Informs That Util Response to NRC Bulletin 88-010 & Suppl 1 to Bulletin 88-010 Complete
ML17328A356
Person / Time
Site: Cook  
Issue date: 07/25/1990
From: Colburn T
Office of Nuclear Reactor Regulation
To: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
References
IEB-88-010, IEB-88-10, TAC-71282, TAC-71283, NUDOCS 9008020127
Download: ML17328A356 (5)


Text

Ouly 25, 1990 Docket No. 50-315 and 50-316 Mr. Milton P. Alexich Indiana Michigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216

Dear Mr. Alexich:

SUBJECT:

D.

C.

COOK UNITS 1 AND 2 " RESPONSE TO NRC BULLETIN 88"10 AND SUPPLEMENT 1 TO BULLETIN 88-10 (TAC NOS.

71282 AND 71283)

BY letter dated May 16, 1989 (AEP:NRC:1083A) and July 27, 1989 (AEP:NRC: 1083B), Indiana Michigan Power Company responded to Bulletin 88-10 for Donald C.

Cook Units 1 and 2, respectively.

As a result of Supplement 1

to Bulletin 88-10, corrections to your original response were 'forwarded by letter dated November 6, 1989 (AEP:NRC: 1083E).

In your responses, you confirmed that activities required to address the issue of substandard molded-case circuit breakers as discussed in Bulletin 88-10 would be performed on an acceptable schedule.

The staff understands that all actions are to have been completed by this time.

A detailed technical review of your response has not been performed;

however, the area may be subject to inspection at a later da'te.

If a subsequent inspection identifies deficiencies in your actions or responses, this issue will be reopened.

At present, the staff considers your response to Bulletin 88-10 and Supplement 1 to Bulletin 88-10 to be complete.

Sincerely,

~j)gg 'pgn4~

~}

cc:

See next page DISTRIBUTION t

DOCKET FILE Q NRC L LOCAL PDRs PD31 R/F TCOLBURN JSTONE OGC EJORDAN ACRS(10)

PSHUTTLEMORTH RSTRANSKY JZWOLINSKI Timothy Colburn, Project Manager Project Directorate III-1 Division ot Reactor Projects " III, IV, V & Special Projects Office of Nuclear Reactor Regulation LA/P031: 0RSP PM/P031: DRSP PSHUTTLEMORTH TCOLBURN 7/gy/90 W~

7/p)/90 l~

900S020i27 900724 PDR ADOCK 050003i5 PDC

, QPai (A

D31:DRSP RPI N

7A 90 I [5 COOK B88-10 TAC 71282/3

I a g

~

~

~

I I

~

~

0 I

'I

~

~

(I

UNITED STATES NUCLEAR REGULATORY COMMlSSION WASHINGTON, D. C. 20555 Quly 25, 1990 Docket No. 50-315 and 50"316 Hr. Hilton P.

Alexi ch Indiana Michigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216

Dear Mr. Alexich:

SUBJECT,:

D.

C.

COOK UNITS 1 AND 2 -

RESPONSE

TO NRC BULLETIN 88-10 AND SUPPLEMENT 1 TO BULLETIN 88-10 (TAC NOS.

71282 AND 71283)

BY letter dated May 16, 1989 (AEP:NRC:1083A) and July 27, 1989 (AEP:NRC: 1083B), Indiana Michigan Power Company responded to Bulletin 88-10 for Donald C.

Cook Units 1 and 2, respectively.

As a result of Supplement 1

to Bulletin 88-10, corrections to your original response were for'warded by letter dated November 6, 1989 (AEP: NRC: 1083E).

In your responses, you confirmed that activities required to address the issue of substandard molded-case circuit breakers as discussed in Bulletin 88-10 would be performed on an acceptable schedule.

The staff understands that all actions are to have been completed by this time.

A detailed technical review of your response has not been performed;

however, the area may be subject to inspection at a later date.

If a subsequent inspection identifies deficiencies in your actions or responses, this issue will be reopened.

At present, the staff considers your response to Bulletin 88"10 and Supplement 1 to Bulletin 88-10 to be complete.

Sincerely, Timothy Colbu

, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V 5 Special Projects Office of Nuclear Reactor Regulation cc:

See next page

pl

.'l'r. 'M'ilton Alexich

,.Ind>ana Michigan Power Company Donald C.

Cook Nuclear Plant CC:

Regional Administrator, Region III U.S. Nuclear Regulatory Commission

'99 Roosevelt Road Glen Ellyn, Illinois 60137 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, Michigan 48913 Township Supervisor Lake Township Hall Post Office Box 818 Bridgman, Michigan 49106 Al Blind, Plant Manager Donald C.

Cook nuclear Plant Post Office Box 458 Bridgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, Michigan 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.H.

Washington, DC 20037 Mayor, City of Bridgman Post Office Box 366 Bridgman, Michigan 49106 Special Assistant to the Governor Room I - State Capitol Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N. Logan Street Post Office Box 30035 Lansing, Michigan 48909 Mr. S. Brewer American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216