Corrected Tech Spec Page 3/4 10.5 Re Position Indicator Channels Shutdown
ML17320B095
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/04/1984
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17320B094 List:
References
NUDOCS 8406080113
Download: ML17320B095 (2)


Text

C 0

NDICATO SHUT 0 3.10.5 The limitations of Specification 3.1.3.3 may be suspended during the performance of individual full length (shutdown and control) rod drop time measurements provided; a.

Only one shutdown or control bank is withdrawn from the fully inserted position at a time, and b.

The demand position indication system is OPERABLE>> dur ing the withdrawal of the rods, and c.

The rod position indicator is OPERABLE>> during the withdrawal of the rods.

measurements.

LQXZQK'ith the rod position indicator channels or the demand position indication system not OPERABLE", or more than one bank of rods withdrawn, immediately open the reactor trip breakers.

C RJ'~U@LQLTS 4.10.5.1 The demand position indication system shall be determined to be OPERABLE>> by verifying the demand position indication system is responsive to a rod movement demand signal during withdrawal.

4.10.5.2 The rod position indicator channels shall be determined to be OPERABLE>> by verifying the rod position indicator channels indicate rod movement during withdrawal.

>>OPERABILITY for this Technical Specification is defined by the above Surveillance Requirements.

840b080ii3,840b04 PDR ADOCK 050003ibI

~ '

",,PDR,'.

C.

COOK - UNIT 2 3/4 10>>5