ML17329A487

From kanterella
Jump to navigation Jump to search
Forwards DC Cook Nuclear Plant Individual Plant Units 1 & 2 Individual Plant Exam Summary Rept & DC Cook Nuclear Plant Units 1 & 2 Individual Plant Exam of External Events Summary Rept, Per Generic Ltr 88-20.W/3 Oversize Drawings
ML17329A487
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/01/1992
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17329A488 List:
References
AEP:NRC:1082E, GL-88-20, NUDOCS 9205050329
Download: ML17329A487 (7)


Text

ACCELERATED DI BUTION DEMONS ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9205050329 DOC.DATE: 92/05/01 NOTARIZED: YES DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.

Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.

Document Control Branch (Document Control Desk)

R D

S 3'

SUBJECT:

Forwards "DC Cook Nuclear Plant Individual Plant Units 1

6 2

Individual Plant Exam Summary Rept"

& "DC Cook Nuclear Plant Units 1

6 2 Idividual Plant Exam of External Events Summary Rept," in response to Generic Ltr 88-20.

DISTRIBUTION CODE:

A011D COPIES RECEIVED:LTR ENCL K SIZE:

TITLE: Generic Ltr 88-20 re Individual Plant Evaluatio s

NOTES:

RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL 1

1 RECIPIENT ID CODE/NAME STANG,J COPIES LTTR ENCL 1

1 A

D D

INTERNAL: ACRS HOUSTON,M.

NRR HERNAN,R.

REG 1

REG 3

L CHELL,J.

EXTERNAL: NRC PDR 1

1 1

1 1

1 1

1 1

1 1

1 1

1 AEOD/DSP/TPAB NRR/DREP/PRAB REG 2

REG 4

RES FLACK,J.

RES/DSIR/SAIB/B NSIC 1

1 1

1 1

1 1

1 D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO, REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIEB REQUIRED'TTR 27 ENCL QP QM D

D

Indiana Michigan Power Company I'.O. Box 16631 Cofumbus, OH 43216 AEP:NRC'1082E Donald C.

Cook Nuclear Plant Units 1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 INDIVIDUALPLANT EXAMINATION SUBMITTAL

RESPONSE

TO GENERIC LETTER 88-20 U.

S. Nuclear Regulatory Commission Document Control Desk Washington, D.

C.

20555 Attn:

T. E. Murley May 1, 1992

Dear Dr. Murley:

In November 1988, the NRC issued Generic Letter 88-20 to formalize the requirements for conducting an Individual Plant'xamination (IPE) for operating licensees.

American Electric Power Service Corporation (AEPSC) responded to Generic Letter 88-20 and its Supplement 1 in letter AEP:NRC:1082 dated October 24, 1989.

In that submittal, AEPSC committed to perform a Level IIIprobabilistic risk assessment and to include consideration of internal and external events.

Subsequently, in June of 1991, Supplement 4 to Generic Letter 88-,20 was issued to formally require an Individual Plant Examination of External Events (IPEEE).

This letter transmits two reports

,summarizing the IPE and IPEEE evaluations performed for Donald C.

Cook Nuclear Plant Units 1 and 2.

The first at:tached report summarizes the IPE for internal initiating events.

Consistent with the previous commitment, this examination was accomplished with a Level IIIprobabilistic risk assessment and considered Generic Letter 88-20 Supplements 1 and 3.

The report format and content are consistent with the requirements of NUREG-1335.

The second attached report summarizes the IPEEE.

This examination consisted of a seismic and fire probabilistic risk assessment and an evaluation of "other external events" using the guidance of Generic Letter 88-20 Supplement 4.

The report format and content are consistent with the requirements of NUREG-1407.

The analysis of the performance of the hydrogen control system installed at the Cook Nuclear Plant is not included herein.

This analysis is to comply with the requirements of 10CFR50.44(c),

and is intended to demonstrate the ability of the hydrogen control system P;Ig,A ) ~i c

9205050329 920501 PDR ADOCK 05000315 P

PDR

I'5

~

~,

~

Dr. T. E. Murley AEP:NRC:1082E to mitigate the consequences of the release of hydrogen into the Cook Nuclear Plant containment during postulated degraded core accidents.

The MAAP computer code, which is intended to be used in this analysis, has required modifications to properly address unique features of the Cook Nuclear Plant containment.

These modifications, in conjunction with the completion activities associated with the two attached reports, resulted in our inability to meet the April 30, 1992 schedule for this analysis despite the dedication of additional resources.

The complete 10CFR50.44 analysis will be submitted by July 31, 1992.

This letter is submitted pursuant to 10CFR50.54(f) and, as such, an oath of affirmation is enclosed.

Sincerely, ED E. Fitzpatrick Vice President Attachments CC:

D. H. Williams, Jr.

A. A. Blind - Bridgman J.

R. Padgett G. Charnoff NFEM Section Chief A, B. Davis

- Region III NRC Resident Inspector

- Bridgman

Qp

Dr. T.

E. Murley 3

AEP:NRC:1082E bc:

S. J.

Brewer D. H. Malin/K. J. Toth M. L. Horvath - Bridgman J.

B. Kingseed D. Modeen, NUMARC - Washington, D.

C J.

B. Shinnock W.

G. Smith, Jr.

J.

F. Stang, NRC - Washington, D. C.

AEP:NRC:1082E DC-N-6015.1

STATE OF OHIO)

COUNTY OF FRANKLIN)

Eugene E. Fitzpatrick, being duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power

Company, that he has read the foregoing Response to Generic Letter No. 88-20 and knows the contents thereof; and that said contents are true to the best of his knowledge and belief.

Subscribed snd sworn to before me this ~~

day of 1992.

NOTARY PUBLIC RITA D. HILL NOTARY PUBLIC. STAT OF OHIO

,NY COM!AISSIOII EXPIRES

+ o "J