ENCLOSURE 1
NOTICE OF VIOLATION Arizona Public Service Company Palo Verde Nuclear Generating Station Docket:
50-529 License:
NPF-51 During an NRC inspection conducted on March 6-10,
- 1995, one violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"
the violation is listed below:
A.
10 CFR Part 50, Appendix B, Criterion XVI, requires, in part, that measures be established to ensure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected.
Contrary to the above, as of February 17,
- 1995, the existence of startup strainers in the suction piping of the Unit 2 containment spray
- pumps, a
condition that did not conform to the design configuration of the plant, were not promptly identified and corrected.
This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Arizona Public Service Company is hereby required to submit a written statement or explanation to the U.S.
Nuclear Regulatory Commission, ATTN:
Document Control
- Desk, Washington, D.C.
20555 with a copy to the Regional Administrator, Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas
- 76011, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).
This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results
- achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response.
If an adequate reply is not received within the time specified in this Notice, an order or a
Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.
Where good cause is
- shown, consideration will be given to extending the response time.
Dated at Arlington, Texas, thisp+4day of Pj+<g, 1995 9505020014 950425 PDR ADOCK 05000528 8
'DR
J 0