05000341/LER-1917-005, Regarding Non-Functional Mechanical Draft Cooling Tower Fan Brakes Leads to HPCI Being Declared Inoperable and Loss of Safety Function
| ML17310A167 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 11/03/2017 |
| From: | Polson K DTE Electric Company, DTE Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-17-0070 LER 17-005-00 | |
| Download: ML17310A167 (6) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(ix)(A) 10 CFR 50.73(a)(2)(x) |
| 3411917005R00 - NRC Website | |
text
Keith J. Polson Senior Vice President and Chief Nuclear Officer DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.6515 Fax: 734.586.4172 Email: keith.polson@dteenergy.com DTE Energy-10 CFR 50.73 November 3, 2017 NRC-17-0070 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Reference:
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Licensee Event Report (LER) No. 2017-005 Pursuant to 10 CFR 50.73(a)(2)(v)(D), DTE Electric Company (DTE) is submitting LER No. 2017-005, Non-Functional Mechanical Draft Cooling Tower Fan Brakes Leads to HPCI Being Declared Inoperable and Loss of Safety Function which is a Condition Prohibited by Technical Specifications and Loss of Safety Function.
No new commitments are being made in this LER.
Should you have any questions or require additional information, please contact Mr. Scott A. Maglio, Manager -Nuclear Licensing, at (734) 586-5076.
Sincerely, Keith J. Polson Senior Vice President and CNO
Enclosure:
Licensee Event Report No. 2017-005 cc: NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 5, Region III Regional Administrator, Region III Michigan Public Service Commission Regulated Energy Division (kindschl@michigan.gov)
Enclosure to NRC-17-0070 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Licensee Event Report (LER) No. 2017-005 Non-Functional Mechanical Draft Cooling Tower Fan Brakes Leads to HPCI Being Declared Inoperable and Loss of Safety Function
LICENSEE EVENT REPORT (LER)
NRC FORM 366 (04-2017)
U.S. NUCLEAR REGULATORY COMMISSION the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
APPROVED BY OMB: NO. 3150-0104 EXPIRES: 03/31/2020 (See Page 2 for required number of digits/characters for each block) 1 OF
- 3. PAGE 05000
- 4. TITLE
- 5. EVENT DATE
- 6. LER NUMBER
- 7. REPORT DATE
- 8. OTHER FACILITIES INVOLVED MONTH DAY YEAR SEQUENTIAL NUMBER REV NO.
FACILITY NAME 05000 DOCKET NUMBER FACILITY NAME 05000 DOCKET NUMBER
- 9. OPERATING MODE
- 10. POWER LEVEL
- 11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply)
- 12. LICENSEE CONTACT FOR THIS LER LICENSEE CONTACT TELEPHONE NUMBER (Include Area Code) CAUSE SYSTEM COMPONENT MANU-FACTURER REPORTABLE TO EPIX
CAUSE
SYSTEM COMPONENT MANU-FACTURER REPORTABLE TO EPIX
- 14. SUPPLEMENTAL REPORT EXPECTED YES (If yes, complete 15. EXPECTED SUBMISSION DATE)
NO
- 15. EXPECTED SUBMISSION DATE YEAR DAY MONTH ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines)
NRC FORM 366 (04-2017)
YEAR YEAR DAY MONTH 20.2201(b) 20.2203(a)(3)(i) 50.73(a)(2)(vii) 20.2203(a)(2)(ii) 20.2203(a)(2)(i) 20.2203(a)(1) 20.2201(d) 20.2203(a)(2)(iii) 20.2203(a)(2)(iv) 20.2203(a)(2)(v) 20.2203(a)(2)(vi) 20.2203(a)(3)(ii) 20.2203(a)(4) 50.36(c)(1)(i)(A) 50.36(c)(1)(ii)(A) 50.36(c)(2) 50.46(a)(3)(ii) 50.73(a)(2)(i)(A) 50.73(a)(2)(i)(B) 50.73(a)(2)(ii)(A) 50.73(a)(2)(ii)(B) 50.73(a)(2)(iii) 50.73(a)(2)(iv)(A) 50.73(a)(2)(v)(A) 50.73(a)(2)(v)(B) 50.73(a)(2)(v)(C) 50.73(a)(2)(v)(D) 50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B) 50.73(a)(2)(ix)(A) 50.73(a)(2)(x) 73.71(a)(4) 73.71(a)(5)
OTHER Specify in Abstract below or in Page of 05000-
- 3. LER NUMBER YEAR SEQUENTIAL NUMBER REV NO.
PREVIOUS OCCURRENCES
Previous occurrences of HPCI inoperability due to non-functionality of the MDCT fan brake system were reported in LER 2016-06. However, the instances described in LER 2016-06 were associated with inadequate procedural guidance related to the fan brake systems and were all the result of problems with the nitrogen pressure supply. The condition described in this LER is not a result of inadequate procedural guidance and was not due to problems with the nitrogen pressure supply.
Therefore, the corrective actions previously performed in LER 2016-06 could not have prevented the occurrence described in this LER as they could not have prevented the inverter from failing.
4 4
Fermi 2 341 2017 005 00