05000316/LER-1979-047-03, /03L-0:on 791124,during Grid Degraded Voltage Relay Calibr,Relay 27-1-201-AB Dropped Out at Nonconservative Value.Caused by Zener Diode Failure.Diode Replaced & Relay Recalibr

From kanterella
(Redirected from ML17326A424)
Jump to navigation Jump to search
/03L-0:on 791124,during Grid Degraded Voltage Relay Calibr,Relay 27-1-201-AB Dropped Out at Nonconservative Value.Caused by Zener Diode Failure.Diode Replaced & Relay Recalibr
ML17326A424
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/19/1979
From: Rischling J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17318A519 List:
References
LER-79-047-03L, LER-79-47-3L, NUDOCS 7912270602
Download: ML17326A424 (2)


LER-1979-047, /03L-0:on 791124,during Grid Degraded Voltage Relay Calibr,Relay 27-1-201-AB Dropped Out at Nonconservative Value.Caused by Zener Diode Failure.Diode Replaced & Relay Recalibr
Event date:
Report date:
3161979047R03 - NRC Website

text

U. S. NUCLEAR REGULATORY COMMISSION ICENSEE EVENT REPORT Q1 (PLEASE PRINT OR TYPE ALLREQUIRED INFORMATION) 6 0

0 0

0 0

0 0

0 0 0024 I

1 1

1 04~05 LICENSE, NUMBER 26 LICENSE TYPE 30 57 CAT 58 NRC FORM 366 (7.77)

T RE, ~ 1 CONTROL BLOCK:

I [Qadi]

M I

D C

C 2

Qp 0

8 9

LICENSEE CODE 14 15 CON'T

~oi RE'DR

~LQB O

5 O

O O

3 1

6 Q7 1

1 2

4 7

9 Qs.>

2 9

~

9 Qe SOURCE 7

8 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABI.E CONSEQUENCES Q10 DURING THE CALIBRATION OF GRID DEGRADED VOLTAGE RELAYS RELAY NUMBER 27 1

201 AB DROPPED OUT AT A VA'LUE CORRESPOND ING TO 2 1. 9 KV.

THIS IS NON-CONS ERVATIVE IN

~P4 RESPECT TO T.S.

TABLE 3. 3-5 ITEM 8. b REQUIREMENTS.

~O6

~O7

~os 7

8 7

8 80 SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

~IB Q11 E

Q12

~G Qu I

N S

T R

U QR

~SQ15

~Z Q15 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LER)RP EVENT YEAR REPORT NO.

CODE TYPE NO.

Q REPORT

~79

~

~04 7

21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDQ PRIME COMP.

COMPONENT

~015 ~~0>>

~O>>

L402'

" 0>>

L~JO4 LJO>>

G'

'kI 0" 33 34 35 36 37 40 41 i42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 INVESTIGATION REVEALED THAT A ZENER DIODE HAD FAILED IN THE AFFECTED RELAY MANUFACTURED BY GF-NGV13A11A.

THE ZENER DIODE WAS REPLACED AND THE RELAY WAS CALIBRATED TO THE PROPER SETPOINTS.

NO FURTHER ACTIONS ARE REQUIRED 3

AS A RESULT OF THIS EVENT.

4 80 80 NA 80 80 80 y(g.s-lob<>

80 NRC USE ONLY 80 0

68 69 616-465-5901 PHONE'.

L. RISCHLING NAME OF PREPARER 7

8 9

FACILITY

~3P METHOD OF STATUS

%%d POWER OTHER STATUS ~

DISCOVERY DISCOVERY DESCRIPTION Q32 Q25

~00 0

Q25 NA

~BQET SURVEILLANCE TEST 7

8 9

10 12 13 44 45 46 ACTIVITY CONTENT RELEASEO OF RELEASE AMOUIOF ACTIVITYQ36 LOCATIONOF RELEASE Q [it~]~ Q33 Z

Q34 7

8 9

10 11 44 45 PERSONNEL EXPOSURES 7

8 9

11 12 13 PERSONNEL INJURIES 7

8 9

11 12 LOSS OF OR DAMAGETO FACILITYQ43 TYPE

DESCRIPTION

z Q42 NA 7

8 9

10 PUBLICITY 7

8 9

10

0 A

> ( $,

I

)

t 4"t