05000244/LER-1980-009-03, /03L-0:on 801003,during Performance of PT-12.1 to Verify Operability of 1A Emergency Generator,Part from Barring Device Seen to Fly Out.Caused by Bearings Not Designed to Withstand Operation W/Generator Running

From kanterella
(Redirected from ML17309A104)
Jump to navigation Jump to search
/03L-0:on 801003,during Performance of PT-12.1 to Verify Operability of 1A Emergency Generator,Part from Barring Device Seen to Fly Out.Caused by Bearings Not Designed to Withstand Operation W/Generator Running
ML17309A104
Person / Time
Site: Ginna 
Issue date: 10/31/1980
From: Spector S
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17250A718 List:
References
LER-80-009-03L, LER-80-9-3L, NUDOCS 8011040466
Download: ML17309A104 (2)


LER-1980-009, /03L-0:on 801003,during Performance of PT-12.1 to Verify Operability of 1A Emergency Generator,Part from Barring Device Seen to Fly Out.Caused by Bearings Not Designed to Withstand Operation W/Generator Running
Event date:
Report date:
2441980009R03 - NRC Website

text

NRC,FQPRM 366 (7.77I 80-009/03L-0 LICENSEE EVENT REPORT ~

(CAR 1224)

CONTROL BLOCK:

QI

{PLEASE PRINT OR TYPE ALLREQUIRED INFORMATION)

I 6

NY RE G1Q200 00000 00Q241111QR~QE 9

LICENSEE, CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58

~O 7

8 CON'T

~01

~LQ60 5

0 0

0 2

4 4Q7 1

0 0

3 8

OQB1 0

3 1

8 0

Qe 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10 During performance of PT-12.1 to verif o erabilit of lA Emer enc

'Generator EG 7

8 and 1B EG started during inspection of 1A EG.

(T. S. 3. 7. 1d. ) Investigation, 'ncluding 6

con suiting with manufacturer,showed that device, used to rotate shaft during overhaul when engaged did not affect operability of EG or upon failure would not damage EG or other equipment.

~3 parts found to be from barring device were seen to fly out.

EG was immediately stoppe

~OB 7

8 9

80

~Oe 7

8 SYSTEM

CAUSE

CAUSE

COMP, VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

~EE Qll A

QI2

~XQTE E N G

1 N

E 04

~ZQ>>

~Z Q'8 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LERJRO EVENT YEAR REPORT NO.

CODE TYPE NO.

Qlz REPQRT ~80

+

~00 0

+W

~02

+L

+

0 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDP PRIME COMP.

COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB.

SUPPLIER MANUFACTURER Q18 ~G plz

~ZQ20

~Z pzl 0

0 0

0

~N pzz

~N Qzz

~A Q25 A

1 S

2 Qzs 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 8

investigation could not Identity person who engaged barring device.

According to manufacturer bearings for devices are not designed to withstand continued operation 1

being engaged with EG running.

Devices have been removed from both units.

Proce-3 dures have been changed to instal 1 and remove them before and after maintenance 7

6 9

FACILITY STATUS

% POWER OTHER STATUS QBO 6

E zs 0

0 ze NA CO Lip~O ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITYQS 6

~~

Q33

~~Q34 7

8 9

10 44 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39 1 ~00 0

Qzl ~ZQ38 NA 7

8 9

11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41 8 ~00 0

Q45 NA METHOD OF DISCOVERY DISCOVERY DESCRIPTION Q32

~BQ31 Performance of PT 12.1 45 46 LOCATIONOF RELEASE Q6 NA 45 0

80 80 80 80 7

8 7

8 o

8 NAME OF PREPARER S. M. Spector 9

11 12 LOSS OF OR DAMAGETO FACILITYQ43 TYPE

DESCRIPTION

Z Qz NA 9

10 PUBLICITY ISSUED DESCRIPTION~

'A 9

10 80 68 69 NRC USE ONLY 80 o

80 ER PHDNE 5/524-4446, ext. 214 a

$811040 Vcc g

J a