ML17310A692
| ML17310A692 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/12/1993 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-02688-WFC-R, 102-2688-WFC-R, NUDOCS 9310150189 | |
| Download: ML17310A692 (65) | |
Text
SUBJECT:
Forwards response to CAL,dtd 931004,map of tubes re-evaluated in SGs 31
& 32,cumulative rept of non-quantifiable indications, possible deposits, bowing, possible axial indications
& eddy current graphics of notable indications.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR I ENCL I
BISE: 3P TITLE: OR Submittal: General Distribution A
05000530 D
NOTES:Standardized plant.
,,ACCELERATED DOCUMENT DISTRIBUTION SYSTEM lji'EGULATOR INFORMATION DISTRIBUTIONGSTEM (RIDE)
ACCESSION NBR:9310150/89 DOC.DATE: 93/10/12 NOTARIZED:
NO DOCKET ¹ FACIL':STN-50-530 Palo Verde 'Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAYFW.F.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
RECIPIENT ID CODE/NAME PDV LA TRAN,L INTERNAL: ACRS NRR/DORS/OTSB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1 EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 2
2 6
6 1
1 1
1 1
1 1
0 1
1 RECIPIENT ID CODE/NAME PDV PD NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SRXB q.C/WEDC ZG FILE Ol NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
0 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTIEIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19
I 1
a WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR Arizona Public Service Company P.O. BOX 53999
~
PHOENIX, ARIZONA85072-3999 102-02688-WFC/RAB/JR P
October 12, 1993 U. S. Nuclear Regulatory Commission ATlN: Document Control Desk Mail Station P1-37 Washington, DC 20555
References:
1.
Letter dated October 4, 1993, from B. H. Faulkenberry, Regional Administrator, Region V, USNRC, to W. F. Conway, Executive Vice President, Nuclear, APS 2.
Letter 102-02654, dated September 29, 1993, from W. F. Conway, Executive Vice President, Nuclear, APS, to USNRC
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No. STN 50-530 Response to Confirmatory Action Letter File: 93-056-026 By letter dated October 4, 1993, (Reference 1), the NRC required that Arizona Public Service Company (APS), provide a written summary of the results of the re-analysis of Eddy Current Testing (ECT) data from Unit 3 third refueling outage (3R3), and the basis for disposition of ail newly identiTied indications.
Based on ECT data from the recent Unit 2 refueling outage, a decision was made to re-evaluate the ECT data from Unit 1 and Unit 3. The re-evaluation of 3R3 rotating pancake coil (RPC) data was performed for specific midspan indications.
This re-evaluation focused on tubes in row 90 and higher and in the area between 07H and the first vertical strap (VS). The findings of the RPC evaluation resulted in the decision to review all of 3R3 bobbin coil eddy current data in the area described above.
1400l5 0310100139 031013 J~ '".A00OII OSOOOS3O
, paR.
boa~lt(
I e
, ~
~ ia
U. S. Nuclear Regulatory Commission ATTN: Document control Desk Response to Confirmatory Action Letter Page 2 The enclosure to this letter contains APS's response to the Confirmatory Action Letter, a map of the tubes re-evaluated in Steam Generators 31 and 32, a cumulative report of the non-quantifiable indications (NQI's), possible deposits (PDP's), bowing (BOW), and possible axial indications (PAI's).
Also included are actual Eddy Current graphics of notable indications identified during re-evaluation.
The Unit 3 ECT data re-evaluation was performed using the guidelines as modified for the Unit 1 fourth refueling outage (1R4),
based on the lessons learned from Unit 2.
Should you have any questions, please contact Richard A. Bernier at (602) 393-5882.
Sincerely, WFC/RAB/JRP/bcf Enclosure cc:
B. H. Faulkenberry B. E. Holian J. A. Sioan
0 I
1
ENCLOSURE RESPONSE TO CONFIRMATORYACTION LETTER
I t
Jl f
'I
'NRC REQUEST'ou will continue to review the Unit 3.ECT data to identify indications which were not identified in refueling outage 3R3 by bobbin coil ECT. Although not documented in your September 29, 1993, letter, you will provide a written summary of the results of this review, and your basis for disposition of all newly identified indications, to the NRC by October 12, 1993. This data and the experience of the Unit 1 ECT inspection willbe used to define the scope of the inspection in Unit 3. The final scope of Unit 3 ECT inspection will be provided to the NRC prior to commencing the inspection.
APS RESPONSE'he Unit 2 Steam Generator Tube Rupture Event Analysis identified an arc-shaped region of the PVNGS Steam Generators susceptible to thermal hydraulic conditions which could create an environment conducive to Outer Diameter Stress Corrosion Cracking (ODSCC).
A re-evaluation of Motorized Rotating Pancake Coil (MRPC) data acquired in the arc of interest during the third refueling outage Unit 3 (3R3), which took place in Fall 1992, was conducted as a result of the findings of the ECT data from 2R4.
During this review, two indications were observed in Steam Generator 31 which could not be characterized due to the use of a single coil pancake probe, and as a conservative measure, all available bobbin data for rows 90 and higher, were reviewed for both Steam Generator 31 and 32.
This review included bobbin data for 3072 tubes in Steam Generator 31 and 1358 tubes in Steam Generator 32.
The review was conducted using the analyst guidelines similar to those developed for the 1R4 outage based on lessons learned from the 2R4 outage ECT inspections.
Each analyst was trained and tested to these guidelines prior to analyzing 3R3 bobbin data.
The results of this review are attached to this response.
The disposition of indications in Steam Generator 31 includes three which have shown no change from previous data, one plugged tube, one weak non-quantifiable indication (NQI), one short (0.34") possible axial indication (PAI) and one NQI with absolute drift.
The three indications which have not changed since the previous outage in 1991, do not appear to be actively growing defects.
The plugged tube is not in service and, therefore,
'ot a concern.
Based on the critical flaw size analysis performed by APS, the short PAI would not be expected to rupture for Main Steam Line Break (MSLB) pressure, even if it penetrates through wall.
The R144C57 tube NQI has some characteristics unique among the NQI's found which cannot be resolved without MRPC inspection.
The absolute drift signal in the area around the NQI is approximately four to eight inches in length and may be indicative of intergrannular attack or stress corrosion. cracking, and there is indication of a deposit on the tube at the elevation of the NQI.
However, the bobbin probe does not allow the analyst to determine if the deposit and NQI are at the same azimuth, and an MRPC inspection is necessary to resolve the issue.
f The NQI in Steam Generator 32 is weak, and it was not evident in the 1991 data of 3R2.
It requires MRPC to further characterize it.
APS analysts have completed the review of ECT data from 3R3, the results of which are included in the following pages.
This data and the Unit 1 ECT data, which is being gathered during the ongoing refueling outage, will be used to determine if additional actions are necessary for the continued operation of Unit 3.,
With over 80% of the arc of interest in both Unit 1 Steam Generators inspected, there has been no pattern of axial indications identified in Unit 1
~ Although the inspection in Unit 1 is not complete at this time, the evidence from the Unit 1 inspection supports the hypothesis that enough differences exist between the units to conclude that accelerated tube degradation, as experienced in Unit 2, is not expected to occur in Unit 1 and Unit 3.
As stated in Reference 2, administrative controls on primary coolant dose equivalent iodine and enhanced leak detection methods provide assurance of prior warning to a tube rupture event and limit offsite dose consequences to less than 10CFR100 limits.
In summary, the continued operation of Unit 3 until the proposed midcycle outage does not present an undue risk for the following reasons:
the PAI identified by RPC in Steam Generator 31 (R99C148),
is short and may be volumetric; the evidence from Unit 1
inspections in progress do not presently show the Unit 2 failure mechanism to be fully transportable; enhanced leakage monitoring improves our ability in the identification of the precursors to a tube rupture event; and the safety assessment discussed in Reference 2, demonstrates that even in the unlikely event of a MSLB with consequential multiple tube ruptures, with.the proposed administrative limits on reactor coolant system dose equivalent iodine, and the reduction in the CPC variable overpower setpoints, the resulting offsite doses are less than 10CFR100 limits.
l C
~ '
Row Column Location Steam Generator 31 Call Resolution 102 25 08H+25" to 36" NQI~
Previous indications with no change since 1991 105 114 95 102 99 30 BW1+ 20" 57 09H + 25" 135 08H +38.62" 138 BW1 + 13" 139 08H + 25" 148 BW1+ 12" NQI*
NQI*
PDP NQI*
PAI PDP BOW NQI" NQI*
PAI PDP BOW Previous indications with no change since 1989 Indication not evident in 1991 data. 100 Khz absolute drift in same area. Appears to also have PDP indication.
Previous indication evaluated as a pit and was plugged during U3R3.
Indication not evident in 1991 data. Does not have strong signal of defect.
Previous indication with no change since 1989 Previous RPC evaluation at BW1+12" found acceptable. PAI identifie -.34" long at BW1
+ 3.73" during reevaluation Row Column Location
,Steam Generator 32 Call Resolution 156 107 08H + 21" NQI*
Indication not evident in 1991 data. Does not have strong signal of defect.
~Bobbin Coil
1 i
=
p
- 09l93, ARIZONA PUBLIC SERVICE CO.,
PALO VERDE, UNIT 3 STEAM GENERATOR: 3f OUTAGE DATA SET CURRENT SELECTION VARIABLES:
DATE: 09/29/93 TIME:
17: 49: 43 STAYS 105
+
6 10UL 3072
+
150 150 140 140 130 130 120 110'00 90 120 110 100 70 60 50 40 30 20 io
.80 vo 60 50 40 30 20 10 I
I 10 20 30 40 50 60 70 80 90 500 110 120 130 140 150 160 170 180 REVIEW OF 10/92 BOBBIN DATA ROW 90 9 UP CONAN NUCLEAR.
ENC. BN
C CUMULATIVE REPORT 09/93 i ARIZONA PUBLIC SERVICE CO ~ I PALO VERDEI UNIT STEAM GENERATOR:
31
'TAGE DATA SET CURRENT ECTION VARIABLES: Percent PAGE:
1 OF 2
DATE:
09/30/93 TIME:
14:15:41 I
I I
I I
I I
I F102/
25/
I I
I I
I I
i107i 26' I
I
[losi 30/
/109/
30(
/120(
35'121'O
/
I I
I I 116 I 45 I EXP 1 I
/114/
49/
1 114 I 51I 1140 I 51 I
/142/
53/
/143/
54/
/144'7)
I I
I I1041 77IEXP 1I
'159I 86I 981 99I I 103 I 100 I I 109 I 1001 I 99!106 I
93)114' 1171118 I
I 'I I
i113/124/EXP 1/
/114/135/EXP 1/
I I
I I
95 I 138 I I102I139IEXP 2I 99 I 148 I EXP 2 I 1021153 EXP 2 I I 104 153 IEXP 21 1106 153 IEXP 2I I
I I
C C
C C
C C
C C
C C
H C
C C
C C
C C
C H
C C
C C
C H
H H
H H
H C
C H
H H
H C
C C
/TEC-TEHiTEC-TEHi (TEC-TEHiTEC-TEHi ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI AZTEC-TEHJTEC-TEHJ ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI.
ITEC-TEHITEC-TEHI ITEH-VS2ITEH-VS61 ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI ITEC-TEHITEC"TEHI AZTEC-TEHJTEC-TEH/
ITEC-TEHITEC-TEHI I BW1-BW1 I BW1-BW1 I ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI ITEC"TEHITEC-TEHI ITEC-TEHITEC-TEHI I 09H-BW1 I 09H-BW1 I ITEH-09HITEH-09HI I BW1-VS2 I BW1-VS2 I I OSH-BW1 I OSH-BW1 I I OSH-BW1108H-BW11 I OSH-BW1 I OSH-BW11 ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI I BW1-VS2 I BW1-VS2 I I BW1-VS2 I BW1-VS2 I I BW1-VS2 I BW1-VS2 I I BW1-VS2 I BW1-VS2 I ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI I
I I
00006/610UL/OSH+
00006i610UL/OSH+
I 00006 I 610UL I 0SH+
I 00006 I 610UL I 07H+
I 00006 I 610UL I OSH+
I 00006 I 610UL I BW1+
I 00006 I 610UL I 07H+
I00006I610ULI07H+
i 00006 i 610UL / 07H+
/ 00006
/ 610UL / OSH+
I00004I610ULIOSH+
I 00007 I 610UL I OBH+
I 00007 I 610UL I 0BH+
I 00007 I 6 10UL I 09H+
I 00007 I 610UL I 07H+
I 00007 I 610UL I 07H+
/00007/610ULi09H+
I 00007 I 610UL I 09H+
/ 00031
/ 610UL i 07H+
I 00074 I 5 8 ORC I BW1-
/ 00020
/ 610UL / OSH+
f 00020 J 610UL J OBH+
i 00020 i 610UL / OSH+
/ 00019 (610UL/ OSH+
I 00019 I 610UL I OSH+
100074ISSORCI09H-I00074ISSORCI09H-I 00074 I SSORC I BW1+
I000741580RCIOSH+
I00074ISSORCIOSH+
I00074ISSORCIOSH+
I 000 67 I 610UL I BW1+
/00069i610ULJOSH+
I00074ISSORCIBW1-I00074ISSORCIBW1+
I 00074 I 5 8 ORC I BW1+
I00074ISSORCIBW1+
/00070)610UL/OSH+
00070 J 610UL i OSH+
00070 J 610UL i OSH+
I I
EXAM EXTENT JROWiLIN/
iLEG/PROGRAM/ ACTUALiEXP/ CAL iPROBEi LOCATION 25.36 32.36 34.64 5.92to+ 25. 12 I 4.50to+ 18.24 20.39 33.54to+ 40.97 31.54to+ 40.40
- 22. 17 to+ 32 04 I
- 4. 44to+
19 '851 43.96to+ 46.48(
17 '9to+ 28 991 19.70to+ 31.82' 95to+ 18 89I 18.24to+
34 481 19.53to+
36.97'3.
43to+ 27. 19 i 24.78 I
31. 06 to+ 37
~ 24 I 2.74to-4.00'.68to+9.04' 73to+
8 04I 20.47to+
26.41'.09to+11.0li 1 94TO+ 12 57I 4.47to-1.991 4,.32to+
4 181 13.49to+
30.42'6.52to+
47.04'7.74to+42.56(
39.95 13.46 24.94 1.05to+
3 861 3.20to+
4.09'.83 19.38to+
23.Sled 9.97to+
17 851 15.52to+
25.02'0 90to+ 28 291 I
CURRENT IVOLTSIMILIDEGI 0 ICH 37(N{}ZJP 1/
56/NQI/P 1/
46(NQI/P li OIPDPI BI OIPDPI SI 1141 INQZ IP 1I OIPDPI 81 OIPDPI SI OIPDPI SI OIPDPI SI OIPDPI SI OIPDPI SI OIPDPI SI OIPDPI SI OIPDPI SI OIPDPI BI OIPDPI BI 42 IN{}ZIP 1I OIPDPI SI OIPDPI 41 OIPDPI SI OIPDPI SI OIPDPI SI OIPDPI 81 OIPDPI SI OIPDPI 4I
~
IBOWI 3I 262IPDPI 4I I352IBOWI 3
I OIPDPI 4
I 12IPAZIP 1 I 101 IN{}IIP 1 28INQZI 1I OIBOWI 3I OiPDPi 4i 1248 I PAI I P 1I 0.90 0.45 0.58 0.30 0.30'.65'.30'.37) 0.30)
O.soi O.OOJ O.31'.18/
0.42I 0.43/
0.32/
O.SO/
0.59'.40(
0.70/
0.55 0.47 0.58 0.36 0.36I 1.65'
- 5. 181 1.46 I 2.01'.68I 1.0X, i 3.51i 1.25 J
0.64 i 0.981 2.34) 0.511 O.ssi I
4/
Si 8
8 0 I PDP 0 I PDP OIPDP OIPDP I
REVIEW OF 10/92 BOBBIN DATA ROW 90
& UP
l
~
CUMULATIVE REPORT 09/93i ARIZONA PUBLIC SERVICE CO
~
PALO VERDEi UNIT 3 STEAM GENERATOR 31
%AGE DATA SET CURRENT
~ECTION VARIABLES: Percent PAGE:
2 OF 2
DATE:
09/30/93 TIME:
14: 15: 41 NUMBER OF TUBES SELECTED FROM CURRENT OUTAGE:
29 NUMBER OF DATA RECORDS SELECTED FROM CURRENT OUTAGE:
40 NO TREND ANALYSIS REQUESTED DATA SELECTION CRITERIA:
Percent:
NQI, PDP, BOW, PAI REPORT OPTIONS:
Only examination results matching criteria are included REVIEW OP 10/92 BOBBIN DATA ROW 90
& UP
l
< ~ ~
F
1-5 Ver t 1: 550 DIFF
.10vr'd sp 2 r 26 3:
990 DIFF 5:
100 DIFF Pi: 1-5 DIFF
. 07v/d sp 1 r 11. 07v/d sp 1
r 15. 10v/d sp 2 r 26
~
~
OD<>
= Dk00003a Call>
= SG10CCAL00006 THU 19:31:50 OCT-08-92 SG 10 ROIJ 102 COL 25 ID 137D Next-Last Tube ReFresh
<10)
ZOOMED 30 10 YS2-X2-r2 Liz Chan HxR Vmx G An 180 0.67v 57d 92%
HxRVmxGAn 180 gggMxRVmxGAn 180 MxRVmxGAni80
- 0. 20v 62d 95%
0, 35v 59d 52%
- 0. 69v 51d 94%
OBH
+ 25.36 Next-Last Channel 2;
550 ABSL
.07v/d sp 1 r 7 4: 990 ABSL
. 07v/d sp 1 r 28 6;
100 ABSL P2: 2-6 ABSL
.07v/d sp 1 r 32.15v/d sp 1 r 5 8-LISS Data-Dirt File-Func OBH-Process Channels E5gMxRVmxGAn180 0.41v 232d HxRVmxGAn 180 0.05v 243d 0.28v 23id 0.87v 216d 20%
gggMxRVmxGAn180 ~MxRVmxGAn180 Pr int Scr een
I asgf 441 4
W.l
-,!!'!!:'"'M' '!~~~ ""!'MJ~
'LT% ~V
' VU'"-'" '
XN""'"'""" '"'
J1'
':"l '
'::]'!i.
- '-,".:;',:--:';,,'="-:.:-",;'::;.:'":l;'.-'.:,".:"',:,'g Zetec-Eddynet:
Analysis [G]-1S8S,SO userd h as resolution] at ND414837 I,:..:"-,'-.:',.::.'-,-,'-,'=:.:'-:,;:-:.~~-::,;:,]:jlmfjj 1-5 1'50 DIFF Lmrk 3: 990 DIFF 07H-Vert
. 14v/d sp 3 r 26. 07vr'd s 1 r 10 5'00 DIFF
. 07v/d sp 1 r 16 Pi: 1-5 DIFF
.11v/d s 3 r 26
~
~
ODN = Dk 7A Caid
= ta e045A. cal00 TUE 4: i5 APR-09-91 SG 'l0 ROW 102 COL 25 ID 43O Next-Last Tube ReFr esh ZOOHED 30 10 08H-
~ 0 IvDL'pggVmx GAn 180
- 0. 35v 55d 61%
08H
+ 24.99 VppggVmx GAni80 pp VmxGAn180 0.76v 5id 93%
0,24v 49d 96%
VppjggVmx GAn 180 0.00v Od X2-r2 Liz Chan Next-Last Channel 2: 550 ABSL 4'90 ABSL 6:
100 ABSL 8;
20 ABSL
~
~
.16v/d sp 4 r 6.07v/d s 1 r 28.iivr'd sp 3
r 31.14v/d sp 3 r 1 8-LISS Data-Dirt File "Func Process Channels Vpp Vmx GAn 180 0.30v 202d Vpp Vmx GAn 180 0.15v 248d pp Vmx GAn 180 pp VmxGAn180 0.15v 164d 0.04v 326d Print Screen
~
I
~ i F,
Lmrk
- 1-5 5
100 DIFF Pi: 1-5 DIFF 1:
550 DIFF 3:
990 DIFF Vert
.2v/ds 4
r 265.iv/dsp 2 r 111.1v/dsp 1 r 156.2v/dsp 4 r 265 OD¹
= Dk00003a Cal¹
= SG10CCAL00006 TWU 20: 12;01 OCT-08-92 SG 10 ROW 105 COL 30 ID 152D Next-Last Tube ReFresh CRESS ZOOMED 30 10 X2-/'2 Llz Chan Vpp Vmx GAn180 pp VmxGAn180 Vpp Vmx GAn 180 Vpp VmxGAn180 Next-Last Channel 0.70v 154d 11%
0.34v 175d 50%
0.25v 116d 0.65v 150d 9%
VS2-BWi
+ 19.07
~, ~ 'L 1
'- ~ )
4'90 ABSL 2'50 ABSL
.2vr'dsp 5 r 75.iv/dsp 1 r 281 6:
100 ABSL
.iv/dsp 1 r 321 P2: 2-6 ABSL
.4v/dsp 5 r 55 8"LISS Data-Dir r'ile-Func Pr ocess Channels 08H-0.27v 246d 0.86v 221d Vpp VmxGAn180 pp VmxGAn180 pp Vmx GAn 180
- 0. 20v 213d pp Vmx GAn 180 1.79v 198d 32%
Print Screen
I
f%ed/Ih if
$66<<6.
stsc t
Iva C
O'I)650 uter aa a ry at 4)474ihS
$2 <<Jlld<<<<jg 2
6 g'Da
= Dk un<<t3 Cala
- r. ta e003A.cal01 MOil 22<<03 APR-10-09 SG 11 ROIJ 105 LIII 30 ID L<<<<r k 1<< 1-5 1<<S50 DIFF 3: 990 DIFF Vert
).2v/d s
4 r 220
. Iv/d s
2 r 68 5<<100 DIFF Pl <<1-5 BIFF
/d 2
262 2.2 /d 2
6 266 llext-La t Tube ReFresh (7)
ZOOMED 30 7
X2-/2 Llz Chan Vpp ggg V<<ax GAn 100 Vpp ~ V<<ax GAn 100 Vpp IIIVa<<x GAn 100 Vpp Im V<<ax GRn 100 tlext-Last Channel VS2 0.67v 135d 37X 2<< 550 ABSL 0.27v 143d 66X B<<JI
- 4. 990 ABSL 0.27v 03d
+ 17.76 6
100 ABSL 0.64v 140d 0
20 ABSL
.4v/d s
9 r 25
.2v/d s
3 r 246
.2v/d s
4 r 323
. lv/d s
2 r 11 8-LISS BIJ1 Data-Dlr/
File-Func Process Channels OBH Vpp gg V<<2<<x GAn 100 Vpp ~
V<<2<<x GAn 100 0.66v 195d 1.51v 210d Vpp IIIVa<<x GAn 100 Vpp gg V<<ax GRn 100 0.07v 135d 0.24v 221d Print Screen
~
0 V
".'. jP>~~'fj'l~<."'t~,'j'I eteo-ynet: Ana ysls user3 as resoluton at 0
14 2
~":~$/)!"
'j.,
',jlf9I'mr k
1-5 Vert 1
550 DIFF 3
990 DIFF
.27v/d s
7 r 26.1vr'ds 1 r 110 5'00 DIFF Pi'-5 DIFF
. 1v/d sp 2 r 154
. ivy'd s 3 r 265 ODM
= Dk00004a Calu
= SG10CCAL00007 FRI 1'12'07 OCT-09-92 SG 10 ROM 144 COL 57 ID 55D Next-Last Tube ReFresh ZOOHED 30 4
X2-I 2 Liz Chan Vpp VmxGAni80 pp Vmx GAn 180 0 49v 50d 96%
0 12v 75d 92%
pp Vmx GAn180 Vpp Vmx GAn180 0 19v 63d 30%
0 60v 43d 94%
Next-I ast Channel 09H
+ 25.52 2
550 ABSL 4 ~ 990 ABSL 6'00 ABSL Pi 1-5 DIFF
.3vr'ds 8
r 75
.ivy'ds 3 r 281.1v/ds 2 r 321
. 1vr'd s 3 r 265 8-LISS Data-Dirt File-Func Process Channels 09H-0.22v 243d 0.25v 246d 0.78v 240d Vpp VmxGAn180 Vpp VmxGAn180 pp VmxGAni80 Vppgg Vmx GAn 180 0.60v 43d 94%
Pr lnt Screen
~
~
fJ.+4
"'VNAAI';-;!gg~~$
~!~'-!xiii.)~!if eteo-ynet: Ana ysls [G <<0,0 user as resolut on at ND 14042
[,l!9~ii".g '<<$4Ji";I,~ f;",~'
~
ODN
= Dk 7A Caid
= ta e043R.cal01 TUE 0;50 APR-09-91 SG 10 ROW 144 COL 57 ID 7
Landmarks 09H-P '-
Vert 0
BS Vert 0 25 v/d 1'50 I
F s an 5
rot 251 Hext-Last Tube ReFresh ZOOHED 30 4
X2-r'2 Liz Chan Hex't Las't Channel HxR Vmx GAn 180 09H
+ 25 65 1-LISS Data-Dirt File"Func Process Channels Pr int Scr een
~
~
4 C
Zetec-Eddynet:
Analysis [C]-1989,90 fuser8 as resolution] at ND414637
~
~
- OD¹
= Dk00004a Cal¹
= SG10CCAL00007 FRI 1:12:07 OCT-09-92 SG 10 ROW 144 COL 57 ID 55 Landmarks 1
550 DIFF Vert 6
100 ABS Ver t 0.37 v/d 6'00 ABS s an 6
rot 294 Next-Last Tube Refresh (5)
ZOOMED 30 5
X2-r2 Liz ChanO Next-Last Channel 555 MxR Vmx GAn 180 0 85 volts 20 de ADR 09H
+ 19.49to+ 27.45 1-LISS Data-Dirt Fi1 e-Func Process Channels 09H-Print Screen
~
~
.t
F ZetQC ODii
= Dk 1
Analysis tC]-1989,90
[dbh as resolution] at: -
f CAL00043 IJEO 17:52:25 OCT-14-92 SG 10 ROW 114 LIII 135 ID
-Zddynet:
2a Call~
= SG10C Landmarks P1'-5 D
Vert 8'0 ABSL Ver t P '-5 DIFF 0.17 u/d s
an 2 rot 261 IIext-Last Tube ReFresh KUBLA ZOOI4EO 30 10 X 2 "/'2 Liz Chan BW1-C
~J 533 I'lxR Vmx GRn 180 044 u
s 4
08H
+ 38 15 Next-Last Channel RPC)
CrackHap 1-LISS Da ta-Dirt'i 1 e-Func 00ll-Process Channels Sys'em Functions
~.
Print-FF Screen
~
J 4
~
~
~
~
III I
~
I I I I
~ ~
'I 1
~
~
~
~
1
~
~
~ I
~
~
~
0
~
~
~
iver p4
,fm
>>4 p,
it 4
!>>6'
~ I
~
I
~
~
I I
~
I IRIS'mRR
~
~
1 lgq lv
ggi,gj~~~."- '""'
"'"~-"~~"""iYii" itiJii.i
- -."~4=:-:--.;-::-'*.:'.=':=::-,:'.:=:'=':-='.-q Zetec-Eddynet:
Analysis t C]-1989,90
[user11 as resolution] at ND27264D
~'-:-:,,-,'=..,-'.'-.i'-';=.:,.-':-:,'=:.-:,,:'=:=->I'==,,(fjl OCT-17-92 SG lO ROlJ 95 LIH Landmar ks TEC-TSC-VLL 02C 03C-04C-05C-06C 07C-OBC-P 15 D
Vert 8'
ABS Vert 0.30 v/d Pi'-
IF san6 rot 259
~
~
j ODll = Dk 17a Calo
= SG10CCAL00067 SAT 21:46:52 138 ID 13D Hext-Last Tube ReFresh
<64>
Zoom 30 4
X2-l2 Liz Chan Hext-Last Channel VS1-BW1-OBH-07H-06H-05I-I-04H-03H-02H-VLI1 ISH-TEH 555 MxR Vmx GAn 180 068 v its 101 d
BW1
+ 12. 84 1-LISS Data-Dirt File-Func Pr ocess Channels Print Scr een
~
~
~
4i 4 4 'i i,
t.i'
~
~
OD¹ = Dk 7a Cal¹
= tape022A.cal01 SUN 9:00 APR-07-91 SG 10 ROM 95 COL 138 ID 66 Landmarks TEH-TSH V1H-van 03H-04H 05H-06H 07H-08H BM1 VS1- "
Pi 1-5 D
Vert 8'0 ABSL Vert Pi'-5 DIFF 0.32 v/d s an 6
rot 262 Next-Last Tube Refresh (65)
Zoom c
30 10 X2-I'2 Liz Chan Next-Last Channel BM2 08C 07C-06C 05C-04C 03C 02C 01C I bl TEC-Vpp HxR Vmx GAn 180
+ 12.84 1-LISS Data-Dirl File-Func Process Channels Pr int Scr een
~
~
)
L Lmrk 1"5 1'50 DIFF Vert
.27vid sp 7 r 28 5:
100 DIFF P1; 1-5 DIfF 3:
990 DIFF
.11vr'd sp 3 r 12.07vid sp 2 r 15.30vid sp 8 r 28
~
~
OD4
= Dk 17a Cal u
= SG10CCAL00069 SUlk 7: 45: 56 OCT-18-92 SG 10 ROM 102 LIN 139 ID 83O Next-Last Tube Refresh (4)
ZOONED 30 4
Vpp Vmx GAn 180 1 15v 28d 70%
0.49v 28d 0,32v 37d 93%
0.00v Od 08H
+ 24.99 VppggVmx GAn180 Vpp VmxGAni80 ppggYmx GAn 180 X2-r2 Liz Chan Next-Last Channel 2'50 ABSL
.32vr'd sp 9 r 7 4'90 ABSL
. 12vid sp 3 r 26 6'00 ABSL P2: 2-6 ABSL
.12vr'd sp 3 r 32.40vid sp 11 r 7 8-LISS Data-Diri File "Func Pr ocess Channels 08H-Vpp Vmx GAn 180 1.34v 196d pp VmxGAn 180 0.53v 183d 0.50v 221d 0.00v Od Vpp VmxGAn 180 pp Vmx GAn 180 Pr int Screen
. ~
~ p
Lmrk 1-5 1: 550 DIFF Ver t
.24v/d sp 5 r 22 3: 990 DIFF 5:
100 DIFF
.iiv/d sp 2 r 6.10v/d sp 2 r 15 ODN = Dk unit3 Caid
= ta e031A.cal01 MED 15:38 APR-19-89 SG 11 ROM 102 LIH 1 P 1: 1-5.
DIFF
. 26v/d sp 6 r 20 39 ID 380 Hext-Last Tube ReFresh (4>
Vpp VmxGAni80 1.03v 25d pp VmxGRn180 YppmmVmxGAn180 0.47v 27d 0.42v 51d Vppgg Vmx GAn 180 0.00v Od ZOOHED 30 4
X2-I'2 Liz Chan Hext-Last Channel 2'50 ABSL 08H 4: 990 ABSL
+ 24.36 6:
100 ABSL P2: 2-6 ABSL
.32v/d sp 7 r 2,14vr'd sp 3 r 24.17v/d sp 3 r 29.38v/d sp 9 r 2 8-LISS Data-Dirt File-Func Process Channels 08H-Vpp Vmx GAn 180
- 1. 37v 196d 0.72v 204d 0.60v 209d pp VmxGRn180 pp Vmx GAn 180 Vpp mgLVmxGAn 180 0.00v Od Print Screen
1 J
,P
".'lik4 I A ttl '4 rf iA, '.'g>"'",tl
~ rflrrif'rrtr'rrc-'('i'frl'yr'i'night>>lyrh't'I')-"IUO&tJO'" f'I'tat'rrs r'n'v'rr't iN4 t4dJ]"'f'-'..".",'.,Zr...','n f0'F5'<. ".~r!)PFI~II;DVPltl 00>>
n Dk IGa Cal>>
6:
IOO.nDSL 1.00 v/d Pll 1-5 DIFf sparl 12 rat 203 tlext-Last Tube Refresh 14)
ZOOMEO 30 4
VSZ-XZ-/2 LIz Chan llext-Last Channel MRPC C-Scan DMI-Vpp M>>R K%
O.'Ol vults O deg MDI DMI I
3.73 Gnn 100 I-LISS Data-Olr'/
F Ile-Func Process Channels Dotl ~
Pr Int Screen
'I'1 Q II 5
I I
l I
t I
-.'4.;'"=;:,-.-:.;-':-,-:.::::":-'::.-":=:.,:-"=.'.::;:--,-',-g Yrtr.i:-Fddyiirit:hn~tysb jGj-'tJOO OO fusorZ as resofutroiiJ nt ND3iJ(CUE ti:':",".";:"-:.:'.-'"':.'
~
ODrr
= Unknown Calrr
= SGllNCAL00074 WED 4:37!45 OCT-21"92 SG 11 ROW 99 LIN 148 ID 21 Lmrk Pi; 2-3 DIFF Vert rr oF Scans Trig OFFset
=
PointsrScan
=
Pl: 2-3 DIFF 109 0
78 s
an 16 rot 277 X
- 8. Y Scale
=
0.9 Filter t OFF Pulses7 NO Update Axial Liz7 NO
-1. 31
- t. 31 360 180 0 ~i. 31 Circ Liz 360 270~100~90 0
BW1 0
3 73 X Rotation Z Rotation
- 81. 0 329,0 X Translation
=
0 Y Translation
=
0 V ~.'- N C-I4.i --~ I
-Wj ~ I-Wji-~ i.i III+II~'+M ARROW on)
PRINT HAIN IHAGE CRKHP X2-r2 REFRSH ZOON USER I IEAs A/Row
=IcrnvL CSCAN XHATCH
( on>
FLAW SELECT (252) 30 10 SPAN
~+- ""I'I+ "
IMAGE'N~
' A"'FN ~ If+III+IIII+IjifIII+I' II ~ I+MI I I"'4 II+II~ I +I I IIII I ~ I I I+II<+II'Ã4 III+'"' I I+I +I ' 8 I'I IN+I '
~
~
I Il I
Wl
~
~
~
~
~ ~
010
~
I I I I
~
~
~
~
~ r
~
~
~
~
I
't 1
tr
~
~ ~
~
~
I e
f
~
~
~
~ I
~
~
l ~
I I I I I
I I I
g
'I
~
~
g I'e 1
4i
~
4' 1
I l) 4 r'I;l P
I]
.)
I 1
'I 1
l'
~
~ ~ s I
I 0
I II I
t
~
~
I I
~
J T
- 09l93, ARIZONA PUBLIC SERVICE CO.,
PALO VERDE, UNIT 3 STEAM GENERATOR:
32 OUTAGE DATA SET CURRENT SELECTION VARIABLES:
DATE: 09/29/93 TIME:
17: 57: 16 STAYS 94
+
6109.
jasa
+
150 140 130 120 110 lO ioo 90 80 70 60 50 40 30 20 10 150 140 130 120 iio 100 90 80 70 ~
60 50 40 30 20 10 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 REVIEW OF jo/92 BOBBIN DATA AOW 90 G UP CONAN NUCLEAR, INC. 8$
'C'
ftt
~
CUMULATIVE REPORT 0 9/93 i ARIZONA PUBLIC SERVICE CO i
PALO VERDE i UNIT 3 STEAM GENERATOR 32
%AGE DATA SET CURRENT LECTION VARIABLES: Percent PAGE:
1 OF 1
DATE:
09/30/93 TIME:
14:25:40 I 1561107 I
I I
I H
I TEH-VS1 I TEH-VS1 I 00021 I 610ULI 08H+ 20.96 I
I I
I I
EXAM EXTENT ROW I LINI I LEG I PROGRAM I ACTUALI EXP I CAL I PROBE I LOCATION I
I I
I I
I I
CURRENT I VOLTS I MILI DEG I 96 I CH I
I I
- 0. 60 I 136 I NQI I P 1 I I
I I
I NUMBER OF TUBES SELECTED FROM CURRENT OUTAGE:
NUMBER OF DATA RECORDS SELECTED FROM CURRENT OUTAGE:
NO TREND ANALYSIS REQUESTED DATA SELECTION CRITERIA:
Percent:
NQ1,BOW,PDP,PAI REPORT OPTIONS:
Only examination results matching criteria are included REVIEW OP 10/92 BOBBIN DATA ROW 90
& UP
0
~
r.
i~
t t~
Zetec-Eddynet:
Analysis [C)-1989,90 Puser8 as resolutiong at ND414837;:=,--:::-::=.'--..::.::;,:::.:;:..:='=.'.::='-:'-':-:-:-.:':-':-,:::=.,I.:".-'-:"-:Ig Landmarks TEH-TSH-vLn vcn-03H-04H 05H 06H-.
07H-08H 09H P1 15 D
Vert 6
100 ABSL Ver t
~
~
'D¹
= Dk 11a Cal ¹ = tape049A. cal01 THU 7:39 APR-11-91 SG 20 ROW 156 COL 1
P1 1-5 DIFF s an 5
rot 228 0.26 v/d 07 ID 230 Hext-Last Tube Refresh Zocm 30 10 X2-r'2 Liz Chan Hext-Last Channel 09C 08C 07C 06C-05C-04C-03C 02C-01C-I hl TEC-Vpp HxR Vmx GAn 180 08H
+ 20,96 1-LISS Data-Dire'ile-Func Pr ocess Channels Print Screen
~ I n
Zeteo-Eddynet:
Analysis [G]-1989,90
[user& as resolution] at ND414837
',,'::::-::-::::::,:::,=-::.'::-':::::..'::::::::-:,-'.:,=;,:-:g,'::-:'::::I-::
"OD¹ = Dk 3b Cal¹
= SG21HCAL00021 NON 9:21:54 OCT-12-92 SG 21 ROM 156 COL 107 ID 14 Landmarks TSH" 01H-02H-03H-04H-05H-P1'-5 Vert 550 ABSL Ver t P1'-5 DIFF 0.27 vr'd s an 5, r ot 271 Next-Last Tube Refresh ggsgg 2
corn 30 10 X2-r2 Liz Chan Next-Last Channel 06H 07H 08H-Vpp HxR Vmx GAn 180 08H
+ 20. 75 1-LISS Data-Dirt File-Func 09H" Process Channels Pr f.nt Screen
<<o t