Provides Summary of 990721 Meeting with APS in Arlington, Texas Re APS Steam Generator Replacement & Power Uprate at Palo Verde Nuclear Generating Station Unit 2.APS Meeting Presentation Slides & List of Meeting Attendees Encl
ML17313B021
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/26/1999
From: Harrell P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 9907300125
Download: ML17313B021 (46)


Text

uu c,"

C~'o Op Cl EA o~

'III f V+

~O

+g*y+

t UNITED STATES f

NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011-8064 JUL 26 I999 James M. Levine, Senior Vice President, Nuclear Arizona Public Service Company P.O. Box 53999 Phoenix, Arizona 85072-3999

SUBJECT:

ARIZONAPUBLIC SERVICE COMPANY MEETING JULY 21, 1999

Dear Mr. Levine:

This refers to the meeting conducted in the Region IVoffice on July 21, 1999, to discuss your steam generator replacement and power uprate project at Palo Verde Nuclear Generating Station Unit 2. This meeting, which was open to the public, was held in the NRC regional office located in Arlington, Texas.

During this meeting, your staff provided information on the schedule for these activities, th'e status of the project, and reviewed future activities. The meeting attendees are listed as Enclosure 1

~ Your presentation is included as Enclosure 2.

The NRC staff considered the meeting informative. Your presentation allowed us to gain a better understanding of your plans and progress for your steam generator replacement and power uprate project.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Sine y,

Harrell, Chief Pr ject Branch D Di ion of Reactor Projects Docket Nos.:

50-528 50-529 50-530 License Nos.: NPF-41 NPF-51 NPF-74 9907300%25 990726 PDR ADQCK 05000528 P

PDR

Arizona Public Service Company

Enclosures:

1. List of Attendees
2. Licensee Presentation cc w/enclosures:

Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, Arizona 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800

Rosemead, California 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, Arizona 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Angela K. Krainik, Manager Nuclear Licensing Arizona Public Service Company P.O. Box 52034 Phoenix, Arizona 85072-2034 John C. Horne, Vice President, Power Generation EI Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, Arizona 85004 Terry Bassham, Esq.

General Counsel El Paso Electric Company

'23 W. Mills El Paso, Texas 79901

Arizona Public Service Company Mr. John W. Schumann Los Angeles Department of Water 8 Power Southern California Publi'c Power Authority P.O. Box 51111, Room 1255-C Los Angeles, California 90051-0100 Mr. David Summers Public Service Company of New Mexico 414 Silver SW, ¹1206 Albuquerque, New Mexico 87102 Mr. Jarlath Curran Southern California Edison Company 5000 Pacific Coast Hwy. Bldg. DIN San Clemente, California 92672 Mr. Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, Arizona 85251

Arizona Public Service Company JUL 26 l999 bcc to DCD (IE45) bcc distrib. by RIV w/Enclosure 2:

RIV File Senior Project Inspector (DRP/D) bcc distrib. by RIV w/o Enclosure 2:

Regional Administrator DRP Director DRS Director Branch Chief (DRP/D)

Branch Chief (DRP/TSS)

Resident Inspector RITS Coordinator DOCUMENT NAME: R:QPNPV7-21MS.DRP To receive c f docu ent, indicate In box: "C" = Co without enclosures "E" = Co with enclosures "N" = No co RIV:S E'/

C:DR KMK nn 7/

/99 PH a

7//9 OFFICIALRECORD COPY

Arizona Public Service Company bcc to DCD (IE45) bcc distrib. by RIV w/Enclosure 2:

RIV File Senior Project Inspector (DRP/D) bcc distrib. by RIV w/o Enclosure 2:

Regional Administrator DRP Director DRS Director Branch Chief (DRP/D)

Branch Chief (DRP/TSS)

Resident Inspector RITS Coordinator DOCUMENT NAME: R;QPNPV7-21MS.DRP To receive c f docu ent, Indicate In box: "C = Co without enclosures "E" ~ Co viith enclosures "N = No co RIV:S E'/

KMK nn 7/

/99, C:DR PH a

7/~/9 OFFICIALRECORD COPY

ENCLOSURE'I ATIENDANCE LIST Licensee Carl Churchman, Director, Steam Generator Replacement Richard Bernier, Senior Regulatory Affairs Consultant Mohammad Karbassian, Engineering Section Leader, Design Kevin Neese, Engineering Section Leader, Replacement Steam Generator NRC Ellis Merschoff, Regional Administrator Ken Brockman, Director, Division of Reactor Projects (DRP)

Phil Harrell, Chief, Project Branch D, DRP Dale Powers, Chief, Electrical Mechanical Branch, Division of Reactor Safety (DRS)

Lee Ellershaw, Senior Reactor inspector, DRS Kriss Kennedy, Senior Project Engineer, DRP Nancy Salgado, Resident Inspector, DRP Members of the Public Fred Gowers, El Paso Electric Company, Palo Verde Nuclear Generating Station Site Representative

A

ENCLOSURE 2

Palo Verde team enerator Re lacement And Power Uprate Project Presentation To The Nuclear Regulatory Commission Region IV July 21, 1999

Palo Verde Steam Generator Replacement And Power Uprate Project arl hurchman R Project Director

Meetin b ectives

> Update of activities since July 1998 meeting

> Provide integrated schedule

< Provide status of fabrication activities

> Discuss project oversight

< Discuss transportation plans

Meetin b ectives

< Provide status of installation plans

< Discuss status of safety analyses

< Review future activities

Recent Activities

< RSG fabrication started

~ CENTS benchmarking

< Transportation route survey completed e Installation contractor chosen

Visits To ther Utilities

< Braidwood - October 1998

~ Observed SG replacement activities

~ South Texas - October 1998

~ Discussed SG replacement project organization and engineering programs

~ Korea - January 1999

~ Discussed operating experiences of recent ABB-designed steam generators

PVNGS Unit 2 Steam Generator Replacement Project Integrated Level One Schedule for RSG & Power Uprate 1997 1998 1999 2000 2001 2002 2003 2004 3

4 1

2 3

4 1

2 3

4 1

2 3

4 1

2 3

4 1

2 3

4 1

2 3

4 1

2 Phase I

12/9$ II~V>-.-- rr Jr 4751l

~r3 Phase II 1/01 Phase III 12N3 Cchtr441 10 Ah58l6O Design & Document Phase 12/97 10/98 Fabrication of RSG'slAnsaldo Energia s.p.a. in Milan, Italy Signed Transportation Contract With Fagioli 3/99 Transport to Venice 5/02 Transportation Phase 5I92~ 592 RSG's Arrive At PVNGS

+9/02 Uprate Scoping Study I/Rc l9ll~ II99 u/N110 APS & CE RSG/ Uprate Engineering Analysis Complete Engineering Analysis

. Srrbrhreal 9/96 12/00 6NO NRC Evaluation/Approval of Uprate Submittal RSG & Power Uprate Modification Engineering & Installation 12/03 LPFW Heater Eng.

U2R10 - LPFW Heater Installation U2R11 - LPFW Heater Installation 12/00 3/02~ 5/02 9J03 erhrmrrr can 12/03 Spray Pond Temp Transmitter Uprate Eng.

Spray Pond Temp Transmitter Uprate Installation 1/01 9/01 3/02~ 5/02 Main Transformer Cooling Eng.

Main Transformer Cooling Installation II92~592 552~592 Signed Installation Phase I Contract With Bechtel

+

3/99 Site Preparattions for Installation ED Control Valve Eng.

ED Control Valve Installal'2/02 6N3 9J03 12/03 U2R8-Laser Piping Templating 3/99 errrO 5/99 U2R11 - Replace SG's 9N3 gmmsmeQ 12N3 U2R9-Design Verilication Walkdowns U2R10- Bio-shield Wall Mods 1800 carr 11/00 3N2~ SN2 Final Design For Bio-shield Wall Mods 3/0'1 3J02 Design and Construct Old SAG Facility Installation Final Engineering & Package Preparation 6NO 6/01 S/02 9N3 Install Protected Area Access - North Side 6N1 2/02

R Fabrication tatus

< Tubing

. Sandvik of Sweden chosen to supply tubing

~

. Procedure preparation to be complete in July 1999

. Fabrication to start in September 1999 and willcomplete in April 2000

R Fabrication tatus i Tubesheet 41

~ Cladding operations complete

. Weld buildup for stub barrel weld complete

~ Intermediate heat treatment complete

> Tubesheet P2

. Cladding operations complete

. Weld buildup for stub barrel weld complete

< Tubesheet drilling to start Sept/Oct 1999

R Fabrication tatus

~ Transition cone 41

. Th e of three longitudinal welds complete

> Transition cone 42

. Preparation of longitudinal welds in progress

< Stub barrel 41

~ W Id buildup for all five handholes complete

~

. B th feedwater nozzles welded into the stub barrel and NDE complete

. R diography of longitudinal weld complete~,

R Fabrication tatus

~ Stub Barrel 42

~ Weld buildup for handholes in progress

> Lower Shell

. Four plates have been received

. Will be prepped and rolled in next few months

> Primary channel heads

~ Both channel heads shipped from Japan Steel Works

< Feedwater nozzle safe ends complete

versi ht r anization Senior Vice President, Nuclear Director, S.G.

Replacement Project

~ h Director, Nuclear Assurance RSG Section Leader

% ~ ~

Senior Project Quality Manager Senior Quality Engineer Milan Senior Metallurgical Engineer Milan 0l ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ s ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

i

versi ht Activities

> Oversight organization i Residents in Milan

. Filing daily and monthly reports

. Discovered several non-conformance items

I

versi ht Activities

~ Other QA activities

. Visited Braidwood in June and October 1998

~ Audit of ABB Engineering (Chattanooga) in May 1999

~ Audit of Ansaldo in June 1999 Wisconsin Public Service Corp.

participated

. Audit of ABB Engineering (Windsor) in August 1999

R Trans ortation

< Fagioli of Milan, Italy has been chosen as transportation contractor

> Completed detailed route survey from Puerto Penasco, Mexico

< Held meetings with various environmental and transportation officials in both countries

R Installation

> Bechtel chosen as contractor fo th

- following RSG installation wo k:

. Prepare mods and 50.59 for inst II ti

~ Onsite RSG transportation

afet Anal ses

> CENTS Code

> ECCS performance analysis

ENT Dde

<CENTS will be the primary tool for Chapter 15 non-LOCA transient analysis at PVNGS

< Completed running benchmark cases for LOCV, MSLB, SGTR

~ Benchmarking shows that CENTS is correctly modeling the events

E Performance Anal sis

> PVNGS Analyses of Record AOR is based

-on core power level of 4070 MWt 3990 x 1.02

< No explicit analyses are scheduled for this project

> ABB willdemonstrate that the RSGs result in increased margin of safety compared to the AOR

< The LBLOCA, SBLOCA and long-term cooling analyses in the AOR remain applicable

(I>..

tructural Evaluations

> Entire reactor coolant system RCS

> RCS branch lines

~ Secondary piping affected by replacement steam generators RSGs and power uprate

> Sampling and instrumentation nozzles

Licensin ubmittals

< June 2000

. Chapter 15 analyses

. Most of Chapter 6 analyses

< December 2000

. Seismic analysis of RCS branch lines

. EQ evaluations

. Remainder of Chapter 6 analyses

Potential Technical ecification han es

-< Definition of Rated Thermal Power

< Low SG pressure reactor trip and MSIS setpoint o Peak containment pressure

> Operating range for cold leg temperature at 100% power

Power U rate Licensin Re orts o NSSS licensing report outline

> BOP licensing report outline

R Re ort And 50.59 Utl)ne

~ RSG design e RSG fabrication

~ Safety evaluation

Ma or Activities

~ U2RB spring 1999

~ Laser templating of piping in containment

. UT RCS piping to verify thickness

. Measure roundness of equipment hatch

~ Optical measurement of SG snubbers

. General walkdown of containment

Major Activities

~ U2R9 fall 2000

~ Laser templating of piping in containment

~ Design verification walkdowns in containment

~ Polar crane inspections

< U2C10 winter 2000- spring 2002

. Personnel access and north side sally port

Major Activities

< U2R10 spring 2002

. Replace 2 feedwater heaters

~ Remove interfering commodities from bioshield wall

. Polar Crane Preparations (based on U2R9 inspection)

~ SG2 auxiliary crane supports

Ma or Activities

< U2C11 summer 2002-fall 2003

. Craft access facility

. Outside liftsystem

~ Haul route

~ RSG preparations

~ RSG lifting and rigging concept

Ma or Activties i U2R11 fall 2003

~ Replace 4 feedwater heaters

. Bio/shield wall modifications and interference removal

. Replace steam generators

Future Activit

> Conduct periodic meetings with Region IV and NRR

> Keep NRC Residents informed of progress and site activity

> Work with NRC to perform inspection module 50001

0 4.