ML17318A519

From kanterella
Jump to navigation Jump to search
Forwards LER 79-046/03L-0 & LER 79-047/03L-0
Date released: 05/31/2018 Download: ML17318A519


LER 79-047/03L-0:on 791124,during Grid Degraded Voltage Relay Calibr,Relay 27-1-201-AB Dropped Out at Nonconservative Value.Caused by Zener Diode Failure.Diode Replaced & Relay Recalibr
ML17326A424
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/19/1979
From: Rischling J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A424 (2)
LER 79-046/03L-0:on 791119,during Refueling,Source Range Neutron Flux Monitor N-31 Failed.Caused by Excessive Moisture in Detector Wells.Detectors Replaced & Dried
ML17326A423
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/19/1979
From: Rischling J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A423 (4)
Forwards LER 79-046/03L-0 & LER 79-047/03L-0
ML17318A518
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/19/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17318A518 (2)