ML17325B218
| ML17325B218 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/06/1989 |
| From: | Stang J Office of Nuclear Reactor Regulation |
| To: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| References | |
| GL-88-05, GL-88-5, TAC-68912, TAC-68913, NUDOCS 8906140217 | |
| Download: ML17325B218 (3) | |
Text
'I, e
"~
Dockets Nos.
50-315 and 50-316 Mr. Milton P. Alexich Vice President Indiana Michigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216 DISTRIBUTIONS~
t Docket Fi-le--
NRC 8 Local PDRs AGody MVirgilio PShuttleworth JStang OGC EJordan BGrimes ACRS (10)
PD31 Gray File
Dear Mr. Alexich:
SUBJECT'ESPONSE TO GENERIC LETTER 88-05 (TAC NOS.
68912 AND 68913)
On March 17, 1988, the NRC staff issued Generic Letter 88-05, "Boric Acid Corrosion of Carbon Steel Reactor Boundary Components in PWR Plants."
In this letter, we requested that you provide assurances that a program has been implemented at your plants that addresses the corrosive effects of reactor coolant system leakage at less than Technical Specification limits.
The Generic Letter identified four considerations which your program should include.
In a letter dated June 7, 1988, you responded to Generic Letter 88-05, describing your commitment to. a boric acid leakage monitoring and preventive program at your plant.
We find that you have provided assurance that a program is in place dealing with boric acid leakage that potentially could affect the integrity of the reactor coolant pressure boundary.
This fulfills your requirement'in responding to Generic Letter 88-05.
As discussed in Generic Letter.88-05, you should maintain, in auditable
- form, records of the program and results obtained from implementation of the program.
These records may be subject to future auditing.
N This completes our effort under TAC NOS.
68912 and 68913.
Sincerely, cc w/enclosures:
See next page Weof@~gj John F. Stang, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation LA/PD31: DRSP.
PM/PD31: DRS PShuttl ewor h
AGody:b~
6/~/89 6/g /89
~'32989-1/1
/
31: DRSP
/89 (A)D/PD3 :DRSP LYandell 6/g/89 85'Obi402i7 890606 PDR ADOCK 050003i5 P
0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASH)NGTON,g. C. $0@5 Dockets Nos.
50-315 and 50-316 Hr. Hilton P. Alexich Vice President Indiana Michigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216
Dear Mr. Alexich:
SUBJECT:
RESPONSE
TO GENERIC LETTER 88-05 (TAC NOS.
68912 AND 68913)
On March 17, 1988, the NRC staff issued Generic Letter 88-05, "Bor'ic Acid Corrosion of Carbon Steel Reactor Boundary Components in PWR Plants."
In this letter, we requested that you provide assurances that a program has been implemented at your plants that addresses the corrosive effects of reactor coolant system leakage at less than Technical Specification limits.
The
" Generic Letter identified four considerations which your program should include.
In a letter dated June 7, 1988, you responded to Generic Letter 88-05, describing your commitment to a boric acid leakage monitoring and preventive program at your plant.
We find that you have provided assurance that a
program is in place dealing with boric acid leakage that potentially could affect the integrity of the reactor coolant pressure boundary.
This fulfills your requirement in responding to Generic Letter 88-05.
As discussed in Generic Letter 88-05, you should maintain, in auditable
- form, records of the program and results obtained from implementation of the program.
These records may be subject to future auditing.
This completes our effort under TAC NOS.
68912.and.68913.
Sincerely,- -
cc w/enclosures:
See next page hn F. Stang, roject Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
a
~.
1
~ I Mr. Milton Alexich Indiana Michigan Power Company Donald C.
Cook Nuclear Plant CC:
Regional Administrator, Region III U.S.
Nuclear Regulatory Commission 799 Roosevelt Road Glen El lyn, Illinois 60137 Attorney General Department of Attorney General 525 West Ottawa, Str eet Lansing, Michigan 48913 Township Supervisor Lake Township Hall Post Office Box 818 Bridgeman, Michigan 49106 W.
G. Smith, Jr..
Plant Manager Donald C.
Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan
.49106 U.S.
Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensvil le. Michigan 49127 Gerald Charnoff. Esquire Shaw.
- Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Mayor. City of Bridgeman Post Office Box 366 Bridgeman.
Michi gan
.49106 Special Assistant to the Governor Room 1 - State Capitol
'ansing, Michigan 48909 Nuclear Facilities and Environmental-Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N.
Logan Street Post Office Box 30035 Lansing, Michigan 48909 Mr.
S.
Brewer American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216