ML17312B018

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/96-13,50-529/96-13 & 50-530/96-13 on 960825-1005 & Notice of Violation.Three Examples of Plant Personnel Failing to Follow Procedure Describing Requirements for Control of Doors W/Design Basis Functions
ML17312B018
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/25/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17312B019 List:
References
NUDOCS 9611010224
Download: ML17312B018 (10)


See also: IR 05000528/1996013

Text

P

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9611010224

DOC.DATE: 96/10/25

NOTARIZED:

NO

DOCKET

g

FACIL:STN-50-528 Palo Verde Nuclear Station,

Unit 1, Arizona Publi

p5ppp528

STN-50-529 Palo Verde Nuclear Station,

Unit 2, Arizona Publi

05000529

STN-50-530 Palo Verde Nuclear Station,

Unit 3, Arizona Publi

05000530

AUTH.NAME

AUTHOR AFFIIIATION

DYERIJ.E.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

LEVINE,J.M.

Arizona Public Service

Co. (formerly Arizona Nuclear

Power

C

SUBJECT:

Forwards insp repts

50-528/96-13,50-529/96-13

& 50-530/96-13

on 960825-1005

s notice of violation. Three examples of

plant personnel failing to follow procedure

describing

requirements

for control of doors w/design basis functions.

DISTRIBUTION CODE:

ZEOZD

COPIES

RECEIVED:LTR I ENCL g

SIZE: I otal

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:STANDARDIZED PLANT

Standardized

plant.

Standardized

plant.

RECIPIENT

ID CODE/NAME

PD4-2

PD

COPIES

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,J

COPIES

LTTR ENCL

1

1

05000528

05000529 0

05000530

R

INTERNAL: ACRS

ILE CENTER

NR

FB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

2

2

1

1

1

1

1

1

1

1

1

1

1

1

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

1

1

1

1

1

1

1

1

1

1

1

1

D

EXTERNAL: LITCO BRYCE,J

H

NRC

PDR

1

1

1

1

NOAC

1

1

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

t,

v

gS RECT

Wp

+

0

+p~g4

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

October 25, 1996

James

M. Levine, Senior Vice

President,

Nuclear

Arizona Public Service Company

P.O. Box 53999

Phoenix, Arizona 85072-3999

SUBJECT:

NRC INSPECTION REPORT 50-528/96-13; 50-529/96-13; 50-530/96-13 AND

NOTICE OF VIOLATION

Dear Mr. Levine:

An NRC inspection was conducted August 25 through October 5, 1996, at your Palo

Verde Nuclear Generating Station, Units 1, 2, and 3 reactor facilities. The enclosed report

presents

the scope and results of that inspection.

During the 6-week period covered by this inspection, your conduct of activities at the Palo

Verde facility was generally characterized

by safety conscious

operations,

sound

engineering

and maintenance

practices,

and careful radiological controls; however,

a

violation of NRC requirements

occurred.

The violation involved three examples of plant

personnel

failing to follow a procedure describing the requirements for the control of doors

with design basis functions.

Although these examples were identified by your staff, a

similar problem was identified in NRC Inspection Report 50-528, 529, 530/96-07, and the

actions initiated to prevent recurrence were ineffective.

Additionally, other issues

discussed

in this report identify the need to provide management

attention to the control

and testing of essential ventilation boundaries.

The violation is cited in the enclosed

Notice of Violation (Notice) and the circumstances

surrounding this violation is described

in detail in the enclosed report.

Please note that you

are required to respond to this letter and should follow the instructions specified in the

enclosed

Notice when preparing your response.

The NRC will use your response,

in part,

to determine whether further enforcement action is necessary

to ensure compliance with

regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter,

its enclosure(s),

and your response

will be placed in the NRC Public Document Room

(PDR). To the extent possible, your response

should not include any personal privacy,

proprietary, or safeguards

information so that it can be placed in the PDR without

redaction.

96i1010224 96i025

PDR

ADOCK 05000528

8

PDR

Arizona Public Service Company

-2-

Should you have any questions

concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

J. E. Dyer, Director

4

Division of Reactor Projects

Docket Nos.: 50-528

50-529

50-530

License Nos.:

NPF-41

NPF-51

NPF-74

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-528/96-13; 50-529/96-13; 50-530/96-13

cc w/enclosures:

Mr. Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, Arizona 85007

Douglas K. Porter, Senior Counsel

Southern California Edison Company

Law Department, Generation

Resources

P.O. Box 800

Rosemead,

California 91770

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson,

10th Floor

Phoenix, Arizona 85003

Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, Arizona 85040

0

Arizona Public Service Company

Angela K. Krainik, Manager

Nuclear Licensing

Arizona Public Service Company

P.O. Box 52034

Phoenix, Arizona 85072-2034

John C. Horne, Vice President

Power Supply

Palo Verde Services

2025 N. Third Street, Suite 220

Phoenix, Arizona 85004

]

Arizona Public Service Company

.4-

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Richard Correia (RPC)

E-Mail report to Ronald Frahm, Jr. (RKF)

tkcCo 6MB"(IE01)

bcc distrib. by RIV:

L. J. Callan

Resident Inspector

DRP Director

DRS-PS 8

Branch Chief (DRP/F, WCFO)

MIS System

Senior Project Inspector (DRP/F, WCFO)

RIV File

Branch Chief (DRP/TSS)

M. Hammond (PAO, WCFO)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

DOCUMENT NAME: R:7 PV'rPV613RP.KEJ

To receive copy of document,

Indicate in box: "C" = Copy without enciosures

"E" = Copy with enciosures "N" = No copy

RIV:RI:DRP/F

KEJohnston

10/I

96

C:DRP/F

DFKirsc

10

/96

D:WCFO

D:DRP

JEDyer

10

96

KEPerkins

10

96

0

I IALR

RD

PY

10/ /96

)I

~l

0

1