REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)
CESSION NBR:9808180174
DOC.DATE: 98/08/10
NOTARIZED: NO
DOCKET
CIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi
05000528
STN.-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi
05000529
STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi
05000530
AUTH.NAME
AUTHOR AFFILIATION
HARRELL,P.H.
Region
4
(Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
LEVINE,J.M.
.
Arizona Public Service
Co.
(formerly Arizona Nuclear Power C
SUBJECT:
Forwards insp repts 50-528/98-05
&
50-530/98-05
to maintain configuration controls
valve, as required by procedure.
50-529/98-05
&.
re failure of personnel
for locked safety-related
'DISTRIBUTION CODE:
TITLE: General
(50
NOTES:STANDARDIZED
Standardized
Standardized
05000528(
05000529
0500053/
IEOIF
COPIES
RECEIVED:LTR J
ENCL
I
SIZE: 5 $ Z
Dkt)-Insp Rept/Notice of Violation Response
PLANT .
~
plant.
plant.
RECIPIENT
ID CODE/NAME
PD4-2
ERNAL: ACRS
E
C @TE
R DRPM/PECB
'UDOCS-ABSTRACT
OGC/HDS2
COPIES
LTTR ENCL
1
1
2
2
1
-
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
FIELDS,M
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HOHB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
EXTERNAL
LITCO BRYCE F J
H
NRC
1
1
'1
1
NOAC
NUDOCS FULLTEXT
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE HASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTZON LZS
OR REDUCE THE NUMBER OF COPIES RECE'IVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTR
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF
COPXES
REQUIRED:
LTTR
19
ENCL
19
I
0
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE. SUITE 400
ARLINGTON.TEXAS 76011.6064
AUG
I 0
l998
James
M. Levine, Senior Vice
President, Nuclear
Arizona Public Service Company
P.O. Box 53999
Phoenix, Arizona 85072-3999
SUBJECT: NRC INSPECTION REPORT 50-528/98-05; 50-529/98-05; 50-530/98-05 AND
Dear Mr. Levine:
From May 31 through July 11,*1998, an inspection was conducted at your Palo Verde Nuclear
Generating Station, Units 1, 2, and 3, reactor facilities. The enclosed report presents the scope
and results of that inspection.
During the 6-week period covered by this inspection, your conduct of activities at the Palo
Verde facilitywas generally characterized
by safety-conscious
operations, sound engineering
and maintenance practices, and careful radiological controls; however, one violation of NRC
requirements was identified. The violation resulted from failure of personnel to maintain the
configuration controls for a locked safety-related valve, as required by procedure.
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding this violation are described in detail in the enclosed report.
Please note that you
are required to respond to this letter and should followthe instructions specified in the enclosed
Notice when preparing your response.
The NRC will use your response,
in part, to determine
whether further enforcement action is necessary
to ensure compliance with regulatory
requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules, of Practice," a copy of this letter, its
enclosure(s), and your response willbe placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we willbe pleased to discuss them
with you.
S'ely,
. H. Harrell, Chief
P ojects Branch D
Di ision of Reactor Projects
q8081'80<7+
$808'i
Poa
8
f
Arizona Public Service Company
I
-2-
Docket Nos.:
50-528
50-529
50-530
I icense Nos.: NPF-41
NPF-51
Enclosures:
1.
2.
NRC Inspection Report
'
50-528/98-05; 50-529/98-05; 50-530/98-05
cc w/enclosures:
Mr. Steve Olea
Arizona Corporation Commission
1200 W. Washington Street
Phoenix, Arizona 85007
Douglas K. Porter, Senior Counsel
Southern California Edison Company
Law Department, Generation Resources
P.O. Box 800
Rosemead,
California 91770
Chairman
Maricopa County Board of Supervisors
301 W. Jefferson, 10th Floor
Phoenix, Arizona 85003
Aubrey V. Godwin, Director
Arizona Radiation Regulatory Agency
481 4 South 40 Street
Phoenix, Arizona 85040
Angela K. Krainik, Manager
Nuclear Licensing
.Arizona Public Service Company
P.O. Box 52034
Phoenix, Arizona 85072-2034
John C. Horne, Vice President
Power Supply
El Paso Electric Company
2025 N. Third Street, Suite 220
Phoenix, Arizona 85004
l
l
Arizona Public Service Company
Terry Bassham,
Esq.
General Counsel
El Paso Electric Company
123 W. Mills
EI Paso, Texas
79901
Mr. Robert Burt
Los Angeles Department of Water 8 Power
Southern California Public Power Authority
111 North Hope Street, Room 1255-B
Los Angeles, California 90051
Mr. David Summers
Public Service Company of New Mexico
Albuquerque, New Mexico 87102
Mr. Brian Katz
Southern California Edison Company
14300 Mesa Road, Drop D41-SONGS
San Clemente, California 92672
Mr. Robert Henry
Salt River Project
6504 East Thomas Road
Scottsdale, Arizona 85251
r
0
e
Arizona Public Service Company
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/D)
Senior Project Inspector (DRP/D)
Branch Chief (DRP/TSS)
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMEN
NAME: R'3 PNPV805RP.JHM
To
eveco
fdocu
t,indtc etn box:"C"=Co
wit
encl
res "E =Co
vrithe
tosures
"N"=Noco
7/7
8
P/D
RI:DR
NL
I ad
/
8
RID
/
DR art
/f798
SRI:
/D
OFFICIAL RECORD COPY
4
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/D)
Senior Project Inspector (DRP/D)
Branch Chief (DRP/TSS)
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMEN
NAME: R:t PNPV805RP.JHM
To
e ve co
f doc
t, Indlc
e inbox: "C" =Cop
wit
encl
res "E =Co
viithe
tosures
"N" =Noco
7/7
8
P/D
RI:DR
NL
I ad
/
8
RI:D
/
DR art
/P98
SRI:
/D
HM
0
ygG Iilu
OFFICIAL RECORD COPY