ML17319A904
| ML17319A904 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/02/1981 |
| From: | Streeter J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO. |
| Shared Package | |
| ML17319A905 | List: |
| References | |
| NUDOCS 8106050473 | |
| Download: ML17319A904 (4) | |
See also: IR 05000315/1981008
Text
8 REMI
+
rr
O~
~y
Co
~ jI
0
eo
+a**+
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION III
799 ROOSEVELT ROAD
GLEN ELLYN,ILLINOIS60137
'30'2
(981
Docket No. 50-315
Docket No. 50-316
American Electric Power Service
Corporation
and Michigan Power
Company
ATTN:
Mr. John
E. Dolan
Vice Chairman
Engineering
2 Broadway
New York, NY
10004
Gentlemen:
4iEcopy
9
<ob >
~p
This refers to the investigation
conducted
by Messrs.
J.
H. Neisler and
C. H. Weil of this office during the period July 30,
1980,
through April 8,
1981, of activities at the Donald
C.
Cook Nuclear Power Plant,
Bridgman,
Michigan and to the dis'cussions
with Mr. D. V. Shaller, Plant Manager,
concerning the invest,igation.
The enclosed
copy of our investigation report identifies areas
examined
during the investigation.
Within these
areas,
the inspection consisted
of a selective
examination of procedures
and representative
records,
observations,
and interviews with personnel.
During this investigation,
certain of your activities appeared
to be in non-
compliance with NRC requirements,
as described in the enclosed
Appendix A.
The investigation
showed that action had been taken to correct the identified
noncompliance
and to prevent recurrence.
Consequently,
no reply to this
noncompliance is required
and
we have
no further questions
regarding this
matter at this time.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter and the enclosed
investigation report will be placed in the NRC's
Public Document
Room. If this report contains
any information that you or
your contractors
believe to be exempt from disclosure
under
it is necessary
that you (a) notify this office by telephone within seven
(7)
days
from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days
from the date of
8X 06 050
II
0+ A%)
fo
American Electric Power
Service Corporation
2
~98>
this letter
a written application to this office to withhold such infor-
mation.
Section 2.790(b)(1) requires that any such application must be
accompanied
by an affidavit executed
by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons
on the basis
which it is claimed that the
information should be withheld from public disclosure.
This section further
requires
the statement
to address
with specificity the considerations
listed
The information sought to be withheld shall be
incorporated
as far as possible into a separate
part of the affidavit. If
we do not hear from you in this regard within the specified periods noted
above,
a copy of this letter and the enclosed investigation report will be
placed in the Public Document
Room.
We will gladly discuss
any questions
you have concerning this investigation.
Sincerely,
J. F. Streeter,
Acting Director
Enforcement
and Investigation Staff
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Investigation Report
No. 50-315/81-08
and
No. 50-316/81"12
cc w/encls:
D. V. Shaller, Plant
Manager
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
local PDR
Ronald Callen, Michigan
Public Service
Commission
RIZ
W
/Jp
5
2 /81
RIII
yes
~j> fl
RIII .~~
Knop
RIII
St
eter