,> . rishi. ik 3 4.8 ELECTRICAL POWER SYSTEMS 3 4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8 '.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite trans-mission network and the onsite Class 1E distribution system, and
b. Two separate and independent diesel generators, each with:
1. A separate day fuel tank containing a minimum volume of 70 gallons of fuel,
2. A separate fuel storage system* containing a minimum volume of 42,000 gallons of fuel, and
3. A separate fuel transfer pumps APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

Ia ~ With an offsite circuit of the above required A.C. electrical

, power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours.

With a diesel generator of the above required A.C. electrical lA power sources inoperable, demonstrate the OPERABILITY of the

<(9K A.C. offsite sources by performing Surveillance Requirement aalu.

CO 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> there-OO ct NN n after; and if the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel Ala generator by performing Surveillance Requirement 4.8.1.1.2.a.4 OU OA within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; restore diesel generators to OPERABLE status within t

168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br />, not to exceed an accumulated annual outage time of 576

)OC hours exclusive of MODES 5 and 6 or be in at least HOT STANDBY cBcLL, j within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30

'j hours. At the number of failures for the inoperable diesel indicated in Table 4.8-1 perform the Additional Reliability Actions

) prescribed in Table 4.8-1 and its attachments.

  • Tanks are separate between diesels but shared between Units 1 and 2.

COOK NUCLEAR PLANT - UNIT 1 3/4 8-1 AMENDMENT NO ~

('k Ni ~

C

'4)

~ III f.'o a

ELECTR CAL POWER SYSTEMS ACTIO Co tinued With one offsite circuit and one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.CD offsite source by performing Surveillance Requirement 4.8.1.1 1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter and if ~

the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; restore at least one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. With the diesel generator restored to OPERABLE status, follow ACTION Statement a.* With the offsite circuit restored to OPERABLE status, follow ACTION Statement b.*

d. With two of the above required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of two diesel generators by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> unless the diesel generators are already operating. Restore at least one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> >or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. With only one offsite source restored, follow ACTION Statement a.*
e. With two of the above required diesel generators inoperable, demonstrate the OPERABILITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. With one diesel generator unit restored, follow ACTION Statement b* or c.*

The ACTION statement time shall be based upon the time associated with the component inoperability, and is not reset when exiting this ACTION statement.

SURVEILLANCE RE UIREMENTS 4.8.1.1.1 Each of the above required independent circuits between the offsite transmission network and the onsite Class lE distribution system shall be:

a ~ Determined OPERABLE at least once per 7 days by verifying correct breaker alignments and indicated power availability, and

b. Demonstrated OPERABLE at least once per 18 months by transferring the unit power source automatically from the normal auxiliary source to the preferred reserve source and by transferring manually to the alternate reserve source.

D. C. COOK - UNIT 1 3/4 8-2 AMENDMENT NO.

0p e k'q

, t I, ~1 l,

Vg,

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:

a. In accordance with the frequency specified in Table 4.8-2 on a STAGGERED TEST BASIS by:
1. Verifying the fuel level in the day tank,
2. Verifying the fuel level in the fuel storage tank,
3. Verifying that the fuel transfer pump can be started and that it transfers fuel from the storage system to the day tank,
4. Verifying that the diesel starts from ambient condition and that it accelerates to at least 514 rpm in less than or equal to 10 seconds,*
5. Verifying that the generator is loaded to greater than or equal to 1750 kw and that it operates for greater than or equal to 60 minutes and verifying that the generator output breaker to the emergency bus is OPERABLE, and
6. Verifying that the diesel generator is aligned to provide standby power to the associated emergency busses.
b. By removing accumulated water**:
1) From the day tank at least once per 31 days and after each occasion when the diesel is operated for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and
2) From the storage tanks at least once per 31 days.
c. By sampling new fuel oil** in accordance with the applicable guidelines of ASTM D4057-81 prior to adding new fuel to the storage tanks and
1) By verifying, in accordance with the tests specified in ASTM D975-81 and prior to adding the new fuel to the storage tanks, that the sample has a) A kinematic viscosity of greater than or equal to 1.9 centistokes 0

but less than or equal to 4.1 centistokes at 40 0

C (alternatively, Saybolt viscosity, SUS at 100 F of greater than or equal to 32.6 but less than or equal to 40.1), if gravity was not determined by comparison with supplier's certification.

b) A flash point equal to or greater then 125 F.

  • The diesel generator start (10 seconds) from ambient conditions shall be performed at least once per 184 days in these surveillance tests. All other engine starts for the purpose of this surveillance testing and compensatory action may be at reduced acceleration rates as recommended by the manufacturer so that mechanical stress and wear on the diesel engine are minimized.

~*The actions to be taken should any of the properties be found outside of specified limits are defined in the Bases.

D. C. COOK - UNIT 1 3/4 8-3 Amendment No.

A I,%

)4

~1*

1'

)V l 4

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued

2) By verifying, in accordance with the test specified in ASTM D1298-80 and prior to adding the new fuel to the storage tanks, that the sample has either an API gravity of greater than or equal 0 to 30 degrees but less than or equal to 40 0 degrees at 60 F or an absolute specific gravity at 60/60 F of greater than or equal to 0.82 but less than or equal to 0.88, or an API gravity of within 0.3 degrees at 60 F when compared to the supplier's certificate or a specific gravity of within 0.0016 at 60/60 F when compared to the supplier's certificate.
3) By verifying, in accordance with the test specified in ASTM D4176-82 and prior to adding new fuel to the storage tanks, that the sample has a clear and bright appearance with proper color.
4) By verifying within 31 days of obtaining the sample that the other properties specified in Table 1 of ASTM D975-81 are within the appropriate limits when tested in accordance with ASTM D975-81 except that the analysis for sulfur may .

be performed in accordance with ASTM D2622-82.

d. At least once per 31 days by obtaininga sample of fuel oil from the storage tanks in accordance with ASTM D2276-83, and verifying that total particulate contamination is less than 10 ..

mg/liter when tested in accordance with ASTM D2276-83, Method A+*.

e. At least once per 18 months, during shutdown, by:
  • Subjecting the diesel engine to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service,
2. Verifying the generator capability to reject a load greater than or equal to 600 kw while maintaining voltage at 4160 +

420 volts and frequency at 60 + 1.2 Hz,

3. Verifying the generator capability to reject a load of 3500 kw without exceeding 75% of the difference between nominal speed and the overspeed trip setpoint,
4. Simulating a loss of offsite power by itself, and:

a) Verifying de-energization of the emergency busses and load shedding from the emergency busses,

    • The actions to be taken should any of the properties be found outside of the specified limits are defined in the Bases.
  • The provisions of Specification 4.0.6 are applicable..

D. C. COOK - UNIT 1 3/4 8-4 Amendment No.

A P.

)4'

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued b) Verifying that the diesel starts on the auto-start signal, energizes the emergency busses with permanently connected loads within 10 seconds, energizes the auto-connected shutdown loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the shutdown loads. After load sequencing is completed, the steady state voltage and frequency of the emergency busses shall be maintained at 4160 + 420 volts and 60 + 1.2 Hz during the test.

5. Verifying that, on a Safety Injection actuation test signal (without loss of offsite power), the diesel generator starts on the auto-start signal and operates on standby for greater than or equal to 5 minutes,
6. Simulating a loss of offsite power in conjunction with a Safety Injection actuation test signal, and by:

a) Verifying de-energization of the emergency busses and load shedding from the emergency busses, b) Verifying the diesel starts on the auto-start signal, energizes the emergency busses with permanently connected loads within 10 seconds, energizes the auto-connected emergency (accident) loads through the load, sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the emergency loads'fter load sequencing is completed, the steady state voltage and frequency of the emergency busses shall be 4160 + 420 volts and 60 +

1.2 Hz. The voltage and frequency shall be maintained within these limits for the remainder of this test, and c) Verifying that all automatic diesel generator trips, except engine overspeed and generator differential, are automatically bypassed upon loss of voltage on the emergency bus and/or Safety Injection actuation signal.

7. Verifying that the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. During this test the diesel generator shall be loaded to 3500 kw. Within 5 minutes after completing this 24-hour test, perform Surveillance Requirement 4.8.1.1.2.e.4,
8. Verifying that the auto-connected loads to each diesel generator do not exceed 3500 kw.
9. Verifying the diesel generator's capability to:

D. C. COOK - UNIT 1 3/4 8-5 Amendment No.

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued a) Synchronize with the offsite power source while the generator is loaded with its emergency loads upon a simulated restoration of offsite power.

b) Transfer its loads to the offsite power source, and c) Be restored to its standby status.

10. Verifying that with the diesel generator operating in a test mode while connected to its test load, a simulated Safety Injection signal overrides the test mode by:

a) Returning the diesel generator to standby operation, and b) Verifying the emergency loads are serviced by offsite power.

f. At least once per 10 years by:
1) Employing one of the following cleaning methods to clean the fuel oil storage tanks:

a) Drain each fuel oil storage tank, remove the accumulated sediment, and clean the tank, or b) Agitate the fuel oil in the storage tank while pumping the oil from the bottom of the tank through a 5-micron filter, and back to the opposite end of the tank. Three successive samples shall be taken and analyzed according to ASTM D2276-83. If the contaminant level in any of the samples is greater than 10 mg per liter, the agitation, filtration, and sampling processes shall be repeated. If the contaminant level remains above 10 mg per liter after 3 iterations, the draining and cleaning method described in surveillance requirement 4.8.1.1.2.f.l.a shall be employed.

2) Performing a precision leak detection test to verify that the leakage rate from the fuel oil system is less than or equal to

.05 gallons per hour.

COOK NUCLEAR PLANT - UNIT 1 3/4 8-5a AMENDMENT NO.

TABLE 4.8-1 ADDITIONAL RELIABILITYACTIONS No. of failures No. of failures in last 20 in last 100 valid tests valid tests Action Within 14 days prepare and maintain a report for NRC audit describing the Diesel Generator

'Reliability Improvement Program implemented at the site.

Minimum requirements for the report are indicated in Attachment 1 to this table.

Declare the diesel generator inoperable. Perform a requali-fication test program for the affected diesel generator.

Requalification test program requirements are indicated in Attachment 2 to this table.

D. C. COOK - UNIT 1 3/4 8-6 AMENDMENT NO.

lf J

I P

4~1 4

ATTACHMEN 1 TO TABLE 4 8-1 REPORTING RE UIREMENT As a minimum the Reliability Improvement Program report for NRC audit shall include the following:

a) A summary of all tests (valid and invalid) that occurred within the time period over which the last 20/100 valid tests were performed, b) Analysis of failures and determination of root causes of failures, c) Evaluation of each of the recommendations of NUREG/CR-0660, "Enhancement of Onsite Emergency Diesel Generator Reliability in Operating Reactors,"

with respect to their application to the Plant, d) Identification of all actions taken or to be taken to 1) correct the root causes of failures defined in b) above and 2) achieve a general improvement of diesel generator reliabili.ty, e) The schedule for implementation of each action from d) above, and f) An assessment of the existing reliability of electric power to engineeped-safety-feature equipment.

Once a licensee has prepared and maintained an initial report detailing the diesel generator reliability improvement program at his site, as defined above, the licensee need prepare only a supplemental report within 14 days after each failure during a valid demand for so long as the affected diesel generator unit continues to violate the criteria (3/20 or 6/100) for the reliability improvement program remedial action. The supplemental report need only update the failure/demand history for the affected diesel generator unit since the last report for that diesel generator. The supplemental report shall also present an analysis of the failure(s) with a root cause determination, if possible, and shall delineate any further procedural, hardware or operational changes to be incorporated into the site diesel generator improvement program and the schedule for implementation of those changes.

In addi,tion to the above, the licensee shall submit a yearly data report on the Diesel Generator Reliability Improvement Program in the Annual Operating Report.

D. C. COOK - UNIT 1 3/4 8-7 AMENDMENT NO.

ATTACHMENT 2 TO TABLE 4 8-DIESEL GENERATOR RE U LIFICATION PROG (1) Perform seven consecutive successful demands without a failure within 30 days of diesel generator being restored to OPERABLE status and fourteen consecutive successful demands without a failure within 75 days of diesel generator being restored to OPERABLE status.

(2) If a failure occurs during the first seven tests in the requalification test program, perform seven successful demands wi.thout an additional failure within 30 days of diesel generator being restored to OPERABLE status and fourteen consecutive successful demands without a failure within 75 days of being restored to OPERABLE status.

(3) If a failure occurs during the second seven tests (tests 8 through 14) of (1) above, perform fourteen consecutive successful demands without an additional failure within 75 days of the failure which occurred during the requalification testing.

(4) Following the second failure during the requalification test program, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

(5) During requalification testing the diesel generator should not be tested more frequently than at 24-hour intervals.

After a diesel generator has been successfully requalified, subsequent repeated requalification tests will not be required for that diesel generator under the following conditions:

(a) The number of failures in the last 20 valid demands is less than 5, (b) The number of failures in the last 100 valid demands is less than 11, and (c) In the event that following successful requalification of a diesel generator, the number of failures is still in excess of the remedial action criteria (a and/or b above) the following exception will be allowed until the diesel generator is no longer in violation of the remedial action criteria (a and/or b above).

Requalification testing will not be required provided that after each valid demand the number of failures in the last 20 and/or 100 valid demands has not increased. Once the diesel generator is no longer in violation of the remedial action criteria above the provisions of those criteria alone will prevail.

D. C. COOK - UNIT 1 3/4 8-8 AMENDMENT NO.

Table 4 8-DIESEL GENERATOR TEST SCHEDUL Number of Failures in Last 20 Valid Tests* Test Fre uenc Less than or equal to 1 At least once per 31 days Greater than or equal to 2 At least once per 7 days~*

~Criteria for determining number of failures and number of valid tests shall be in accordance with Regulatory position C.2.e of Regulatory Guide 1.108, Revision 1, August 1977, where the number of tests and failures is deternaned on a per diesel generator basis. For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the "last 20 valid tests."

~~This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.

D. C. COOK - UNIT 1 3/4 8-9 AMENDMENT NO

ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. One circuit between the offsite transmission network and the onsite Class 1E distribution system, and
b. One diesel generator with:
1. A day fuel tank containing a minimum of 70 gallons of fuel,
2.  : A fuel storage system containing a minimum of 42,000 gallons of fuel, and
3. A fuel transfer pump.

APPLICABILITY: MODES 5 and 6.

ACTION:

Wi.th less than the above minimum required A.C. electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes*until the minimum required A.C. electrical power sources are restored to OPERABLE status.

SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5. **

  • For purposes of this specification, adaitxon of water from the RWST does not constitute a positive reactivity addition provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2.
    • The provisions of Specification 4.0.6 are applicable.

D. C. COOK - UNIT 1 3/4 8-10 AMENDMENT NO.

t

h

"~

V S,

ELECTRICA POWER SYSTEMS 3 4 8 2 ONSITE POWER DISTRIBUTION SYSTEMS A C DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.1 The following A.C. electrical busses shall be OPERABLE and energized with tie breakers open between redundant busses:

4160-volt Emergency Bus ¹ T 11A & T 11B 4160-volt Emergency Bus ¹ T llC & T llD 600-volt Emergency Bus ¹ llA & 11B 600-volt Emergency Bus ¹ 11C & 11D

~120-volt A.C. Vital Bus e Channel I xl20-volt A.C. Vital Bus ¹ Channel II

~120-volt A.C. Vital Bus ¹ Channel III

~120-volt A.C. Vital Bus Channel IV

~Energized from its associated inverter connected to a DC bus.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With less than the above complement of A.C. busses OPERABLE, restore the inoperable bus to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

'SURVEILLANCE RE UIREMENTS 4.8.2.1 The specified A.C. busses shall be determined OPERABLE and energized from A.C. sources with tie breakers open between redundant busses at least once per 7 days by verifying correct breaker alignment and indicated power availability.

D. C. COOK - UNIT 1 3/4 8-11 AMENDMENT NO.

ELECTRICAL POWER S STEMS A C DISTRIBUTION - SHUTDO LIMITING CONDITION OR OPERAT ON 3.8.2.2 As a minimum, the following A.C, electrical busses shall be OPERABLE and energized:

1 - 4160-volt Emergency Bus, 1 - 600-volt Emergency Bus, and 2 - *120-volt A.C. Vital Busses.

APPLICABILITY: MODES 5 and 6.

ACTION:

With less than the above complement of A.C. busses OPERABLE and energized, establish CONTAINMENT INTEGRITY within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

  • Energized from its associated inverter connected to a D.C. bus'.

SURVEILLANCE RE UIREMENTS 4.8.2;2 The specified A.C. busses shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated power availability.

D. C. COOK - UNIT 1 3/4 8-12 AMENDMENT NO.

a '

4 A<

1 tg

ELECTRICAL POWER SYSTEMS D.C DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.3 The following D.C. bus trains shall be energized and OPERABLE with tie breakers between bus trains open:

TRAIN AB consisting of 250-volt D.C. bus AB, 250-volt D.C. battery bank No. 1 AB, and a full capacity charger, and TRAIN CD consisting of 250-volt D.C. bus CD, 250-volt D.C. battery bank No. 1 CD, and a full capacity charger.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION'.

With one 250-volt D.C. bus inoperable, restore the inoperable bus to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b. With one 250-volt D.C. battery and/or its charger inoperable, restore the inoperable battery and/or charger to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE UIREMENTS 4.8.2.3.1 Each D.C. bus train shall be determined OPERABLE and energized with tie breakers open at least once per 7 days by verifying correct breaker alignment and indicated power availability.

4.8.2.3.2 Each 250-volt battery bank and charger shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that:
1. The electrolyte level of each pilot cell is between the minimum and maximum level indication marks, D. C. COOK - UNIT 1 3/4 8-13 AMENDMENT NO.

I~

t

'I A

l

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued

2. The pilot cell specific gravity, corrected to 0 77 F, and full electrolyte level (fluid at the bottom of the maximum level indication mark), is grater than or equal to 1.200,
3. The pilot cell voltage is greater than or equal to 2.10 volts, and
4. The overall battery voltage is greater than or equal to 250 volts.
b. At least once per 92 days by verifying that:
1. The voltage of each connected cell is greater than or equal to 2.10 volts under float charge and has not decreased more than 0.05 volts from the value observed during the original acceptance test, and
2. The specific gravity, corrected to 77 0 F, and full electrolyte level (fluid at the bottom of the maximum level indication mark), of each connected cell is greater than or equal to 1.200 and has not decreased more than 0.03 from the value observed during the previous test, and
3. The electrolyte level of each connected cell is between the top of the maximum level indication mark and the bottom of the maximum level indication mark.
c. At least once per 18 months by verifying that:
1. The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration,
2. The cell-to-cell and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material,
3. The battery charger will supply at least 140 amperes at greater than or equal to 250 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
d. At least once per 18 months, perform a battery service test during shutdown (MODES 5 or 6), by verifying that the battery capacity is adequate to supply and maintain in OPERABLE status the actual or simulated emergency loads for the times specified in Table 4.8-3 with the battery charger disconnected. The battery terminal voltage shall be maintained greater than or equal to 210 volts throughout this test.*
e. At least once per 60 months, perform a battery discharge test during shutdown (MODES,5 or 6), by verifying that the battery capacity is at least 80% of the manufacturer's rating. This performance dis-charge test shall be performed in place of the battery service test.

<<The provisi'ons of Specification 4.0.6 are applicable.

COOK NUCLEAR PLANT - UNIT 1 3/4 8-14 AMENDMENT NO.

TABLE 4.8-3 BATTERY EMERGENCY LOADS AB Batter Loads Minimum Time

l. Channel III static inverter 3 hrs
2. Channel IV static inverter 3 hrs
3. Computer static inverter" 3 hrs
4. Feed pump turbine lE oil pump 1 hr
5. Control room emergency lighting 8 hrs
6. Hain turbine backup oil pump 3 hrs
7. Isolation valve control 8 hrs
8. All control circuits 8 hrs CD Batter Loads
1. Channel I static inverter 3 hrs
2. Channel II static inverter 3 hrs
3. BOP static inverter~~ 3 hrs
4. Feed pump turbine 1W oi'1 pump 1 hr
5. Generator seal oil pump 8 hrs
6. Turbine emergency oil pump 3 hrs
7. Isolation valves 8 hrs
8. Annunciators 8 hrs
9. All control circuits 8 hrs

<AC power sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval.

Inverters may be left in this operating mode for the duration of the discharge test.

D. C. COOK - UNIT 1 3/4 8-15 AMENDMENT NO.

ELECTRICAL POWER SYSTEMS D' DISTRIBUTION - SHU DO LIMITING CONDITION FOR OPERATION 3, 8. 2.4 As a minimum, the following D. C. electrical equipment and bus shall be energized and OPERABLE:

1 - 250-volt D.C. bus, and 1 - 250-volt battery bank and charger associated with the above D.C. bus.

APPLICABILITY: MODES 5 and 6.

ACTION:

With less than the above complement of D.C. equipment and bus OPERABLE, establish CONTAINMENT INTEGRITY within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SURVEILLANCE RE UIREMENTS 4.8.2.4.1 The above required 250-volt D.C. bus shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated power availability.

4.8.2.4.2 The above required 250-volt battery bank and charger shall be demonstrated OPERABLE per Surveillance Requirement 4.8.2.3.2.*

  • The provisions of Specification 4.0.6. are applicable.

D. CD COOK - UNIT 1 3/4 8-16 AMENDMENT NO.

4 4ltl A4

E ECTRICAL POWER SYSTEMS D.C DISTRIBUT ON - OPERATING - TRAIN N BATTERY SYSTEM LIMITING CO DI ION FOR OPERAT 0 3.8.2.5 The following D.C. bus train shall be energized and OPERABLE:

TRAIN N consisting of 250-volt D.C. bus N, 250-volt D.C. battery bank N and a full capacity charger.

APPLICABILITY: MODES 1, 2 and 3.

ACTION:

With the Train N battery system inoperable, declare the turbine driven Auxiliary Feedwater Pump inoperable and follow the ACTION statement of Specification 3.7.1.2.

SURVEILLANCE RE UIREMENTS 4.8.2.5.1 The D.C. bus train N shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated power availability.

4.8.2.5.2 The 250-volt battery bank and charger shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that:
1. The electrolyte level of each pilot cell is between the minimum and maximum level indication marks, D. C. COOK - UNIT 1 3/4 8-17 Amendment No.

tj '

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued

2. The pilot cell specific gravity, corrected to 0 77 F, and full electrolyte level (fluid at the bottom of the maximum level indication mark), is grater than or equal to 1.200,
3. The pilot cell voltage is greater than or equal to 2.10 volts, and
4. The overall battery voltage is greater than or equal to 250 volts.
b. At least once per 92 days by verifying that:
1. The voltage of each connected cell is greater than or equal to 2.10 volts under float charge and has not decreased more than 0.05 volts from the value observed during the original acceptance test, and
2. The specific gravity, corrected to 77 0 F, and full electrolyte level (fluid at the bottom of the maximum level indication mark), of each connected cell is greater than or equal to 1.200 and has not decreased more than 0.03 from the value observed during the previous test, and
3. The electrolyte level of each connected cell is between the top of the maximum level indication mark and the bottom of the maximum level indication mark.
c. At least once per 18 months by verifying that:
1. The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration,
2. The cell-to-cell and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material,
3. The battery charger will supply at least 10 amperes at greater than or equal to 250 volts for at least 4 hours'.

At least once per 18 months, perform a battery service test during shutdown (MODES 5 or 6), by verifying that the battery capacity is adequate to supply and maintain in OPERABLE status the actual or simulated emergency loads for the times specified in Table 4.8-4 with the battery charger disconnected. The battery terminal voltage shall be maintained greater than or equal to 210 volts throughout this test.*

e. At least once per 60 months, perform a battery discharge test during shutdown (MODES 5 or 6), by verifying that the battery capacity is at least 80% of the manufacturer's rating. This performance dis-charge test shall be performed in place of the battery service test.
  • The provisions of Specification 4.0.6 are applicable.

COOK NUCLEAR PLANT - UNIT 1 3/4 8-18 AMENDMENT NO.

TABL 4.8-4 PATTER EME GENC LOADS "N" Batter Loads Minimum Time Auxiliary feedwater turbine control bus 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-211 valve FMO-221 valve FMO-231 valve FMO-241 valve TDTU valve

Valves will.be operated through the following sequence:
1. Beginning of test: open valves.
2. Five minutes after the beginning of the test: close the valves.
3. Ten minutes after the beginning of the test: reopen the valves.
4. Four hours after the beginning of the test: close the valves.

End of the test.

D. C. COOK - UNIT 1 3/4 8-19 Amendment No ~

o t. "4 '

P,p

LECT ICAL POWER SYSTEM 3 4 8 3 lte nat ve A.C Power Sources LIMITING CONDITION FOR OPERATION 3.8.3.1 The steady state bus voltage for 'the manual alternate reserve source be greater than or equal to 90% of the nominal bus voltage. 'hall APPLICABILITY: Whenever the manual alternate reserve source (69 kv) is connected to more than two busses.

ACTION: With bus voltage less than 90% nominal, adjust load on the remaining busses to maintain steady state bus voltage greater than or equal to 90%

limit.  !

SURVEILLANCE RE UIREMENTS 4,8.3.1 No additional surveillance requirements other than those required by Specifications 4.8.1.1.1 and 4.8.1.2.

  • Shared with D. C. Cook Unit 2.

D. C. COOK - UNIT 1 3/4 8-20 AMENDMENT NO.

~ 0 t 5 A V

6o

%1

3 4.8 ELECTRICAL POWER SYSTEMS BASES The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for 1) the safe shutdown of the facility and 2) the mitigation and control of accident conditions within the facility. The minimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design Criteria 17 of Appendix "A" to 10 CFR 50, The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the level of degradation. The OPERABILITY of the power sources are consistent with the initial condition assumptions of the accident analyses and are based upon maintaining at least one redundant set of onsite A.C. and D.C power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of the other onsite A.C. source.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that 1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability is available for monitoring and maintaining the facility status.

In reference to Specification 3.8.1.1 Action b, the phrase "and an accumulated annual outage time of 576 hours0.00667 days <br />0.16 hours <br />9.523809e-4 weeks <br />2.19168e-4 months <br /> exclusive of MODES 5 and 6" shall be interpreted as follows. This phrase refers to the amount of time the diesel generator has been inoperable in the past 365 days while in MODES 1, 2, 3, and 4. This time includes the amount of time spent in ACTION statements except for the time utilized for regularly scheduled surveillances. The accumulated annual outage time is reset to zero upon successful completion of the diesel generator requalification program (Attachment 2 to Table 4.8-1).

The train N station battery system provides an independent 250 volt DC power supply for power and control of the turbine driven auxiliary feedwater pump train. The limiting conditions of operation for the train N battery are consistent with the requirements of the auxiliary feedwater system. The surveillance requirements for the train N battery system are consistent with the requirements of the AB and CD station batteries. The train N battery loads are derived from equipment in the turbine driven auxiliary feedwater pump train and battery sizing is consistent with the functional requirements of these components. Simulated loads for battery tests are loads equivalent to measured actual loads.

D. C. COOK - UNIT 1 B 3/4 8-1 Amendment No.

ELECTRICAL POWER SYSTEMS (Continued)

BASES Removal of accumulated water as required by 4.8.1.1.2.b.2 is performed by drawing the contents off the bottom of the tank until acceptable results are obtained for either a tape test or a water and sediment test. An acceptable result for the water and sediment content is a measured value less than 0.05 percent volume.

The sample specified in 4.8.1.1.2.c.4 is sent offsite for testing. A serious attempt will be made to meet the 31-day limit on the offsite tests; however, if for some reason this limit is not met (e.g., if the sample is lost or broken or if the results are not received in 31 days), the diesel generators If the sample is lost, broken, or fails should not be considered inoperable.

the offsite tests and the new oil has already been put into the storage tank, the offsite tests will be performed on a sample taken from the storage tank.

If the results on the subsequent storage tank sample are not within specified limits, the diesel generators should be considered OPERABLE and the out-of-spec properties should be returned to within specification as soon as possible.

If the monthly storage'ank sample taken in accordance with Specification.

4.8.1.1.2.d fails the particulate contamination test, the diesel generators should be considered OPERABLE and the contamination level should be restored to below 10 mg/liter as soon as possible.

The precision leak-detection test described in Surveillance Requirement 4.8.1.1.2.f.2 should be performed as described in NFPA (National Fire Protection Association) -329. As NFPA-329 is revised, the precision leak-detection test may be modified to incorporate changes to the test as described in the revisions to NFPA-329.

COOK NUCLEAR PLANT - UNIT 1 B 3/4 8-2 AMENDMENT NO.

'C kt ga g

3 4.8 ELECTRICAL POWER SYSTEMS 3 4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite trans-mission network and the onsite Class lE distribution system, and
b. Two separate and independent diesel generators, each with:
l. A separate day fuel tank containing a minimum volume of 70 gallons of fuel,
2. .A separate fuel storage system+ containing a minimum volume of 42,000 gallons of fuel, and
3. A separate fuel transfer pump.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With an offsite circuit of the above required A.C. electrical power. sources inoperable, demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b. With a diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> there-after; and if the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.4.

within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; restore diesel generators to OPERABLE status within 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br />, not to exceed an accumulated annual outage time of 576 hours0.00667 days <br />0.16 hours <br />9.523809e-4 weeks <br />2.19168e-4 months <br /> exclusive of MODES 5 and 6 or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. At the number of failures for the inoperable diesel indicated in Table 4.8-1 perform the Additional Reliability Actions prescribed in Table 4.8-1 and its attachments.

  • Tanks are separate between diesels but shared between Units 1 and 2.

COOK NUCLEAR PLANT - UNIT 2 3/4 8-1 AMENDMENT NO.

$ /41 E

,I " ~

1,a fa

EL C 0 c ~ With one offsite circuit and one diesel generator of'the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.l.l.l.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter and if the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; restore at least one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. With the diesel generator restored to OPERABLE status, follow ACTION Statement a.* With the offsite circuit restored to OPERABLE status, follow ACTION Statement b.*

d. With two of the above required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of two diesel generators by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> unless the diesel generators are already operating. 'Restore at least one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> .or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. With only one offsite source restored, follow ACTION Statement a.*
e. With two of the above required diesel generators inoperable, demonstrate the OPERABILITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.F 1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. With one diesel generator unit restored, follow ACTION Statement b* or c.*
  • The ACTION statement time shall be based upon the time associated with the component inoperability, and is not reset when exiting this ACTION statement.

SURVEILLANCE RE U RE E TS 4.8.1.1.1 Each of the above required independent circuits between the offsite transmission network and the onsite Class 1E distribution system shall be: **

a 0 Determined OPERABLE at least once per 7 days by verifying correct breaker alignments and indicated power availability, and

b. Demonstrated OPERABLE at least once per 18 months by transferring the unit power source automatically from the normal auxiliary source to the preferred reserve source and by transferring manually to the alternate reserve source,
    • The provisions of Specification 4.0.6 are applicable.

D. C. COOK - UNIT 2 3/4 8-2 AMENDMENT NO.

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4,8.1.1.2 Each diesel generator shall be demonstrated OPERABLE: +

a. In accordance with the frequency specified in Table 4.8-2 on a STAGGERED TEST BASIS by:
l. Verifying the fuel level in the day tank,
2. Verifying the fuel level in the fuel storage tank,
3. Verifying that the fuel transfer pump can be started and that it transfers fuel from the storage system to the day tank,
4. Verifying that the diesel starts from ambient condition and that it accelerates to at least 514 rpm in less than or equal to 10 seconds,*
5. Verifying that the generator is loaded to greater than or equal to 1750 kw and that it operates for greater than or equal to 60 minutes and verifying that the generator output breaker to the emergency bus is OPERABLE, and
6. Verifying that the diesel generator is aligned to provide standby power to the associated emergency busses.
b. By removing accumulated water**:
1) From the day tank at least once per 31 days and. after each occasion when the diesel is operated for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and
2) From the storage tanks at least once per 31 days.

cd By sampling new fuel oil** in accordance with the applicable guidelines of ASTM D4057-81 prior to adding new fuel to the storage tanks and

1) By verifying, in accordance with the tests specified in ASTM D975-81 and prior to adding the new fuel to the storage tanks, that the sample has a) A kinematic viscosity of greater than or equal to 1.9 centistokes 0

but less than or equal to 4.1 centistokes at 40 0

C (alternatively, Saybolt viscosity, SUS at 100 F of greater than or equal to 32.6 but less than or equal to 40.1), if gravity was not determined by comparison with supplier's certification.

b) A flash point equal to or greater then 125 F.

  • The diesel generator start (10 seconds) from ambient conditions shall be performed at least once per 184 days in these surveillance tests. All other engine starts for the purpose of this surveillance testing and compensatory action may be at reduced acceleration rates as recommended by the manufacturer so that mechanical stress and wear on the diesel engine are minimized.
    • The actions to be taken should any of the properties be found outside of specified limits are defined in the Bases.

+ The provisions of Specification 4.0.6 are applicable.

D. C. COOK - UNIT 2 3/4 8-3 Amendment No.

f]  !'t fi'!

)~a tlII%

gV

'A r h

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued

2) By verifying, in accordance with the test specified in ASTM D1298-80 and prior to adding the new fuel to the storage tanks, that the sample has either an API gravity of greater than or equal 0 to 30 degrees but less than or equal to 40 0 degrees at 60 F or an absolute specific gravity at 60/60 F of greater than or equal to 0.82 but less than or equal to 0.88, or an API gravity of within 0.3 degrees at 60 F when compared to the supplier's certificate or a specific gravity of within 0.0016 at 60/60 F when compared to the supplier's certificate.
3) By verifying, in accordance with the test specified in ASTM D4176-82 and prior to adding new fuel to the storage tanks, that the sample has a clear and bright appearance with proper color.
4) By verifying within 31 days of obtaining the sample that the other properties specified in Table 1 of ASTM D975-81 are within the appropriate limits when tested in accordance with ASTM D975-81 except that the analysis for sulfur may .

be performed in accordance with ASTM D2622-82.

d. At least once per 31 days by obtaining a sample of fuel oil from the storage tanks in accordance with ASTM D2276-83, and verifying that total particulate contamination is less than 10 mg/liter when tested in accordance with ASTM D2276-83, Method A+*.
e. At least once per 18 months, during shutdown, by:*
1. Subjecting the diesel engine to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service,
2. Verifying the generator capability to reject a load greater than or equal to 600 kw while maintaining voltage at 4160 +

420 volts and frequency at 60 + 1.2 Hz,

3. Verifying the generator capability to reject a load of 3500 kw without exceeding 75% of the difference between nominal speed and the overspeed trip setpoint,
4. Simulating a loss of offsite power by itself, and:

a) Verifying de-energization of the emergency busses and load shedding from the emergency busses,

    • The actions to be taken should any of the properties be found outside of the specified limits are defined in the Bases.
  • The provisions of Specification 4.0.7 are applicable.

D. C. COOK - UNIT 2 3/4 8-4 Amendment No.

'P J Mi r1a

~ I' cv

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued b) Verifying that the diesel starts on the auto-start signal, energizes the emergency busses with permanently connected loads within 10 seconds, energizes the auto-connected shutdown loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the shutdown loads'fter load sequencing is completed, the steady state voltage and frequency of the emergency busses shall be maintained at 4160 + 420 volts and 60 + 1.2 Hz during the test.

5. Verifying that, on a Safety Injection actuation test signal (without loss of offsite power), the diesel generator starts on the auto-start signal and operates on standby for greater than or equal to 5 minutes,
6. Simulating a loss of offsite power in conjunction with a Safety Injection actuation test signal, and by:

a) Verifying de-energization of the emergency busses and load shedding from the emergency busses, b) Verifying the diesel starts on the auto-start signal',

energizes the emergency busses with permanently connected loads within 10 seconds, energizes the auto-connected emergency (accident) loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the emergency loads. After load sequencing is completed, the steady state voltage and frequency of the emergency busses shall be 4160 + 420 volts and 60 +

1.2 Hz. The voltage and frequency shall be maintained within these limits for the remainder of this test, and c) Verifying that all automatic diesel generator trips, except engine overspeed and generator differential, are automatically bypassed upon loss of voltage on the emergency bus and/or Safety Injection actuation signal.

7. Verifying that the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. During this test the diesel generator shall be loaded to 3500 kw. Within 5 minutes after completing this 24-hour test, perform Surveillance Requirement 4.8.1.1.2.e.4.
8. Verifying that the auto-connected loads to each diesel generator do not exceed 3500 kw.
9. Verifying the diesel generator's capability to:

D. C. COOK - UNIT 2 3/4 8-5 Amendment No.

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued a) Synchronize with the offsite power source while the generator is loaded with its emergency loads upon a simulated restoration of offsite power.

b) Transfer its loads to the offsite power source, and c) Be restored to its standby status.

10. Verifying that with the diesel generator operating in a test mode while connected to its test load, a simulated Safety Injection signal overrides the test mode by:

a) Returning the diesel generator to standby operation, and b) Verifying the emergency loads are serviced by offsite power.

f. At least once per 10 years by:
1) Employing one of the following cleaning methods to clean the fuel oil storage tanks:

a) Drain each fuel oil storage tank, remove the accumulated sediment, and clean the tank, or b) Agitate the fuel oil in the storage tank while pumping the oil from the bottom of the tank through a 5-micron filter, and back to the opposite end of the tank. Three successive samples shall be taken and analyzed according to ASTM D2276-83. If the contaminant level in any of the samples is greater than 10 mg per liter, the agitation, filtration, and sampling processes shall be repeated. If the contaminant level remains above 10 mg per liter after 3 iterations, the draining and cleaning method described in surveillance requirement 4.8.1.1.2.f.l.a shall be employed.

2) Performing a precision leak detection test to verify that the leakage rate from the fuel oil system is less than or equal to

.05 gallons per hour.

COOK NUCLEAR PLANT - UNIT 2 3/4 8-5a AMENDMENT NO.

TABLE 4.8-1 ADDITIONAL RELIABILITYACTIO S No. of failures No. of failures in last 20 in last 100 valid tests valid tests Within 14 days prepare and maintain a report for NRC audit describing the diesel generator reliability improvement program implemented at the site.

Minimum requirements for the report are indicated in Attachment 1 to this table.

Declare the diesel generator inoperable. Perform a requali-fication test program for the affected diesel generator.

Requalification test program requirements are indicated in Attachment 2 to this table.

D. C. COOK - UNIT 2 3/4 8-6 AMENDMENT NO ~

<<gQs W4,

ATTACHMENT TO TABLE 4 8-REPORT NG RE UIREMENT As a minimum the Reliability Improvement Program report for NRC audit shall include the following:

a) . A summary of all tests (valid and invalid) that occurred within the time period over which the last 20/100 valid tests were performed, b) Analysis of failures and determination of root causes of failures, c) Evaluation of each of the recommendations of NUREG/CR-0660, "Enhancement of Onsite Emergency Diesel Generator Reliability in Operating Reactors,"

with respect to their application to the Plant, d) Identification of all actions taken or to be taken to 1) correct the root causes of failures defined in b) above and 2) achieve a general improvement of diesel generator reliability, e) The schedule for implementation of each action from d) above, and f) An assessment of the existing reliability of electric power to enginezred-safety-feature equipment.

Once a licensee has prepared and maintained an initial report detailing the diesel generator reliability improvement program at his site, as defined above, the licensee need prepare only a supplemental report within 14 days after each failure during a valid demand for so long as the affected diesel generator unit continues to violate the criteria (3/20 or 6/100) for the reliability improvement program remedial action. The supplemental report need only update the failure/demand history for the affected diesel generator unit since the last report for that diesel generator. ,The supplemental report shall also present an analysis of the failure(s) with a root cause determination, possible, and shall delineate any further procedural, hardware or operational if changes to be incorporated into the site diesel generator improvement program and the schedule for implementation of those changes.

In addition to the above,, the licensee shall submit a yearly data report on the diesel generator reliability improvement program in the Annual Operating Report.

D. C. COOK - UNIT 2 3/4 8-7 AMENDMENT NO.

ATTACHMENT 2 TO TABLE 4 8-1 DIESEL GE ERATOR RE UALIFICATION PROGRAM (1) Perform seven consecutive successful demands without a failure within 30 days of diesel generator being restored to OPERABLE status and fourteen consecutive successful demands without a failure within 75 days of diesel generator being restored to OPERABLE status.

(2) If a failure occurs during the first seven tests in the requalification test program, perform seven successful demands without an additional failure within 30 days of diesel generator being restored to OPERABLE status and fourteen consecutive successful demands without a failure within 75 days of being restored to OPERABLE status.

(3) If a failure occurs during the second seven tests (tests 8 through 14) of (1) above, perform fourteen consecutive successful demands without an additional failure within 75 days of the failure which occurred during the requalification testing.

(4) Following the second failure during the requalification test program, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN wit+n the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

(5) During requalification testing the diesel generator should not be tested more frequently than at 24-hour intervals.

After a diesel generator has been successfully requalified, subsequent repeated requalification tests will not be required for that diesel generator under the following conditions:

(a) The number of failures in the last 20 valid demands is less than 5, (b) The number of failures in the last 100 valid demands is less than 11, and (c) In the event that following successful requalification of a diesel generator, the number of failures is still in excess of the remedial action criteria (a and/or b above) the following exception will be allowed until the diesel generator is no longer in violation of the remedial action criteria (a and/or b above).

Requalification testing will not be required provided that after each valid demand the number of failures in the last 20 and/or 100 valid demands has not increased. Once the diesel generator is no longer in violation of the remedial action criteria above the provisions of those criteria alone will prevail.

D. C. COOK - UNIT 2 3/4 8-8 AMENDMENT NO.

f~;

bt 4'i iPv' I

i

Table 4.8-2 DIESEL GENERATOR TEST SCHEDUL Number of Failures in Last 20 Valid Tests* Test Fre uenc Less than or equal to 1 At least once per 31 days Greater than or equal to 2 At least once per 7 days**

~Criteria for determining number of failures and number of valid tests shall be in accordance with Regulatory Position C.2.e of Regulatory Guide 1, August 1977, where the number of tests and failures is determined 1.108'evision on a per diesel generator basis. For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the "last 20 valid tests."

~~This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.

D. C. COOK - UNIT 2 3/4 8-9 AMENDMENT NO.

1 sl II 1

ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. One circuit between the offsite transmission network and the onsite Class 1E distribution system, and
b. One diesel generator with:
l. A day fuel tank containing a minimum of 70 gallons of fuel,
2. A fuel storage system containing a minimum of 42,000 gallons of fuel, and
3. A fuel transfer pump.

APPLICABILITY: MODES 5 and 6.

ACTION:

With less than the above minimum required A.C. electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes*until the minimum required A.CD electrical power sources are restored to OPERABLE status.

SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5.*

  • For the purposes of this specification, addition of water from the RWST does not constitute a,positive reactivity addition provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2.
    • The provisions of Specification 4.0.6 and 4.0.7 are applicable.

D. C. COOK - UNIT 2 3/4 8-10 AMENDMENT NO ~

ELECTRICA POWER SYSTEMS 3 4 8.2 ONSI E POWER DISTRIBUTION SYSTEMS A C DI STRI BUTION - OPERATI G LIMITING CONDITION FOR OPERATION 3.8.2.1 The following A.C. electrical busses shall be OPERABLE and energized with tie breakers open between redundant busses:

4160-volt Emergency Bus ¹ T 11A & T llB 4160-volt Emergency Bus ¹ T 11C & T 11D 600-volt Emergency Bus ¹ llA & 11B 600-volt Emergency Bus ¹ llC & llD

  • 120-volt A.C. Vital Bus ¹ Channel I
  • 120-volt A.C. Vital Bus ¹ Channel II

>120-volt A.C. Vital Bus ¹ Channel III

~120-volt A.C. Vital Bus ¹ Channel IV

~Energized from its associated inverter connected to a DC bus.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With less than the above complement of A.C. busses OPERABLE, restore the inoperable bus to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE UIREMENTS 4.8.2.1 The specified A.CD busses shall be determined OPERABLE and energized from A.C. sources with tie breakers open between redundant busses at least once per 7 days by verifying correct breaker alignment and indicated power availability.

D. C. COOK - UNIT 2 3/4 8-11 AMENDMENT NO.

~C +~ t ELECTRICAL POWER SYSTEMS A C DISTRIBU ION - SHUTDOWN LIMITI G CONDI ION FOR OPERATION 3.8.2.2 As a minimum, the following A.C. electrical busses shall be OPERABLE and energized:

1 - 4160-volt Emergency Bus, 1 - 600-volt Emergency Bus, and 2 - *120-volt A.C. Vital Busses.

APPLICABILITY: MODES 5 and 6.

ACTION:

With less than the above complement of A.C. busses OPERABLE and energized, establish CONTAINMENT INTEGRITY within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SURVEILLANCE RE UIREMENTS 4.8.2.2 The specified A.C. busses shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated power availability.

  • Energized from its associated inverter connected to a DC bus.

D. C. COOK - UNIT 2 3/4 8-12 AMENDMENT NO.

C I ELECTRICA POWER SYSTEMS D C DISTRIBUTIO - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.3 The following D.C. bus trains shall be energized and OPERABLE with tie breakers between bus trains open:

TRAIN AB consisting of 250-volt D.C. bus AB, 250-volt D.C. battery bank No. 1 AB, and a full capacity charger, and TRAIN CD consisting of 250-volt D.C. bus CD, 250-volt D.C. battery bank No. 1 CD, and a full capacity charger.

ACTION'.

With one 250-volt D.C. bus inoperable, restore the inoperable bus to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b. With one 250-volt D.C. battery and/or its charger inoperable, restore the inoperable battery and/or charger to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STA.'4DBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE UIREMENTS 4.8.2.3.1 Each, D.C. bus train shall be determined OPERABLE and energized with tie breakers open at least once per 7 days by verifying correct breaker alignment and indicated power availability.

4.8.2.3.2 Each 250-volt battery bank and charger shall be demonstrated OPERABLE"

a. At lease once per 7 days by verifying that:
1. The electrolyte level of each pilot cell is between the minimum and maximum level indication marks,
  • The provisions of Specification 4.0.6 are applicable.

D. C. COOK - UNIT 2 3/4 8-13 AMENDMENT NO ~

4 ~

t'p

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued

2. The pilot cell specific gravity, corrected to 0 77 F, and full electrolyte level (fluid at the bottom of the maximum level indication mark), is grater than or equal to 1.200, The pilot cell voltage is greater than or equal to 2.10 volts, and The overall battery voltage is greater than or equal to 250 volts.

least once per 92 days by verifying that:

The voltage of each connected cell is greater than or equal to 2.10 volts under float charge and has not decreased more than 0.05 volts from the value observed during the original acceptance test, and

2. The specific gravity, corrected to 77 0 F, and full electrolyte level (fluid at the bottom of the maximum level indication markl, of each connected cell le greater than or equal to 1.200 and has not decreased more than 0.03 from the value observed during the previous test, and
3. The electrolyte level of each connected cell is between the top of the maximum level indication mark and the bottom of the maximum level indication mark.
c. At least once per 18 months by verifying that:
1. The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration,
2. The cell-to-cell and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material,
3. The battery charger will supply at least 140 amperes at greater than or equal to 250 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
d. At least once per 18 months, perform a battery service test during shutdown (MODES 5 or 6), by verifying that the battery capacity is adequate to supply and maintain in OPERABLE status the actual or simulated emergency loads for the times specified in Table 4.8-3 with the battery charger disconnected. The battery terminal voltage shall be maintained greater than or equal to 210 volts throughout this test.
e. At least once per 60 months, perform a battery discharge test during shutdown (MODES 5 or 6), by verifying that the battery capacity is at least 80% of the manufacturer's rating. This performance dis-charge test shall be performed in place of the battery service test.

COOK NUCLEAR PLANT - UNIT 2 3/4 8-14 AMENDMENT NO.

4)1 1 4

~ ~

TABLE 4 8-3 BATTERY EMERGENCY LOADS AB Batter Loads Minimum Time 1 ~ Channel III static inverter 3 hrs

2. Channel IV static inverter 3 hrs
3. Computer static inverterx 3 hrs
4. Feed pump turbine 1E oil pump 1 hr
5. Control room emergency lighting. 8 hrs
6. Hain turbine backup oil pump 3 hrs
7. Isolation valve control 8 hrs
8. All control circuits 8 hrs CD Batter Loads
1. Channel I static inverter 3 hrs
2. Channel II static inverter 3 hrs
3. BOP static inverter~ 3 hrs
4. Feed pump turbine 1M oil pump 1 hr
5. Generator seal oil pump 8 hrs
6. Turbine emergency oil pump 3 hrs
7. Isolation valves 8 hrs
8. Annunciators 8 hrs
9. All control circuits 8 hrs

~AC power sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval.

Inverters may be left in this operating mode for the duration of the discharge test.

D. C. COOK - UNIT 2 3/4 8-15 AMENDMENT NO.

~ s

~ ~

C%

~ J

ELFCTRICAL POWER SYSTEMS D C. DISTRIBUTION - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.2.4 As a minimum, the following D.C. electrical equipment and bus shall be energized and OPERABLE:

1 - 250-volt D.C. bus, and 1 - 250-volt battery bank and charger associated with the above D.C. bus ~

APPLICABILITY; MODES 5 and 6.

ACTION:

With less than the above complement of D.C. equipment and bus OPERABLE, establish CONTAINMENT INTEGRITY within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SURVEILLANCE RE UIREMENTS 4.8.2.4.1 The above requi.red 250-volt D.C. bus shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated power availability.

4.8.2.4.2 The above required 250-volt battery bank and charger shall be demonstrated OPERABLE per Surveillance Requirement 4.8.2.3.2.

  • The provasions of Specification 4.0.6 are applicable.

D. C. COOK - UNIT 2 3/4 8-16 AMENDMENT NO.

ELECTRICAL POWER SYSTEMS D C DISTRIBUT ON - 0 ERATING - T I BATTERY SYSTE L MITING CO DITION OR OPERATION 3.8.2.5 The following D.C. bus train shall be energized and OPERABLE:

TRAIN N consisting of 250-volt D.C. bus N, 250-volt D.C. battery bank N and a full capacity charger.

APPLICABILITY: MODES 1, 2 and 3.

ACTION:

With the Train N battery system inoperable, declare the turbine driven Auxiliary Feedwater Pump inoperable and follow the ACTION statement of Specification 3.7 1.2. ~

SURVEILLANCE RE UIREMENTS

4. 8. 2. 5. 1 The D.C. bus train N shall be determined OPERABLE and energized at le'ast once per 7 days by verifying correct breaker alignment and indicated power availability.

4.8.2.5.2 The 250-volt battery bank and charger shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that:
1. The electrolyte level of each pilot cell is between the minimum and maximum level indication marks, D. C. COOK - UNIT 2 3/4 8-17 Amendment No.

e ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued

2. The pilot cell specific gravity, corrected to 0 77 F, and full electrolyte level (fluid at the bottom of the maximum level indication mark), is grater than or equal to 1.200,
3. The pilot cell voltage is greater than or equal to 2.10 volts, and
4. The overall battery voltage is greater than or equal to 250 volts.
b. At least once per 92 days by verifying that:
1. The voltage of each connected cell is greater than or equal to 2.10 volts under float charge and has not decreased more than 0.05 volts from the value observed during the original acceptance test, and
2. The specific gravity, corrected to 77 0 F, and full electrolyte level (fluid at the bottom of the maximum level indication mark), of each connected cell is greater than or equal to 1.200 and has not decreased more than 0 '3 from the value observed during the previous test, and
3. The electrolyte level of each connected cell is between the top of the maximum level indication mark and the bottom of the maximum level indication mark.
c. At least once per 18 months by verifying that:
1. The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration,
2. The cell-to-cell and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material,
3. The battery charger will supply at least 10 amperes at greater than or equal to 250 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
d. At least once per 18 months, perform a battery service test during shutdown (MODES 5 or 6), by verifying that the battery capacity is adequate to supply and maintain in OPERABLE status the actual or simulated emergency loads for the times specified in Table 4.8-4 with the battery charger disconnected. The battery terminal voltage shall be maintained greater than or equal to 210 volts throughout this test.
e. At least once per 60 months, perform a battery discharge test during shutdown (MODES 5 or 6), by verifying that the battery capacity is at least 80% of the manufacturer's rating. This performance dis-charge test shall be performed in place of the battery service test.

COOK NUCLEAR PLANT - UNIT 2 3/4 8-18 AMENDMENT NO.

1!

BATTERY EMERGENCY LOADS "N" Batter pads Minimum Time Auxiliary feedwater turbine control bus 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-211 valve FMO-221 valve FMO-231 valve FMO-241 valve TDTV valve

~Valves will be operated through the following sequence:

Beginning of test: open valves.

Five minutes after the beginning of the test: close the valves.

Ten minutes after the beginning of the test: reopen the valves.

Four hours after the beginning of the test: close the valves.

End of the test.

D. C. COOK - UNIT 2 3/4 8-19 Amendment No.

's ELECTRICAL POWE SYSTEMS 3 4.8 3 Alte nat ve A C Power Sources LIMITING CONDITION FOR OPERATION 3.8.3.1 The steady state bus voltage for the manual alternate reserve source~

shall be greater than or equal to 90% of the nominal bus voltage.

APPLICABILITY: Whenever the manual alternate reserve source (69 kv) is connected to more than two busses.

ACTION: With bus voltage less than 90% nominal, adjust load on the remaining busses to maintain steady state bus voltage greater than or equal to 90%

limit.

SURVEILLANCE RE UIREMENTS 4.8.3.1 No additional surveillance requirements other than those required by Specifications 4.8.1.1.1 and 4.8 1.2.~

~Shared with D. C. Cook Unit 1.

D. C. COOK - UNIT 2 3/4 8-20 AMENDMENT NO.

~s>

r V

c r'gf f.

\

C l~

'li

'1 lg

3 4.8 ELECTRICAL POWER SYSTEMS BASES The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for 1) the safe shutdown of the facility and 2) the mitigation and control of accident conditions within the facility. The minimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design Criteria 17 of Appendix "A" to 10 CFR 50.

The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the level of degradation. The OPERABILITY of the power sources are consistent with the initial condition assumptions of the accident analyses and are based upon maintaining at least one redundant set of onsite A.CD and D.C power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of the other onsite A.C.. source, The OPERABILITY of the minimum specified A.C. and D.C. power sources; and associated distribution systems during shutdown and refueling ensures that 1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability is available for monitoring and maintaining the facility status.

In reference to Specification 3.8.1.1 Action b, the phrase "and an accumulated annual outage time of 576 hours0.00667 days <br />0.16 hours <br />9.523809e-4 weeks <br />2.19168e-4 months <br /> exclusive of MODES 5 and 6" shall be interpreted as follows. This phrase refers to the amount of time the diesel generator has been inoperable in the past 365 days while in MODES 1, 2, 3, and 4. This time includes the amount of time spent in ACTION statements except for the time utilized for regularly scheduled surveillances. The accumulated annual outage time is reset to zero upon successful completion of the diesel generator requalification program (Attachment 2 to Table 4.8-1).

The train N station battery system provides an independent 250 volt DC power supply for power and control of the turbine driven auxiliary feedwater pump train. The limiting conditions of operation for the train N battery are consistent with the requirements of the auxiliary feedwater system. The surveillance requirements for the train N battery system are consistent with the requirements of the AB and CD station batteries. The train N battery loads are derived from equipment in the turbine driven auxiliary feedwater pump train and battery sizing is consistent with the functional requirements of these components. Simulated loads for battery tests are loads equivalent to measured actual loads.

D. C. COOK - UNIT 2 B 3/4 8-1 Amendment No.

ELECTRICAL POWER SYSTEMS (Continued)

BASES Removal of accumulated water as required by 4.8.1.1,2.b.2 is performed by drawing the contents off the bottom of the tank until acceptable results are obtained for either a tape test or a water and sediment test. An acceptable result for the water and sediment content is a measured value less than 0.05 percent volume.

The sample specified in 4.8.1.1.2.c.4 is sent offsite for testing. A serious attempt will be made to meet the 31-day limit on the offsite tests; however, if for some reason this limit is not met (e.g., if the sample is lost or broken or if the results are not received in 31 days), the diesel generators should not be considered inoperable. If the sample is lost, broken, or fails the offsite tests and the new oil has already been put into the storage tank, the offsite tests will be performed on a sample 'taken from the storage tank.

If the results on the subsequent storage tank sample are not within specified limits, the diesel generators should be considered OPERABLE and the out-of-spec properties should be returned to within specification as soon as possible.

If the monthly storage tank sample taken in accordance with Specification 4.8.1.1.2.d fails the particulate contamination test, the diesel generators should be considered OPERABLE and the contamination level should be restored to below 10 mg/liter as soon as possible.

The precision leak-detection test described in Surveillance Requirement 4.8.1.1.2.f.2 should be performed as described in NFPA (National Fire Protection Association) -329. As NFPA-329 is revised, the precision leak-detection test may be modified to incorporate changes to the test as described in the revisions to NFPA-329.

COOK NUCLEAR PLANT - UNIT 2 B 3/4 8-2 AMENDMENT NO.