ML17331A146

From kanterella
Jump to navigation Jump to search
App a to Tech Specs,Detailing Separating of Shared Operation of Motor Driven Auxiliary Feedwater Pumps by Installation of Addl Pump in Each Unit
ML17331A146
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/09/1979
From:
INDIANA MICHIGAN POWER CO.
To:
Shared Package
ML17317B427 List:
References
NUDOCS 7908140559
Download: ML17331A146 (12)


Text

AT, ACilELIM 00N¹0 C. COOK tlUCL"AR PLAtl! UNITS l Af<D 2 APPENDIX A TECHl ICAL SPiCll'ICATiGllS 7908140 0

PLA" 5"5 -'S AUXILIARY FE=D'nATER SYSTE i LIaRITI.'<6 CC".iDITICsl FOR OPERATIC.'(

3.7.1.2 At least three inde end nt st am gererator auxiliary fe dwa r pumps and asscciaaed fl)w pa;.'".s "n ll be OPERABLE with:

a. two feedwater, pumps, each capable of being powered from separate emergency bu: es, and
b. -..One feeduater pu...p capable of being powered from an OPERABLE Is earn supply sys A?FLIC;-'.Si'TY: MODES 1, 2 and 3.

ACTION(:

'shth one auxiliary feedwater pu."..p inoperable, restore '-: ',east .hree auxil'.::ry feedwater pumps ( ".~'o c'"able of being o.:::ared from separate emergency buisses and one cape 1 a o, hei iig powered b l =n CP-RANI E steam supply syst=-n) to OPERABL status within 72 hou:s or "~ in HCT SHJTDC'AH wi thin the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SUR/ "~ C- 9 J RE'- S 4.7.1.2 Each auxiliary feeduater pump shall be demcnstrated OPERABLE:

a. At least once per 31 'days by:
1. Starting each pump from the control rc'-,.
2. Verifying that: 4
a. Each motor driven pumD develops a discharge pressure of > 1375 psig on recirculation flow, and
b. The steam > rbine driven pump develops a of > 12S5 psig at a flow of > 7GO gpm when discharge'ressure the secondary steam pressure is greater than 310 psig.

0- C. COOK-Ufl.7 2 3/4 7-5 I ~

PLA)NT SYST". !S ILL SURYE "lC"= R-"":UIR"-Flf S Continued

3. Yerifying that each pump operates for at least 15 minutes.
4. Cycling each testable power oper t d or automatic valve in the flow path through at least one'.mplete cycle of full travel.
5. Yeri ying that eacn valve (manual, power operat d or automatic) in the flow path that~ is not locked, sealed, or otherwise secured in position, is in its correct position.
b. At least once per 18 months during shutdown by:
l. Cycling each pcwer operated valve in the flow path that is not testable during plant operation, through at least once complete cycle of full travel.
2. Verify',ng that each motor driven pump starts automatically upon receipt of each of the following signals:

a) Loss of main feedwater pumps.

b) Safety Injec '.'on.

c) Steam Generator Mater Level--Low-Low from one steam generat'or, 2 out of 3 channels.

3. Verifying that the steam turbine driven pump s arts auto-matically upon receipt of e ch of the ollowing signals:

a) Steam Generator Mater Level Low-Low from two steam generators, 2 out of 3 channels.

b) Reactor Coolant Pump Bus Undervoltage.

D.C. COOK-Ui(IT 2 3/4 7-6

Lii ~ ~

~ !y 1 ~ r~ Prt ~ ~ ~ wo, r eg P,q~g1'f f Po ~

I 3.8.2.S ":e following D.C. bus train shall be energi ed and dPERABLE w.:h t.e breakers be. ween it ardthe Train AB and Train CD batt ry circuit open.

I I

'TRAl;.'; c~s". "o >, I~

"- vol' D.C. bu l'o. i'i, Zi9 'i.l". D.C.

iAPPLiCi'.:"::: l'0."ES 1, 2, and 3.

ACT 1 O.',:

a. Kith the 250 vol t D.C. b!!s inoperable,  ! cs'0!'e the inope~".ble bus t 0 ~ ' P.r~."LE s ta tus;!i '.h i n 72 ho"! s or ".=- in a t 1 eas t HOT SHUTDO';,"l within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b. ~ith the 25O "olt D.C. battery 8). N and/or its charger inoperable, restore;he iroperable batter; and/o!- ch=r-e!. to OPEp:.;";LE sta! us iwith'.n72 hours or be in HOT SHUTDO';fi) v:ithin the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SUP'~1! '""= "-'~" I~-""""TS 4.8.2.5 .1 The D.C. bus train t/o. H shall be deteruined OPERABLE and energized wi U! tie breakers ooen at least once per 7 days bv verifying co! rect breaker al': r.-en~ a..d ind cated power avai lab'.li:y.

4.8.2.5.2 The 250 volt battery bank and c.",'.rger shall be deronstrated OPCP B'-

a. At least once per 7 days by verifying that:
1. The electrolyte level of each. pilot cell is bet!;een the minimum arid r,.axir,:um level indicatio!! marks, 0- C. COOK - UliiT1 3/4 8- 13

Si'>> iLL: ~ ~ ~ >> 'i>> ~ >>>> ~ ITS { 't >>l>>>> ~

d)

2. The pilot cell s.". cific gia;it;. correc'ed to 77"F and full electrolyte level, is ~ 1.20'3,
3. The pilot cell ;olt ge is . 2.10 volts, an" The ov rail battery voltag e is  :. 2';0 volts.
b. At least once per 92 days by verifyin: t! at
l. The volt.age o: e.'.ch connected cell 2.1<1 v< >",s un"er float chai ge 'nd has not 'decreaseJ fi o!1 the value obs>> i 'e>>'j>>'Uriii~>>

t!i'est,

2. The specific gr vity, co rected to 70".I lyte level, oi ea-h connec'ed c '

decreased i:: re than 0.03 fi.o.:i the valu~ observe" C:.rin",

is and 1 .

ful'. electro-200>>'n'. nc'i s il ~

t the pi evious te t, and

3. The electi'olyte level of each co!ii ected cell is . etween the rinir.;>>Ji.i ailJ "laxl ..Jlil level invica ion,;>>ar!.s.
c. At least once per 18 r.:onths by veri:y',ng tha':
l. The cells, cell plates and batier; rac!:s sho;; i:o v'.suali indication of physical da;.iage oi'.":io:".".al d terioration.
2. The cell-t'o-cell ard teri.iinal connections are cl an, tight, and co ted with anti-corrosion;;aterial.
3. The battery charger viill suply a least 10 a:.hei.cs at

> 250 volts for at least 4 ! ours.

n

d. At least on" e er 18 r!onti.s durii>>~ shutdown b vei.i f"'.n".

that the battery capacity is adequate .o supply and;.:a ntain in OPEPADLE status the erergency loads for the specified ti;ies of Table 4.8-2 with the battery cha: g. r discoiinec'ed. The battery ter:".,inal voltage shall be maintairad > 210 volts throughout the entire test.

e. At least once per 60 m>onths, during shutdown, by verifying that the battery capacity is at least 80-. of the manufacturer's rating when subjected to a per.foi;.,ance discharge test. This perforiiance discharge test shall be per forred subsequent to the satisfactory co.;>>pletion of the required batteiy service test. ~

. C. COOK - Ul/IT 1 3/4 8 14

TABLE 4.8-2 BATTERY El"iERCE!ICY LOADS "H" Battery Loads Hinimum Time Auxiliary feedwater turbine control bus hours FYO-211 valve Fl~i0-221 Ft~i0-231 Fh0-241 TDTV

  • Yalves will be operated through the following sequence:
1. Beginning of test: open valves.
2. Five minutes after the beginning of the test: close the valves.

3 ~ Ten minutes after the beginning of the test: 'eopen the valves.

4. Four hours after the beginning of the tes t: close the valves.

End of the test.

D C COOYi - U "s IT 3/4 8-15

"./'.8 =L=C .."".I"..~L PC"."=2 SYS: =."S The QP-"~.'-."-ILITY of the A.C. an" O.C ""w- r so rc s and <<ssociate" d <5trirution sy5 e;5 cUf n.", o er ion eli<5ures ".".a SU i j e. " "r "er wi 1 1 Le a'i iabl e 3 SU ly ".e Saf e:y <<la o Qru "i."..~ant e0 Ji I

~

~< f": I 1

" .e sa e shv.'- .~n< of the faci accl

.";1" re"

.'3 <t A 'nd I < ty 3"..d 2) the t i( oil nd n7. 'I c con<" .';c:ls wi thin -.';".= feel i ty. 1 pcwof'or

<i ~ <

The min!m<um< s<lec and d 'i ~ <

~tgt'i cn

'i l: ~,':<'" i-

~

5 de.<t ard ~ C 5 i5 satisfv .he I =quire,.ents c- 6"n<eral Design Criteria 17 of Ap"end'.x 10 CI".2 '"'0.

'o t

ho C " rer <J, re en. 5 Sar C'., i od O< tt",o joVoi 5 Oi r<<.r r;.r'.i;.d faC ';i"V C"=er='-ion c -<<., ".5 .'r':=

<~<~ .~ "f

~ <

z"

< o ~ the level o; "e raca <C... Ihe QP"-","~iL:T  :-. :.".= .c;;e.

initial

~ ~

scu -=- 3:-e consistent .vi<".h "."'.=- cc.";d'.:ion assu.'".ptiofls ~ he acc'd "<3 a ">> vs "5 anc al e Ibased 'Jooll mai f1".ain nc at eas o!.e o ~ ea SQUrco5 aflc as5c i ated dii 5 tf i U Qf'< 5J5 e.;

o l5 i <,e A C, af', D, C, pc" '

0- "w "L- "J. in., ac" de.""

of si-.e "cw:. ard 5-ingi c" .'ns failure coinc den" 'eiiih an assu...ed Ioss o o, the o her onsite A.C. source.

~

5 of the mini;Um speci;i A.C. and D.C. sources he CP=?~.BIL d

'"pc:> I' Y

Svs <.o'1<5 dul' f'<g ShutdCWfl and re ~ 1 I S'll eS that 1) ti;e facility can be .",aintain d ill the silutdcwn or r -. eiir.

condit;cn -,or extend d ti:=:e periods and 2} su<ficient instr<J,".,en-3 .cn and control cacability is avail able =or monitoring and maint ining =ne faciiiiy Status.

The train t3 station battery system provides an independent 250 volt OC power supply for power and control of the turbine driven auxiliary feedwater pump train. The limiting conditions of operation for the train H battery are consistent with the requirer..ents of the auxiliary feedwater system. The surveillance requirements for the train battery system are colisistent with <'l with requirements of the AB and CD station batteries. Standby circuits provide the capability to connect the train << battery system to the AS or Co station battery trains. The train N battery loads are derived from equipment in the turbine driven auxiliary feodwater pump tl ain and battery sizing is consistent with the functional requirements of these components.

D. C. CCGK-U'(Il 1 8 3/4 8-1

EL ECTR I C: L P"".ER 5 vSTEllS D.C. DISTR!BUT:0 - OPERATI"-" - TRAIN N BATT RY YSTQl f 'T ~ s+ Cgar+IMfg 'i AP QQ g Ll) ~ ~

f gas 3.8.2.5 ,he following O.C. bus train shall be energized and OPERABLE with tie breakers be ween it andthe Train AB and Train CD battery circuit open.

TRAI,'l N cons sting of 250 volt D.C. '.ius l'o. N, Z.:6;alt . ~ C.

bat t ery bcnk No. N afid a ful I capaci ".~ ci:ar "er.

APPL!CA": ILI:Y: llQDES 1, 2, and 3.

ACTION:

With the 250 volt D.C. bus inoperable, restore the inoperable bus to OPERABLE status within 72hours or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. P

b. Wi th the 250;ol t D. C. battery No. N and/or its charger inoperable, restore the inoperable battery cfid/or barge! .o C.-EPABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURGE IL' iCE P.EOU IREE'.ENTS 4.8.2.5..1 The D.C. bus train No. N shall be deternined OPERABLE and energized with tie breakers open at least once per 7 d.ys by verifying correct breaker alig."rent and indicated power availability.

4,8.2.5 .2 The 250 volt battery bank and c.",.rger shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that:.
1. The electrolyte level of each pilot cell is between the minimum and maximum level indication marks, D. C. COOK - UNIT 2 3/4 8- 12

>ELECTRICAL PO';lE".. SYSTEtlS SUR /E I L Lib, ~ C .iEl "3 s:.~h o!TS ( Con (! nuo. )

2. The pi1ot cell speci. ic gravity, co! rec:ed o 77'F and full electroly'e leve!, is > 1.200,
3. The pilot cell vol.".ge is > 2.10 volts, an",
4. The overall battery . ol tage is > 250 vol ts.
b. At least once per- 92 d=ys by verifying h;.t:
1. The voltac o of eac!! conn c! ed cell floa( charge and has no; decreased from L'ilu valbe observed during th" tes t.,
2. The specific gravity, correct'ed '.o 70',"-'and '.ul'. electro-lyte level, of each connected c'll is .: 1.200 and has mo~ e tnan 0.03 from the value observed di ring no'ecreased the previous test, and
3. The electrolyte level of each con! ected cell is between the minimum and n!axi:-;.um level indication mar!.s.
c. .

At least once per 18 months by verify',ng that:

l. The cells, cell plates and battery rac!:s sho;: .;o visual indication of physical damage or a"no!';"..al d='.orioration.
2. The cell-to-cell and terminal connections are clean, tight, and coated with anti-corrosion ;;ateri'1.
3. The battery charger;will supply at least 10 a::.pe:es ai

> 250 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

d. At least once per lG ":anti.s, during sh.t"o;;-!, by veri;;iflg that the battery capacity is adequate to supp',y and n!aintain in OPERABLE status the emergency loads for <<Iie specified times of Table 4.8-2 with the battery charger disconnected. The battery terminal voltage shall be maintaired -

210 volts throughout the entire test.

e. At least once per 60 months, during shutdown, by verifying that the battery capacity is at least 80-: or the manufacturer's rating when subjected to a performance discharge test. This performance discharge test shall be performed subsequent to the satisfactory completion of the required battery service test.

. C. COOK - UHIT 2 3/4 8- 13

TABLE 4.8-2 BATTERY EMERGENCY LOADS "ti" Battery Loads Minimum Time s

Auxiliary feedwater turbine control bu$ 4 hours I

FMO-211 valve FHO-221 FMO-231 FPO-241 TDTV

  • Valves will be operated through the following sequence:
1. Beginning of test: open valves.
2. Five minutes after the beginning of the test: close the valves.
3. Ten minutes after the beginning of the test: reopen the valves.
4. Four hours after the beginning of the test: close the valves.

End of the test.

D. C. COOYi - UNIT 2 3/4 8-14

3/4.0 EL CTRI Ci"iL r'Cii'E'ER SYSTEM'1S iBASES The OPER.".BILITY of one A.C. and O.C power sources and associa:ed distr ibution systems duririg o!!erat on ensures that suffi i=nt '. 'L"e! will be avai 1=-I le -.o supply erie safe:; re la tee equirr ent require .'. r ) tne 1 safe sfiutdc'r I o i! e aci1i ty ana ') -he .::i tiga tio. 3no co i.ro! OT deci-de<<t c ndi:ion;;ithin:he facility. he mini;iu:", s,,coif! u i..;-.pendent

=

and  ! edi.natant "..C. and O.C. po>>e! sources and distribu-';on s,:::.s sa'.is.y he reqiiii e'.!ents o General Des on ' i 'ei i' 7 of Ajpen" i  %:" to 1 J 0 R 30.

The ACTION requirements spec. eu or the levels o '.-'r:"J. Ioli of the power sources provide -es-"ric:ion upon continued "acili".; o;.. ration co. ',!ensut ate ""i th rhe level of Jegi ada ion. The QPERABIL' Y i ine pow

~

are consistent with ".he iriitiai -con ition assu:"..p .ons "= the l'ources accident analyses and are based u>on r.aintaining at lees. one i edundant set of onsite il.C. a.id O.C. power =-o.rces ard associated Cis.r"-u-ion syste,",is OPE."ABLE duririg accident conditions coincident with aii assumed loss of otfsite power and single faiiure of the other onsite .".C. source.

The OPEPABILITY of the minimum specified A.C. and D.C. po; er sources and associated distribution systems during shutdown and ! efueling ensures that 1) the acility can be maintained in the shutdown o!.. f ei',ng condi-tion for extended time periods and 2) sufficient instrui::entat,"on and control capability is available "or;ionitoring and maintaining tne facility status.

The Surveillance Requirements for demonstrating the OPERABILITY of the oiesel generators are in accordance with the recommendatiolis Guid s 1.9 "Selection of Diesel Generator Set Caoaci:y for 0'egulatory Standby Power Supplies"; triarch 10, 1971, and 1.108 "Periodic Tes.ing of Diesel Generator Units Used as Onsite Electric Power Systems at

'(uclear vower Plants", Revision 1, Aug~st 1977.

The train H station battery system provides an independent 250 volt DC power supply for power and control of the turbine driven auxiliary feedwater pump train. The l.imiting conditions of operation for the train N battery are consistent with the requirements of the auxiliary feedwater system. The surveillance requirements for the train tI battery system are consistent with the requirements of the AB and CD station batteries. Standby circuits provide the capability to connect the train H battery system to the AB or CD station battery trains. The train N battery loads are derived from equipment in the turbine driven auxiliary feedwater pump train and battery sizing is consistent with the functional requirements of these components.

D. C. COOK - Ui<IT 2 8 3/4 B-l