shutdown to resolve design basis questions discovered during the Architect and Engineering Inspection. The unit was initially shutdown on September 8, 1997 to resolve these issues.

Sincerely, D.. Cooper Plant Manager fjc Attachment NRC Region III INPO Records Center ANI Nuclear Engineering Department D.R. Hahn S. Hamming B. Lewis J.R. Sampson B.L. Bartlett P.A. Barrett S.J. Brewer D.W. Paul D.L. Noble W.H. Schalk D.G. Turner G. John D.P. Lynch R.G. Pickard G.T. Gaffney 9805270358 9805iS PDR ADGCK 050003ib R PDR