ML17328A976

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 3.5.4.1 & 3.5.4.2 Deleting Requirements for Boron Injection Sys & Changing Tech Specs Table 3.3-5 Safety Injection Response Times to Be Consistent W/New Analyses Assumptions
ML17328A976
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/26/1991
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17328A975 List:
References
AEP:NRC:1140, NUDOCS 9104010371
Download: ML17328A976 (375)


Text