Forwards Inservice Insp Rept for Unit 2
ML17308A480
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/17/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17223A232 List:
References
L-89-253, NUDOCS 8907260002
Download: ML17308A480 (192)


Text

Il gc CE1Z RATED'TKBUTION DE MONS AT10.'i SYSTEM

~0 REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RXDS)

)

ACCESSION NBR:8907260002 DOC.DATE: 89/07/17 NOTARIZED- NO DOCKET N FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power S Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION WOODY,C.O. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R inservice insp rept for Unit

SUBJECT:

Forwards DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR TXTLE: OR Submittal: Inservice Inspection/Testing/Reli Q

2.

ENCL f

SIZE:

from

/ fI ASME Co e NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 5 NORRIS,Z 1 1

'1 INTERNAL ACRS 6 AEOD/DSP/TPAB 1 Xb D NRR/DEST/MEB 9H 1 0 NRR/DEST/MTB 9H 1 Q NUDOCS-ABSTRACT 1 9 OC/LFMB 1 0 D OGC/HDS2 1 0 E 1 1 RES/DSIR/EXB 1 e EXTERNAL: EGGG BROWN, B 1 EGGG ROCKHOLD,H 1 N LPDR 1 1 NRC PDR 1 1 NSIC 1 - 1 D

NOZE 'IO ALL "RIDS" R1XZPXENIS'IZASE S

HELP US 'IO REDUCE %!ASTE! CGHZACI'IHE DOCUMEPZ CGNIK)L DESK TOTAL NUMBER OF COPIES REQUIRED: LTTR

~

ROC'l-37 (EXT. 20079) TO EZZKGQZB %BUR NAME FMM DIPHGEPZIQN LISTS FOR DOCUMENI'8 DONFT NEED!

26 ENCL

Cg 4J 83QQp ~~~ ~~> >>')l~ (]f"]p.' "':." ~'~M( <

P.O. Box14000, Juno Boach, FL 33408-0420 JULY. 1 7 1989 L-89-253 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: St. Lucie Unit 2 Docket No. 50-389 Inservice Ins ection Re ort Please find attached the Owner's Data Report for Inservice Inspection (Forms NIS-1 and NIS-2) which is submitted in accordance with the provisions of the ASME Code,Section XI, (IWA-6230), for St. Lucie Unit 2.

Should there be any cpxestions concerning this report, please contact us.

Very truly yours, O. Wo Acting ior Vice President Nuclear COW/MSD/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC 8907260002 8907i7 PDR ADOCK 05000389 P PDC an FPL Group company

~1 FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST. LUCIE NUCLEAR PLANT P.O.BOX 128 FT.PIERCE, FLORIDA 33454-UNIT 2 STEAM GENERATOR 2A & 2B 1989 EDDY CURRENT RESULTS CUMULATIVE REPORT J.

50-309 ST. LUG IE, 2 FP&LC INSERVICE INSPECTION REPORT Rec'd. w/1tr. 7/17/89.........8907260002

CUMMULATIVE DISTRIBUTION

SUMMARY

ST. LUCIE 2 02/89 COMPONENT: S/G 0 A Page : 1 of 1 Date 04/17/89 Time:

':58 PM Examination Dates  : 02/09/89 thru 03/01/89 Total Number of Tubes Inspected 8203 Total Indications Between 20% and 39% 52 Greater than or equal to 40% 6 Total Tubes Plugged as Preventive Maint 7 Total Tubes Plugged 13 Location Of Indications 20% to 100%

Hot Leg Cold Leg TSH .5 to 01H -2.1 0 TSC -.5 to 01C -2.1 01H -2.0 to 07H +2.0 1 01C -2.0 to 07C +2.0 07H +2.1 to DHB -3.1 0 07C +2.1 to DCB -3.1 DHB -3.0 to DCB -3.0 54

PLUGGABLE TUBES LIST St. Lucie 2 00 02/89 CONPONENT :STG ¹A Page: 1 of 1 Date : 04/14/89 Time : 9:53 AH

+ + + + + + + + +

I I IREQI I TESI'ED I I I I I I I I IROMILINEIZONEIEXTILEGI EXTENT I REEL I CMI PROBE LOCATION I X IvoltsIOegI Oataset

+ + + + + + + + + + + + + + +

11261 481 14 I TEHI C I TEH PC IAC121 11A-SBO SF/RH I OHT 0.0 I 451 6.41110 IDECRADEO I 11361 641 14 TEHI C I TEH 1

IAC124 I 1IA-580 SF/RH I OHT 0,0 IPTP I 4 ~ 711301 IHPERFECT I I 941 661 16ITEHI C ITEH PCGYIAC116 IH 1IA 580 SF/RH vs4 0.7 I 401 5.11 951IMPERFECT I 391 731 4ITEHI C ITEH PCGYIAC006 11A-580-SF/RH I OHB 0.0 IPTPI 3.61120IIHPERFECT I I 421 761 41TEHI C ITEH PSGYIAC006 IH 1IA-SBO.SF/RH I vs3 0.5 IPTPI 1.111081IMPERFECT 11351 811 15ITEHI C ITEH GYIAC064 IH 1IA-580-SF/RH I vs4 -0.8 IPTPI 2.51102IIHPERFECT I I 501 861 6ITEHI C ITEH GYIAC069 I IIA-580 SF/RH I OCT 0.0 IPTPI 2.41129IIHPERFECT I I I I ITEHI"C ITEH PSGNIAC069 I 1IA SBO.SF/RH I OHB 0.0 IPTPI 0.5 I 1291 IHPERFECT I 471 871 6ITEHI C ITEH GHIAC069 I 1IA-580 SF/RH I OHT 0.0 IPTPI 0.41135IIHPERFECT I I I I ITEHI C ITEH GNIAC069 I 1IA-580-SF/RH I OCT 0.0 IPTPI 2.81129IIHPERFECT I I I I ITEHI C ITEH PSGNIAC069 I 1IA-580-SF/RH I OHB 0.0 IPI'PI 1.311261IHPERFECT I I 941 901 17ITEHI C ITEH PSGMIAC056 IH 11A.SBO.SF/RH I vs3 1.0 I 401 3.21 971IHPERFECT I I 401 961 6ITEHI C ITEH PSCNIAC069 IH 1IA.580-SF/RH I vs3 -0.7 I 481 2.51 9010EGRAOED I 501 961 6ITEHI C ITEH PSGNIAC069 IH 11A 580 SF/RH I vs3 -0.7 I 481 1.31 9010ECRADED 11151 1291 10ITEHI C ITEH PCIAC048 I 1IA SBO.SF/RH I TSH 14.5 IU II 0.01 011-s I 561 1501 BITEHI C ITEH PSGYIAC034 IH 11A-580-SF/RH I vs3 1.0 I 431 1.81 87IBALANCE I

+ + + + + + + + + + + +

Number of Pluggable Tubes: 13 Number of Indications 16 Selection Criteria :

PerCent T.M. .. ~ . 40 Includes ADI,NQI,OSI,OTI,DRI,LPI,TBP,TRS,PTP Codes

CUHMULATI VE EXAHI NATION REPORT St. Lucia 2 OUTAGE : 02/89 CDHPONENT  : STG ¹A Page : 1 of 2 DESCRIPTION : 20X TO 100X Date : 4/ 3/89 Time : 12:33 PH

+

I ( Extent I 02/89 I N/A I (Row(L in(Leg(Req(Tst/Note( Reel Probe Location (Volts(Oeg(Ch X (Diff( Location (Volts(Deg(Ch X I" I"" "-I" -"-.I----.-.---- I-( ( I I I I-- I ---I. ---I--- -I---I-- I .I I 86( 221 C ITEHITEH PSIAC105 IA-580-SF/RH IVS3 -.8 2.01112IH 11 231 I I I I I I 92( 26( C ITEHITEH PSIAC106 IA-580-SDF/RMIVS4 -1.0 .51 98IH 11 351 I I I I I I 93( 271 C ITEHITEH PSGNIAC106 IA.580.SOF/RHIVS4 .7 2.81 97IH 11 361 I I I I I I 981 28( C (TEH(TEH PSIAC107 IA.580.SF/RH IVS4 -.6 .91112IH 11 201 I I I I I I 98( 301 C ITEHITEH IAC107 IA-580-SF/RH IVS2 .4 .6( 125 1 1( 28( I I I I I 11051 33( C ITEHITEH IAC108 IA 580 SF/RH IVSZ .3 1.011321 11 211 I I I I I

( 55( 37( C ITEH(TEH GN(AC103 (A-580-SF/RH (VS3 1 ~ 0 2.0(102(H 1( 28( I I I I I I 11261 481 C ITEHITEH PCIAC121 IA-580-SF/RH IOHT .0 6.411101 11 451 I I ( I I I I I I C ITEHITEH IAC121 IA-580-SF/RH IVS1 -.9 1.511131M 11 211 I I I I I I I 20( 521 C ITEHITEH SSGNIACOOZ IA-SSO.SF/RH 106H 33.9 .5( 120( 1( 33( I I I I I I I 84( 521 C 'ITEHITEH PSIAC112 IA 580-SF/RM IVS3 .1 2.0(127( 'll 27( I I I I I I

( 95( 57( C ITEHITEH IAC114 IA.SSO-SF/RM IVS2 .8 .8(106(H 1( 27( I I I I I I 11271 59( C ITEHITEH IAC123 IA-580-SF/RH IVS1 .9 1.1(107(H 1( 24( I I I I I I (13l ( 611 C ITEHITEH IAC123 IA.SSO-SF/RH .0 .9(130( 1( 23( I I I I I I I 191 631 C ITEHITEH GNIACOOS IOHI'A.580-SF/RH IVS3 -.9 .81110IH 11 271 I I ~ I I I I 94( 64( C ITEHITEH SS(AC115 IA-580-SF/RH IVSZ 1.0 1.81 101IH 11 321 I I I I I I 341 64( C ITEHITEH IAC124 IA-580-SF/RH IOHT ~ 0 2.811311, 11 241 I I I I I I 641 C ITEHITEH IAC124 IA-580 SF/RH IDHT .0 4.711301 11 251 I I I I I I I 94( 661 C ITEHITEH PCGYIAC116 IA-SSO.SF/RH IVS4 .7 5. 1( 95 IH 1( 40( I I I I I I I I C (TEHITEH GM(AC116 IA-580-SF/RH IVS4 .2 1.31100IH 11 351 I I I I I I

( 39( 73( C.ITEHITEH PCGYIAC006 IA 580 SF/RH IDHB .0 3.61 1201 11 331 I I I I I I I 451 73( C (TEHITEH GHIAC006 IA-SBO.SF/RH IOCB 1.31 1321 11 221 I I I I I I I 471 731 C ITEHITEH PSGNIAC006 IA 580 SF/RH IVS3 .8 1.81113IH 11 241 I I I I I I 11351 73( C ITEHITEH PSGNIAC062 IA-580-SF/RH IVS1 .7 1.21112IH 11 221 I I I I I I I 821 741 C ITEHITEH IAC117 IA.580-SF/RH IVS1 . 7 1 ~ 21 103(H 1( 29( I I I I I I I 421 76( C ITEH(TEH PSGY(AC006 IA 580-SF/RH IVS3 .5 1.1(108(H 1( 29( I I I' I I I 531 77( C ITEHITEH GNIAC014 IA 580-SF/RH IOHB .0 .511331 11 211 I I I I I I I 44( 78( C ITEH(TEH IAC006 (A-SBO.SF/RH IOHB .0 2.311311 11 231 I I I I I I

I 491 79( C ITEHITEH SSGNIAC006 IA 580-SF/RH IVS3, .0 .7(1Z4( 1( 30( I I I I I I I I I C ITEHITEH SSGNIAC006 IA-580-SF/RM IVS3 .6 1.51 95(H 1( 36( I I I I I I I 471 811 C ITEHITEH SSGNIAC006 IA-580 SF/RH IVS3 .1.0 1.41105 IH 11 231 I I I I I I (135( 81( C ITEHITEH GYIAC064 IA-580-SF/RH IVS4 ..8 2.5(102(H 1( 30( I I I I I I

( 531 831 C ITEHITEH GNIAC016 IA-580-SF/RH IOCB .0 .911261 11 281 I I I I I I I 501 841 C ITEHITEH PSGHIAC007 IA-580-SF/RH IDCT .0 1.911341 11 221 I I I I I I I 49( 851 C ITEHITEH GNIAC069 IA-SSO SF/RH IDHB .0 .6(134( 1( 21( I I I I I I

( 59( 851 C ITEHITEH PCGNIAC075 IA-580-SF/RH IOHB .0 .51134( 11 211 I I I I I. I

( 50( 861 C ITEHITEH PSGNIAC069 IA-580-SF/RM IOHB .0 .511291 11 261 -I I I I I I I I I C ITEHITEH GYIAC06 IA 580 SF/RH IOCT 2.4(129( 1( 26( I I I I I I I 921 S61 C ITEHITEH PCGNIACOSS IA-SSO.SF/RH IVS2 -1.0 ~ 91114IH 1 I 21( I I I I I I 47( 87( C ITEHITEH GNIAC069 (A-580-SF/RM IDHT .0 .411351 11 201 I I I I I I I I C ITEHITEH PSGNIAC069 IA-580-SF/RH IDHB .0 1.3(126( 1( 29( I I I I I I I I C ITEHITEH GHIAC069 IA-SBO.SF/RH IOCT .0 2.8(129( 1( 26( I I I I I 44( 901 PSIAC069 IA-580-SF/RM .0 I

I-- I- --I---I-C I"

ITEHITEH I- I" IDHT

- I-I .411311 I

11 241 I"-I --I--.-I-----.-.--"-I-- -.I---I" I '""

I I I I I

I I

CUMMULATI VE EXAHINAT IOH REPORT St. Lucie 2 OUTAGE  : 02/89 CCNPOHEHT  : STG O'A Page  : 2 of 2 DESCRIPTION: 20X TO 100X Oate : 4/ 3/89 time  : 12:33 PH

+ +

I I Extent I 02/89 M/A I (Ro~(Lin(Leg(Req(tst/Mote( Reel Probe Location (Volts(Oeg(Ch I X IOiff ( Location (Volts(Oeg(Ch I I X I I

- -I" I

- I-(

-I--- ----I--- ----I---"--- ---I------- -"---I-----I- -I---I" I- I-.----- ----I-- --I---I-" --I I I 94( 90( C (TEHITEH PSGHIAC056 IA-580-SF/RH IVS3 1.0 ( 3.2( 97(H 1( 40( I I I I I I 43( 91( C ITEHITEH PSIAC069 (A-580-SF/RH (OHB .0 ( .6(135( 1( 20( I I I I I 11091 911 C ITEHITEN IAC056 IA.580-SF/RM ITSC 5.0 I .911301 11 251 I I I I I I I 49( 95( C ITEH(TEH IAC069 (A-580-SF/RM (OCT .0 ( .6(128( 1( 27( I I I I I I 401 961 C ITEHITEH PSGMIAC069 IA-580-SF/RH IVS3 .7 I 2.51 90IH 1( 48( I I I I I I 421 961 C ITEHITEH IAC069 IA-580-SF/RH .0 IOHT I .411351 11 201 I I I I I.

( 50( 96( C (TEH(TEH PSGN(AC069 (A-580.SF/RM (VS3 -,7 ( 1.3( 90(N 1( 48( I I I I I

( 47( 97( C (TEHITEH GNIAC069 IA-580-SF/RH (VS3 .6 ( 1.2(109(H 1( 27( I I I I I

( 53( 97( C ITEH(TEH GN(AC077 (A-580-SF/RN (04C 26.3 ( .6(135( 1( 20( I I I I I

( 43( 99('C (TEHITEH (AC069 (A.580-SF/RH (04C 11.9 I 1.'2(134( 1( 21( I I I I I

( 31(101( C ITEHITEH GNIAC070 IA-580.SF/RN (OCT ~ 0 I .71129( 11 311 I I I I I I 112611061 C ITEHITEH GNIAC045 IA-580-SF/RH I VS1 -.9 I .61 991M 11 351 I I I I I I

( 87( 129( C ItEHITEH PSGN(AC039 IA-580.SF/RN (VS3 .8 I 1.9(110(H 1( 24( I I I I I I 93(131( C ITEHITEH PSGM(AC040 IA-580-SF/RM IVS2 .7 I 1.8( 99(M 1( 39( I I I I I 56(150( (TEH(TEH PSGY(AC034 (A.580-SF/RH 1.0 I---I" I---I-- I--.-

( C IVS3 1.8( 87(H 1( 43(

( I I

- -I- I I I" I "I---I" I---- I


". I----- I.-- I--- I--- II I I Nunber of INDICATIONS Selected from Current Outage: 58 Nuaber of TUBES Selected from Current Outage : 52

CUMMULATIVE DISTRIBUTION

SUMMARY

ST. LUCIE 2 02/89 COMPONENT: S/G 5 B Page  : 1 of 1 Date  : 04/17/89 Time  : ~

1:58 PM Examination Dates  : 02/09/89 thru 03/01/89 Total Number of Tubes Inspected .....: 8256 Total Indications Between 20% and 39% 41 Greater than or equal to 40% 4 Total Tubes Plugged as Preventive Maint Total Tubes Plugged Location Of Indications 20% to 100%

Hot Leg Cold Leg TSH -.5 to 01H -2.1 1 TSC -.5 to 01C -2.1 1 01H -2.0 to 07H +2.0 0 01C -2.0 to 07C +2.0 1 07H +2.1 to DHB -3.1 2 07C +2.1 to DCB -3.1 0 DHB -3.0 to DCB -3.0 40

PLUGGABLE TUBES LIST St. Lucia 2 02/89 COMPOHEHT :STG ¹8 Page  : 1 of 1 Oate : 04/14/89 Time : 9:53 AM

+ + + + + + + + + + + + + + +

I I I IREQI I TESTEO I I I I I I I I I IROWILIHEIZOHEIEXTILEGI EXTEHT I REEL I CHI PROBE LOCAT IOH ( X (Volts(geg( Oataset

+ + + + + + + + + + + + +

I 471 79( 4(TEHI C ITEH PCGYIBC008 I 1(A-580-SF/RN I OHT 0.0 (PTP ( 3.2(128( IMPERFECT

( 46( 80( 4(TEH( C (TEH PSGY(BC008 I 1(A.SBO.SF/RH I OHB 0.0 (PTP( 2.6(131(IMPERFECT

( 56( 80( 3(TEH( C (TEH PSGH(BC016 (M 1(A-580-SF/RM (

VS3 0.9 I 50( 1 ~ 5( 94(IMPERFECT I 46( 82( 4(TEHI C ITEH PCGYIBC008 1(A-580-SF/RN I OHB 0.0 ( 41( 3.1(117( INPERFECT I

( 48( 86( 6(TEH( C (TEH PSGY(BC070 I 1(A.580.SF/RN I OCT 0.0 I 46( 1.5(114(1-S (

( 96( 941 17(TEHI C ITEH SCGYIBC057 1(A 580-SF/RN I VS3 0.5 IPTP I 0.8(134( IMPERFEC1' I I I ITEHI C ITEH GYIBC057 IN 1(A-580.SF/RM ( VS2 -0.9 IPTP I 2.4 (112( INPERFECT (

( 31( 101( 6(TEH( C (TEH SSGN(BC071 I 1(A-580 SF/RN ( OCr 0.0 I 46( 0.9(113( IMPERFECT I

+ + + + +

Number of Pluggable Tubes:

Humber of Indications Selection Criteria :

PerCent T.W. ...: 40 Includes AOI,HQI,OSI,DTI,ORI,LPI,TBP,TRS,PTP Codes

CUNHULATlvE EXAHiNATioM REPORT St. Lucie 2 OUTAGE : 02/89 CDHPONENT  : STG ¹8 Page  : 1 of 2 DESCRlPTIOM : 20K TO 100X Date : 4/ 3/89 Time : 12:3C PH I I Extent I I 02/89 I I N/A I IRoMILinlLegIReqlTst/Motel Reel Probe I Location lvoltsloeglch I x lo iffl Location lvoltsloegl ch I x I I---I---I---I---I- I I I


I-----I---I--- I- I I I I I

-I-- I I 96I 24I C ITEHITEH I BC107 IA-580-SF/RN IOBH -1.1 I .9I 97IH ll 38I I I I I I I I 97I Cll C ITEHITEH PCIBC110 IA-580-SF/RN Ivs4 .6 .71140 I ll 211 I I I I I I I 68I 50I C ITEHITEH GNIBC009 IA 580-SF/RH IVS3 -.9 .5I117IH ll 25I I I I I I I I 57I 5ll C ITEHITEH PSGMIBC010 IA-580-SF/RH IVS3 -1.0 .BI105IK ll 37I I I I I I I l131I 55I C ITEHITEH PSIBC124 IA-580-SF/RN Ioce .0 .7I 139 I ll 23I I I I I I I I 391 69I C ITEHITEH GNIBC IA-580 SF/RH IVS3 .9 1.1I109IH ll 30I I I I I I I 52I 76I C ITEHITEH PCGNIBC015 IA-580 SF/RM IVS3 .8 .81107IH 1 I 38I I I I I I I I C3I rrl C ITEHITEH PSGNIBCOOS IA-580-SF/RM loce .0 1.2I139I ll 20I I I I I I I I 50I 7SI C ITEHITEH Pclecoos IA-580.SF/RM IOCT .0 .4 I 136 I ll 23I I I I I I I I 47I 79I C ITEHITEH PCGYIBCOOB IA-580.SF/RH ID HT .0 3.2I128I 1 I 31I I I I I I I I 49I 79I C ITEHITEH PCIBCOOS IA 580-SF/RH IOCT .0 1.5 I 131 I ll 28I I I I I I I I 51I 79I C ITEHITEH PSGNIBC016 IA.SSO.SF/RN IDCB .0 .7I 139 I ll 23I I I I I I I I 571 79I C ITEHITEH PSGNISC016 IA 580-SF/RM IDCT .0 1.1 I 133 I ll 29I I I I I I I I C6I Sol C ITEHITEH PCGYIBCOOS IA-580-SF/RH IOHB .0 2.6 I 131 I ll 2SI I I I I I I I 56I 801 C ITEHITEH PSGNIBC016 IA 580 SF/RH Ivs3 .9 1.5I 94IH ll 50I I I I I I I 471 81I C ITEHITEH PCIBCOOS IA-580-SF/RH IOHT .0 1 7I 140

~

I 11 20I I I I I I 46I 82I C ITEHITEH PCGYIBC008 IA-580-SF/RH IDHS .0 3.1 I 117I 1 I 41I I I I I I I I 89I 83I C ITEHITEH I BC121 IA-580 SF/RM Ivs3 -.7 1. 7I 110 IH ll 30I .I I I I I I I 47I 85I C I'TEHITEH IBC070 IA-580 SF/RM Ioce .0 1.91139 I 1 I 22I I I I I I I I 53I 85I C ITEHITEH PSGHIBC076 IA-580-SF/RH IDCB ~ 0 1.0 I 131 I ll 24I I I I I I I I 48I 86I C ITEHITEH sslecoro IA 580 SF/RH IOHB .0 .8 I137I I I I I I I I C ITEHITEH PSGYIBC070 IA 580-SF/RM IOCT .0 1 ~ 5 I114 I 1 I 46I I I I I I I I 52I 88l C ITEHITEH PsGMlecOr6 IA 580 SF/RH Ivs3 .7 1.1I110IH ll 20I I I I I I I I 54I 90I C ITEHITEH Pslec077 IA-580-SF/RH Ioce .0 .4 I 137I ll 21I I I I I I I I 87I 93I C ITEHITEH PSGHIBC057 IA-580-SF/RN IVS3 -.9 .SI112IH ll 24I I I I I I I I 96I 94I C ITEHITEH GYIBC 5 IA-SSO SF/RH IVS2 -.9 2.4I112IH ll 24I I I I I I I I I I C ITEHITEH scGYlecosr IA 580 SF/RH IVS3 .5 .BI134I ll 28I I I I I I I I 94I 96I C ITEHITEH PSGNIBC057 IA-580-SF/RH IVS2 -1.0 1.0lloSIH ll 28I I I I I I I I 961 96I C ITEHITEH SSGMIBC057 IA-580-SF/RH IVS2 -1.0 .9I 106IH ll 30I I I I I I I I I I C ITEHITEH PSGMIBC057 IA.SSO-SF/RH IVS3 .8 1.7I113IH ll 23I I I I I I I I 35I 97I C ITEHITEH PSGMIBC070 IA-580-SF/RH IOHB .0 .CI138I" ll 23I I I I I I I I 89I 971 C ITEHITEH PsGNleco58 IA-580-SF/RH IVS4 .9 .6I103IH ll 34I I I I I I I I 97I 97I C ITEHITEH IBC058 IA-580 SF/RM ITSH 21.6 .6I 140 I ll 21I I I I I I I I 34I 98I C ITEHITEH PSGNIBC070 IA-580-SF/RH IVS3 ..8 .9I104IH ll 34I I I I I I I I 35I 99I C ITEHITEH IBC070 IA 580-SF/RH Ioce .0 .6 I 137I ll 24I I I I I I I I 31lloll C ITEHITEH SSGNIBC071 IA-580.SF/RH IOCT .0 .9 I 113 I 1 I 46I I I I I I I I 89I103I C ITEHITEH GNISC059 IA-580.SF/RH lvs2 -.9 ~ 9I 1101H ll 2rl I I I I I I I 52lllol C ITEHITEH GMIBC081 IA-580 SF/RH IVS3 .5 ~ 6I109IH ll 25I I I I I I I I 96I114I C ITEHITEH GMIBC036 IA-580-SF/RK Ivs2 -.8 1.5I112IH ll 26I I I I I I I 129I115I C ITEHITEH PSGHIBC047 IA-580-SF/RH IOSH .9 1.2I124IH ll 23I I I I I I 94I122I C ITEHITEH PSGMISC038 IA.SSO-SF/RN Ivs2 - 7 .5 I 114 IH ll 24I I I I I I I 55I125I C ITEHITEH PSGMIBC029 IA-580-SF/RN IVS3 ..9 1.3I113IH ll 34I I, I I I I I I 94I126I C ITEHITEH SSGMIBC039 IA 5SO-SF/RH IVs2 -.9 .6I114IH ll 26I I

- I---I- -I-I

"- I I I- I I I I I I I I I I

CUMMULATI VE EXAMINATION REPORT St. Lucie 2 OUTAGE  : 02/89 COMPONENT  : STG ¹8 Page  : 2 of 2 DESCRIPTIOH : 20X TO 100X Date : 4/ 3/89 Time : 12:34 PM J

Extent I 02/89 I N/A I (Roe(Lin)LegfReq[Tst/Note] Reel Probe Location [Volts)Deg(Ch X /Diff) Location ]Volts)Deg(Ch I

---I---I-"I"I--------I--"----I-----------I-- -" -------I----I.-.I---I" f f f I---- I -"-----------I---- I---I---I---I

/ X f

/108/136( C (TEN[TEN /BC041 ]A-580-SF/RM /01C 31.0 J .9/126/M 1i 20I I I I I I I 12/166/ C /TEH/TEH PSGH/BC028 /A-580.SF/RM /TSC 27.0 .8/135/ 1( 27/

I

"-I" I"-I---I-- -----I------- I

/

"-I----------"--I----I- I I I I

I I I I I


I"-- I---I---I.--I I

Nuaber of INDICATIONS Selected from Current Outage : 45 Nwher of TUBES Selected from Current Outage : 42

FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST. LUCIE NUCLEAR PLANT P.O.BOX 128, FT.PIERCE, FLORIDA 33454 UNIT 2 1989 OUTAGE INSERVICE INSPECTION

SUMMARY

TABLES

@APL PERCENT OF EXAMINATIONS COMPLETE

1. Owner: Florida Power and Liciht Co. 300 Universe Blvd.

Juno Bch.FL.33408

2. Plant: St. Lucia Nuclear Power Plant P.O.Box ~128 Ft. Pierce FL. 33454 3.Plant Unit: 2 4.Owner Certificate of Authorization ~N A S.Commerical Service Date: 8 Aucuust 1983 6.Unit National Board No. A ~N EXAMINATIONS NHICH CAN NOT BE DEFERRED FOR CLASS 1, AND ALL APPLICABLE CLASS 2 EXAMINATIONS.

CODE NO. PERIOD SECOND PERIOD CATEGORY SELECTED COMPLETED / COMPLETED /

B-B 36 12 33.34 6 504 B-F 33 33.34 9 60. 64'2 B-G-2 40* 13 32.5% 62.54' B-H 294'IRST 04 504'7 234 80 344 67%

C-A 25% 3 62%

C-B 0> 1 504 C-C 31 11 64.5%

C-F 290 100 34% 189 654

  • This number represents the number of flanges,pumps, valves and components applicable, not the number of studs, nuts &

bolts examined.

Summary Table Format Inservice Inspection Summary Outage (Year) Period Interval Class Components SYSTEM (I) N I 0 ZONE NUMBER:(J) ASME S 0 N G T

SUMMARY

EXAMINATION AREA SEC.

CATGY XI NDE TRSEH A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METH PROCEDURE T C G M R CAL BLOCK DWG. NO.(K)

(L) (M) . (p) (R) (S) (W) (T) (U)

(N) (Q)

(0)

(A) Date of the inspection plan table was generated.

(B) The current revision number of the plan (C) The outage number within the period (D) Year of the outage (E)'urrent period (First, Second, Third)

(F) The current interval (First, Second, Third, Fourth)

(G) Applicable ASME Code Class (H) Page number of the table (I) System applicable to this table (J) The applicable Zone number for this table (K) The applicable isometric drawing number for this table (L) Item number associated with the item (M) Component or weld identification number (N) The component or weld description (0) Elevation level (P) ASME Code Category (Q) ASME Code Item Number (R) NDE Method to be used for the examination (S) The NDE procedure used (T) Results of the NDE examinations (U) Any remarks associated with the examination results (V) Ultrasonic calibration block to be used (W) Status of exam, C = Completed

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE:

VISION: 2 INSERVICE INSPECTION

SUMMARY

REPORT 0 OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS REACTOR PRESSURE VESSEL N I 0 ZONE NUMBER: 001 ASHE S ONGT SEC. XI T RSEN SUHMARY EXAHINATION AREA CATGY EXAH A E I 0 E REMARKS NUHBER IDEN'IIFICATION ITEH NO HETNOO PROCEDURE T C G H R *~CALIBRATION BLOCK**

REF. DUG. NO. 02-001-B 000010 101.151 B-A UT-0,45,60 700-11-000010 C - - - C 3-4-89 UT COHPLETE SKI CNF ¹ 001 FOR BOT.HD. DOME-TO-PEEL SEG. TOR. B1.21 UT-50/70 700-11-000010 C . . - ONE 45/60 DEGREE DETECTED RCB INDICATION,EVALUATED ACCEPTABLE PERASME SECTION XI, IN-3510-1.

    • UT-1,UT-4**

000020 101.154-A B A UT 0(45(60 700 1 1 000020 C C 2 27 89 UT( COMPLETE ~

PEEL SEG..TO-PEEL SEG. 9 30o B1.22 'T-50/70 700.11-000020 C-RCB

  • ~UT-1(UT 4~*

0030 101-154-B B-A UT-0(45(60 700 11 000030 C C - - - 2-27-89 UTI COHPLETE PEEL SEG.-TO PEEL SEG. 9 90o B1.22 UT-50/70 700-11-000030 C - - .

RCB

    • UT-1,UT-4**

000040 101-154-C B-A UT-0,45,60 700-11;000040 C C - - - 2-27-89 UT; COHPLETE PEEL SEG.-TO-PEEL SEG. 9 150o B1.22 UT-50/70 700.11.000040 C - - .

RCB

~~UT-1(UT-4~~

000050 101-154.D 8-A UT-0,45,60 700-11-000050 C C - - - 2-27-89 UT; COHPLETE PEEL SEG.-TO.PEEL SEG. Q 210o 81.22 UT-50/70 700.11-000050 C RCB

    • UT-1,UT 4~~

101-154-E 8-A Ul'-0(45,60 700 ~ - - 2-27-89 UTI 000060 11 000060 C G COHPLETE PEEL SEG.-TO-PEEL SEG. 9 270o 81.22 UT-50/70 700-11-000060 C - - .

RCB

  • "UT-1(UT-4*~

~0070 101-154- F 8-A UT-0,45,60 700 11-000070 C C - - - 2-27-89 UT; COMPLETE PEEL 'SEG.-TO-PEEL SEG. 9 330o B1.22 UT-50/70 700-11-000070 C-RCB

+*UT 1 UT 4*+

TE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 2 I SIGH 0 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS REAC'FOR PRESSURE VESSEL H I 0 ZONE NUMBER: 001 ASME ,

S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM HO METHOD PROCEDURE T C G M R>>>>CALIBRATIOH BLOCK>>>>

REF. DUG. NO. 02-001-A 000080 201-141 8-A UT-0,45,60 700.11-000080 C C - - - 2-26 89 UT; COMPLETE 700.11.000080 ~ - .

BOT.HD.-TO-LSI.SHELL GIR.'MELD 81.21 UT-50/70 C RCB

>>>>UT-I,UT-4>>>>

REF. DIJG. HO. 02-001-C 000090 101-142-A 8-A UT-0,45,60 700-11-000090 C C - - - 3-1-89 UT; COMPLETE LN. SHELL LONG MELD 9 15o 81.12 UT-50/70 700-11-000090 C - --

RCB

    • UT-1,UT-2**

00100 101.142-8 8-A UT-0,45,60 700.11-000100 C C - - - 3-2-89 UT; COMPLETE LN. SHELL LOHG. HELD Q 135o 81.12 UT-50/70 700-11 000100 C-RCB

    • UT-1,UT-2**

000110 101-142-C 8-A UT.0,45,60 700.11.000110 C C . - . 3.2.89 UT; COMPLETE LN. SHELL LONG. HELD 9 255o S1.12 UT-50/70 700. 11.000110 C - --

RCB

    • UT-1,UT-2**

REF. DUG. HO. 02-001-A 000120 101-171 8-A UT-0,45,60 700-11-000120 C C - - - 3-1-89 UT; COMPLETE LN. SHELL-TO-INT. SHELL G.N. B1 ~ 11 UT.50/70 700-11-000120 C-RCB

    • UT-1,UT-2**

REF. DMG. HO. 02-001-C 00130 101.124.A 8-A UT-0,45,60 700 11-000130 C C - 3-1-89 UTI COMPLETE INT ~ SHELL LOHG. MELD 9 15o 81 ~ 12 UT ~ 50/70 700.11-000130 C-RCB

    • UT-1,UT-2**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 3 REVISIOH: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS REACTOR PRESSURE VESSEL N I 0 ZONE NUMBER: 001 ASME S ONGT SEC ~ XI RSEH SUMMART EXAMIHATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK~~

REF. DWG. HO. 02-001-C 000140 101-124-8 8-A UT-0,45,60 700-11-000140 C C - - - 3-1-89 UT; COMPLE'TE IHT. SHELL LONG. WELD 8 135o 81.12 UT-50/70 700-11-000140 C - --

RCB

    • UT-1,UT-2~*

000150 101-124.C 8-A UT-0,45,60 700-11.000150 C C - - 3-2-89 UT; COMPLETE INT. SHELL LONG. 'WELD 8 255o 81.12 UT-50/70 700-11-000150 C - --

RCB

    • UT-1)UT-2**

REF. DWG. HO. 02-001-A 00160 106-121 8-A UT-0,45,60 700-11.000160 C C . . - 3-4-89 UT; COMPLETE IHT ~ SHELL-TO-UPP. SHELL G.W. 81.11 UT-50/70 700-11-000160 C-RCB

<<*UT-I,UT-2~>>

REF. DWG. HO. 02-001-C 000170 101-122.A 8-A UT-0,45,60 700-11.000170 C C - ~ 2.28.9 UT: COMPLETE UPP. SHELL LONG ~ WELD 8 15 81.12 UT-50/70 700.11.000170 C - --

DEGREES RCB

    • UT 1**

000180 101-122-B 8-A UT-0,45,60 700 11-000180 C C - - - 2-28-89 UT; COMPLETE UPP. SHELL LONG. WELD 8 135 81.12 UT-50/70 700-11-000180 C . --

DEGREES RCB

    • UT 1*%

000190 101.122.C 8-A UT-0,45,60 700-11-000190 C C - - . 3.1-89 UT; COMPLETE UPP ~

D SHELL LONG.~ WELD 8 255o 81.12 UT-50/70 700-11-000190 C-

    • UT 1**

ATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 4 VISION: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRSI'NTERVAL CLASS 1 COMPONENTS REACTOR PRESSURE VESSEL H I 0 ZONE NUMBER: 001 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS HUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R *~CALIBRATIOH BLOCK~

REF. DWG. NO. 02-001-A 000200 101-121 B-A UT-0,45,60 700-11-000200 C C - . 28-89 UTI COMPLETE EXAMIHED FROM THE UPP. SHELL-TO-FLANGE GIR. WLD. 81.30 UT-50/70 700-11-000200 C - - - VESSEL I.D..

RCB e*UT REF. DWG. NO. 02-001-8 000210 105-121-A B-D O'T-0,45,60 700-11-000210 C C - - 2-89 UT; COMPLETE OUTLET NOZZ.-TO-SHELL 8 Oo 83.90 UT-50/70 700-11-000210 C - --

RCB l*UT 1*t 00220 103-121-A B.D UT-0,60 700-11-000220 C C - - 2-89 UTI COMPLETE, GEOMETRIC INLET NOZZ.-TO-SHELL 9 60o 83.90 UT.50/70 700-11-000220 C - - REFLECTION FROM THE SUPPORT LUG LOCATED RCB UT-45 700-11-000220 . C - 8 180 DEGREES.

    • UT I)UT-9~~

000230 .103.121-8 8 0 UT.0,45,60 700.11.000230 C C - - 12 89 UI'; COMPLETE INLET HOZZ.-TO-SHELL 9 120o .83.90 UT-50/70 700-11-000230 C - --

RCB

    • UT.1,UT.9**

000240 105.121-8 8-D UT-0,45,60 700-11-000240 C C - - . 3.2-89 UT; COMPLETE OUTLET HOZZ.-TO-SHELL 8 180o 83.90 UT-50/70 700.11-000240 C - --

RCB a*UT 1**

000250 103-121-C B-D UT-0,45,60 700-11-000250 C C - - 3 3 89 UT; COMPLETE INLET HOZZ.-TO-SHELL 9 240o 83.90 UT-50/70 700-11 '00250 C - --

RCB

    • UT-I,UT-9~*

0260 103-121-0 8-D UT.0,60 700.11-000260 C C - - 3 3-89 UT; COMPLETE, 45 DEGREE GEOMETRIC IHLET NOZZ.-TO.SHELL Q 300o 83.90 UT-50/70 700.11-000260 C - REFLECTION FROM tHE SUPPORT LUG 9 180 RCB UT.45 700.11-000260 C - DEGREES.

~*UT 1,UT 9**

TE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 5 I SION: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUI'AGE 2 (1989), SECOHD PERIOD, FIRST INTERVAL CLASS 1 COMPONEHTS REACTOR PRESSURE VESSEL H I 0 ZONE NUMBER: 001 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS HUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK<<*

REF. DWG. NO. 02 001-A 000280 IH-IR-A 8 0 UT-50/70 700.11-000280 C C - - - 3-3-89 UT; COMPLETE INH. RAD. INLET NOZZ. 9 60o B3.100 RCB

    • UT 1**

000290 IH-IR-8 8-D UT-50/70 700 11 000290 C C - - - 2.22-89 UT; COMPLETE IHN. RAD. INLET NOZZ. Q 120o 83.100 RCB

    • UT-1<<*

310 IN- IR-C ~

B.D UT-50/70 700-11-000310 C C . - - 3-3-89 UT; COMPLETE INN.~ RAD.~ INLET HOZZ. 9 240o 83.100

~

RCB

<<*UT 000320 IH-IR.D 8-D UT-50/760 700-11-000320 C C - - - 2-26 89 UT; COMPLETE IHH. RAD. INLET NOZZ. <<I 300o B3.100 RCB

    • UT 1*<<

REF. ONG. NO.'2-001-8 000350 201-128-A 8 J UT-45 700.8-000350 C - - C - 2-23-89 UT; COMPLETE, 45 DEGREE INLET NOZZ.-TO-EXTEH. Q 60o B9.11 UT-50/70 700.8.000350 C . - - GEOMETRIC REFLECTION FROM THE SUPPORT RCB UT.O 700.8-000350 LUG 9 180 DEGREES. 0 DEGREE USED TO MOHITOR BACKHALL ONLY

<<<<IR-CS-46-SLC, UT-5**

000360 RC-112.6 8-J UT-0,45 700.8-000360 C C - - 2-23-89 UT; COMPLETE 0 DEGREE USED TO IH. NOZZ. EXT.-TO-ELBN 9 60o 89.11 UT-50/70 700.8.000360 C - - - MONITOR BACKWALL OHLY.

RCB

    • UT-5,IR-CS ~ 46-SLC*<<

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 6 VISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOHD PERIOD, FIRSl'HTERVAL CLASS 1 COMPONENTS REACTOR PRESSURE VESSEL N I 0 ZONE NUMBER: 001 ASME S ONGT SEC. XI T RSEN

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R <<*CALIBRATIOH BLOCK**

REF. O'IJG. NO. 02-001-B 000370 201-128- 8 8-J UT 0,45 700.8.000370 C C - - 22-89 UT; COMPLETE( 0 DEGREE USED TO INLET NOZZ.-TO-EXTEN. a 120o 89.11 UT-50/70 700-8.000370 C - - - MONITOR BACGIALL ONLY.

RCB

    • IR-CS-46-SLC(UT-5**

000380 Rc-121-6 8-J UT-45 700-8-000380 C - - C 22-89 UT; COMPLETE,45 DEGREE IN.HOZZ. EXT.-TO-ELBN 8 120o 89.11 UT-D 700-8.000380 REFLECTIOH FROM THE LONG SEAM CRONHS RCB UT-50/70 700-8-000380 C - - - LOCATED 8 90 AHD 270 DEGREES. 0 DEGREE USED TO MONITOR BACGIALL OHLY.

    • UT 5, IR-CS-46-SLC*>>

0410 201-128-C 8-J UT-0(45 700-8-000410 C C - - 23-89 UTI COMPLETE 0 DEGREE USED TO IH.~ HOZZ.-TO-EXTEN.~ 9 240o

~ 89.11 UT.50/70 700.8 000410 C - - MONITOR BACK MALL ONLY.

RCB

  • >>IR-CS 46-SLC,UT-5**

000420 Rc-124-6 8 J UT.0,45 700-8.000420 C C - ~ 23-89 UT; COMPLETE, 0 DEGREE USED TO IH.HOZZ. EXT.-TO-ELBSI 9 240o 89.11 UT-50/70 700-8.000420 C - - - MONITOR BACOIALL ONLY.

RCB

    • UT-S, IR-CS-46-SLC**

000430 201-128.0 8-J UT.45 700.8.000430 C - - C - 2 22-89 UT; COMPLETE, 45 DEGREE INL. HOZZ ~ -TO.EXTEH. 9 300o 89.11 UT-50/70 700.8.000430 C - - - GEOMETRIC REFLECTIOH FROM THE SUPPORT RCB UT 0 700.8.000430 LUG 8 180 DEGREES. 0 DEGREE USED TO MONITOR BACKWALL OHLY.

    • IR-CS-46-SLC,UT-S*>>

000440 RC-115.6 8-J UT-0,45 700 8-000440 C C - - 23 89 UT'OMPLETE, 0 DEGREE USED TO IN.HOZZ. EXT.-TO-ELBN 8 300o 89.11 UT-50/70 700-8-000440 C - - - MONITOR BACKWALL ONLY.

RCB I

  • <<UT-5, IR-CS-46-SLC**

0490 MSH-01 8-N-2 VT 3 SL-410-003-23 C C - - 8-89 VT; COMPLETE,CE I.D. ¹ SC- 1.

MAT. SURVEIL. HOLDER 9 83o 813.10 RCB

<<*N/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 7 VISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS REACTOR PRESSURE VESSEL H I 0 ZOHE NUMBER: 001 ASME S OHGI' SEC. XI RSEH

SUMMARY

EXAM!HATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IOEHTIFICATIOH ITEH NO METMCO PROCEDURE T C G M R **CALIBRATIONBLOCK**

REF. DUG. NO. 02-001-8 000500 MSH-02 B-H.Z VT-3 SL.410-003.23 C C - - 8-89 VT; COMPLETE,CE I.D. ¹ SC-2.

MAT. SURVEIL. HOLDER 9 97o 813.10 RCB

    • N/A**

000510 MSH-03 B-H.2 VI'-3 SL-410-003-23 C C - - - 3-8-89 VT; COMPLETE,CE I.DE ¹ SC-3.

NATL.SURVEIL. HOLDER 9 104o 813.10 RCB

%*H/A*4 0520 MSH-04 B-H.2 VT-3 SL.410.003-23 C C - - - 3.8-89 VT; COMPLETE, CE I.D. ¹ SC-4, MAT. SURVEIL. HOLDER 8 263o 813.10 NOTE: NO CAPSULE IN HOLDER.

RCB

    • N/A~~

000530 MSH-05 B.N-2 VT-3 SL-410.003-23 C C - - - 3-8.89 VT; COMPLETE,CE I.D. ¹ SC.S.

MAT. SURVEIL. HOLDER 9 277o 813 '0 RCB

    • N/A**

000540 HSH-06 8-H-2 VT.3 SL-410.003-23 C C - - . 3-8-89 VT; COMPLETE,CE I.D. ¹ SC-6.

MAT. SURVEIL. HOLDER 9 284o 813 ~ 10 RCB

    • N/A**

REF. DUG. NO. 02-001-A 000550 101-141-A B.N-2 VI'-3 SL-410-003.21 C - C - 8-89 VT; COHPLETE,CE I.D. ¹ CORE STABILIZING LUG 9 Oo 813.10 CS 1.SCRATCHES AND GRINDING MARKS NOTED.

RCB

    • N/A*~

560 101-141-8 B-N-2 VT-3 SL-410-003 -21 C C - - - 3-8-89 VT; COMPLETE, CE I.D. ¹ CS-2.

CORE S'TABILIZIHG LUG 9 60o 813.10 RCB

    • N/A*"

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 8 EVI SION: 2 IHSERVICE INSPECTION

SUMMARY

REPORI'UTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS REACTOR PRESSURE VESSEL H I 0 ZOHE NUMBER: 001 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM HO METHOD PROCEDURE T C G M R *~CALIBRATIOH BLOCK**

REF. DIJG. HO. 02-001-A 000570 101-141-C 8-N-2 VT-3 SL-410-003-21 C C - 3 8 89 VT; COMPLETE, CE I.D. ¹ CS 3.

CORE STABILIZIHG LUG 9 120o 813 ~ 10 RCB

    • N/AP4 000580 101-141-0 8-H-2 VT-3 SL-410.003-21 C - C - - 3.8-89 VT; COMPLETE, CE I.D. ¹ CS.4, CORE STABILIZING LUG 9 180o 813.10 SCRATCHES NOTED.

RCB

  • AH/A%*

00590 101.141-E 8-H-2 VT-3 SL-410-003-21 C - C - - 3-8-89 VT; COMPLETE, CE I.D. ¹ CORE STABILIZIHG LUG 9 240o B13.10 CS 5 ~ SCRATCH NOTED ~

RCB

    • H/Ak*

000600 101-141- F B-H-2 VT-3 SL-410-003-21 C C - - - 3 8-89 VTI COMPLETEI CE I.D. ¹ CS 6.

CORE STABILIZING LUG 9 300o 813.10 RCB e*H/A~~

000610 103-151-A 8-H-2 VT-3 SL-410-003-19 C C - - - 3-8-89 VT COMPLETE, CE I.D. ¹ CSL-1.

CORE STOP LUG 9 10 DEG. 813.10 RCB

  • ON/A*%

000620 103-151-8 B-N-2 VT.3 SL-410.003-19 C C - - - 3-8-89 VT; COMPLETE, CE I.D. ¹ CSL-2.

CORE STOP LUG Q 40 DEG. 813.10 RCB

    • H/A**

000630 103.151.C 8-H-2 VI'-3 SL-410.003-19 C - C - - 3-8.89 VT; COMPLETE, CE I.D. ¹ CSL-3, C ORE STOP LUG 9 85 DEG ~ 813 ~ 10 SCRATCHES NOTED.

RCB

    • H/A**

ATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 9 VISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS REACTOR PRESSURE VESSEL H I 0 ZONE NUMBER: 001 ASME S ONGT SEC. XI T RSEM

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R *"CALIBRATIOH BLOCK**

REF. DWG. HO. 02 001 A 000640 103-151-0 B-N-2 VT-3 SL.410-003-19 C C - - 3-8-89 VT; COMPLETEI CE I.D. ¹ CSL-4.

CORE STOP LUG 9 135 DEG. 813.10 RCB

    • N/A**

000650 103-151-E B-N-2 VT.3 SL-410-003-19 C C . - - 3-8.89 VT; COMPLETE, CE I.D. ¹ CSL.S.

CORE STOP LUG 8 160 DEG. 813.10 RCB

    • N/A**

0660 103-151- F B-H-2 VT-3 SL.410-003-19 C C .. - 3-8.89 VT; COMPLETE,CE I.O. ¹ CSL.6.

CORE STOP LUG 9 205 OEG. B13.10 RCB 14H/A%%

000670 103-151.G 8-H-2 VT-3 SL-410.003-19 C C - - - 3-8-89 VT; COMPLETE,CE I.D. ¹ CSL-7.

CORE STOP LUG 9 250 DEG. 813.10 RCB DEGAS

    • H/A**

000680 103-151-N 8-N-2 VT-3 SL-410-003-19 C C - - - 3-8 89 VT; COMPLETE, CE I.D. ¹ CSL 8.

CORE STOP LUG 9 280 DEG ~ 813.10 RCB

  • 1H/AIO 000690 103-151-1 B.H-2 VT-3 SL-410-003-19 C C - - - 3-8.89 VT; COMPLETE, CE I.D. ¹ CSL.9.

CORE STOP LUG 9 305 813.10 RCB

    • N/A**

00700 FB-01 B-N-2 VT-3 SL-410 003 20 C - C - 3 8-89 VT; COMPLETE,CE I ~ 0 ~

FLOH BAFFLE B13.10 FSB-1.SCRATCHES NOTED.

RCB

    • N/A*+

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 10 EVI SION: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS REACTOR PRESSURE VESSEL N I 0 ZONE HUMBER: 001 ASME S ONGT SEC ~ XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*>>

REF. DWG. NO. 02-001-A 000710 CSB-01 B.N-3 VT-3 SLY 410-003.006 C C - - - 3-5-89 VTI COMPLETE.

CORE SUPPORT BARREL 813.30 VT-3 SL.410.003-007 C-RCB VT-3 SL.410 '03.008 C-VT-3 SL-410.003-009 C-VT-3 SL-410-003-010 C >>*N/A**

VT-3 SL-410-003-016 C-VT-3 SL-410-003-017 C-000711 CSA 8-H-3 VT-3 SL-410.003-014 C - - - C 3.8.89 VT; COMPLETE,CHR ¹ 89.2-067, TWO CORE BARREL SHROUD 813.30 VT-3 SL.410.003-015 - - . C INDICATIONS IDENTIFIED, NCR 2-217 RCB EVALUATED AS ACCEPTABLE, POSE NO OPERABILITY CONCERN.TME IHDICATIONS ARE NOT OF THE TYPE WHICH WILL PROPAGATE.

    • N/A*>>

000712 CBAK.1 TMRU CBAK-4 8 AH-3 VT-3 SL-410 003 005 C . C - 3 4 89 VT; COMPLETE, MINOR SCRATCH CORE BARREL ALIGNMENT KEYS (4) 813.30 IDENTIFIED OH O.D. SURFACE RIGHT OF 0 RCB DEGREE/CBAK-1.

    • H/A*>>

000713 CBGL-1 THRU CBGL-4 8-H-3 VT-3 SL.410-003-013 C C - - - 3-8-89 VT; COMPLETE ~

CORE BARREL GUIDE LUGS (4) 813.30 RCB

    • N/A**

000714 SB-1 THRU SB-6 B-N-3 VT-3 SL-410.003-018 C C - - - 3-8-89 VT; COMPLETE CORE BARREL,SNUBBER BLOCKS (6) B13.30 RCB

>>>>H/A**

000720 UGS-01 B.H-3 VT-3 SL.410-003-001 C C

- - - 3-3-89 VT; COMPLETE UPPER GUIDE STRUCTURE 813.30 VT-3 SL.410.003.002 C VT-3 SL-410-003-003 C - --

VT-3 SL-410.003-004 C-

    • N/A*>>

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 11 VIS IOH: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOHD PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS REACTOR PRESSURE VESSEL N I 0 ZONE NUMBER: 001 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER I DENT I F I CAT IOH ITEM HO METHOD PROCEDURE T C G M R >>*CALIBRATION BLOCK>>*

REF. DiJG. NO. 02-001-C 000730 AK-01 8-H-1 VT-3 SL-410-003-012 C C - - - 3-6 89 VT; COMPLETE, CE I.D. ¹ Kil-1.

ALIGNMENT KEY 9 Oo 813.10 RCB

<<*H/A*>>

000740 AK-0? 8-N-1 VT-3 SL-410.003.012 C C - - - 3 6 89 VT; COMPLETE,CE I.O. ¹ KW 2.

ALIGNMEHl'EY 9 90o B13.10 RCB

  • <<H/A**

00750 AK-03 8-H-1 VT.3 SL 410-003-012 C C - - 3-6 89 VT; COMPLETE,CE I.D. ¹ Kil 3.

ALIGHMEHT KEY 9 180o 813.10 RCB

<<*N/A>>>>

000760 AK-04 B-H-1 VT-3 SL-410-003-012 C C - - - 3-6-89 VT; COMPLETE, CE I.D. ¹ KM-4.

ALIGNMENT KEY 9 270o 813.10 RCB

"*H/A**

REF. DWG. NO. 02-001-8 000770 OH- I E-A B N-1 VT-3 SL-410-003-022 C C - - - 3-8-89; VT-3 COMPLETE IHTEGRAL EXT. MAT SURF.,HOZZLE 813.10 SL.410-003 9 0 DEBS RCB

<<<<N/A>>>>

000780 ON- IE-B 8-N 1 VT-3 SL.410.003-011 C C - - - 3-6-89 Vl'-3; COMPLETE INTEG. EXT MAT. SURF.,NOZZLE 9 B13 ~ 10 SL-410-003 180 DEG.

>><<H/A<<<<

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 12 VIS IOH: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPOHENTS REACTOR PRESSURE VESSEL N I 0 ZOHE NUMBER: 001 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R *~CALIBRATIOH BLOCK~*

REF. DNG. NO. 02-001-8 000785 RVMS B-N-1 VT-3 SL-410 ~ 003 ~ 11 C - - - C 3.8-89 VT-3; COMPLETE, GOUGE 9 20 REACTOR VESSEL FLANGE MATING 813.10 QI.9-2 REV.12 DEGREES, IDENTIFIED IN 1984, NO CHANGE.

SURFACE SL-410.003 ACCEPTABLE.

RCB 41H/Af1

DATE: 07/07/89 ST. LUCIE NUCLEAR PLAHT UNIT 2 PAGE: 13 VISION: 2 INSERVICE INSPEC'TION

SUMMARY

REPORT OUTAGE 2 (1989),'ECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS PRESSURIZER N I 0 ZONE NUMBER: 005 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHT IF I CAT IOH ITEM HO METHOD PROCEDURE T C G M R *~CALIBRATIOH BLOCK~~

REF. O'WG. NO.02-005 001450 SVH-IR-A B.O UI'-30,70 NDE5.13 - 001 C C - - 24.89 UT; COMPLETE SFTY. VLVE. HOZZ., IH. RADIUS B3.120 RCB

    • UT.6*%

001480 RVH-IR B.D UT-30,70 HDE5.13 - 001 C C - - - 2-24-89 UT; COMPLETED REL. VLVE. HOZZ., INN ~ RADIUS 83.120 RCB

  • kUT 6**

1500 SVN-IR-8 B.D UT-30,60 NDE5.13 - 001 C C . - - 2-24.89 UT; COMPLETE S.V. NOZZ.,

~ ~ IHH.~ RADIUS B3.120 RCB 001530 SVH- IR-C 8-D UT-30,70 NDE5.13 - 004 C C - - - 2-24-89 UT; COMPLETE S.V. HOZZ., IHH. RADIUS 83.120 RCB i*UT 001540 503.671-C 8-F Ul'-45,60 NDE 5.11 - 001 C C - - - 2-25-89 Ptg COMPLETE, THREE INDICATIOHS, S.V. HOZZ.-TO-FLANGE WELD 85.20 PT HDE 3.3 - 001 - C - - ACCEPTABLE. 3-3-89 UT; COMPLETE RCB

    • Ut 17~~

001570 501-671 8-B UT-0,45,60 HDE 5.1 - 001 C C - - - 3-3-89 Ut COMPLETE,SEE PRE SERVICE DATA TOP HD.-TO.UP. SHELL CIR.WLO. 82.11 FOR LIMITATIOHS.

RCB

    • UT4A*~

001580 101-622-A 8-B UT-0,45(60 NDE 5.1 - 001 C C - - - 3-3-89 UT; COMPLETE UPP.~ SHELL LONG.~ WELD AT Oo B2.12 RCB

~*UT4A~~

DATE: 07/07/89 ST ~ LUCIE NUCLEAR PLANT UNIT 2 PAGE: 14 VISION: 2 INSERVICE INSPECTION SUHHARY REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COHPONEHTS PRESSURIZER N I 0 ZOHE NUMBER: 005 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHINATIOH AREA CATGY EXAH A E I 0 E REHARKS HUHBER IDEHTIFICATION ITEN NO HETHOO PROCEDURE T C G H R **CALIBRATIOHBLOCK**

REF. DMG. NO.02-005 001590 101-622-B B-B UT-0,45,60 HDE 5.1 001 C C - - - 3-3 89 UT; COHPLETE UPP. SHELL LONG. MELD AT 180o 82.12 RCB

  • >>UT4A>>>>

001610 101-642-A 8 B UT.O(45,60 NDE 5.1 - 001 C C - - 3 3-89 UTI COHPLETE LOM. SHELL LONG. MELD AT 90o B2.12 RCB

    • UT4A**

1620 101-642.B B-B UT-0,45,60 NDE 5.1 - 001 C C . - - 3.3 89 UT; COHPLETE LOM. SHELL LONG. MELO AT 270o B2.12 RCB

    • UT4A*>>

001630 304-671 8-B UT-0 45,60 NDE 5.1 - 001 C C - - - 3-3-89 UT; COHPLETE LOM. SHELL-TO-LOM. HEAD MELD B2.11 RCB

    • UT4A*>>

001640 103-651 8-H HT NDE 2.2 - 001 C - C - - 02-21-89 HT: TMO LINEAR INDICATIOHS,BOTH SUPPOR'I SKIRT-TO-LOM. HEAD MD. B8.20 .15",ACCEPTABLE.

RCB

    • N/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLAHT UNIT 2 PAGE: 15 VISION:, 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS REACTOR COOLAHT PIPING N I 0 ZOHE HUMBER: 009 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM HO METHOD PROCEDURE C G M R ~*CALIBRATIOH BLOCK~*

LOOP A PUMP 2A2 TO REACTOR VESSEL REF. DUG. NO.02-009 002100 RC-115-701-771 8-F UT-45,60 HDE 5.11 - 001 C C - - - 2-21-89 PT; COMPLETE, 2-22.89 UT; SAFE EHD - TO - PIPE 85.50 PT NDE 3.3 - 002 C - - COMPLETE RCB

    • UT 59**

8-J - 001 ~ - - 2-21-89 ,2-22-89 002110 RC.115.103.722-LS-A UT.45,60 HDE 5.3 C C MT: COMPLETE UT PIPE LONGITUDINAL SEAM 89.12 MT NDE 2.2 - 002 C - - - COMPLETE RCB

    • UT.6k%

02120 RC-115.103-722-LS 8 8-J UT.45,60 NDE 5.3 - 001 C C - - - 2 21-89 MT;COMPLETE( 2.22 89 UT; PIPE LONGITUDIHAL SEAM 89.12 MT HDE 2.2 - 002 C . . - COMPLETE RCB

+FAUT 6**

002140 RC-115-105-742-LS-A B-J Ul'-0,45 700.8.002430 C C - - - 2-23-89 UTT COMPLETE 8 CIRC WELD ELBOH LONGITUDINAL SEAM 89. 12 UT-50/70 700-8.002430 C - - - RC 115 1, 0 DEGREE USED TO MONITOR RCB SWI-NDT-700-8 BACOIALL ONLY.

    • UT-6(UT-5*>>

002150 RC-115-105-742-LS-8 8-J UT-O(45 700-8.002440 C C- 2.23-89 UT; COMPLETE, 9 CIRC. MELD ELBOH LONGITUDINAL SEAM 89.12 UT-50/70 700-8-002440 C RGB 115.1. 0 DEGREE USED TO MOHITOR RCB SHRI HDT-700-8 BACKWALL ONLY.

<<~UT-6,UT 5~*

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 16 VISION: 2 INSERVICE INSPECTION SUMHARY REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 CCHPONENTS REACTOR COOLANT PIPING N I 0 ZONE NUHBER: 011 ASHE S ONGT SEC. XI T RSEN

SUMMARY

EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEM NO HETNOO PROCEDURE T C G H R **CALIBRATIONBLOCK~*

LOOP B PUMP 281 TO REACTOR VESSEL REF. O'MG. NO.02-011 002420 RC-121-801-771 B.J UT-45,60 NDE 5;3 . 002 C C - - - 2 21-89 HT; COMPLETE, 3-3-89 UT; PIPE - TO - ELBOJ 89.11 MT NDE 2.2 - 003 C - - - COHPLETE RCB

    • UT 6**

002430 RC-121-105-742-LS-A 8-J UT-45,60 NDE 5.3 - 002 C C . - - 2-21-89 HT; COHPLETE, 3-3-89 UT; ELBSl LONGITUDINAL SEAM 89 '2 HT NDE 2.2 . 003 C - - - COHPLETE 9 CIRC. VELD RC-121-801-771.

RCB

    • UT.6**

02440 RC-121-105-742-LS-B 8-J UT-45,60 NDE 5.3 - 002 C C - - - 2-21-89 HT; COMPLETE, 3-3-89 UT; ELBSJ LONGITUDINAL SEAH 89.12 HT NDE 2.2 - 003 C - - - COHPLETE RCB

    • UT 6**

002470 RC-121-812-771 B-J HT NDE 2.2 - 004 C C .. - 2.21.89 HT; COHPLEIE BRAN. CONN. SPRAY NOZZLE e9.32 RCB

%AN/A1*

002480 RC-121-806-771 BRAN. CONN. CHARGING NOZZLE 8-J 89.32

'T NDE 2.2 . 005 C C - - 2-21-89 H1'; COHPLETE RCB

    • N/A*"

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 17 EVI SION: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONEHTS PRESSURIZER SURGE LINE N I 0 ZONE NUMBER: 016 ASME S OHGT SEC. XI T RS EH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*~

REF. DUG. HO.02-016 003085 H1B F-C VT-3,4 HDE 4.3 . 038 C C 2-21-89 VT-3(4; COMPLETE, CHR ¹ VARIABLE SPRING CAH HANGER F-1,4 Vl'-4 89-2-054, EVALUATION OF RCB SPRIOISPOSITIOHEDCR ~2-204,JPE EVALUATED ACCEPTABLE AS FOUND.

<<"H/A~*

003095 H28 F-C VT-3,4 NDE 4.3 . 036 C C 2.13-89 VT-3,4; COMPLETE, CNR ¹ VARIABLE SPRING CAN MANGER F- 1,4 VT-4 89.02.42,EVALUATION OF SPRING RCB SETTINGS.NCR ¹2-199 DISPOSITIOHED ACCEPTABLE AS FOUHD.

    • H/A**

3125 H38 F-C VT-3,4 HDE 4.3 . 037 C C 2-11-89 VT-3,4; COMPLETE,CHR ¹ 89.02-43 VARIABLE SPRING CAN HAHGER F-1,4 VT-4 EVALUATION OF SPRING CAH SETTINGS. NCR ¹ RCB 2.200 OISPOSITIOHEDACCEPl'ABLE AS FOUND.

    • H/A~*

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 18 VISION: 2 INSERVICE INSPECTION

SUMMARY

REPORT 0 OUTAGE 2 (1989), SECOND PERIOD, CLASS 1 COMPOHEHTS FIRST INTERVAL REACTOR COOLANT PUMP 2A1 N I 0 ZONE NUMBER: 017 ASME S ONGT SEC. XI T RSEM

SUMMARY

EXAMINA1'IOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DWG. HO.02-017 003240 02-017.008 H/A UT-25L HDE 5.15 - 001 C C - 2-4 89 UT; COMPLETE, REG. GUIDE 1.14 FLYWHEEL BORE AND KEYWAY H/A EXAM.

RCB

    • N/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 19 VISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT PUMP 2A2 H I 0 ZONE HUNGER: 018 ASME S OHGT SEC. XI T RSEM

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS HUMBER IDENTIFICATION ITEM NO METHOD PROCFDURE T C G M R *~CALIBRATIOH BLOCK**

REF. DWG. NO.02-018 003341 02.018.RPH-6 F-C VT-3/4 4.3 - 001 C . - - C 2-27-89 VT; CHR ¹ 89-2-059, EVALUATE PUMP SUPPORT - SPRING TYPE F-1,4 VT.3/4 4.3 . 065 C - - - SPRING CAH SETTING.JPE EVALUATED RCB ACCEPTABLE AS IS. 4-15-89 VTI HO'I FUNCTIONAL ~ SETT IHGS ONLY SAT ~

    • H/A**

003380 02-018.008 N/A UT-25L NDE 5.15 - 002 C C - - - 2-4-89 UT; COMPLETE( REG. GUIDE 1.14 FLYWHEEL BORE AND KEYWAY H/A EXAM.

RCB

++N/A+*

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 20 VISION: 2 INSERVICE IHSPECI'ION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT PUMP 281 H I 0 ZONE HUMBER: 019 ASME S ON 0T SEC. XI RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R *>>CALIBRATIOH BLOCK**

REF. DUG. NO.02-019 003450 02-019-001 8 L-1 RT HDE - 12 REV.7 C C - - - 3-4-89 RT; COMPLETE, 97K REOUIRED UPPER SCROLL MELO 812.10 PT COVERAGE ACHIEVED OVERALL,TORUS 'WELD RCB INCLUDED.

    • N/A**

003460 02.019.002 B-L-1 RT NDE - 12 REV.7 C C - - - 3-4-89 RTI COMPLETEI 97K OF REOUIRED LONER SCROLL WELD B12.10 PT VOLUME ACHIEVED.

RCB

    • H/A**

3470 02-019-003 8-L-2 VT-3 ISI-354,REV. 3 C C 3-2-89 VT-3 COMPLETE PUMP CASING INTERNAL SURFACE 812.20 RCB

    • N/A>>>>

003482 02-019.RPH-10 F-C VT-3/4 NDE 4 .3 - 046 C - . - C 2-28 89 VT; CHR ¹ 89.02-060, EVALUATE PUMP SUPPORI'PRIHG TYPE F-1.4 VT-3/4 HDE 4.3 - 067 C - - - SPRING SETTINGS.JPE EVALUATED AS RCB ACCEPTABLE. 4-15-89 VT; HOT FUNCTIONAL, CHECKED SETTINGS SAT.

    • H/A>>*

003492 02-019-RPH-11 F C VT-3/4 NDE 4.3 - 043 C - - . C 2-28-89 VT; CHR ¹ 89.02-061, EVALUATE PUMP SUPPORT - SPRING TYPE F-1.4 VT-3/4 NDE 4.3 - 069 C - - - SPRING SETTING. JPE EVALUATED ACCEPT AS RCB IS. 4-15-89 VT; HOT FUNCTIONAL, CHECKED SETTING, SAT.

>>>>N/A>>>>

003502 02-019-RPH-12 F-C VT-3/4 HDE 4.3 - 044 C - - - C 2-28-89 VT; CHR ¹ 89-02-044I EVALUATE PUMP SUPPORT - SPRING TYPE F-1-4 VT-3/4 NOE 4.3 - 066 C - . SPRIHG SETTINGS. JPE EVALUATED ACCEPT AS RCB IS. 4-15-89 VTI HOT FUHCTIONAL, CHECKED SPRIHG SETTINGS, SAT.

  • >>N/A>>>>

DATE: 07/07/89 ST. LUCIE NUCLEAR PLAH'I UNIT 2 PAGE: 21 VI SIGH: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS REACTOR COOLAHT PUMP 2B1 H I 0 ZONE HUNGER: 019 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMIHATION AREA CAT 0Y EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM NO METHOD PROCEDURE T C G M R *~CALIBRATIOH BLOCK**

REF. DUG. NO.02-019 003512 02-019.RPH-9 F-C VT-3/4 NDE 4.3 - 047 C - - C 2-28-89 VT; CNR ¹ 89.02.063, EVALUAI'E PUMP SUPPORT - SPRING TYPE F-1-4 VT-3/4 NDE 4.3 - 068 C - - SPRING SETTINGS. JPE EVALUATED RCB ACCEPTABLE AS IS. 4-15.89 VT; HOT FUNCTIONAL, CHECKED SPRING SET'TING,SAT ~

    • N/A%1 003520 02.019.008 H/A UT-25L NDE 5.15 . 003 C C - 4 89 UTI COMPLETE, REG. GUIDE 1.14 FLYHHEEL BORE AHD KEYLIAY H/A EXAM.

RCB 4*N/A**

3540 02-019.S-001 THRU 016 B.G-1 UT.60 'DE 5.7 - 001 C C - . - 3.4-89 Vl',UT; COMPLETE REACTOR COOL. PUMP STUDS (16) B6.190 VT-1 NDE 4.1 - 001 C-RCB

  • ~LATR**

003570 02-019-H-001 TO 016 B-G-1 VT-1 HDE 4. 1 - 002 C C . - - 3-4.89 VT; COMPLETE REACTOR COOL ~ PUMP HUTS (16) B6.170 RCB

"*H/A**

003580 2B1-L I G-01-16 B-G-1 VT-1 NDE 4. 1 - 003 C C - - - 3-4.89 VT; COMPLETE STUD HOLE THREADS Bt LIGAMEHT 86.170 RCB

  • ON/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 22 VISION: 2 INSERVICE IHSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST IN'IERVAL CLASS 1 COMPONEN'TS REACTOR COOLANT PUMP 2B2 H I 0 ZONE HUMBER: 020 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T' G M R *~CALIBRATIOH BLOCK**

REF. DWG. HO.02-020 003660 02-020.008 H/A UT-25L HDE 5.15 . 004 C C - - - 2-3-89 UT; COMPLETE, REG.GUIDE 1.14 FLYMNEEL BORE AHD KEYNAY N/A EXAM.

RCB 4*H/At*

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 23 VISION: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 <1989), SECOND PERIOD, FIRST INTERVAL CLASS 'I COMPOHEHTS LOOP 2A2 SAFETY INJECTION PIPING H I 0 ZONE NUMBER: 022 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I" 0 E REMARKS NUMBER IDENT IF ICATION ITEM NO METHCO PROCEDURE T C G M R **CALIBRATIONBLOCK~~

INSIDE COHTAIHMENT REF. DQG. NO. 02 022 004150 S I -149- FII-4 8-J UT-45,60 NDE 5.4 - 001 C - - C - 3-8-89 PT,UT; COMPLETE, ROOT GEOME'IRY VALVE (V-3217) - TO - PIPE 89.11 PT HDE 3.3 - 004 C - - - DETECTED HITH 60 DEGREE SCAH.

RCB saUT35e*

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 24 VI SION: 2 IHSERVICE INSPECTION SUHMARY 0

REPORI'UTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COHPONENTS LOOP 281 SAFETY INJECTION PIPING N I 0 ZONE HUHBER: 023 ASHE S ONGT SEC. XI RSEH SUMHARY EXAHIHATIOH AREA CATGY EXAM A E I 0 E REMARKS HUHBER IDENTIFICATIOH ITEH NO HETHOO PROCEDURE T C G M R **CALIBRATIOHBLOCK**

IHSIOE CONTAINMENT REF. OHG. HO.02-023 004510 V-3237 8-H-2 VT-3 NDE 4.3 - 049 C - - - C 3-6-89 VT; COHPLETE, LIGHT PITI'ING NOTED VALVE INTERNAL SURFACES 812.40 VT.3 NDE 4.3 . 050 C - - - ON SEAL FACE OF DISC AND VALVE BODY.

RCB BORIC ACID RESIDUE BORIC ACID CLEANED OFF AREA RE-EXAHIHED,NRI.

    • H/A**

004520 V-3237 8-G-2 VT-1 HDE 4.1 - 013 C C . - 9-89 VT-1; COHPLETE BOLTING 87.70 RCB

    • M/A**

780 SI-4204-153 B-K.1 PT NDE 3.3 - 005 C C - - 23-89 PT; COHPLETE MELDED SUPPORT LUGS (8) 810. 10 RCB

<<<<H/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 25 VISION: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INI'ERVAL CLASS 1 COMPONENTS LOOP 281 SPRAY LINE N I 0 ZONE NUMBER! 026 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMIHATION AREA CATGY EXAM A E I 0 E REHARKS NUMBER IOEHTIFICATIGH ITEH NO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK**

REF. DWG. NO.02-026 005570 RC-906-771 8-F PT NDE 3.3 . 012 C C - - - 2-23-89 PT; COMPLEI'E SAFE ENO - TO - PIPE NOZZLE 85.51 RCB

  • "N/A**

005590 RC-109A-SW-1 8-J PT NDE 3.3 - 011 C C - - - 2-18-89 PT; COMPLETE ELBOW - TO - PIPE 89.21 RCB

    • N/A**

5600 RC.109A.SW-2 B-J PT NDE 3.3 - 010 C C - - - 2-18-89 PT; COMPLETE PIPE - TO - ELBOW 89.21 RCB 005660 RC-109C-SW-2 8-J PT NDE 3.3 - 009 C C - - - 3-07.89 PT; COMPLETE ELBOW TO PIPE 89.21 RCB

  • AN/A**

005670 RC-109-FW.903 8-J PT NDE 3.3 - 008 C C . - - 2-18.89 PT; COMPLETE PIPE - TO - ELBOW 89.21 RCB

    • N/A*"

005760 RC-109-FW.908 8-J . PT NDE 3.3 - 007 C C - - - 3-3-89 PT; COMPLETE VALVE - TO - PIPE 89.21 RCB

    • N/A**

005770 RC-109-FW-909 8-J PT NDE 3.3 - 006 C C - - - 3-3-89 PT; COMPLETE PIPE-TO-VALVE (PCV 1100 F) B9.21 RCB ~

4*N/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 26 VI SION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS PIPE SUPPORTS. LOOP 281 SPRAY LIHE H I 0 ZONE NUMBER: 026 ASME S ONGT SEC. XI T RSEM

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DUG. NO.02-026 005940 SPS-407 F-C VT.3 NDE 4.3 - 003 C C - - ~ 2-27.89 VT-3; COMPLETE RIGID STRUT SUPPORT F-123 RCB N/A*

006010 SPS-524 F-C VT-3 HDE 4.3 - 004 C C - - 27.89 VT-3; COMPLETE RIGID STRUT SUPPORT F-123 F RCB

    • H/A*"

06020 SPA-550 F-8 VT.3'DE 4.3 - 005 C C - - 28-89 VT-3; COMPLETE VALVE ANCHOR F-2,3 RCB

    • N/At*

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 27 VISIOH: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS LOOP 2B2 SPRAY LINE N I 0 ZONE HUMBER: 027 ASME S ONGT SEC ~ XI T RSEH

SUMMARY

EXAMINATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK~~

REF. DWG. NO.02-027 006150 RC-141C-SW-1 8-J PT HDE 3.3 - 018 C C - - - 3-3-89 PT; COMPLETE ELBOW - TO . PIPE 89.21 RCB

  • +N/A*a 006160 RC-141-FW-904 8-J PT NDE 3.3 . 017 C C . - - 3-3-89 PT; COMPLETE PIPE - TO - ELBOW 89.21 RCB
    • H/A~>>

6170 RC-141-FW-905 8-J PT NDE 3.3 - 016 C C - - . 3-3.89 PT; COMPLE'IE VALVE - TO - PIPE 8'1 RCB

    • H/A**

006180 RC-141-FW-906 8-J PT HDE 3.3 . 015 C C - . - 3-3.89 PT; COMPLETE PIPE - TO - VALVE (V-1441) 89.21 RCB RCB H/A

  • 006240 RC-141-FW.909 8-J PT HDE 3.3 - 014 C C - . - 2-28.89 PT; COMPLETE VALVE - TO . PIPE 89.21 RCB

<<~N/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 28 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS PIPE SUPPORTS-LOOP 282 SPRAY LINE N I 0 ZONE NUMBER: 027 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT I F ICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK**

REF. DUG. HO.02-027 006490 SPS-127 F-8 VT-3 NDE 4.3 - 006 C C - - - 2-27-89 VT-3; COMPLETE RIGID FRAME SUPPORT F-123 RCB

>>>>N/A>>*

006500 SPS-128 F.C VT.3 NDE 4.3 . 007 C C . . - 2-27.89 VT-3; COMPLETE RIGID STRUT SUPPORT F-123 RCB

    • H/A>>>>

006520 SPA-180 F-B VT-3 HDE 4.3 - 008 C C - - - 2-23-89 VT-3; COMPLETE SPRAY VALVE ANCHOR F-2,3 RCB

>>>>N/A>>>>

006530 SPS-237 F-C VT-3 HDE 4.3 - 009 C - . - C 2-23 89 VT-3; CNR¹ 89.2 058( LOOSE JAM RIGID STRUT SUPPORT F-123 VT-3 HDE 4.3 - 057 C - - HUT,MISALIGNED STRUT.NCR-2-207,SEE JPE RCB D I SPOS I 7 ION, RE-EXAMIHED 3-16 89,SATISFACTORY.

    • H/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 29 VISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST'NTERVAL CLASS 1 COMPOHENTS SHUTDOWN COOLING 8 MOT LEG !NJECTION PIPING N I 0 ZONE NUMBER: 028 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM NO METHCO PROCEDURE T C G M R <<~CALIBRATION BLOCK*~

LOOP B REF. DWG. NO. 02-028-A 007100 SI-4205-456B B-K-1 PT NDE 3.3 019 C - C - 3-89 PT; COMPLETE, LIMITED EXAM DUE TO WELDED ATTACHMENT LUGS (8) 810.10 CLAMP & PADS ON LUGS 1 8 2. ROUNDED RCB IHDICATIOHS,ACCEPTABLE

~*H/A~~

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 30 VISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONEN'TS CHARGING LINE TO LOOP 2B1 N I 0 ZONE HUMBER: 031 ASHE S ONGI' SEC. XI RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEH HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK>>>>

REF. DWG. NO. 02.031 008710 CH-148-FM-12 8-J PT NDE 3.3 - 020 C - C . 16-89 PTI COMPLETE ROUND PIPE - TO - ELBN 89.40 INDICATIOH,.35"ClJ 0(NNSTREAM 0 COUPLIHG RCB FUSIOH LINE < F 05" DIA. ACCEPTABLE

  • <<H/A*>>

008720 CH-148-SW.13 8-J PT NDE 3.3 - 021 C C - - - 2-18-89 PT; COMPLETE ELBOM - TO - PIPE 89.40 RCB

    • N/A**

08750 CH-148- SN.16 8-J PT NDE 3.3 - 022 C C - - - 3.7-89 PT; COMPLETE PIPE - TO - TEE 89.40 RCB

    • H/A**

008760 CH-148-SH-17 8-J PT NDE 3.3 - 023 C C - . - 2.18.89 PT; COMPLETE TEE - TO - REDUCER 89.40 RCB

>><<H/A<<>>

008820 RC-150-SM-2 8-J PT HDE 3.3 - 024 C C .- - - 2-18.89 PT; COMPLETE PIPE - TO - ELBOW 89.40 RCB

<<*H/A>>*

008830 RC-150-S'M.3 8-J PT NDE 3.3 - 025 C C - 18.89 PT; COMPLETE ELBCM - TO - PIPE 89.40 RCB

<<*N/A<<*

008850 CH-904-771 8-F PT NDE 3.3 - 026 C C - - - 2-23-89 PT; COMPLETE CHARGING NOZZLE-TO SAFE EHD 85.50 RCB

<<H/A*>>

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 31 EVI SION:T 2 IHSERVICE IHSPECTIOH

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS PIPE SUPPORTS ~ CHARGIHG LINE TO LOOP 281 H I 0 ZONE NUMBER: 031 ASHE S OHGT SEC. Xl T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT I F I CATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOH BLOCK*>>

REF. DUG. NO.02-031 008880 CH-108-R3 F-8 VT 3 HDE 4.3 - 010 C C - - - 2-27-89 VT-3; COMPLETE RIGID FRAME SUPPORT F-2,3 RCB

    • H/A*>>

DATE: 07/07/89 ST. LUCIE NUCLEAR PLAHT UHIT 2 PAGE: 32 VISION: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS CHARGING LINE TO LOOP 2A2 H I 0 ZOHE NUMBER: 032 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM NO METHOD PROCEDURE T C G M R *>>CALIBRATIOH BLOCK*>>

REF. O'. NO. 02-032-A 009340 CH-147.FH.9 8-J PT HDE 3.3 . 027 C C - - - 3-8-89 PT; COMPLETE PIPE TO - TEE 89.40 RCB

>>*H/A>>>>

009390 CH-147-SW.5 8-J PT HDE 3.3 - 028 C C - - - 2-18.89 PT; COHPLETE PIPE - TO - COUPLING 89.40 RCB

    • H/A**

009400 CH-147. FII.4 8-J PT NDE 3.3 . 029 C C - - - 2-18-89 PT; COMPLETE COUPLIHG - TO - PIPE 89.40 RCB

  • >>N/A**

009440 RC-148.SH.2 8- J NDE 3.3 - 030 C C - - - 2-18 89 PT; COMPLETE VALVE - TO - PIPE P1'9.21 RCB

    • H/A>>*

009460 CH-704-771 8-F PT NDE 3.3 . 031 C C - - - 3-03-89 PT; COMPLETE CHARGING NOZZLE-TO SAFE END 85.50 RCB

    • H/A>>'>>

DATE: 07/07/89 ST. LUCIE HUCLEAR PLANT UNIT 2 PAGE: 33 EVI SION: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 1 COMPONENTS PIPE SUPPORTS. CHARGING LINE TO LOOP 2A2 N I 0 ZONE HUMBER: 032 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS

'UMBER IDEHT IF ICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DUG. NO. 02-032-A 009740 CH-103-R5A F-C VT.3 NDE 4.3 - 011 C C - - - 2-28.89 VT.3; COMPLETE RIGID U-STRAP SUPPORT F-2,3 RCB

    • N/A**

009750 CN-103 ~ RSB F-C VT-3 NDE 4.3 012 C C - - 2 27 89 PTI COMPLETE RIGID STRUT SUPPORT F-123 RCB f1H/A14

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 34 VISION: 2 INSERVICE INSPECTION SUHMARY REPORT 0 OUTAGE 2 (1989), SECOND PERIOD, CLASS 1 COHPONENTS FIRST INTERVAL LOOP 281 PRIHARY DRAIN N I 0 ZONE NUMBER: 035 ASME S ONGT SEC. XI T RSEM

SUMMARY

EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEM NO HETHOO PROCEDURE T C G H R **CALIBRATIONBLOCK*~

REF. DWG. NO.02-035 010000 RC-122-FW.2 8-J PT NDE 3.3 . 032 C C - - - 2-23-89 PT; COHPLETE PIPE - TO - TEE 89.40 RCB

    • N/A**

010010 RC-122-S'N.3 8-J PT NDE 3.3 - 033 C C - 2 23-89 PT; COHPLETE TEE - TO - PIPE 89.40 RCB

~*N/A~*

10020 RC-122-SLI.4 8-J PT NDE 3.3 - 034 C C - . . 2 23-89 PT; COHPLETE PIPE - TO - VALVE (V-1450> 89.40 RCB

    • N/A*0

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 35 EVI SION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRS'I INTERVAL CLASS 1 COMPOHENTS LETDOWN LINE N I 0 ZONE NUMBER: 037 ASME S OHGT SEC. XI T RSEH

SUMMARY

'EXAMINATIONAREA CATGY EXAM A E I 0 E REMARKS HUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R <<<<CALIBRATIOH BLOCK**

REF. DUG. HO.02-037 010220 RC.I42.SN.B 8-J PT HDE 3.3 - 035 C C - - - 2.18-89 PT; COMPLETE PIPE ~ TO - CQUPLIHG 89.40 RCB

<<<<H/A<<<<

010230 RC.142-FII.9 8-J PT NDE 3.3 . 036 C C . - . 2-'18.89 PT; COMPLETE COUPLING TO - PIPE 89.40 RCB

<<*H/A<<*

010240 RC-142-SH.10 B.J PT NDE 3.3 . 037 C C - - . 2.18.89 PT; COMPLETE PIPE - TO - COUPLING B9.40 RCB N/A 010250 RC.142.FW.11 BJ PT NDE 3.3 - 038 C C - - 2 18 89 PT; COMPLETE COUPLIHG - TO - PIPE 89.40 RCB

    • H/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 36 VISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONEHTS STEAM GENERATOR 2A N I 0 ZONE NUMBER: 041 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS HUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R <<*CALIBRATIOH BLOCK**

SECONDARY SIDE REF. DUG. NO. 02.041 011120 SG-2A-102.221 C-A UT.O(45,60 NDE 5.1 . 007 C . . C . 3.6-89 Ul'; COMPLETE, 0 DEGREE SCAN INTER. SHELL-TO-CONE 'HELD C1.10 II DETECTED I.D. GEOMETRY.

RCB t1U T25ae 011190 SG.2A-111-221- IR C.B UT . 45 NDE 5.13 - 005 C C - - - 3-13-89 UT; COMPLETE FEEDMATER HOZZ INH. RAD. SEC. C2.22 RCB

    • UT 254%

011220 SG-2A-103-221-8 C-C PT NDE 3.3 - 068 C C . - . 3-13-89 PT; COMPLETE KEY BRACKET AT 180o C3.10 RCB

    • N/A*4 011240 SG-2A-105.221-A C-C MT NDE 2.2 - 007 C C - - - 3.9-89 MT; COMPLETE SUPPORT BRACKET AT 90o C3.10 RCB
    • H/Ae*

011250 SG-2A-104-221.B C-C MT NDE 2.2 - 007 C C - . - 3.9-89 Ml'; COMPLETE CLEVIS BRACKET AT 135o C3.10 RCB

    • H/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 37 EVI SION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONENTS LPSI PUMP 2A DISCHARGE PIPING H I 0 ZONE HUMBER: 043 ASME S ONGT SEC. Xl T RSEH SUMMART EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF ICATION ITEM NO METHOD PROCEDURE T C G M R *~CALIBRATION BLOCK*>>

OUTSIDE CONTAINMENT REF. OWG. HO. 02-043-B 011780 S I -410-I-SW-3 C-F PT HDE 3.3 . 039 C C - - - 2-28-89 PT; COMPLETE TEE - TO - PIPE C5.11

    • N/A**

OUTSIDE CONTAIHMEHT REF. DWG. HO. 02-043-C 012410 SI -129. FW-901 C-F UT-45,60 HDE 5.4 - 002 C . - C - 3.09-89 PT; COMPLETE, 3-10-89 UT; ELBOW - TO - PIPE C5.21 PT HDE 3.3 - 042 C - - - COMPLETE, 45 8 60 DEGREE SCANS OETECTEO I.O. GEOMETRY (ROOT)

    • UT38+*

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UHIT 2 PAGE: 38 VISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONEHTS PIPE SUPPORTS-LPSI PUMP 2A DISCHARGE PIPING N I 0 ZONE NUMBER: 043 ASME SOHGT SEC. XI 'T RSEM

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS HUMBER I DENT I F I CATION ITEM NO METHOD PROCEDURE T C G M R *"CALIBRATIOH BLOCK**

OUTSIDE COHTAIHMEHT REF. D'MG. HO. 02-043-C 013360 S I.2408-38 F.B VT-3 NDE 4.3 - 013 C C . - . 2-27-89 VT-3; COMPLETE RIGID FRAME SUPPORT F-123 i*N/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNII' PAGE: 39 EVISIOH: 2 IHSERVICE IHSPECTIOH

SUMMARY

REPORT

~ OUTAGE 2 (1989), SECOND PERIOD, FIRST IN'TERVAL CLASS 2 COMPONENI'S SAFETY INJECTION PIPING 'TO TANK 2A1 H I 0 ZONE NUMBER: 046 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R *"CALIBRATION BLOCK**

INSIDE CONTAINMEHT REF. O'LIG. NO.02-046 016200 S I -4201-7201A C-C PT NDE 3.3 - 044 C C - - - 3-7-89 PT; COMPLETE SHEAR LUGS (8) T='I 1/4" C3.40

>>>>N/A>>>>

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 40 V I SIGH: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONENTS PIPE SUPPORTS-SHUTDOWN COOLING LIHE B N I 0 ZONE NUMBER: 052 ASME S ONG'I SEC ~ XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK~*

IHSIDE CONTAINMEHT REF. DUG. NO. 02-052-B 020590 SI-4205-6444 F-B VT-3 NDE 4.3 . 014 C C - - - 2.27-89 VT-3; COMPLETE RIGID BASE SUPPORT F.123

<<*N/A~~

0 DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 41 EVISIOH: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONENTS SAFETY INJECTION TANK 201 PIPING N I 0 ZOHE NUMBER: 059 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*>>

REF. 01lG. NO.02-059 021420 SI-103-FH. I C-F UT-45.,60 HDE 5.4 - 003 C - - - C 3.3-89 PT; COMPLETE,3-13-89 UT; VALVE (V.3235) - TO - PIPE C5.21 PT HDE 3.3 - 045 C - - - COMPLETE, I.D. GEOMETRY DETECTED BOTH 45

& 60.

'*UT35*~

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 42 REVISION: 2 INSERVICE INSPECTION SUMHARY REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONENTS HPSI PUMP 2B TO HEADER B N I 0 ZONE NUMBER: 062 ASHE S ONGT SEC. XI T RSEH

SUMMARY

EXAMIHATIOH AREA CAj'GY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK**

REF. DUG. NO.02-062 022090 SI-2415.213 C-C PT HDE 3.3 - 046 C C - - - 3 9-89 PT; COMPLETE,SEE DATA SHEET FOR SUPPORT ATTACHMENT C3.40 L IMITAT IONS.

    • H/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 43 EVI SION: 2 INSERVICE INSPECTIOH

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 2 CCHPONENTS MAIN STEAM LINE 2A1 N I 0 20HE NUMBER: 063 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINAl'OH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*>>

INSIDE CONTAINMENT REF. DWG. NO. 02 063 022410 MS-4100.9 C-C MT HDE 2.2 - 009 C C - - - 3-3-89 MT; COMPLETE SHEAR LUGS (8) T=2 1/2" C3 ~ 40

>>*N/A>>I 022420 MS-4100-6079 C.C MT NDE 2.2 . 10 C C . . - 3-2.89 MT; COMPLETE SHEAR LUGS (4) T=1 1/4" C3.40

    • H/A*>>

DATE: 07/07/89 ST ~ LUCIE NUCLEAR PLANT UNIT 2 PAGE: 44 EVISION: 2 INSERVICE INSPECTION SUHHARY REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INI'ERVAL CLASS 2 CQHPONENTS HAIN STEAH LINE 2B1 N I 0 ZONE NUMBER: 064 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUHBER IDENTIFICATION ITEH NO HETNOD PROCEDURE T C G H R **CALIBRATIONBLOCK**

INSIDE CONTAINMENT REF. DWG. NO.02-064 022930 HS-4101-314 CC HT NDE 2.2 - 012 C C - ~ - 3-3.89 HT; COHPLETE SHEAR LUGS (8) T=2 1/2" C3.40

    • N/A*>>

023050 HS-29-FW-901-LS C-F UT.45,60 NOE 5.2 - 001 C C . - - 3-3.89 HT, UT; COHPLETE.

PIPE LONG SEAN C5.22 HT NDE 2.2 . 012 C-

    • UT45**

023070 HS.29-FW-SA C.F UT.45,60 NDE 5.2 - 001 C - - C . 3.389 HT,UT; COMPLETE, ROOT GEOMETRY, PIPE - TO - ELBOW C5.21 HT NDE 2.2 - 012 C . - - LIHITED UPSTREAM SCAN,SEE DATA SHEET.

    • UT45**

023080 HS-29.FW.SAA-LS ,

C.F UT-45,60 NDE 5.2 - 001 C C - - - 3-3-89 UT,HT; COHPLETE ELBOW LONG SEAM C5.22 HT NDE 2.2 . 0'l2 C-4*UT454*

023090 HS.29-FW-SAB-LS C-F UT.45,60 NDE 5.2 - 001 C C - - - 3-3.89 UT,HT; COHPLETE ELBOW LONG SEAH C5 ~ 22 HT NDE 2.2 - 012 C - --

tiUT454*

IP DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 45 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT 0 OUTAGE 2 <1989), SECOND PERIOD, CLASS 2 COMPOHENTS FIRST INTERVAL PIPE SUPPORTS-MAIN STEAM LIME 281 N I 0 ZONE HUMBER: 064 ASME S ONGT SEC. Xl T RSEM

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

INSIDE CONTAINMENT REF. DWG. NO. 02.064 023320 MS-4101-305 F-C VT.3 4 NDE 4.3 - 016 C - - - C 2-25-89 VT; CNR ¹ 89-2-056, BENT RCO, VARIABLE SPRING SUPPORT (2) F-1234 EVALUATE SPRING SETTING.ACCEPT AS IS PER RCB JPE,NCR ¹ 2-202.

1*N/A**

DATE: OT/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 46 REVISIOH: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONENTS MAIN STEAM LINE 2A N I 0 ZONE HUHBER: 065 ASHE S OHGT SEC. XI T RS EH SUHHARY EXAHIHATION AREA CATGY EXAH A E I 0 E REHARKS HUHBER IDEHI'IF I CATION I TEH NO HEI'HOO PROCEDURE T C G H R **CALIBRATIONBLOCK**

OUTSIDE COHTAINMEHT REF. O'NG. HO. 02 065-A 023626 MS-32-F'N-1-LS C-F UT-45)60 HDE 5.2 - 003 C C - - .'-28.89 HT; COHPLE'IE,3.8-89 UT; PIPE LONG SEAH AT FW 1 C5.31 HT HDE 2.2 - 014 C - - . COHPLETE, SEE DATA SHEETS FOR EXAM AREA LIMITATIONS.

    • UT44**

DATE: 07/07/89 ,ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 47 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPOHENTS COMBINED CS 2A B 2B FROM R'WST N I 0 ZONE NUMBER: 070 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*>>

INLET PIPING REF. OWG. NO.02-070.B 025490 CS-2-3.SW-1 C-F PT NDE 3.3 . 066 C C - - - 3-15-89 PT; COMPLETE ELBOW - TO - PIPE C5 ~ 1'1

<<<<H/A*>>

025500, CS-2-3-S'W.1-LS C-F PT NDE 3.3 - 067 C C - - - 3-15-89 PT; COMPLETE EXAMINED 2.5T AT PIPE LONG SEAM C5.12 SW-1.

    • N/A<<*

025540 CS-2-F'W-3A-LS C-F PT NDE 3.3 - 047 C C - - - 2-23-89 PT; COMPLETE ELBOW LONG SEAM C5.12

    • H/A**

025550 CS-2.FW-3B-LS C F NDE 3.3 . 048 C C - - . 2-23-89 PT; COMPLETE P1'5.12 ELBOW LONG SEAM

<<<<N/A<<*

DATE: 07/07/89 ST. LUCIE NUCLEAR PLAHT UHIT 2 PAGE: 48 REVISIOH: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOO, FIRST INTERVAL CLASS 2 COMPONENTS PIPING SUPPORTS-COMB. C.S. 2A & 2B FROM RMST N I 0 ZONE NUMBER: 070 ASME S ONGT SEC. Xl T RSEM

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF I CA'TIOH ITEM NO METHOO PROCEDURE T C G M R **CALIBRATIOHBLOCK**

INLET PIPING REF. DID. NO. 02-070-B 026960 S1-2407-22 F-B VT-3 NOE 4.3 - 018 C C - - 2 27-89 VT-3; COMPLETE RIGID FRAME SUPPORT F-123

    • H/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 49 REVI SION: 2 IHSERVICE IHSPECTIOH

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPOHEHTS PIPE SUPPORTS-SHUTDOWN COOLING HEAT EXCH. 2A N I 0 ZONE NUMBER: 076 ASME S OHGT SEC ~ XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF I CATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*"

INLET PIPING REF. DUG. NO.02-076.A 033100 SI-2406-35 F.B VT-3 HDE4.3 - 019 C C - - - 2-27-89 VT; COMPLETE RIGID FRAME SUPPORT F-2,3 a*N/A*1 033110 SI-2406-34 F-C VT-3 HOE 4.3 . 020 C C - - - 2-27-89 VT COMPLETE RIGID STRUT SUPPORT F-123

    • N/A**

033120 S I -2406-33 F-B VT-3 NDE 4.3 - 021 C C - - - 2-27-89 VT; COMPLETE RIGID PEHETRATIOH SUPPORT F 2,3

    • N/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 50 IHSERVICE IHSPECTIOH

SUMMARY

REPORT ei SHUTDOHH COOLING HEAT EXCHANGER 2B OU'TAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONENTS N I 0 20HE NUMBER: 078 ASME S OHGT SEC. Xl T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHT IF I CAT IOH ITEM NO METHOD PROCEDURE C G M R *'CALIBRATIOH BLOCK**

INLET PIPING REF. DUG. NO. 02-078-A 034630 Sl-2404-64 C-C PT NDE 3.3 - 052 C C - - - 3-8-89 PT; COMPLETE WELDED LUGS (8) T=1" C3.40

  • ~N/A">>

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 51 REVISION: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPOHENTS SHUTDOWN COOLING HEAT EXCHANGER 2A H I 0 ZONE NUMBER: 080 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS PROCEDURE 'I **CALIBRATIOHBLOCK~~

NUMBER IDENTIFICATION ITEM HO METHCO C G M R TO CONTAINMEHT SPRAY HEADER REF. DWG. NO. 02-080-A 035700 SI -406-3-S'W-1 C-F PT HDE 3.3 . 053 C C - - - 3-3 89 PT; COMPLETE FLANGE - TO PIPE C5.11

    • H/A**

036170 SI-406-9-FW.1-LS C-F PT NDE 3.3 . 056 C C - - - 3-8.89 PT; COMPLETE 1 FW-9 PIPE LONG SEAM C5.12

  • AN/A**

036180 SI-406-FW.9 C-F PT NDE 3.3 - 055 C C - - . 3-8.89 PT; COMPLETE PIPE.TO.VALVE (I-V-07-1514) C5.11

    • H/A**

036260 CS-11-FW-3 C- F NDE 3.3 057 C - C - 3-8-89 PT; COMPLETE,3/16" INDICATION ON VALVE - TO - PIPE P1'5.11 VALVE BODY, ACCEPTABLE.

AiN/A0k 036270 CS-1'I-FW-3-LS C-F PT HDE 3.3 - 058 C C - - - 3-8-89 PT; COMPLETE 8 FW-3 AND FW.4.

PIPE LONG SEAM C5.12 PT HDE 3.3 - 060 C - .-

<<~N/A*+

036280 CS.11-FW-4 C-F PT NDE 3.3 - 059 C C - - - 3-8.89 PT; COMPLETE PIPE - TO - VALVE (V-7162) C5.11

    • H/A

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UHIT 2 PAGE: 52 REVISIOH: 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 3 COMPONENTS OMPONEHT COOLING WATER H I 0 ZONE NUMBER: 101 ASME S ONGT SEC. Xl T RSEH

SUMMARY

EXAMIHAT I OH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO ME'IMOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*~

HEAT EXCHAHGERS 2A-2B DISCHARGE REF. DWG. HO. 02-101-A 036720 CC-2075-90 F-8 VT-3 HDE 4.3 - 022 C C - - - 2-23-89 VT; COMPLETE RIGID FRAME SUPPORT F-123

    • H/A**

HEAT EXCHANGERS 2A-2B DISCHARGE REF. DWG. NO. 02 101-B 036770 CC-2075-110 F-8 VT.3 HOE 4.3 - 023 C - - - C 2-18-89 VT; CHR ¹ 89-2-052, HEAVY RIGID FRAME SUPPORT F-123 VT.3 NDE 4.3 - 056 C - - - CORROSION, CLEANED 8 RE-INSPECTED, SATISFACI'ORY. PER JPE LETTER DATED 3/6/89.

    • H/A**

6810 CC-2075.8101 F-B VT-3 HDE 4.3 - 024 C C - - - 2-23 89 VT; COMPLETE RIGID FRAME ANCHOR F-2,3 i *+N/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 53 REVI SION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 3 COMPONEN'IS COMPONENT COOLING WATER N I 0 ZONE NUMBER: 102 ASHE S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R *~CALIBRATION BLOCK*~

SUPPLY HEADER A REF. DWG. NO.02-102 036940 CC-2062-183 F-B VT-3 NDE 4.3 025 C C - - - 3-3-89 VT; COMPLETE RIGID FRAME SUPPORT F-2,3 eaH/A*i 037000 CC.2062.6220 F-8 VT-3 HDE 4.3 - 026 C C - - - 3-3.89 VT; COMPLETE RIGID FRAME SUPPORT F-2,3

    • N/A**

037020 CC-2062-7227 F-C VT-3 HDE 4.3 - 027 C - - - C 2-18.89 VT; CNR ¹ 89.2-051, PAINTED RIGID STRUT SUPPORT F-123 VT-3 HDE 4.3 - 058 C - - - SPHERICAL BEARINGS,CLEANED,REEXAHIHED 3-16.89 VT-3,COMPLETE.

t*H/A**

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 54 IHSERVICE IHSPECTIOH

SUMMARY

REPORT OU'TAGE 2 (1989), SECOHD PERIOD, FIRST IHTERVAL CLASS 3 COMPONENTS COMPONENT COOLING 'MATER N I 0 ZONE NUMBER: 105 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT I F ICATION ITEM NO METHOD PROCEDURE T C G M R

  • CALIBRATION BLOCK++

RETURN HEADER A REF. DUG. NO. 02-105-A 037260 CC.2064.7609 F-8 VT-3 HDE 4.3 - 028 C C - - - 3-16-89 VT; COMPLETE RIGID FRAME SUPPORT F-123

    • N/At*

037350 CC-2064.212 F-8 VT.3 HDE 4.3 - 029 C - - - C 2-21-89 VT; CHR ¹ 89-2-050, LOOSE HUI'N RIGID FRAME SUPPORT F-123 VT-3 HDE 4.3 - 053 C - - CLAMP.TIGHTEHED HUT PER JPE.

3.13.89 VT; COMPLETE.

    • H/A**

037370 CC-2064-58 F B VT-3 NDE 4.3 - 030 C C - - - 2-22-89 VT; COMPLETE. NOTE: LOCKED ROOM RIGID FRAME SUPPORT F-2,3, teH/PP

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 55 REVISION: 2 INSERVICE INSPECTION

SUMMARY

REPORI'UTAGE 2 (1989), SECOND PERIOD, FIRST IN'IERVAL CLASS 3 COMPONENTS COMPONENT COOLIHG MATER H I 0 ZONE NUMBER: 107 ASME S OHGT SEC. XI T RSEM

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IOENTIFICATIOH ITEM NO METHOD PROCEDURE T C G M R *"CALIBRATIOH BLOCK**

PUMP SUCTION HEADERS REF. DWG. NO. 02-107-A 037810 CC-2074.61 F-B VT-3,4 HDE 4.3 . 031 C - - - C 2-18-89 VT; CNR ¹ 89-2 049,EVALUATE VARIABLE SPRING SUPPORT F-1234 SPRING SETTINGS'CR 2.205, ACCEPT AS IS.

    • H/A**

037830 CC-2074-59 F-C VT-3 HDE 4.3 . 032 C - - - C 2-18-89 VT; CNR ¹ 89-2-049, LOOSE PARTS, RIGID STRUI'UPPORT F-123 VT-3 NDE 4.3 - 054 C - - - LOCKED UP SPHERICAL BEARING. CORRECTED PER LETTER, "(JPE) ISI 89-027 DATED 3-6-89, RE-INSPECTED 3-15 89, SAT.

~~H/A~~

DATE: 07/07/89 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 56 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 3 COMPONENTS ONDEHSATE N I 0 ZONE NUMBER: 109 ASME S OH 0T SEC. XI T RSEH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATION ITEM HO METHOD PROCEDURE T C G M R ~*CALIBRATIOH BLOCK**

AUX. FEEDHATER PUMP 2C SUCTION REF. DWG. HO. 02.109-B 038I60 C-2204-60 F-B VT-3 HDE 4.3 . 048 C - - - C 3-7-89 VT; CNR ¹ 89-2-064, CORROSIOH.

RIGID FRAME SUPPORT F-2,3 HCR ¹ 2-220,ACCEPTABLE, CLEAN 8 PRESERVE.

    • H/A*4 038180 C-2204-66 F-8 VT-3 NDE 4.3 - 033 C - - C 3 7-89 VT; CHR ¹ 89-2-065, CORROSION.HCR RIGID FRAME SUPPORT F-2,3 ¹ 2-220, ACCEPT AS IS, CLEAN 8 PRESERVE.

DATE: 07/07/89 ST. LUCIE NUCLEAR PLAHT UNIT 2 PAGE: 57 REVI SION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989), SECOND PERIOD, FIRST INTERVAL CLASS 3 COMPONENTS CIRCULATING MATER N I 0 ZONE NUMBER: 112 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IOENTIFICATIOH ITEM HO METHOD PROCEDURE T C G M R *~CALIBRATION BLOCK~*

INTAKE C,M PUMPS 2B &r 2C DISCHARGE HEADERS REF DWG NO, 02 112 A 038370 CH-3000-54 F-C VT-3 NDE 4.3 - 034 C - - C 3-20-89 VTICNR ¹ 89-20-070, CORROSION(

RIGID STRUT 8 ROO HANGER SUPP F-123 SPHERICAL BEARING LOCKED UP.NCR ¹ 2-239, ACCEPT AS IS ~ CLEAN BEARIHG 8 LUBRICATE. CLEAN 8 PRESERVE SUPPORT.

    • H/A**

038380 CM-3000-57 F-8 VT-3 NDE 4.3 - 035 C C - . - 2-27.89 VT; COMPLETE SLIDIHG BASE SUPPORT F-2,3

  • AH/A**

FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST. LUCIE NUCLEAR PLANT P.O.BOX 128 FT.PIERCE, FLORIDA 33454 UNIT 2 1989 OUTAGE SNUBBER FUNCTIONAL TESTING REPORT

Florida Power & Light Gompany Snubber Functional Test Results Summary St. Lucie Unit 4Q-1989 Refueling Outage TENSON COMPRESSION Tag: 2401 Breakaway: 898.7-0.2%, PASS. 294.0-0.1% PASS Ng/Cap: Taylor~ Initial Drag: 971.8-0.2%%d, PASS. 1210.3 0.2/o, PASS.

Serial ¹: Activation (Mech):

Mark¹: SS-1-2A Bleed Rate (Hyd): 0.50- PASS. 0.11, PASS.

Deviation: N/A Test Load: 222.801 -89.1/o 249,881 99.9%

NCR: N/A Final Drag: 2048.2-0.4%, PASS 2163.1 0.4%, PASS.

Tag: 2402 Breakaway: 1281.2-0.3%, PASS. 1048.3 0.2/o, PASS.

Ng/Cap: Taylor-400 Initial Drag: 1381.9-0.3%, PASS. 1200.4- 0.2'/o, PASS.

Serial ¹: 2 Activation (Mech):

Mark¹: SS.2-2A Bleed Rate (Hyd): 0.32- PASS. 0.10- PASS.

Deviation: N/A Test Load: 219.513-87.8% 249 947- 99 9o%%d NCR: N/A Final Drag: 1602.6-0.3%, PASS 2146.3 0.4/o PASS.

Tag: 2417 Breakaway: 1052.6-2.6%, PASS. 815.7 - 2.0/o, PASS.

Mfg/Cap: PMHW Initial Drag: 1458.9-3.6%%d,PASS. 1341.5 3.4%, PASS.

Serial ¹: 33336-1 Activation (Mech);

Mark¹; 2A1 Bleed Rate (Hyd): 11.080 ~ PASS. 9.890- PASS.

Deviation: 11 Test Load."

NCR: 2-190 Peak Load: 36.1- 90.2%%d, PASS. 40.0 -100%, PASS.

Devlatlon

Description:

This snubber exceeded the acceptance criteria for release rate (Bleed Rate) in both tension and com-pression. Additionally, the snubber exceeded the specified drag load cnteria of 3/4'er minute.

Disposition Summary: The PSL Snubber Acceptance criteria will be revised to reflect the manufacturer's test criteria. While specified bteed rate is acceptable, JPE indicates that the drag loads are higher Ihan desired. Plans to refurbish this snubber should be made for the next outage.

Tag: 2421 Breakaway: 3.0-0.9%, PASS.

Mfg/ca: PSA-1/4 Initial Drag: 5.3-1.5%, PASS.

Serfal ¹: 38004 Activation (Mech): 0.007- PASS.

Mark¹; RC.58-22 BleedRate(Hyd):

Deviation: 6 Test Load: 259 -73.9% 267- 76.3%

NCR: N/A Final Drag: 7.5-2.1%, PASS 8.3- 2.4%, PASS.

Deviation Descrfptlon: The snubber exceeds the acceptance cnteria in breakaway drag by 4.1¹s (1.2/o) st compression, in running drag by 4.1¹s (1.2o/o) in compression, in final drag by.5¹s (.1%) in tension and 1.3¹s (.4/) in compression which indi-cates that the snubber is perhaps degraded and should either be replaced with a spare or tracked in the future for increased deg-radation.

Dlsposltlon Summary: Snubber drag values Irxfcate degradation but present values are stilt within limits atiowedby PSL-2 ac-ceptance criteria. Snubber was exercised to the extent necessary to restore the drag toads to ~/o. The existing snubber was retested and met the acceptance cnteria and can be used as a spare. A Lisega hydraulic snubber was installed per PC/M.

Replacement S/N: 6121 1/69 Tag: 2422 Breakaway: 2.8-0.8%, PASS. 2.7 0.8%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 4.1 -1.2/., PASS. 3.0 - 0.9%, PASS.

Serfal ¹: 11896 Activation (Mech): 0.011- PASS. 0.011 - PASS Mark ¹: ROW-R8 Bteed Rate (Hyd):

Deviation: N/A Test Load: 241 -68.9% 248 - 70.7%

NCR: N/A Final Drag: 4.1 -1.2o/o, PASS. 2.8 - 0.8%, PASS.

Page 2

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSON Tag: 2423 Breakaway: 2.6 ~

0.7%%d, PASS. 4,9 1.4%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 5.7- 1.6o/o, PASS 4.9 1.4%, PASS.

Serial¹: 38017 Activation (Mech): 0.007- PASS. 0.011 - PASS.

Matk ¹ RCW-R7 Seed Rate (Hyd):

Deviation: N/A Test Load: 256 ~ 73.3% 258 - 73.6/o NCR: N/A Final Drag: 4.7-1.3%, PASS. 4.2 - 1.2/o, PASS.

Tag: 2424 Breakaway: 4.0 - 1.1%

Mfg/Cap: PSA-1/4 Initial Drag: 49-14% PASS 4.2 - 1.2%, PASS.

Serial ¹: 11432 Activation(Mech): 0.012 - PASS. 0.010 - PASS.

Mark ¹: RCW-R7 Seed Rate (Hyd):

Deviation: N/A Test Load: 293 - 83.8% 278 - 79.5'/o NCR: N/A Final Drag: 5.2 1 5%, PASS. 3.1 - 0.9%, PASS.

Tag: 2425 Breakaway: 55-1.6o/o, 12¹ over, FAILI '9,2-83%, 11.7¹ over, FAILI Mfg/Cap: PSA-1/4 initial Drag: 7.1 - 2.0'/o, PASS. 41.4-118%, 23.9¹ over, FAIL!

Serial ¹: 20284 Activation (Mech): 0.017- PASS. 0.020 - PASS.

Mark ¹: RGB.R11 Bleed Rate (Hyd):

Deviation: 5 Test Load: 284-81.3% 281 - 80.2%

NCR: 2-170 -

Final Drag: 8.5 2.4/o, PASS. 215-6.1%,40¹over, FAlL!

Devtatlon Descrfptfon: The snubber exceeds the acceptance criteria in breakaway drag by 12¹s (1.6/o) in tension, 11.7¹s (8.3%) in compression, in running drag by 23.9¹s (11.8%) in compression, in final drag by 4.0¹s (6.1%) in compression which in.

dicates that the snubber is perhaps degraded and should either be replaced with a spare or tracked in the future for Increased degradation.

Dlsposltfon Summary: Snubber was removed and replaced with a Lisega hydraulic snubber per PC/M 296-288.

=

Teardown Results: No teardown was performed, the snubber was scrapped prior to teardown.

Replacement SN: 6121 1/43 Tag: 2426 Breakaway: 4.2-1.2%, PASS. 3.9 -1.1%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 83 -2.4%, PASS. 5.7- 1.6%, PASS.

Serial ¹: 38012 Activation (Mech): 0.007- PASS. 0.010 - PASS.

Mark ¹; RGB-R14 Seed Rate (Hyd):

Deviation: N/A Test Load: 258-73.8% 268- 76.5%

NCR: N/A Final Drag: 8.2-2.3/, PASS. 59 - 1.7%, PASS.

Tag: 2427 Breakaway: 1.7-05%, 16¹ over, FAIL! 2378 -67.9/o, 220.3¹ over, FA!L!

Mfg/Cap: PSA-1/4 Initial Drag: 2343-671%, 2173¹ over, FAIL! 258 6-739%, 241.1¹ over, FAIL Serial ¹: 38003 Activation(Mech): 0.008 - PASS. 0.009 ~ PASS.

Mark ¹: RC-2 R5 Bleed Rate (Hyd):

Oevlatfon: 13 Test Load: 248-71.0/o 262- 74.8%

NCR: 2-206 Final Drag: 255.4 - 73 0%, 237.9¹ over, FAIL! 192.9 - 55.1%, 175.4¹ over, FAIL!

Oevtatfon Oescrlptton: This snubber exhibited high drag values in tension and compression as follows: Initial Tension exceed-ed acceptance criteria by 217.3¹s, initial compression by 241.4¹s, final tension by 237.9¹s and final compression by 175.4¹s.

Dlsposltfon Summary: The snubber was removed and replaced with a Usega hydraulic snubber per PC/M 296-288D.

Teardown Results: Normal seN!ce induced wear on alt parts except for bent shaft assembly which is a condition normally causedby overload.

Replacement SN: 6121 1/74 Page 3

Florida Pov/er 8 Light Company Snubber Functional Test Results Summary St. Lucie Unit 42- 1989 Refueling Outage TENSION COMPRESSION Tag; 2-028 Breakaway: 2.5.-0.7%, PASS. 2.9- 0.8%, PASS.

PSA.1/4 Initial Drag: 3.8-1.1%', PASS. 4J - 1.4%, PASS.

Qfg/Cap:

Serial>>: 380'l5 Activation (Mech): 0.009- PASS. 0.008 - PASS.

Mark ¹: RC-2-RS Bleed Rate (Hyd):

Deviation: N/A Test Load: 244 ~

69.9% 276 - 79.0%

NCR: N/A Final Drag: 3.6-1.0'/o, PASS. 3.8- 1 1%, PASS.

~

Tag: 2-029 Breakaway: 6.3-1.8'/o, PASS. 49-1.4%, PASS.

Ng/Cap: PSA-1/4 Initial Drag: 8.7-2.5/o, PASS. 8.1 - 2.3%, PASS.

Serial ¹: 20174 Activation (Mech): 0.010- PASS. 0.010- PASS.

Mark ¹: RC4-R4 Bleed Rate (Hyd):

Devfatlon: N/A Test Load: 242-69.0% 202-57N NCR: N/A Final Drag: 8.7- 2.5%, PASS. 12.8 - 3.7%, PASS.

Tag: 2430 Breakaway: 121.3-34.7/o, 104¹ over, FAILI 4I 5-114.4%,383.0¹ over, FAIL!

NgCap: PSA-1/4 initial Drag: 172.9-49.4%,155.4¹ over, FAILI 431.8-123.4%,414.3¹ over, FAILI Serial ¹: 38001 Activation (Mech): 0.009- PASS. 0.023-0.003g over, FAILI Mark ¹: RC-59-R2 Bleed Rate (Hyd):

Deviation: 4 Test Load: 292-83.3/o 332-94 9%

NCR: 2-167 Final Drag: 73.3-20.9%,55.8¹ over, FAIL! 362.3-103.5%,344.8¹ over, FAILI Deviation

Description:

The snubber was received in a frozen condition. Breakaway force was adjusted to initiate snubber movement for evaluation purposes.

Disposition Summary: JPE determined that no adverse stress was effected on pipe. The snubber was replaced with a Usega hydraulic snubber per PC/M 296-288D.

Teardown Results: Rust and damage evident on the torque carrier and shaft assembly housing. Guide rods were bent. This conditionis normally causedby vibration andharsh environment.

Replacement S/N: 6121 1/75 Tag: 2.031 Breakaway: 3.7-1.1 /, PASS. 14-0.4%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 4.1 -1.2/o, PASS. 2.0 0 6%, PASS.

Serial ¹: 26328 Activation (Mech): 0.012- PASS. 0.014- PASS.

Mark¹: RC49.R7 Bleed Rate (Hyd):

Deviation: N/A Test Load: 193-55.1% 143-40 9%

NCR: N/A Final Drag: 3.5-1.0%, PASS. 2.7- 0.8%, PASS.

Tag: 2432 Breakaway: 2.8-0.8%, PASS.

Qfg/Cap: PS A-1/4 Initial Drag: 3.5-1.0%, PASS.

Serial ¹: 26321 Activation (Mech): 0.014- PASS.

Mark¹: RC-9-R12 BleedRate(Hyd):

Deviation: 17 Test Load: 110-315% 193-55,2%

NCR: N/A Final Drag: 4.4-1.3'/o, PASS. 206.5-59.0%, 189.0¹ over, FAIL!

Deviation

Description:

This snubber exhibited excessive drag load in compression during final drag testing.

Dtspositlon Summary: The snubber passed the as-found test, therefore no nonconformance exists. Replaced existing snub-ber with a spare.

Teardown Summary: Normal seivfce induced wear on all parts except for bent'shaft assembly. This condition is normally caused by overload.

I Replacement S/N: 19783 Page 4

Florida Power 8 Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q - 1989 Refueling Outage TENSION COMPRESSION Tag: 2433 Breakaway: 2.4 -0.7%, PASS. 2.1 - 0.6'/o, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 45-1.3%, PASS. 2.1 . 0.6%, PASS.

Serial ¹: 38029 Activation (Mech): 0.011 - PASS. 0.011 - PASS.

Mark ¹: RC-18-R9 Bleed Rate (Hyd):

Deviation: N/A Test Load: 237-67.8% 239-68 4%

NCR: N/A Final Orag: 3.4 -1.0%, PASS. 2.6 - 0.7%, PASS.

Tag: 2434 Breakaway: 3.7-1.1%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 4.4 -1.3%, PASS.

Serial ¹: 38010 Activation (Mech): 0.013 - PASS.

Mark ¹: RC-26-R10A Bleed Rate (Hyd):

Deviation: 16 Test Load: 273-78.1% 277- 79.1%

NCR: N/A Final Drag: 5.4-1.5%, PASS. 18.8 -5.4%, 1.3¹ over, FAIL!

Deviation

Description:

Snubber exhibited high drag in compression during final drag testing.

Disposition Summary: Snubber passed as found test, however, snubber permanently removed per PC/M 147-288.

Teardown Results: Rust on bottom of screw shaft and ball bearing. Condition is causedby harsh environment.

Tag: 2435 Breakaway: 3.4-1.0%, PASS. .7- 0.5%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 5.7-1.6%, PASS. 55 - 1.6%, PASS.

Serial ¹: 38013 ~ Activation (Mech): 0.010- PASS. 0.008 - PASS.

Mark ¹: SI-73.R4 Seed Rate (Hyd):

Deviation: N/A Test Load: 274- 78.4% 215 - 61.4%

NCR: N/A Final Drag: 5.4 ~ 15%, PASS. 3.9 - 1.1'/, PASS.

Tag: 2436 Breakaway: 17.3-0.3%, PASS. 75 - 0.1%, PASS.

Mfg/Cap: PSALM Initial Drag: 19.4- 0.3/., PASS. 245 - 0.4%, PASS.

Serial ¹: 16748 Activation (Mech): 0.006- PASS. 0.006 - PASS.

Mark ¹: SI<2054590 Seed Rate (Hyd):

Deviatfon: N/A Test Load: 3569-59.5% 3395- 56.6%

NCR: N/A Final Drag: 27.5 -0.5%, PASS. 305 - 0.5%, PASS.

Tag: 2437 Breakaway: 53.4 0.4%, PASS. 43.7- 03%, PASS.

Mfg/Cap: PSA-10 Inibal Drag: 214.1 -1.4%, PASS. 2677.1 -173%, 1927.1¹ over, FAIL!

Serial ¹: 11388 Activation (Mech}: 0.010- PASS. 0.008 - PASS.

Mark ¹: St<205-4080 Seed Rate (Hyd):

Deviation: 15 Test Load: 11150-74.3% 11332- 75.5%

NCR: 2.207 Final Drag: 28569-19.0%, 2106.9¹ over, FAILI 29215-19.5%, 21715¹ over, FAIL!

Deviation Descrfptlon: This snubber exceeded the speciTied acceptance criteria in initial running drag by 1927.1¹s (12.8%} in compression, 2106.9¹s (17%) in fina drag tension and by 21715¹s (17.5%) in final drag compression.

Disposition Summary: Replace with a spare PSA-10. Disassemble the failed snubber to determine root cause of failure and repair, if practicaL Teardown Results: Normal wear on all parts except that minor dents to the outer thrust bearing was observed. This condition is usually causedby high Aration.

Replacement S/N: 12504 Page 5

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit 42-1989 Refueling Outage 0 Tag:

MfgCap:

2.038 PSA-1 Breakaway:

Initial Drag:

TENSON 6.8 ~ 0.5%, PASS.

14.0-0.9%, PASS.

COMPRESSION 102 0.7/o, PASS.

109 - 0.7%, PASS.

Sertai¹; 19221 Activation (Mech): 0.006- PASS. 0.005 ~

PASS.

Mark ¹: CH-103-R10A Bleed Rate (Hyd):

Devlatton: N/A Test Load: 903 -60.2o/o 916 - 61.0%

NCR: N/A Final Drag: 12.4- 0.8%, PASS. 9.6 0.6/o, PASS.

Tag: 2-039 Breakaway: 4.5-1.3%, PASS. 3.8-1.1%, PASS.

MfgCap: PSA-1/4 Initial Drag: 8.2-2.3%%d, PASS. 6.4-1.8% PASS.

Sertat ¹: 3&MO Activation (Mech): 0.007- PASS. 0.007 - PASS Mark¹: SI43-R3 Bleed Rate (Hyd):

280-80.0% 259 -73.9% ~

Deviation: N/A Test Load:

NCR: N/A Final Drag: 6.1 -1.Tlo, PASS. &.4- 2.4'lo, PASS.

Tag: 2440 Breakaway: 2.2 ~ 0.6'/o, PASS. 25-0.T%%d,PASS.

MfgCap: PSA-1/4 Inibal Drag: 2.8- 0.8%, PASS. 2.9 0.8/o, PASS.

mat>>: 29179 Activation (Mech): 0.010- PASS. 0.012- PASS.

Mark ¹: MS-19 RSB Bleed Rate (Hyd):

Deviation: N/A Test Load: 228 -65.2/. 236- 67.3%

NCR: N/A Final Drag: 3.1 -0.9'/o, PASS. 2.1 0.6 lo, PASS.

Tag: 2.041 Breakaway: 4.4-1.8%, PASS. 4.1 -1.6%%d, PASS.

MfgCap: A/D41 Initial Drag: 5.0-2.0o/o, PASS. 4.5 - 1.8%, PASS.

~at¹: 1292 Activation (Mech):

Mark¹: B.23-R1A Bleed Rate (Hyd): 32,360- PASS. 32380 ~ PASS.

Deviation: N/A Test Load: 124-49.4% 130- 52,0%

NCR: N/A Final Drag: 6.4-2.6%, PASS. 4.S 1.9%, PASS.

Tag i 2442 Breakaway: 3.1-0.9%, PASS. 6.4-1.8%, PASS.

MfgCap: PSA-1/4 Initial Drag: 4.8-1.4%, PASS. 6.4-1.8%, PASS.

Sertal¹: 38008 Activation (Mech): 0.008- PASS. 0.009 - PASS.

Mark¹ CH-105-R2 Bleed Rate (Hyd):

Deviation: N/A Test Load: 241 -689% 234 - 67.0o/

NCR: N/A Final Drag: 5.5-1.6o/o, PASS. 55-1.6%, PASS.

Tag: 2443 Breakaway: 2.8-0.8%, PASS. 43- 1.2%, PASS.

MfgCap: PSA-1/4 initial Drag: 4.2-1.2/o, PASS. 4.3- 1.2'/, PASS.

Sertat ¹: 26320 Activation (Mech): 0.011- PASS 0.010- PASS.

Mark¹: CH-106-R7 Bleed Rate (Hyd):

Devfatfon: N/A Test Load: 201 -575% 197- 56.3%

NCR: N/A Final Drag: 3.6-1.0/., PASS. 3.1 -0.9%, PASS.

Tag: 2444 Breakaway: 2.6-0.7%%d, PASS. 7.1 -2.0%, PASS.

MfgCap: PSA-1/4 Initial Drag: 5.1 -1.5'Yo, PASS. 7.2- 2.1%, PASS.

mat ¹ 38006 Activation (Mech): 0.006 ~ PASS. 0.007- PASS.

Mark ¹: CH-109-R7 Bleed Rate (Kyd):,

Devfatlon: N/A Test Load: 275 - 78.6o/o 264-75Bo NCR: N/A Final Drag: 5.4-1.5% PASS 6.6- 1.9%, PASS.

Page 6

Florida Power & Light Company Snubber Functiona! Test Results Summary St. Lucie Unit 42-1989 Refueling Outage TENSION COMPRESSION Tag: 2445 Breakaway: 2.4 -0.7%, PASS. 4.0 - 1.1%, PASS.

Mfg/Cap: PSA-1/4 initial Drag: 3.4- 1.0%, PASS. 4.4-1.3% PASS.

Serial ¹: 2Q175 Activation (Mech): Q.01Q - PASS. 0.010 - PASS.

Mark ¹: CH-108-R4 Bleed Rate (Hyd):

Deviation: N/A Test Load: 226-64.7/o 224 - 64.1%

NCR: N/A Final Drag: 4.7 -1.3'/, PASS. 2.0 - 0.6%, PASS.

Tag: 2446 Breakaway: 4.6 ~ 1.3%, PASS. 11.2 - 3.2%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 8.0 - 2.3%, PASS. 14.9 - 4.3%, PASS.

Serial ¹: 38028 Activation (Mech): 0.005 - PASS. 0.004 ~

PASS.

Mark ¹: CH-108-R8 Bleed Rate (Hyd):

Deviation: N/A Test Load: 250-71.5% 267- 76.4%

NCR: N/A Final Drag: 63-1.8%, PASS. 12.9 3.7/o, PASS, 2450 Breakaway: 7Q.6- 05%, PASS. 62.9 - 0.4'/o, PASS.

Tag'fg/Cap: PSA-10 Initial Drag: 97.0-0.6%, PASS. 86.4 - 0.6%, PASS.

Serial ¹: 16436 Activation (Mech): 0.013 - PASS. 0.010 - PASS.

Mark¹: SI4201-7741 B Seed Rate (Hyd):

Devlatfon: N/A Test Load: 7731 -51.5% 7828 - 52.P/o NCR: N/A Final Drag; 72,2 ~ 0.5/o, PASS. 110.4 - 0.7%, PASS.

Tag: 2451 Breakaway: 15 -0.4%, PASS. 3.9 - 1.1%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 3.2 -0.9%, PASS. 4.0 ~ 1.1'/o, PASS.

Serial ¹: 19022 Activation (Mech): 0.011 - PASS. 0.012 - PASS.

Matk ¹ Sf<201-736B Seed Rate (Hyd):

Devfatfon: N/A Test Load: 226-64.6% 244- 69.6o/o NCR: N/A Final Drag: 3.1 -09%, PASS. 33 - 1.1%, PASS.

Tag; Breakaway: 2.1 -0.6%, PASS. 3.7 1.1%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 3.0-0.9%, PASS. 4.2 1 2o/o, PASS.

Serial ¹: 38014 Activation (Mech): 0.008- PASS. 0.009 - PASS.

NCR.'452 Mark ¹: SI4201-730B Bleed Rate (Hyd):

Oevlatfon: N/A Test Load: 253-72,2% 270- 77.0%

N/A Final Drag: 35-1.0%, PASS. 45 - 13%, PASS.

Tag: 2453 Breakaway: 113 -02%, PASS. 12.4 - 0.2%, PASS.

Mfg/Cap: PSALM Initial Drag: 322-05%, PASS. 179 - 0.3%, PASS.

Serial ¹: 16749 Activation(Mech): 0.011- PASS. 0.009 - PASS.

Mark ¹: SIA2004343B Bleed Rate (Hyd):

Devlatfon: NIA Test Load: 3575-59.6% 3408 - 56.8%

NCR: N/A Final Drag: 21.1 -0.4%, PASS. 223 - 0.4%, PASS.

Tag: 2454 Breakaway: 16.2-03%, PASS. 4$ ~ 0.1%, PASS.

Mfg/Cap PSALM Initial Drag: 24.7 -0.4%, PASS. 162 - 0.3%, PASS.

Serial ¹: 16760 Activation (Mech): Q.008- PASS. 0.006- PASS.

Mark ¹. Sl<2004343B Bleed Rate (Hyd):

Deviation: N/A Test Load: 3513 ~ 58.5% 3211 - 53.5'/o NCR: N/A Final Drag: 18.7 - 03%, PASS. 178 - 0.3%, PASS.

Page 7

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q-1989 Refueling Outage TENSION COMPRESSION Tag: 2455 Breakaway: 23.7-0.4'/o, PASS. 21.2- 0.4%, PASS.

MfgCap: PSALM Initial Drag: 27.2-0.5%, PASS. 25.4- 0.4%, PASS.

Sertai ¹: 17709 Activation (Mech): 0.006- PASS. 0- 005 ~

PASS.

Mark ¹: SI42004340B Bleed Rate (Hyd):

Deviation: N/A Test Load: 3430 -57.2/. 3328 ~

555%

NCR: N/A Final Drag: 28.0-0.5%, PASS. 31.0- Q.5'/o, PASS.

Tag: 2-056 Breakaway: 34.1-0.6%, PASS. 7.5- 0.1%, PASS.

MfgCap: PSALM Initial Drag: 40.0-0.7'/o, PASS. 23.0-0.4%, PASS.

Sertat>>: 16765 Activation (Mech): 0.011- PASS. 0.006- PASS.

Mark ¹: SI42004340B Bleed Rate (Hyd):

Deviation: N/A Test Load: 3693-615% 3062 - 51.0%

NCR: N/A Final Drag: 38.2-0.6%, PASS. 23.2- 0.4%, PASS.

Tag: 2-057 Breakaway: 13.9-0.2%%d, PASS. 10.6- Q.2%, PASS.

MfgCap: PSALM Initial Drag: 28.6-0.5%, PASS. 17.3- 0.3%, PASS.

Sertai¹: 16753 Activation (Mech): 0.007- PASS. 0.004- PASS.

Mark ¹: SI4200-326B Bleed Rate (Hyd):

Deviation: N/A Test Load: 3135 ~ 52.3'/o 2984 - 49.7%

NCR; N/A Final Ofag: 26.6 0.4%, PASS. 18.9 - 0.3%, PASS.

Tag: 2.058 Breakaway: 32.6-0.5%, PASS. 32.5 0.5%, PASS.

MfgCap: PSALM Initial Drag: 99.3-1.7/o, PASS. 49.6- 0.8%, PASS.

Serial>>: 21266 Activation (Mech): 0.008- PASS. 0.005- PASS.

Mark ¹: Sl<200422G Bleed Rate (Hyd):

Deviation: N/A Test Load: 3335-55.6/ 3176 - 52.9%

NCR: N/A Final Drag: 70.1 -1.2/o, PASS. 64.3 -1.1%, PASS.

Tag: 2459 Breakaway: 2.9-0.8%, PASS. 3.0- 0.9%, PASS.

MfgCap: PSA-1/4 Initial Drag: 3.7-1.1%, PASS. 3.4-1.0%, PASS.

Serfai¹: 11848 Activation (Mech): 0.010- PASS. 0.009- PASS Mark¹: SI4200422B Bleed Rate (Hyd):

Devtation: N/A Test t.oad: 260 -74.2% 270-773%

NCR: N/A ~

Final Drag: 3.3-0.9%, PASS. 3.7- 1.1%, PASS.

Tag: 2460 Breakaway: 8.1 -0.5%, PASS. 9.8-0.7%, PASS.

MfgCap: PSA-1 Initial Drag: 8.5-0.6%, PASS. 11.1 - 0.7%, PASS.

. Sertal ¹: 20362 Activation (Mech): 0.006- PASS. 0.006- PASS.

Mark¹: SI4201-7111 Bleed Rate (Hyd):

Devtatfon: N/A Test Load: 985-65.6/o 960 - 64.0%

NCR: N/A Final Drag: 9.8-0.7%, PASS. 9.4- 0.6%, PASS.

Tag: 2461 Breakaway: 2.7-0.8/., PASS. 2.0-0.6%,PASS.

MfgCap: PSA-1/4 Initial Drag: 4.4-1.3%, PASS. 3.1 -0.9%, PASS.

Sertal ¹: 20285 Activation (Mech): 0.010- PASS. 0.009 - PASS.

Mark¹: SI<2004%7 Bleed Rate (Hyd):

Deviation; N/A Test Load: 236-67.6/o 244-69 6%

NCR: N/A Final Drag: 2.9-0.8%, PASS. 4.6-1.3% PASS.

Page 8

Florida Power 8r, Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSION Tag: 2466 Breakaway: 138.2 - 0.9%, PASS. 66.5 ~ 0.4'/o, PASS.

Mfg/Cap: PSA-10 Initial Drag: 142.0 0.9%, PASS. 87.2 0.6%, PASS.

Serial ¹: 12505 Activation (Mech): 0.010 - PASS. 0.009 - PASS.

Mark ¹: SI4203-71 Seed Rate (Hyd):

Deviation: N/A Test Load: 10647 71.0% 10733 ~

71.6%

NCR: N/A Final Drag: 166.3 - 1.1o/o PASS 69.1 - 0.5%, PASS.

Tag: 2467 Breakaway: 44.6-0.3%, PASS. 25.1 - 0.2%, PASS.

Mfg/Cap: PSA-10 Initial Drag: 48.3 -0.3%, PASS. 85.6 - O.P/o, PASS.

Serial ¹: 16437 Activation(Mech): 0.012- PASS. 0.009 - PASS.

Mark ¹: SI4201-7760 Seed Rate (Hyd):

Devlatfon: N/A Test Load: 11493- 76.6% 11408 - 76.1%

NCR: N/A Final Drag: 51.2-03%, PASS. 643 -0.4'/o, PASS.

Tag: 2468 Breakaway: 242.8-2.4%, PASS. 593-0.6%, PASS.

MfglCap: PMH-10 Initial Drag: 320.1-3.2/, PASS. 144.9 - 1.4'/o, PASS.

Serial ¹: PD 87773-1423 Activation(Mech):

Mark ¹: SI4201-7541 B Seed Rate (Hyd): 24.28- PASS. 24.360 - PASS.

Deviation: 19 Test Load:

NCR: NlA Final Drag: 13531.9-96.6'/o, PASS. 13900.9 - 99.2%, PASS.

Deviation

Description:

Snubber exceeded the drag criteria identified by the PSL-2 Acceptance Criteria.

Disposition Summary: While the drag loads did not conform with PSL-2 acceptance criteria, the results were stiil within the cri-teria speciTied in the PSL-2 Seismic Snubber List. the acceptance criteria will be revised accordingly.

Tag: 2469 Breakaway: 6.9-2.0%, PASS. 72 - 2.1%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 11.1 -3.2/o, PASS. 72 - 2.1%, PASS.

Serial ¹: 38005 Activation (Mech): 0006- PASS. 0.010 - PASS.

Mark ¹: S 14208-264B Seed Rate (Hyd):

Devfatlon: NlA Test Load: 251 ~ 71.6o/o 232- 66.3%

NCR: N/A Final Drag: 11.6-33%, PASS. 92- 2.6%, PASS.

Tag: 2471 Breakaway: 39 ~ 1.1%, PASS. 6.7-1 9%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 5.9 -1.7%, PASS. 6.7 -1.9%, PASS.

Serial ¹: 38007 Activation (Mech): 0.014- PASS. 0.009 - PASS.

Mark ¹: S 14208.266B Seed Rate (Hyd):

Deviation: N/A Test Load: 241 -69.0% 239- 68.3%

NCR: N/A Final Drag: 5.7-1.6%, PASS. 4.6- 13o%%d, PASS.

Tag: 2472 Breakaway: 9.4-0.6%, PASS. 9.7 O.P/o, PASS.

Mfg/Cap; PSA-1 Initial Drag: 12.0-0$ /o, PASS. 113 - 0.8%, PASS.

Serfal ¹: 14878 Activation (Mech): 0.006- PASS. 0.007- PASS.

Mark ¹: SI42054428B Seed Rate (Hyd):

Deviation: N/A Test Load: 1162-77.5% 1155 - 77.0%

NCR: N/A Final Drag: 11.4-0.8%, PASS. 13.2 - 0.9/o, PASS.

Page 9

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSION Tag: 2-073 Breakaway: 2.3-0.7%, PASS. 4.4 1.3%, PASS.

MfgCap: PSA.1/4 tnitial Drag: 4.9-1.4%, PASS. 5.9- 1.7%, PASS.

Sertai ¹: 38024 Activation (Mech): 0.010- PASS. 0.010 ~ PASS.

Mark ¹: CH-103.A7B Bleed Rate (Hyd):

Deviation: N/A Test Load: 249-71.2/. 270 ~ 77 3o NCR: NIA Final Drag: 5.7-1.6%, PASS. 4.4 - 1.3/o, PASS.

Tag: 2474 Breakaway: 10.0-0.2%, PASS. 9.9- 0.2%, PASS.

Ng/Cap: PSALM Initial Drag: 23.2- 0.4%, PASS. 125- 0.2%, PASS.

Serial ¹ 16752 Activation (Mech): 0.010 - PASS. 0.006- PASS.

Mark¹: SI42054713B Bleed Rate (Hyd):

Deviation: N/A Test Load: 3649 - 60 8o/o 2839 - 478%

NCR: N/A Final Drag: 22.6 0.4%, PASS. 13.7-0.2%, PASS.

Tag: 2475 Breakaway: 16.7-0.3%, PASS. 7.8 - 0.1%, PASS.

MfgCap: PSALM Initial Drag: 21.6-0.4'/o, PASS. 253-0.4%, PASS.

Serfal¹: 16769 Activation (Mech): 0.010 ~ PASS. 0.005- PASS.

Mark¹: SI42054713B Bleed Rate (Hyd):

Deviation: N/A Test Load: 3734- 62.2% 3337- 55.6%

NCR: N/A Final Drag: 21.6-0.4'/o, PASS. 24.0- 0.4%, PASS.

Tag: 2476 Breakaway: 23.3-0.2'/o, PASS. 21.6 - 0.1'Yo, PASS.

MfgCap: PSA-10 Initial Drag: 28.0-0.2%, PASS. 32.6- 0.2%, PASS.

Serfat ¹: 8928 Activation (Mech): 0.009- PASS. 0.008 - PASS.

Mark ¹: SI4205456C Bleed Rate (Hyd):

Deviation: N/A Test Load: 6750-45.0/ 6690- 44.6%

NCR: N/A Final Drag: 37.3 ~

0.2%%d, PASS. 27.7- 0.2%, PASS.

Tag: 2477 Breakaway: 26.0 0.2%, PASS. 23.1 - 0.2%, PASS.

Mfgaa: PSA-10 Initial Drag: 545-04% PASS 303- 0.2%, PASS.

Serfal>> 12596 Activation (Mech): 0.009 - PASS. 0.007- PASS.

Mark ¹ SI4205456B Bleed Rate (Hyd):

Deviation: N/A Test Load: 7220 - 48.1% 7314- 48.8%

NCR: N/A Final Drag: 53.2 ~ 0.4%, PASS. 40.1 0.3%, PASS.

Tag: 2478 Breakaway: 39.0- 0.3%, PASS. 345- 0.2%, PASS.

MfgCap: PSA-10 Initial Drag: 111.7- 0.7Yo, PASS. 809- 05%, PASS.

Serfal¹: 12598 Activation(Mech): 0.013 - PASS. 0.009- PASS.

Mark ¹: SI4205456B Bleed Rate (Kyd):

Deviation: N/A Test Load: 6622 - 44.1% 6704- 44.7%

NCR: N/A Rnal Drag: 74.6-0.5%, PASS. 55.6-0.4%, PASS.

Tag: 2479 Breakaway: 7.7-0.5%, PASS. 9.5 0.6/o, PASS.

NgCap: PSA-1 Initial Drag: 13.4-0.9%, PASS. 10.6- 0.7%, PASS.

Sertal ¹: 24734 Activation (Mech): 0.006- PASS. 0.007- PASS.

Mark¹: SI4205-739 B Bleed Rate (Hyd):

Devfatton: N/A Test Load: 937-625/o 899-59 9%

NCR: N/A Final Drag: 10.7 - 0. T/o, PASS. 10.0- 0.7%, PASS.

Page 10

~ l.

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-19&9 Refueling Outage TENSION COMPRESSON 2480 Breakaway: 7.5-0.5%, PASS. 10.6-0.7/., PASS.

Tag'fg/Cap: PSA-1 Initial Drag: 17.4-1.2/., PASS. 10.6 0.7%, PASS.

Serial ¹: 20363 Activation r Mech): 0.006 - PASS. 0.006 - PASS.

Mark ¹: SI4205-642BB Bleed Rate (Hyd):

Deviation: N/A Test Load: 1184- 79.0% 1158 77.2 lo NCR: N/A Final Drag: 16.3 - 1.1%, PASS. 9.9 ~ 0.7%, PASS.

Tag: 2486 Breakaway: 2.9 -0.8%, PASS. 2.6 - 0.7%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 4.1 -1.2%%d, PASS. 2.6 - 0.7%, PASS.

Serial ¹: 38026 Activation (Mech): 0.008 - PASS. 0.008 - PASS.

Mark ¹: Sl-99-R1 Seed Rate (Hyd):

Deviation: N/A Test Load: 248-70.7% 258 - 73.8'/o NCR: N/A Final Drag: 3.4 ~ 1.0'/o, PASS. 45-13%, PASS.

Tag: 2488 Breakaway: 13.0-0.9%, PASS. 14.0 - 0.9'/o, PASS.

Mfg/Cap: PSA-1 Initial Drag: 17.0-1.1%, PASS. 23.7- 1.6%, PASS.

Serial ¹: 20359 Activation (Mech): 0.007- PASS. 0.007- PASS.

Mark ¹: SI4204-1270B Bleed Rate (Hyd):

Devla5on: N/A Test Load: 804-53.6/o 884 - 58.9%

NCR: N/A Final Drag: 14.3 ~

1.0%, PASS. 21.7 - 1.4%, PASS.

fthm-0.8%,

Tag: 2489 Breakaway: 11.1 -0.7%, PASS. 10 8 - 0.7/o, PASS.

Mfg/Cap: PSA-1 Initial Drag: 12.6-Q.Blo, PASS. PASS.

Serial ¹: 26000 Activation (Mech): 0.006 ~ PASS. 0.006 - PASS.

Mark ¹: SI4204-1270B Bleed Rate (Hyd):

Deviation: N/A Test Load: 745 ~

49.7%%d 844- 56.3%

NCR: N/A Final Drag: 11.6-0.8%, PASS. 13.4 - 0.9%, PASS.

Tag: 2495 Breakaway: 674.1 -0.6%, PASS. 'I 21.1 0.1 lo, PASS.

Mfg/Cap; PSA-100 Initial Drag: 1002.1 -0$ %, PASS. 6332.2 5.3%, 332.2¹ over, FAIL!

Serial ¹: 1206 Activa5on (Mech): ON9- PASS. 0.012 - PASS.

Mark ¹: MS4100-16B Bleed Rate (Hyd):

Devlatfon: 12 Test Load: 63-0.1% 63-0.1%

NCR: 2-197 Rnal Drag: 10405-0.9%, PASS. 5854$ - 49/o, PASS.

Devlatfon Descrfptlon: This snubber exhibited a load spike during initial drag (compression) which exceeds the 5% criteria by 332.2¹s. M average drag load was approximately 2% of the rated load of this snubber.

Disposition Summary: This snubber was replaced with a spare PSA-100 snubber. JPE evaluated the condition and found that the drag loads didnot affect the piping.

Teardown Results: Rust and scoring on outside of support cylinder, wear on inertia spring, tangs, and top of planetary gears show rubbng. This condition is usually caused by a harsh environment and is service induced.

Replacement S/N: 2373 Tag: 2496 Breakaway: 629.0- 05%, PASS. 8165 - 0.7%, PASS.

Mfg/Cap: PSA-100 Initial Drag: 833.3 -0.7%, PASS. 1432.7 - 1.2/o, PASS.

Serial ¹: 1205 Ac5va5on (Mech): ONB - PASS. 0.010 - PASS.

Mark ¹. MS4100-16B Bleed Rate (Hyd):

Deviation: N/A Test Load: 59-0.0o%%d 62-0.1%

NCR: N/A Final Drag: 1103.7-0.9%, PASS. 1405.9 - 12'/o, PASS.

Page 11

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q - 1989 Refueling Outage TENSION COMPRESSION Tag'497 Breakaway: 30.3-0.5%, PASS, Initial Drag: 55.7 ~ 0.9%, PASS.

16.6- 0.3%, PASS.

171.4 2.9%, PASS.

MfgCap: PSALM Sertat ¹ 29696 Activation (Mech): 0.008- PASS. 0.004 ~

PASS Mark ¹; SIA20349C Bleed Rate (Hyd):

Deviation: N/A Test Load: 3711-61.9% 3434 - 57.2'/o NCR: N/A Final Drag: 79.5-1.3%, PASS. 63.4 - 1.1%, PASS Note: Although no nonconformance existed, the snubber was replaced with a spare due to 724our Limiting Condition require-inents.

Replacement S/N: 11Q70 Tag: 2499 Breakaway: 5.6- 0.4'/o, PASS. 13.5-0,9%, PASS.

MfgCap: PSA-1 Initial Drag: 12.0 ~ 0.8%, PASS. 14.4-1.0%, PASS.

Serfat¹: 16143 Activation (Mech): 0.008 - PASS. 0.007- PASS.

Mark¹: SI420349B Bleed Rate (Hyd):

Devtation: N/A Test Load: 1147 - 76.5% 1199 - 79.9 lo NCR: N/A Final Drag: 15.2 1,0/o, PASS. 12.1 0.8/o, PASS Tag: 2-100 Breakaway: 7.1 - 0.5%, PASS. 1Q.O 0.7%, PASS.

MfgCap: PSA-1 Initial Drag: 14.4 ~ 1.0o/o, PASS. 14.0 - 0.9%, PASS.

Sertai ¹: 20360 Activation (Mech): 0.007 ~ PASS. 0.006- PASS.

Mark¹: SI420349B Bleed Rate (Hyd):

Deviation: N/A Test Load: 1161 -77.4% 1194 - 79.6%

NCR: N/A Final Drag: 14.0-09% PASS. 207-14o/o PASS Tag: 2-101 Breakaway: 3.2-0.9/o, PASS. 14 ~ 04o/o PAS MfgCap: PSA-1/4 Initial Drag: 3.9-1.1%, PASS. 2.2-0.6%, PASS.

Sertal ¹: 26325 Activation (Mech): 0.011- PASS. 0.009 - PASS.

Mark ¹: SI4201-7201 B Bleed Rate (Hyd):

Deviation: N/A Test Load: 219-62.7% 223- 63.8%

NCR: N/A Final Drag: 4.1 -1.2%, PASS. 2.0 0.6o/o, PASS.

Tag: 2-102 Breakaway: 17.8-1.2%%d, PASS. 16.0 ~

1.1%, PASS.

MfgCap; PSA-1 Initial Drag: 32.4-2.2%, PASS. 22'1.5% PASS Sertat ¹: 14870 Activabon (Mech): 0.008- PASS. 0.007- PASS.

Mark¹: SI4203-24G Bleed Rate (Hyd):

Oevtatfon: N/A Test Load: 853-56.9% 892-59N NCR: N/A Final Drag: 29.3-2.0/o, PASS. 51.2 ~ 3.4%, PASS.

Tag: 2-104 Breakaway: 18.7-1.2%, PASS. 21.4- 1.4%, PASS.

MfgCap: PSA-1 Initial Drag: 31.2- 2.1%, PASS. 38.3- 2.6%, PASS.

Sertai¹: 14876 Activation (Mech); 0.007- PASS. 0.006- PASS.

Mark ¹. SI4203-24B Bleed Rate (Hyd):

Deviation: N/A Test Load: 932-62.1% 944 - 62.9%

NCR: N/A Final Drag: 34.3-2.3'Yo, PASS. 27.3- 1.8%, PASS.

Page 12

Florida Power 8 Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q - 1989 Refueling Outage TENSION COMPRESSON Tag: 2-116 Breakaway: 4.7-1.3%, PASS. 4.4 ~ 13% PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 6.4 -1.8'/., PASS. 5.0 1.4%, PASS.

Serial ¹: 12911 Activation(Mech): 0.014 - PASS. 0.014- PASS.

Mark ¹: SI4206-6254 Bleed Rate (Hyd):

Deviation: N/A Test l.oad: 253-72.2% 263 - 75.1'lo NCR: NfA Final Drag: 5.8-1.7%, PASS. 4.9 - 1.4%, PASS.

Tag: 2-117 Breakaway: 2.0-0.6'/o, PASS. 4.4 ~

1.3% PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 5.8 -1.7/o, PASS. 65 19/o, PASS.

Serial ¹: 38019 Activation(Mech): 0.011 - PASS. 0.010- PASS.

Mark ¹: SI4206.6271 B Seed Rate (Hyd):

Deviation: N/A Test Load: 266-76.0% 264- 75.Plo NCR: N/A Final Drag: 35-1.0%, PASS. 39- 1.1%, PASS.

Tag: 2-124 Breakaway: 2.6-0.7/o, PASS. 2.7- 0.8%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 3.4-1.0 lo, PASS. 29 0$ %, PASS.

Serial ¹: 29366 Activation(Mech): 0.009 - PASS. 0.008 - PASS.

Mark ¹: RC-98.R1 2 Seed Rate (Hyd):

Deviation: N/A Test Load: 241 ~

68.8/o 271 - 77 5o/o NGR: N/A Final Drag: 3.4 ~

1.0/o, PASS. 33 09o/o, PASS.

Tag: 2.125 Breakaway: 2.9 -0.8%, PASS. 3.2 09/o, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 3.0 -0.9%, PASS. 3.2 ~ 0.9'/o, PASS.

Serial ¹: 29332 Activation(Mech): 0.011 - PASS. 0.010 ~ PASS.

Mark ¹: RC-98.R4B Seed Rate (Hyd):

Deviation: N/A Test Load: 231 -65.9/o 238 - 68.1'lo NCR: N/A Final Drag: 3.0-0.9%, PASS. 3.3 -0.9'/o, PASS.

Tag: Breakaway: 32-0,9o/o, PASS. 4.1 1.2%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 4.5 ~

1.3%, PASS. 55- 1.6%, PASS.

Serial ¹: 19068 Activation(Mech): 0.007- PASS. 0.012 - PASS.

Mark ¹: MSI-13-R1 Seed Rate (Hyd):

Deviation: N/A Test Load: 256-73.1% 278- 79 5'lo NCR: N/A Final Drag: 4.7 -1.3%, PASS. 4Z - ta/., PASS.

NCR'-127 Tag: 2-129 Breakaway: 1Q.7- Q.7o/o, PASS, 7.1 ~

05%, PASS.

Mfg/Cap: PSA-1 Initial Drag: 11.6-0.8/o, PASS. 82 -05%, PASS.

Serial ¹: 19229 Activation(Mech): 0.008 - PASS. 0.007- PASS.

Mark ¹: CS.2006-7115 Seed Rate (Hyd):

Deviation: N/A Test Load: 989-65.9o/o 913 - 60.9%

N/A Final Drag: 8.7-0.6/o, PASS. 85-0.6%, PASS.

Tag: 2-132 Breakaway: 3.6- 1.0o/o, PASS. 6.0 1.7%, PASS.

Mfg/Cap PSA-1/4 Initial Drag". 10.7-3.1%, PASS. 10.4 - 3.0%, PASS.

Serial ¹: 38011 Activation (Mech): 0.009 - PASS. 0.010- PASS.

Mark ¹: MS'3B Seed Rate (Hyd):

Deviation: N/A Test Load: 259-74.1/o 2/1 - 77.4o/

NCR: N/A Final Drag: 8.4-2.4%, PASS. 6.7 - 'l9%, PASS.

Page 13

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q - 1989 Refueling Outage TENSION COMPRESSION Tag: Breakaway: 4.3-1.2'/., PASS; 3.8- 1.1%, PASS.

Ng/Cap: PSA-1I4 Initial Drag: 7,3 2,1/o, PASS. 5.3- 1.5'Yo, PASS.

Serial ¹:

NCR'-133 38021 Activation (Mech): 0.006- PASS. 0.007- PASS.

Mark ¹: MS-33 R3B Bleed Rate (Hyd):

Deviation: N/A Test Load: 265- 75.7'/o 257 - 73.3%

N/A Final Drag: 6.2 ~

1.8%, PASS. 4.7 ~ 1 3% PASS.

Tag: 2-134 Breakaway: 4.4-1.3%, PASS. 3.3 0.9/o, PASS.

Ng/Cap: PSA-1/4 Inmal Drag: 5.0 ~ 1.4%, PASS. 3.6 1 0%, PASS.

Serial ¹: 29369 Activation (Mech): 0.0t2- PASS. 0.011- PASS.

Mark¹: RC-101-RSB Bleed Rate (Hyd):

Deviation: N/A Test Load: 217 ~

61.9% 200 - 57.1%

NCR: N/A Final Drag: 5.2-1.5%, PASS. 3.3 0.9/o, PASS.

Tag: 2-136 Breakaway: 2.6-0.7%, PASS. 3.3-0.9% PASS.

Ng/Cap: PSA.1/4 Initial Drag: 3.9-1.1%, PASS. 3.5 1.0/o, PASS.

Serial ¹: 11855 Activation (Mech): 0.007 ~

PASS. 0.008- PASS.

Mark ¹: MS-32.R3B Bleed Rate (Hyd):

Deviation: N/A Test Load: 282-80.55 269 - 76.T/o NCR: N/A Final Drag: 5.0-1.4% PASS. 2.9 0.8%, PASS.

Tag: 2-137 Breakaway: 5.6-1.6%, PASS. 5.0-1.4%, PASS.

Ng/Cap: PSA-1/4 Initial Drag: 9.9-2.8%, PASS. 5.7 1.6o/o, PASS.

Serial ¹: 38002 Activation (Mech): 0.009- PASS. 0.011 - PASS.

Mark ¹: MS-32-R4B Bleed Rate (Hyd):

Deviation: N/A Test Load: 275-78.5/. t89-54.0'/.

NCR: N/A Final Drag: 7.9-2.3%, PASS. 7.1 2.0/o, PASS.

Tag: 2-138 Breakaway: 2.0-0.6%, PASS. 4.6-1.3% PASS.

Ng/Cap: PSA-1/4 Initial Drag: 2.2-0.6'/o, PASS. 4.9. 1.4%, PASS.

Serial ¹: 20198 Activation (Mech): 0.009- PASS. 0.011 ~

PASS.

Mark ¹: MSI-12-R4 Bleed Rate (Hyd):

Deviation: N/A Test Load: 225-64.2'/. 189 - 54.0'/o NCR: N/A ~

Final Drag: 3.6-1.0/o, PASS. 2.9- 0.8%, PASS.

Tag: 2-139 Breakaway: 3.3-0.9/o, PASS. 4.4- 1.3%, PASS.

Ng/Cap: PSA-1/4 Initial Drag: 5.5-1.6%, PASS. 5.3-1.5%, PASS.

Serial ¹ '9091 Acttvathn (Mech): 0.007- PASS. 0.008- PASS.

Mark ¹: MSI-12-R5 Bleed Rate (Hyd):

Devlatlon: N/A Test Load: 225-64.3% 224 - 64.1'/o NCR: N/A Final Drag: 6.1 -1.7%%d, PASS. 5.7-1.6%, PASS.

Tag: 2-144 Breakaway: 8.6-0.6%, PASS. 7.5- 0.5%, PASS.

MfgCap: PSA-1 Initial Drag: 10.4 ~ 0.7/o, PASS. 12.0- 0.8% PASS.

Serial ¹: 16664 Activation (Mech): 0.007 ~ PASS. 0.007 - PASS.

Mark ¹: RC4300-15 Bleed Rate (Hyd):

Deviation; N/A Test Load: 1181 -78.T/o 1175 - 78.3'Yo NCR: N/A Final Drag: 13.7 ~ 0 9% PASS. 12.2- 0.8%, PASS.

Page 14

Florida Power 8 Light Company Snubber functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSON Tag: 2.149 Breakaway: 4.9 0.1%, PASS.

~ 15.0 02/o, PASS.

Mfg/Cap: PSALM Initial Drag: 17.7-0.3%, PASS. 51.9 09%, PASS.

Sertal ¹: 16571 Activation (Mech): 0.009 - PASS. 0.010- PASS.

Mark ¹: RC &00-27 Bleed Rate (Hyd):

Deviation: N/A Test Load: 3783 - 63.1% 3210

  • 53.5%

NCR: N/A Final Drag: 19.7 -0.3%, PASS. 24.2 0.4%, PASS.

Tag: 2-150 Breakaway: 6.4-0.4%, PASS. 6.6-04o%%d PASS Mfg/Cap: PSA-1 Initial Drag: 9.7-0.6o/o, PASS. 10.7 - O.TYo, PASS.

Serial ¹: 14880 Activation (Mech): 0.009- PASS. 0.010 ~ PASS.

Mark ¹: RC400-1 25 Eeed Rate (Hyd):

Deviation: N/A Test Load: 1001 -66.7% 1076-71.8%

NCR: N/A Final Drag: 9.6-0.6%%d, PASS. 10.4 0.7 lo, PASS.

Tag: Breakaway: 5.7-0.4%, PASS. 8.1 -05%, PASS.

Mfg/Cap: PSA-1 Initial Drag: 8.3 -0.6'/o, PASS. 8.1 - 0.5%, PASS.

Serial ¹: 148TT Activation(Mech): 0.007- PASS. O.OM - PASS.

NCR,'-151 Mark ¹: RC4300-.28 Bleed Rate (Hyd):

Oevlatlon: N/A Test Load: 1165-77.7/ 1187- 79 1%

N/A Final Drag: 8.8-0.6%, PASS. 8.2 0.5%, PASS.

Tag: 2-152 Breakaway: 5.2 -03%, PASS. 17.1 - 1.1/o, PASS.

Mfg/Cap: PSA-1 Initial Drag: 8.5 - 0.6o/o, PASS. 17.1 - 1.1lo, PASS.

Serial ¹: 16141 Activation (Mech): 0.009 - PASS. 0.009 - PASS.

Mark ¹: RC4300.28 Eeed Rate (Hyd):

Deviation: N/A Test Load: 1186-79.0% 1185 -79.0'/

NCR: N/A Final Drag: 8.9 - 0.6'/, PASS. 13.0 - 09%, PASS.

Tag: 2-156 Breakaway: 5.7 ~ 0.4'Yo, PASS. 9.4 - 0.6%, PASS.

Mfg/Cap: PSA-1 Initial Drag: 7.4 -05%, PASS. 11.3 0$ %, PASS.

Serial ¹: 19227 Activation(Mech): 0.008- PASS. 0.008 - PASS.

Mark ¹: RCW0044B Eeed Rate (Hyd):

Devlatfon: N/A Test Load: 1194- 79.6% 1184 - 78.9%

NCR: N/A Final Drag: 7.4-05%, PASS. 12.8 - 0.9%, PASS.

TagI 2-160 Breakaway: 18.4-03/o, PASS. T.4-0.1%, PASS.

Mfg/Cap: PSALM Initial Drag: 19.0-03%, PASS., 15.7- 03%, PASS.

Serial ¹: . 20253 Activation (Mech): 0.007- PASS. 0.007- PASS.

Mark ¹: RC400-12 Eeed Rate (Hyd):

Oevlatfon: N/A Test Load: 3324-55A/o 2878 - 48,0%

NCR; N/A Final Drag: 20.7-0.3/o, PASS. 14.0 - 02Yo, PASS.

Tag: 2-161 Breakaway: 17.2-03%, PASS. 82 - 0.1%, PASS.

Mfg/Cap: PSALM tnitial Drag: 20.4-0.3%, PASS. 18.8 -03%, PASS.

Serfal ¹: 20262 Activation (Mech): 0.012 - PASS. 0.008 - PASS.

Mark ¹: RCCOO-12 Bleed Rqte (Hyd):

Deviation: N/A Test Load: 4768-79.5% 4180 ~ 69.7%

NCR: N/A Final Drag: 18.9 -03%, PASS. 21.4 - 0.4%, PASS.

Page 15

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSION Tag: 2-163 Breakaway: 28.1 -0.2/o, PASS. 23.1 0.2/o, PASS.

Ng/Cap: PSA-10 Initial Drag: 45.0-0.3%, PASS, 49.8 ~ 0.3%, PASS.

Serfal ¹: 8931 Activation (Mech): 0.010- PASS. 0.010 ~ PASS.

Mark ¹: RC4300.157 Bleed Rate (Hyd):

Deviation: N/A Test Load: 7561 - 50.4'/. 6794- 45.3%

NCR: N/A Final Drag: 82.2-0.5%, PASS. 94.9 - 0.6%, PASS.

Tag: 2-167 Breakaway: 180.3-1.8%, PASS. 20.2 0.2%, PASS.

Ng/Cap: PMH.2200 Initial Drag: 278.2-2.8%, PASS. 140.8- 1.4'/o, PASS Serfal ¹: PD 87773-1424 Activation (Mech):

Mark ¹: RCCOQ-147 Bfeed Rate (Hyd): 25.890- PASS. 25.750- PASS.

Deviation: 14 Test Load: 13540-135.4/ 14005 - 140.1%

NCR: N/A Final Drag:

Deviation Description; Upon receipt and after removal of the protective bags, it was identified that the snubber reservoir indica.

tor was showing red. Functional test results are similar to those of a snubber containing air.

Dlsposltlon Summary: Snubber was leak tested with reservoir charged and examined after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. No leak-age was observed. A pressure test at 5940 psi was also performed and no leakage was observed. Functional test results were sabsfactory.

Replacement S/N: PO 87773.1891 Tag: 2-168 Breakaway: 22.6- Q.4'lo, PASS. 10,5 0.2/o, PASS.

Ng/Cap: PSALM Initial Drag: 31.6-0.5%, PASS. 18.0- 0.3'/o, PASS.

Serfai¹: 20265 Activation (Mech): 0.008- pass. 0.009- pass.

Mark ¹: RC400-154 Bleed Rate (Hyd):

Deviation: N/A Test Load: 4477- 74.6/o 4172 ~ 695%

NCR: Final Drag: 31.1 - Q.5%, PASS. 17.0 ~

0.3%, PASS.

Tag: 2-179 Breakaway: 7.0-2.0/., PASS. 5.0-1.4%, PASS.

NgCap: PSA-1/4 Initial Drag: 8.6 ~ 2.5/o, PASS. 7.2- 2.1%, PASS.

Serfai¹ 12904 Activation (Mech): 0.012- PASS. 0.013 - PASS.

Mark ¹: RC-97.R1C Bleed Rate (Hyd):

Devfatlon: N/A Test Load: 203 58.1 lo 177-50.6%

NCR: N/A Final Drag: 7.9- 2.3'Yo, PASS. 6.2-1.8%, PASS.

Tag: 2-181 . Breakaway: 5.3 0.8%, PASS. 5.1 -0.8%, PASS.

Nggap: PSA-1/2 Initial Drag: 7.5- 1.2Yo, PASS. 6.1 -0.9%, PASS.

Sertaf>>: 10722 Activation (Mech): 0.010- PASS. 0.010 ~ PASS.

Mark ¹: SPS&7 Bleed Rate (Hyd}:

Devfatlon: N/A Test Load: 436 - 67.1% 502- 77@o NCR: N/A Fina! Drag: 7.5- 1.2'/o, PASS. 5.5-0.8%, PASS.

Tag: 2-182 Breakaway: 1.9-0.3%, PASS. 3.4- 0.5%, PASS.

Ng/Cap: PSA-1/2 Initial Drag: 3.7-0.6/., PASS. 4.4- 0.7%, PASS.

Serfai¹ 11260 Activation (Mech): 0.011- PASS 0.014- PASS.

Mark ¹: SPS&7 Bleed Rate (Hyd):

Devtatlon: N/A Test Load: 301 -46.4'lo 288-44.3%

NCR: N/A Final Drag: 3.6-0.6o/o, PASS. 4.7- 0.7%, PASS.

Page 16

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSION Tag: 2-183 Breakaway: 48-0.3%, PASS. 6.6 - 0.4%, PASS.

MfglCap; PSA-1 Initial Drag: 6.7-0.4%, PASS. 7.1 -0.5'/o, PASS.

Serial ¹: 19224 Activation (Mech): 0.011 - PASS. 0.011 - PASS.

Mark ¹: RC &00-1067 Bleed Rate (Hyd):

Devfatlon: N/A Test Load: 1187 - 79.1% 1186- 79.0'lo NCR: N/A Final Drag: 7.9 ~ 0.5%, PASS. 6.5 0.4%, PASS.

Tag: 2-184 Breakaway: 4.6- Q.3'lo, PASS. 10.1 O.T%, PASS.

Mfg/Cap: PSA-1 fnitial Drag: 7.1 -0.5%, PASS. 1Q.1 0.7/o PASS.

Serial ¹: 19228 Activation (Mech): 0.007- PASS. 0.008 -'ASS.

Mark ¹: RC4300-1067 Bleed Rate (Hyd):

Deviation: N/A Test Load: 1156-77.1'/o 1139 - 75.9%

NCR: N/A Final Drag: 7.0-05%, PASS. 10.2 0.7/o, PASS.

Tag: 2-190 Breakaway: 17.1 -02%, PASS. 21.1 0.4%, PASS.

Mfg/Cap: PSA-3 Initial Drag: 28.7 ONo, PASS. 24.9 - 0.4%, PASS.

Serial ¹: 29503 Activation (Mech): 0.005 ~ PASS. 0.004 - PASS.

Mark ¹: SPS417 Bleed Rate (Hyd):

Deviation: N/A Test Load: 3089- 51.5/ 3170 52.8%

NCR: N/A Fina! Drag: 33.T -0.6'/o, PASS. 29.1 - 0.5%, PASS.

2-199 Breakaway: 8.9 ~ 0.6%, PASS. 5.6 - 0.4%, PASS.

Tag'fg/Cap: PSA-1 Initial Drag: 105 0.7o/o, PASS. 95-0.6% PASS.

Serial ¹: 16943 Activation (Mech): 0.011- PASS. 0.012 - PASS.

Mark ¹: SI40-R9 Bleed Rate (Hyd):

Deviation: N/A Test Load: 981 ~

65.4% 1Q75 71.7 /o NCR; N/A Final Drag: 11.6-0.8%, PASS. 7.7-0.5'/, PASS.

Tag: 2.202 Breakaway: 32- 09k, PASS. 35 - 1.0%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 38-1.1 l., PASS. 3.6 - 1.0'/o, PASS.

Serial ¹: 12900 Activation (Mech): 0.014- PASS. 0.014 - PASS.

Mark ¹ SI40-RTB Seed Rate (Hyd):

Deviation: N/A Test Load: 230-65.8% 208- 59.5%

NCR: N/A Final Drag: 8.0 - 2.3%, PASS. 3.1 -0.9/o, PASS.

Tag: 2.204 Breakaway: 83 ~ 0.6o/, PASS. 7.7-0.5% PASS.

Mfg/Cap: PSA-1 Initial Drag: 153-1.1%, PASS. 9.1 - O.P/o, PASS.

Serial ¹: 19617 Activation (Mech): 0.006 ~ PASS. 0.006- PASS.

Mark ¹: GC.209T-26 Bleed Rate (Hyd):

Deviation: N/A Test Load: 1150-76.7% 1053 - TQ.P/o NCR: N/A Final Drag: 145- 1.0o/o, PASS. 10,7 - 0.7%, PASS.

Tag: 2-205 Breakaway: 2382 -05%, PASS. 145.8 - 03%, PASS.

Mfg/Cap: PSALMS Initial Drag: 261.1 . 05%, PASS. 189.3 -0 4% PASS.

Serial ¹: 8292 Activation (Mech): 0.010- PASS. 0.013 - PASS.

Mark ¹: MS4100.9 Seed Rate (Hyd):

Deviation; N/A Test Load: 27-0.1% 26-0 1%

NCR: N/A Final Drag: 2613 - 0.5%, PASS. 191.4 0.4%, PASS.

Page 17

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q -1989 Refueling Outage TENSION COMPRESSION Tag: 2-206 Breakaway: 6.5-1.9%, PASS. 5.8 1.7%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 8.1 -2.3%, PASS. 8.1 2.3%, PASS.

Serial¹: 19077 Activation (Mech): 0.010- PASS. 0.010 - PASS.

Mark ¹ MS-14-R6 Bleed Rate (Hyd):

Deviation: N/A Test Load: 238-68.0/o 237 - 67 8ol NCR: N/A Final Drag: 7.0 ~ 2.0%, PASS. 8.0 2.3%, PASS.

Tag: 2-207 Breakaway: 2.6-0.7%, PASS. 9.4- 2.70/o, PASS.

MfgCap: PSA-1/4 Initial Drag: 4.0 ~

1.1%, PASS. 11.0 3.1 /o, PASS.

Serial¹: 19093 Activaten (Mech): 0.012- PASS. Q.010- PASS.

Mark¹: MS-13.R6 Bleed Rate (Hyd):

Deviation: N/A Test Load: 227-64.7% 261 - 74.5%

NCR: N/A Final Drag: 5.3-1.5o/o, PASS. 92- 2.6o/o, PASS.

Tag: 2.212 Breakaway 3.7- 1.1%, PASS. 3.7 1.1 /o, PASS.

MfgCap: PSA-1/4 Initial Drag 4.9- 1.4'/o, PASS. 5.8-1.T/o, PASS.

Serial¹: 38023 Activation (Mech) 0.010 ~

PASS. 0.009 - PASS.

Mark ¹: SI-240341 Bhed Rate (Hyd)

Oevfatlon: N/A Test Load 251 - 71.7% 244 ~ 69.T/o NCR: N/A Final Drag 4.6-1.3%, PASS. 6.6 1.9%, PASS.

Tag: 2-214 Breakaway: 2.1 0.3 lo, PASS. 2.9-0.4/o, PASS.

Mfg/Cap: PSA-1/2 Initial Drag: 2.5 0.4 lo, PASS. 3.0 0.5%, PASS.

Serial ¹: 10723 Activation (Mech): O.Q14- PASS. 0.013- PASS.

Mark ¹: CH-2081-147A Bleed Rate (Hyd):

Deviation: N/A Test Load: 436 67.1/o 456 70.1 /o, PASS.

NCR: N/A Final Drag: 2.9- 0.4%, PASS. 2.7 0.4%, PASS.

Tag: 2-215 Breakaway: 6.9-1.1%, PASS. 3.3 0.5/o, PASS.

Mfg/Cap: PSA-1/2 'nitial Diag: 6.9- 1.1'lo, PASS. 4.1 0.6/o, PASS.

Serial¹: 160SS Activation (Mech): 0.007- PASS. 0.005- PASS.

Mark ¹: CH-2081-10QA Shed Rate (Hyd):

Devfatlon: 9 Test Load: 476-73.2% 499-76S%

NCR: N/A Final Drag: 5.5-0.8%, PASS. 4.2 0.6%, PASS.

Oevfatlon

Description:

After passing the functional test, this snubber became frozen during IKited operability (manual stroke).

Dtsposttion Summary: This snubber appears to be indicating erratic operation. Although the drag values are acceptable, the snubber should be replaced with a spare PSA-1/2. Other rebuilding efforts may be taken to salvage the replaced snubber.

Replacement S/N: 20433 Tag: 2-216 Breakaway: 10.3-0. T%%d, PASS. 7.6-0.5% PASS.

MfgCap: PSA-1 initial Drag: 13.5-0.9%, PASS. 15.9 1.1%, PASS.

Serial¹: '!6663 Activation (Mech): 0.007- PASS. 0.007- PASS.

Mark¹: Sl.2419-50A Shed Rate (Hyd):

Oevtatlon: N/A Test Load: 899 ~ 59.9% 881 -58. T/o NCR: N/A Final Drag: 18.5-1.2/o, PASS. 11.7- 0.8%, PASS.

Page 18

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2- 1989 Refueling Outage Tag: 2-217 Breakaway: 44.5 -0.3%, PASS. 385 - 0.3/o, PASS.

Mfg/Cap: PSA-10 Initial Drag: 52.3-0.3%, PASS. 39.3 - 0.3'/o, PASS.

Serial ¹: 16438 Activation (Mech): 0.012- PASS. 0.009 - PASS.

Mark ¹: SI.2407-25 Seed Rate (Hyd):

Devlatfon; N/A Test Load: 7577- 50.5% 7Q43 ~ 47.0%

NCR: N/A Final Drag: 55.0 - 0.4%, PASS. 36.7 - 0.2'/o, PASS.

Tag: 2-218 Breakaway: 24.7 -0.2o/o, PASS. 195 . 0.1%, PASS.

Mfg/Cap: PSA-10 Initial Drag: 41.4 - 0.3%, PASS. 39.9 - 0&o, PASS.

Serial ¹: 8937 Activation (Mech): 0.010 - PASS. 0.011 ~ PASS.

Mark ¹; Sl-2407-25 Bleed Rate (Hyd):

Devfatlon: N/A Test Load: 7511-50.1/o 7052- 47.0%

NCR: NIA Final Drag: 55.7 - 0.4%, PASS. 265 - 0.2%, PASS.

Tag: 2-219 Breakaway: 6.0 -0.1%, PASS. 22.4 0.4%, PASS.

Mfg/Cap: PSA-3 Initial Drag: 22.7- 0.4%, PASS. 24.4- 0.4%, PASS.

Serial ¹: 20259 Activation (Mech): 0.006- PASS. 0.006- PASS.

Mark ¹: CC.2061-101 Bleed Rate (Hyd):

Deviation: N/A Test Load: 3077- 51.3% 2887- 48.1%

NCR: N/A Final Drag: 273 - 05'/o, PASS. 23.0 - 0.4%, PASS.

Tag: 2-220 Breakaway: 24.7- 0.4%, PASS.

Mfg/Cap: PSA-3 Initial Drag: 111.4 -1.9%, PASS.

Serial ¹: 20261, Activation (Mech): 0.005 - PASS.

Mark ¹: CC 2061-101 Bleed Rate (Hyd):

Deviation: N/A Test Load: 3089- 51.5% 3262 ~ 54.4%

NCR: N/A Final Drag: 105.0-1.8%, PASS. 1847.0 -30.8%, 1547.0 over, FAIL!

Devlatlon

Description:

The snubber exhibited excessive drag load during final drag testing.

Disposition Summary: The snubber passed the as-found test, therefore no nowmformance exists. Replaced the existing snubber with a spare; Teardown Results: External rust. This condition is typically causedby a harsh environment Replacement 8/N: 20625 Tag: 2.224 Breakaway: 2.2 -03%, PASS. 25 - 0.4%, PASS.

Mfg/Cap: PSA-1/2 Initial Drag: 25- Q.4%, PASS. 32-05%, PASS.

Serial ¹: 10719 Acbvation (Mech): 0.014- PASS. 0.014- PASS.

Mark ¹ CH.2081 485B Bleed Rate (Hyd):

Deviation: N/A Test Load: 404-62.2% 443 - 68.2%

NCR: N/A Final Drag: 4.4-0.7%, PASS. 3.2 - 0.5%, PASS.

Tag: 2-231 Breakaway: 4.1 1.2'/o, PASS. 3.1 -09%, PASS.

Mfg/Cap; PSA-1/4 Initial Drag: 7.1 - 2.0%, PASS. 4.9 - 1.4%, PASS.

Serial ¹: 19072 Activation (Mech): 0.007- PASS. 0.007- PASS.

Mark k CH-1-R2 Bfeed Rate (Hyd):

Deviation: N/A Test Load: 264-75.5% 250- 71.3%

NCR; N/A Final Drag: 4.6-1.3%, PASS. 4.6 13%, PASS.

Page ~19

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q - 1989 Refueling Outage TENSION COMPRESSION Tag: 2-232 Breakaway: 92.3-26.4,307.4¹ over, FAIL! 0.7-0.2%, PASS.

MfgCap: PSA-1/4 Initial Drag: 314.4-89.8%, 296.9¹ over, FAILI 0.7-0.2%, PASS.

Serial ¹: 38009 Activation (Mech):

Mark ¹: CH-1.R3 Bleed Rate (Hyd):

Devfatlon: 10 Test Load:

NCR: 2-189 Final Drag:

Deviation

Description:

This snubber was delivered to the test facility frozen. A drag test was attempted with the following re-sults obtained. The MSA exhibited a 92.3¹ breakaway and a 314.4¹ drag in tension. Testing was terminated at this point.

Disposition Summary: The snubber was replaced with a Usega hydraulic snubber.

Teardown Results: Normal service induced wear on all parts except for corrosion on clutch assembly-torque carrier. Rod and bearing assembly frozen. These conditions are typically caused by a harsh environment and overload.

Replacement S/N: 6121 1/49 Tag: 2-234 Breakaway: 4.3-1.2/o, PASS. 4.8 1.4% PASS.

Mfg/Cap: PSA-1/4 initial Drag: 6.0-1.T/o, PASS. 4.9 - 1.4%, PASS.

Serial¹: 38016 Activation (Mech): 0.010- PASS. 0.011 - PASS.

Mark ¹: CH-I.R8 Bleed Rate (Hyd):

Deviation: N/A Test Load: 246 ~ 70.4% 272 - 77.8%

NCR: N/A Final Drag: 5.2 ~ 1.5%, PASS. 5.1 - 1.5%, PASS.

Tag: 2.236 3.9 -1.1%, PASS. 11.5- 3.3%, PASS.

MfgCap:

Serial ¹:

N/A'reakaway:

PSA-1/4 23635 Initial Drag:

Activation (Mech):

9.9-2.8o/., PASS.

0.009- PASS 11.5 - 3.3'/, PASS.

0.009 - PASS.

Mark ¹: 8-250148 Bleed Rate (Hyd):

Devlatlon: N/A Test Load: 165-473%- 221 ~

63.2%

NCR; Final Drag: 9.9 ~ 2.8%, PASS. 11.8 ~ 3.4% PASS.

Tag: 2.237 Breakaway: 9.5- 2.7% PASS 3.1 0.9/o, PASS.

MfgCap: PSA-1/4 Initial Drag: 9.6 2.7/o, PASS. 7.0- 2.0%, PASS.

Serial¹: 23634 Activation (Mech): 0.012 - PASS. 0.013 - PASS.

Mark ¹: 8.2501-68 Bleed Rate (Kyd):

Deviation: N/A Test Load: 236 - 67.3% 183-52Z%%d NCR: N/A Final Drag: 8.1 - 2.3%, PASS. 7.0- 2.0%, PASS.

Tag: 2-240 Breakaway: 14.3-0.2/o, PASS. 13.5-0.2%, PASS.

MfgCap: PSALM lnitfal Drag: 19.1 ~

0.3%, PASS. 23.0- 0.4%, PASS.

Serial ¹ 16761 Activation (Mech): 0.008- PASS. 0.010 - PASS.

Mark¹: BF.3020-148 Bleed Rate (Hyd):

Devfatfon: N/A Test Load: 4256-70.9% 4012- 66.9%

NCR: N/A Final Drag: 21.6 - 0.4%, PASS. 19.6- 0.3%, PASS.

Tag: 2-241 Breakaway: 279.7-0.6'/o, PASS. 254.9 -0.5%, PASS.

Mfg/Cap: PSA45 Inibal Drag: 344.4-0.7/., PASS. 254.9- 0.5%, PASS.

Serial ¹: 7809 Activation (Mech): 0.010- PASS. 0.010- PASS.

Mark ¹: MS-4102M , Bleed Rate (Hyd):

Deviation; N/A Test Load: 38-0.1% 36-0.1%

NCR: N/A Final Drag: 325.2 ~ 0.7./., PASS. 262.5- 0.5%, PASS.

Page 20

Florida Power 8 Light Company Snubber Functional Test Results Summary St. Lucie Unit 42-1989 Refueling Outage TENSION COMPRESS(ON Tag; 2-242 Breakaway: 270.0 - 05%, PASS. 1573 0.3/o, PASS.

Mfg/Cap: PSA45 fnitial Drag: 270.0 -0.5%, PASS. 199.3 - 0.4%, PASS.

Serial ¹; 7810 Acbvation (Mech): 0.010- PASS. 0.0! 0 - PASS.

Mark ¹: MS<102-33 Bleed Rate (Hyd):

Devfatlon: N/A Test Load: 37-0.1% 33 - 0.1'/o NCR: N/A Final Drag: 240.0-0.5%, PASS. 712.5 ~ 1.4%, PASS.

Tag: 2.247 Breakaway: 2855 - 0.6%, PASS. 79.7 0.2%, PASS.

Mfg/Cap: PSA-35 Initial Drag: 885$ -1.8%, PASS. 162.3 ~ 0.3 /o, PASS.

Serlat ¹: 7815 Activation (Mech): 0.012 - PASS. 0.012 - PASS.

Mark ¹: MS41 02-275B Seed Rate (Hyd):

Deviation: N/A Test Load: 47-0.1% 46-0 1%

NCR: N/A Final Drag: 2889 0.6/o, PASS. 74.2 - 0.1%, PASS.

Tag: 2-268 Breakaway: 2635 - 4.4%, PASS. 50.6 - 0.8%, PASS.

Mfg/Cap: PSALM Initial Drag: 2316.Q -38.6'/o,2016¹ over, FAIL! 174.4 ~ 2.9'/o, PASS.

Serial ¹; 29692 Activation(Mech): 0.009- PASS. - 0.006- PASS.

Mark¹: BF.4004-258 BleedRate(Hyd):

Deviation: 2 Test Load: 5240 ~ 87.3'/. 5311 - 88.5%

NCR: 2-162 Final Drag: 124.9-2.1%, PASS. 48.0-0.8%, PASS.

Deviation DescrfpUon: The snubber exceeded the acceptance standardby 2016¹s in initial drag in the tension stroke.

Disposition Summary: Snubber was replaced with a spare PSA-3.

Teardown Results: Ball screw assembly indicated type of wear due to high vibration. There was also some corrosion present.

Replacement S/N: 25578 Tag: 2-321 Breakaway: 2523- 72.2/., 235¹ over, FAIL! 25td -71.8'/.,233.8¹ over, FAIL!

Mfg/Cap: PSA-1/4 Initial Drag: 2523 -72.2/o,235¹ over, FAIL! 501.6-143.3'/o,484.1¹ over, FAIL!

Serial ¹; 20136 Activation (Mech):

Mark¹: MS.50.R4 BteedRate(Hyd):

Deviation: 1 Test Load:

NCR: 2-163 Final Drag:

DevlaUon

Description:

This snubber could not be functionally tested due to its degraded condition. The fest bench was able to move the snubber in compression for 1.8'n extension to 1.4 in extension dixing the initial drag test. The test bench was able to move the snubber approximately 2.3'in tension.

Dlsposltfon Summary: Snubber was replaced with a Usega hydraulic snubber in accordance with PC/M 296.288D.

Teardown Results: Rust oninner and outer tubes caused the snubber to bind during limited operability stroking. This condition is typically result of a harsh environment.

Replacement S/N: 6121 1/71 Tag: 2422 Breakaway: 1.0-0.3%, PASS. 6.3 - 1.8%, PASS.

Mfg/Cap: PSA-1/4 Initial Drag: 25-0.7%, PASS. 63 - 1.8/o, PASS.

Serial ¹: 38022 AcUvation (Mech): 0.012- PASS. 0.012 -

Mark ¹ MS-7-R2B Seed Rate (Hyd):

PASS.'31

'DevlaUon: N/A, Test Load: 248-71.0%%d - 66.0%

NCR: N/A Final Drag: 3.9-1.1%, PASS. 50-1.4% PASS.

Page 21

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSION Tag: 2.324 Breakaway: 4.8-0.3%, PASS. 0.0 Q.ty/o, PASS.

MfgCap: PSA-1 Initial Drag: 179.5 ~ 12.0/., 104.5¹ over, FAILI 14.6-1.0/o, PASS.

Serial ¹: 16946 Activation(Mech): 0.008- PASS. 0014- PASS.

Mark ¹: MS-3023.53 Bleed Rate (Hyd):

Deviation: 3 Test l.oad: 1348 -89.9% 1456 ~ 970%

NCR: 2-168 Final Drag: 277.9-18.5%, 202.9¹ over, FAIL! 18.9 1.3%, PASS Deviation

Description:

The snubber became frozen during the limited operability test.

Dlsposltlon Summary: Snubber was replaced with a spare PSA-1.

Teardovm Results: The thrust bearing retainer had backed off 1 ~ 1/2 turns. This condition is typically caused by excessive vi-bration and/or load.

Replacement S/N: 26005 Tag: Breakaway: 2.9 -0.7%, PASS. 5.0 1.2/o, PASS.

MfgCap: A/0-41 Initial Drag: 3.6-0.9%, PASS. 5.5-1.4%, PASS.

Seffar¹:

NCR'-334 1289 Activation (Mech):

Mark ¹; VRC.4-R3 Bleed Rate (Hyd): 54.94- PASS. 56.41- PASS.

Deviation: N/A Test Load: 314 - 78.6'/ 80.1%

'20-N/A Final Drag: 4.8-1.2/o, PASS. 5.3 1.3%, PASS.

Page 22

Q FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST. LUCIE NUCLEAR PLANT P.O.BOX 128 FT.PIERCE, FLORIDA 33454 UNIT 2 1989 OUTAGE NSI-2 REPORTS

0 NIS-2 OWNER'S REPORT FOR REPAIRS & REPLACEMENTS ST. LUCIE UNIT 2 1989 SYSTEM CODE REPAIR IDENTIFICATION SCOPE CLASS ORGANIZATION REACTOR COOLANT PUMP FLANGE REPAIR FPL 2B1 MAIN STEAM SUPPLY TO VALVES REPLACED FPL AUX. FEEDWATER PUMP TURBINE 2C CCW BACKWASH SYSTEM REPAIR/REPLACED FPL VALVE/PIPE SNUBBERS REPLACED/REMOVED 1~2~3 FPL/QUALTEC'NTAKE COOLING WATER REPLACED FPL/BACKFIT DISCHARGE VALVES COMPONENT COOLING WATER REPLACED FPL/BACKFIT ISOLATION VALVE PRESSURIZER SAMPLE REPLACED COMB. ENG.

LINE RCS PIPING RTD REPLACED COMB. ENG.

NOZZLES

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI FLORIDA POWER 5 LIGHT COMPANY 0

1. Owner Date QQ~

Sheet f of

2. Plant Unit P PO¹:

PCM ¹:

3. Work Performed by PWO ¹: ~4)Qp CWO¹: ~ Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

Type Code Symbol Stamp ~

Authorization No. Eh Expiration Date

4. Identification of System
5. (a) Applicable Construction Code ASME SECTION III, 1977 Edition, SUMMER 1977 Addenda.

Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, WINTER 1980 Addenda. Code Cases N/A

6. Identification of Components Repaired or Replaced and Replacement Components ASME Code National Repaired, Stamped Name of Name of Manufacturer Board Other Year Replaced, (Yes Component Manufacturer Serial No. No. Identification Built or or No)

Replacement 2Bt RCP BYRON N/A N/A RCP 281 N/A REPAlREO YES JACKSON

FORM NIS-2 (Back)

7. Description of Work: Indications which were found on the inner and outer gasket seating surface of 281

¹ RCP casing were, repaired by welding in accordance with P.W.O. 4429/62 and NCR¹ 2-287.

8. Tests Conducted: Hydrostatic / Pneumatic Nominal Operating Pressure Other Pressure 2235 psi Test Temp. ~L 1

'P

9. Remarks: N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this REPAIR conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Date wner or Owner's Designee, Title CERTIFICATE OF INSERYICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Pressure Vessel Inspectors and employed by K~ e. >66 I - U of gRIPr a have inspected the components described to , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage of loss of any kind arising from or connected with this inspection.

r Commissions / .v Inspector's Signature National Board, State, Province and Endorsernents Date

NIS-2 SUPPLEMENTAL SHEET

1. Owner Date QLQQQ Sheet Q, of
2. Plant i I Unit PO¹:
3. Work Performed by PCM ¹:

PWO ¹:

CWO¹: ~ Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

4. Identification of System:

G. Description of Work: Indications which were found on the inner and outer gasket seating surface of 2B1

¹ RCP casing were repaired by welding in accordance with P.W.O. 4429/62 and NCR¹ 2-287.

6. Remarks: N/A

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS

'As Required by the Provisions of the ASME Code Section XI FLORIDA POWER It LIGHT COMPANY

1. Owner Date 55LQQ Sheet f of
2. Plant Unit g, PO¹:
3. Work Performed by I w PCM ¹:

~)Qg PWO¹:

CWO¹: ~ Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

4. Identification of System
5. Additional Material (Excluding Welding Material):

Heat/Lot No. or CFC or Name of Manufacturer Specification Type and Description RIR/Report N/A

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI FLORIDA POWER 8 LIGHT COMPANY

1. Owner Date ~13LQZ Sheet 1 of 9.
2. Plant Unit 2, PO¹:

PCM ¹:

3. Wok Performed by PWO ¹:

CWO¹: ~ Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

Type Code Symbol Stamp Authorization No.

~

Expiration Date

4. Identification of System
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda.

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, Winter 1980 Addenda.

6. Identification of Components Repaired or Replaced and Replacement Components ASME Code National Repaired, Stamped Name of Name of Manufacturer Board Other Year Replaced, (Yes Component Manufacturer Serial No. No. Identification Built or or No)

Replacement MV-08-12 Pacific Valves 0102-8 N/A Drawing 7-601 1979 Replaced YES Rev. A MV-08-12 Pacific Valves 0912-7 N/A Isolation Valve, 1987 Replacement . YES Body S/N XN1674 MV-08-12 Pacific Valves 0103-8 N/A Drawing 7-601 1980 Replaced YES Rev. A MV-08-13 Pacific Valves 0913-7 N/A Isolation Valve, 1987 Replacement YES Body S/N XN1675 ~

MS-3023-26A FPL N/A N/A Pipe Lugs (3), 1987 Replacement NO ASTM A36, HT¹ 494L0961

NIS-2 SUPPLEMENTAL SHEET

1. Owner Date ~Ugly Sheet 2 of 9.
2. Plant Unit PO¹:

PCM ¹:

3. Work Performed by PWO ¹:

CWO¹: ~ Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

identification of Components Repaired or Replaced and Replacement Components (Continued):

ASME Code National Repaired, Stamped Name of Name of Manufacturer Board Other Year Replaced, (Yes Component Manufacturer Serial No. No. Identification Built or or No)

Replacement MS-10WFWA FPL N/A N/A Pipe-to-Pipe weld 1987 Replacement upstream MV-08-12 MS-10-FW-5 FPL N/A N/A Pipe-to-Valve 1987 Replacement weld upstream MV-08-12 MS-10-FW-6 FPL N/A N/A Valve-to-Pipe 1987 Replacement NO weld downstream MV-08-12 MS-10-5-FW-1 FPL N/A N/A Pipe-to-Pipe weld 1987 Replacement NO downstream MV-08-12 MS-11-5-FW-1 FPL N/A N/A Pipe-to-Elbow 1987 Replacement upstream MV-08-13 MS-11-FW-6 FPL N/A N/A Pipe-to-Valve 1987 Replacement weld upstream MV-08-13 MS-11-FW-7 FPL N/A N/A Valve-to-Pipe 1987 Replacement weld downstream MV-08-13 MS-11-6-FW-1 FPL N/A N/A Pipe-to.Elbow 1987 Replacement downstream MV-08-13 Pipe Spool HUB N/A N/A 4" Sch. 80 SA106 1987 Replacement MS-10-5 GR.B, HT¹ A40702 Pipe Spool HUB N/A N/A 4" Sch. 80 SA1 06 1987 Replacement NO MS-10-6 GR.B, HT¹ A40702

NIS-2 SUPPLEMENTAL SHEET

1. Owner Date ~3LQZ Sheet 3, of 9.
2. Plant Unit PO¹:
3. Work Performed by PCM ¹:

PWO CWO¹:

¹:

~ Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

Identification of Components Repaired or Replaced and Replacement Components (Continued):

ASME Code National Repaired, Stamped Name of Name of Manufacturer Board Other Year Replaced, (Yes Component Manufacturer Serial No. No. Identification Built or or No)

Replacement Pipe Spool HUB N/A N/A 4" Sch.80SA106 1987 Replacement MS-11-5 GR.B, HT¹ A40702 Pipe Spool HUB N/A N/A 4" Sch. 80 SA106 1987 Replacement MS-11-6 GR.B, HT¹ A40702

RAN ~-1 a%350

'ATA IIKPONT RN IAs Iteqrrited hY Ihe Provtelona of the ~ NUCLEAR ~

Sacr~ ~ moo Code, Sec@on N, Oiv. 1}

~

Qt VAL

~ pgyy

1. ~ccwedoy HCC Pacific Yalves, 320I MaJ.nut Avet)ue Long Beach, CA 90807,

~ rrr.w v4 Aldreoe of asererrrceerer)

g. ~ectwedfor EIQS$ 9 Services, Inc, 2 Rector Street NYC, NY i0006 Florida~r ~ht Ororee one ndereee or aercnow or Owner)

Co. 5t.. Lucis Unit.2 Ft, Pierce, 5j..

Gate V> 1 Ve . Norn)nef )n)ef Sfce I) OotNC S incN

4) Model No.. tblManvfectwers'c) Canadian Series No.

or Type Serial No.

lteqistrefion No.

id) Orawiny No. 'e) C4ee If) Nart Id. No.

Ie} Year Irrat I1) 650" X- 0-'A.X Oj N:8 .- .. Alh . .. 2;.60 I. Rev. A N/P .. I/80 0)

HCC Pacl flc.MIves.

Custco)ey P,O~ NY I)22563 ShoP. Job.&09838

!terr) 20,3 I tea,23 ..

I2) Tag. No Ltl~- l3 .

s..Nuclear SteaaJ'.ofder Plant Oner eeecnorern oi ocr~ ror wrecn eqworeere wee eeoereea 985 ps 550 'p Mr verve presewe Ciees . NlA Preeeunl frweeeeevrnet

2. Co)d Worhinp treasure N/A pa ar 1&%.

L heeewe llecerneg p~

4) Coating (Sne Note A) body. S/K XN 662 SA 2)6 GR MCB P,S,F. Heat l6F6 B ~.~tN XN 66)) SA 2)6 GR VCS P.S.F. HeaW6f 6 Medge ~N XN666 . $$ 2g GR VCB. P.S.F. Heat I)7K6

, 4 Ir) rortpnf)s NOTE A:. P S,F, .n pacif.ic. Souther Sound r.less .Inc.

I1) For menoeay operalad vahrae onN.

~ SuppNrnencaf sheets in Iorrn of )isis, Neachea or drawinoa mey ie wed provided II) aiae ie a )c' 11. 0) )n1ormwon rn horne 1. 2 and S en <<)e deca report )e )ncarded m each"sheet. and IS) eectr sheet ie nwnbered end nwn)rer or eheeca ie recorded ~ top of &is toneL Itf2et ttee teree IeNos2) racy he )teaiheed frere der order oerl, Apaa, sea a. e2 sc Neer Yerl4 N.Y. IIO12

SNSH 5 of 3.

secsan... j...... pope...

Og lcl Soasng Studs: Body-Bonnet SA 193 GR 87 Cisco Nuts:. Body-Bonnetl ,SA. )94.GR 7.. C)sco idI ether Perte

  • NONE R S. Hvdnwtstwteet 2)75 .. peL MOTE 8: Code Case CERTlRCATK OF C~UANCE conetruawn ol Ow ASM'ode lor studeer Po>>ei Ptent Componen~ Seaion O. Div, L '97 we ceitrtv lhel the stetenwnts nwde in this report sre coriea end that this pump, or velve, contorms to Ow rules ol

& I .

~

Addende Suasser m~~S IICC Osw etc

)976 Pacific Valves

~~~coo

. Code Cess ItoSee. Note.S.JLbove sto )2O2 to~

by g

7

~.~

~~ 8-4-8) evict

~ d PPVI CM1l%KAllON Of OfStGH Oeelanevi~cvtyeest, HCC Pacific Va)yes Ssreee eneNsis report ICtsee I oral tet ae et N/A 1 ~ r Ssieee erwtysis ceitised by {1)

Pf Stele iteo. No illSityworre not coul'ietL List nenw only.

CHAlRCATE Of SHOP NCStECllOH

~ ew stetexaaaxttststot

..Ldu.Stf tat.)afety ..

Ca) t fortt) a

~ ~~ .. ~

I. the under>>oned. holding ~ vsad convniseion rssued by the a

l4tionei Soeid ot So'rtei end pressure Vessel Inspeaois sml empioyedby n) v) s) on or v~. wee~

. Rye~ 0 P., end stsse tlwt to the best ol my tno>>tedoe end beliet, the Msnuteauier Iws con.

strutted pie pump. or vetve. In eccoidatce>>ith ttw ASME Code, Seaion M.

&L'L4s~ '.

due ceitlacete. rweher Iw avLwaor nor his employer metes eny wenenty. espiessed or vnptwd. conceinin9 dw eourpmem deeaibed in %is octa lteporL Funlwnnore. neither ew Inspector nor hrs employer shee be twice ei sny or property dsmsge or e loss of eny hnd erisintr Commieeorw L~ or conneaed vnth thw <<wtwaion.

gas>>, erev. sne its i

SMELT /OF g fNQC hFV-1 MANUFACTUSBtS'RATA ff4 Roecserod by the Ptoytsiofso ot the P~ ~ ~ NUCLEAlt ~

Code. Sectors N, Dly. 1)

<Xi VALVES>>

1. asonvtacc~by .HCC PaCif iC,ValVeS, 3201.gailttt~yenue oeoeae cavo 444fvaee ef eeeoeoceceea<<s LCD@. Seatlba C~OZ.
g. Marhhdoccsfred tor KBASCO. Services, (nCe 0 2 Rec<og ee4 aoctfeee er fcfaeeeet ef Oeaaeft S~~ltYC HY ) 0006 F 1 or 1da Sever Unit. ft. Pierce ~Clda
3. Ococtorc ot bsocactaoofs e fvee <<vvae oace.val.v.e..

5 Neevve eaas 444foeee eeeee vve cev ~.. 2.

ovv>> ee Series or Typo No..

tat Model No fbi Mafssftaccwors'cl Cafsadioo Sorsol No.

Rogaecrscsors Ho.

{dl fooeireo No. (Ol Ctaed ln teen.

Id. No.

lOl V~

Ossitl ill 6Stu=X.W-X alO- =69 LEexJL . .HlA ace fee ifi 0aviv.ae.shooJhe.s0-.00cslLSS~7 tst CmictIer.P.O e TaOJh.M-JSS~

IIEET 225~tea ~2 s.. Nuclear. Steam PosNer Plant onet Ocsereoeea ot eeraaeo rer eaavacsa eceaoceeao was eoofvcao v

ceeev v . B85.... ve ~50 Itaesaereoger

. v <<vwv~ ca>> DeA

7. Cckt WorSOOt Presswe I f pea a 1 tttrf.
e. Assews ttaafeneiag Pwccs Mere Nov I

ta) eocafnses (S e ltote a)

Body, S/N Xl166l SA&l(, Cr .1KB . P.S.E hea~git

~fset 5/N x!.'c63 SA 2lo GR. VCB P.S.f'.

Medge~~i s<<5/N... ..SA 21.6 GR~ ~SZ . lieat.4Qr6 ZN665 .

45~ XONE f

osofesaoey opotoeod haeeoos 00lE.A: ~ rac ffc~cheve f uc teevlaeca Saapoterraeoaeat Otaeose 40 tsrsac Ot cist'hotctsos ar droaeecaOS easy bo uood tsrohadod 111 caro fs ~ 10' t t; ~ ifatoifraOCSOSS tfr tcecrae 1. a asad % oca cfvas deca report to sccsadod osc sects stsoot. Orad ot sorts etaoec oe swrdsorod efhd aaffdhor ot etaoecs es rocordod ac cop at <<eo torsaa, ill%i Tthac tsfoea tQXXOtt sooy be beocfaed treoaa der Order Oeoc Assai, %el e. Oy ec reeve Vooef.N.V. 1CN1'0

ctQCEl'. ctf 9 0 SIN DION-S fail ~.1 goehl kt bo&bno sody.= Sonnet.

Studs Sk.l33AILR7MIass

~iLcts

. ~ae 3i0~'od~as - MkLandt 1635-.I L Hytboe&ocic lee& 2 D5 .. pe&.

CKRTVKAT% OF C~UAHCF.

We CetOty ONE the rte&etnen&e tnede n >>tee tepotC ete Cofl ~ Ond &&lee &hie PutnP, Or VOIW, Con&Otttte lo a=La<< I)B=,

Che nhlee Ot p~

M.

cottarttcciott oc ate A$QE code cor Httc&eet pion& cotnoonetkL sec&ion 8, Qttr. L Edition a&d aae eaa<<t<<eaeaae <<a ee<<aeee Ne J202 ae aee aae & . aaee<<<<a<<ca &=4 dll CHAlRCATlCW l& DESIGN MCC I'aclflc Valves

<<aeaa laa<<e 1 eaeyl <<a I!ac <<

Oaaeel aeaeaeae'ee eeeeae aa ala J L Logee

~t m Sl>>&e ELOCida

~ sass eneeyeie cot&tiled by l 1 1 CCeb. CltL aaee aaa.

2950?

~

c, e&e ttnder&&ccned. &te&tsnp aeeeetaeae<<aae<<<<e<<

<< .tta&attfltl~fctt .

co&tered dtio en<<et>>.

e ee4d

. SaLltOCnle If<<(Q '. lb75.~

or whe. in ecca~>>

CKR'%KATE Of cottet~n ond a<<e lect&ed by aeeaeaee eceee d&ec &o crte ASFECT1OOS crto cocoa&or boetd ot baler end pteewte veeeel inepwc&ote

<<<<e<<<<eaeeaaMivisbea.

eae eaaeaa <<aeaea. alaaa<<ee I aee oaaa lleeae <<a beer or tny crtcn&4edoe end be&lee. dte Menttceccttter hee con wtd& >>to ACME code. sec&ton R.

~

~ y dbtttnb >>&le ceteelceee. net&&ter>>to Cnepec&or nOr Cde <<nployer tneeee any eetrenry, eeOteeeed or intp&ied.

~ >>ttip&ttottc deecrb&ed le dtie oece hepotc. ftrtrr~re. net>>ter>>te ~re&or nor ltte etnp&oyer &neo be keble in erty Cor erty pereonoc 4iwy or froper&y detnooe or ~ loco ot erty Qn4 &Nidnb 0eea o&

.Let..-X~ 1b~~

cont~ woo& cree Inepecion C C.C(&-

ggP<<at>>et&et& Co~~>> QlklF> 7 oretc oe otwa. rte . ote &&Ll

SECT(( N

-PAGE Si(EET g of: rL FORM NPV-1 CERTIFICATE HOLDERS'ATA REPORT FOR NUCLEAR PUMPS OR VALVES As Required by the Provisions of the ASME Code,Section III, Div. 1 .

(. Manufactured and certifiedby Pa if iC 1 e 3 01 W n (name and address of N Cenificate Hoiderl B 9 8

2. Manufacture~ for Florida Power 8 Li ht Co. 6501 South AlA Hi hwa Jensen Beach FL (name and address of Purchaser or Ownerl 3 L t f' l( t' Florida Power Itt Li ht Co. St. Lucie Uni t 2 Ft. Pierce, Florida (name and address)
4. Model No., Series No.. or Type Drawing 7" 601 Rev, CRR~NA
5. ASME Code Section III: 1974 Summer 1976 N A Edition Addenda date Class Code Case no
6. Pump or valve Nominal inlet size it II Outlet size 4 ll (in.) (in.)

7 Material Bod)ASME SA21 6 BonnetASME SA21 6 Disk ASME SA216 B,lng Studs ASME SA193 Gr. WCB Gr. WCB Gr. WCB Gr. B7 (a) (b) (c) ((j) Nuts,)ASME SA194 Cert. Nat'I Body Bonnet Disk Gr. 2H Holder's Board Serial Serial Serial Serial No. No. No. No. No.

0912-7 N/A XN1674 XN1676 XN1678 suppiementai information in the form of lists. sketches. or drawings may be used provided (ll size is 8'h x 1 t, (2) information in items l through 4 on tius Oata Repon is inciuded on each sheet. (3l each sheet is numbered and the number of sheets is iecorded at the top of this form.

(6IB5) ThiS fOrm (E00037)may be obtained Rom the Order DeptASME, 345 E. 47th St., New York, N.Y lOOl7

-PAGE FORM NPV-1 (back) S)(EE'f 3.op 'I

, 9~919-7 3-7

8. Remarks
9. Design conditions 985 (pressure) 550 (temperature)

... ~NA

10. Cold working pressure- psi at 100'F
11. Hydrostatic test F Disk differential test pressure ~585 psi CERTIFICATION OF DESIGN Ar N F1orida 5910 Prof. Eng. state Reg. No, Design Report certified by Prof. Eng. state Reg. No.

CERTIFICATE OF SHOP COMPLIANCE We certify that the statements made ln this report are correct and that this pump or valve conforms to the rules for consuuction of the ASME Code,Section III.

N Certificate of Authoritation No. 12 2 Expires

, ~9-29-8 IN Corti()cate Holder)

Sign (representeti )

CERTIFICATE OF SHOP INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of i Cal fOrnia and employed by Cal s forn1a 19 ~, have inspected the pump. or valve. described in this Data Report on and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump; or. valve, in accordance with the ASME Code, Section ill.

'Rpsb ~ e

'b4 'S ~WRPb"s.

By s(gn)neph)s certificate. neither tetr,(nspector no'r his employer makes any warranty, expressed or implied, concerning the epuinmsnLQpseribeotFn tsis oats Repnni Furlhemtore. neither the inspector nor his emptoyer shall be tie bte in anY manner for "be ~

~

anv pe) s'o ':.otiury or property damage or a It)as of any kind arising from or connected with this inspection.

Rs!e 1'9 Commissions (Inspector) (Net'I, (ind. endorsememsl State, Prov. end No.l e (1) for menue))y operated valves only.

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI FLORIDA POWER & LIGHT COMPANY

1. Owner Date QLQLQQ Sheet 3. of
2. Plant Unit PO¹:

PCM ¹:

3. Work Performed by PWO ¹:

CWO¹: ~ Process Sheet: ~

Repair. Organization P.O. No., Job No., etc.

Type Code Symbol Stamp Authorization No.

~

HL6 Expiration Date II

4. Identification of System
5. (a) Applicable Construction Code ANSl 831.7, 1969 Edition, N/A Addenda.

Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs. and Replacement Components 1983 Edition, SUM. 83 Addenda. Code Cases N/A

6. Identification of Components Repaired or Replaced and Replacement Components ASMF Code National Repaired, Stamped Name of Name of Manufacturer Board Other Year Replaced, (Yes Component Manufacturer Serial No. No. Identification Built or No)

Replacement SCH. 40cs 4" pipe N/A N/A N/A IA"-CW-129 N/A REPLACED NO VALVE N/A N/A N/A I-SB-21-11 N/A REPLACED NO 4" C.S. FLANGE N/A N/A N/A IA"-CW-129 N/A REPLACED NO N/A N/A

FORM NIS-2 (Back)

7. Description of Work: A4" dia. pipe and valve were replaced as part of work performed to repair a thru wall leak in the piping adjacent to the flange in accordance with the referenced PWO¹ and NCR¹ 1-285.
8. Tests Conducted: Hydrostatic ~ Pneumatic Nominal Operating Pressure Other pressure ~~ psi Test Temp. Bhlg 'p
9. Remarks: The required Pressure test was conducted as a bench test.

CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Date Ow r or OwneVs Designee, Title CERTIFICATE OF INSERVICE INSPECTION and the State of Province of l~ri and employed by

'ave r <u-'.<<6~1 s ~

I, the undersigned, holding a valid commission issued by the National Board of Pressure Vessel Inspectors inspected the components described of to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage of toss of any kind arising from or connected with this inspection.

Commissions L.C Go Inspector's Signature National Board, State, Province and Endorsernents Date ,19 hQ

NIS-2 SUPPLEMENTAL SHEET

1. Owner Date QQ2LQ9 Sheet 3, of
2. Plant Unit PO¹:
3. Work Performed by PCM ¹:

PWO ¹:

F 4 CWO¹: ~ 1 41 Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

4. Identification of System:
5. Description of Work: A 4" dia. pipe and valve were replaced as part of work performed to repair a thru wall leak in the piping adjacent to the flange in accordance with the referenced PWO¹ and NCR¹ 1-285.
6. Remarks: The required Pressure test was conducted as a bench test.

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI FLORIDA POWER Ilt LIGHT COMPANY

1. Owner Date QQ2LQQ Sheet f of
2. Plant Unit PO¹:
3. Work Performed by I i P w PCM ¹:

PWO ¹:

1 hHw 1 CWO¹: ~ Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

4. Identification of System
5. Additional Material (Excluding Welding Material):

Heat/Lot No. or CFC or Name of Manufacturer Specification Type and Description RIR/Report DUBOSE STEEL ASTM A106 A&B 4-1/2o.d. X.237W SEAMLESS C.S. N07061 AS ME-SA-106 PIPE CONSOL PWR SUP FLANGE C.S. R.F. 4" FLANGE 283R HENRY PRA IT SA516, GR70 4" BUTTERFLY VALVE D2867 (BODY)

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI FLORIDA POWER II LIGHT COMPANY

1. Owner Date Sheet 1 of
2. Plant Unit P
3. Work Performed by

¹:

F 4 PWO CWO¹: ~

JEQQ Process Sheet: ~A Repair Organization P.O. No., Job No., etc.

Type Code Symbol Stamp Authorization No.

~

Hl'h Expiration Date ~A

4. Identification of System
5. (a) Applicable Construction Code ASME SECTION 111, 19?7 Edition, SUMMER 1977 Addenda.

Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, WINTER 1980 Addenda. Code Cases N/A

6. Identification of Components Repaired or Replaced and Replacement Components ASME Code National Repaired, Stamped Name of Name of Manufacturer Board Other Year Replaced, (Yes Component Manufacturer Serial No. No. Identification Built or or No)

Replacement SEE ATTACHMENT ¹1 FOR REMOVED REPLACED SNUBBERS.

OR

FORM NIS-2 (Back)

7. Description of Work: During the PSL-2, 1989 Refueling Outage the following Mechanical and Hydraulic Snubbers were replaced with new snubbers, or were deleted altogether as shown on attachment ¹1. These replacements were initiated either by functional test failures/degradation or through plant modifications.
8. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure other J'ressure htgt pst Test Temp. ~ 'p
9. Remarks: All new snubbers were baseline functionally tested, prior to installing them into the plant.

CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this REPAIR conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A ph Signed Date Own or Owner's Desi ee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Pressure Vessel Inspectors (oi n <4~<'~~s ~

~r and the State of Province of s and employed by of Wo. have inspected the components described in this Owner's Report during the period , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage of loss of any kind arising from or connected with this inspection.

Commissions 7 0 cr 3 ~

D Inspector's Signature National Board, State, Province and Endorsements Date 19

NIS-2 SUPPLEMENTAL SHEET

1. Owner Date QQ5L59 Sheet Q. of
2. Plant Unit P
3. Work Performed by

¹:

Hw 1 PWO GWO¹: ~ Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

4. identification of System:
5. Description of Work: During the PSL-2, 1989 Refueling Outage the following Mechanical and Hydraulic Snubbers were replaced with new snubbers, or were deleted altogether as shown on attachment ¹1. These replacements were initiated either by functional test failures/degradation or through plant modifications.
6. Remarks: All new snubbers were baseline functionally tested, prior to installing them into the plant.

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI FLORIDA POWER 5 LIGHT COMPANY

1. Owner Date QLLMQ Sheet f of
2. Plant Unit 2
3. Work Performed by

¹:

PWO CWO¹: ~ Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

4. Identification of System
5. Additional Material (Excluding Welding Material):

Heat/Lot No. or CFC or Name of Manufacturer Specification Type and Description RIR/Report

ATTACHMENT 4"'l St. Lucie Vnit 02 - February/March 1989 Snubber Inspection Replaced/Removed Snubbers PO¹ B89630-90049: The following list of snubbers have been replaced with a new identical type of snubbber, due to either functional test failures or degradation. The Snubber testing contractor ( Qualtec Testing Services ) performed the snubber change-out.

RC-9-R12 PSA-1/4 19783 2-032 Reactor coolant SI-4205-4080 PSA-10 12504 2-037 Safety Inj.

CH-108-R8 PSA-1/4 11832 2-046 Charging S I-4208-264B PSA-1/4 12049 2-069 Safety Inj.

MS-4100-1 6B PSA-100 2373 2-095 Main Steam S I-4203-69C PSA-3 11070 2-097 Safety Inj.

RC-4300-147 PMH-2200 87773-1891 2-167 Reactor coolant CH-2081-100A PSA-1/2 20433 2-215 Charging CC-2061-101 PSA-3 20625 2-220 Comp. Cooling BF-4004-258 PSA-3 25578 2-268 Boiler Feed MS-3023-53 PSA-1 26005 2-324 Main Steam Page1 of3

ATTACHMENT ¹1 St. Lucie Unit 02 - February/March 1989 Snubber Inspection Replaced/Removed Snubbers PCIM 296-2SSD: This PC/M provided engineering and design information for replace-ment of mechanical snubbers, Model PSA-1I4 kip, with greater load rated "Lisega" hy-draulic snubbers. The snubbers which were replaced are listed below:

f o RC-58-22 Lisega, Type 30- 61 21 1/69 2-021 Reactor Coolant RC-44-R7 18-RF-1 61211/61 2-023 Reactor Coolant RC-44-R7 N 61 211/66 2-024 Reactor Coolant RC-35-R11 61 21 1/43 2-025 Reactor Coolant RC-37-R14 61 21 1/60 2-026 Reactor Coolant RC-2-R5 61 21 1/74 2-027 Reactorcoolant RC-2-RS 61 21 1/44 2-028 Reactor Coolant RC-59-R2 61 21 1/75 2-030 Reactor Coolant S I-73-R4 61 21 1/65 2-035 Safety Inj.

CH-108-R4 61 21 1/55 2-045 Charging S I-4200-322 B 61 211/54 2-059 Safety Inj.

S I-4205-266B 61 21 1/72 2-071 Safety Inj.

Ms-50-R4 61 211/71 2-321 Main Steam CH-1-R3 61 211/49 2-232 Charging Page 2 of 3

ATTACHM E N T 4'1 St. Lucie Unit 02 - February/March 1989 Snubber inspection Replaced/Removed Snubbers E

PCIM 297-288: Ten mechanical snubbers with small thermal movement were perma-nently removed and replaced with rigid restraints in accordance with this document.

This will eliminate the need for any further inspection and testing for the following snub-bers:

Ms-33-R38 N/A N/A 2-132 Main Steam Ms-33-R38 N/A N/A 2-133 Main Steam Ms-32-R38 N/A N/A 2-136 Main Steam MS-32-R48 N/A N/A 2-137 Main Steam S I-241 9-50 N/A N/A 2-21'6 Safety Inj.

CH-1-R5 N/A N/A 2-230 Letdown CH-1-R2 N/A N/A 2-231 Letdown CH-1-RB N/A N/A 2-234 Blowdown 8-2501-68 N/A N/A 2-236 Slowdown 8-2501-68 N/A N/A 2-237 Blowdown PCIM 147-288: This package was initiated to replace the following snubbers with a rigid restraint.

RC-26-R10A N/A N/A N/A Reactor coolant Page 3 of 3

FORM N5-2 0%NER'5 REPORT FOR REPhIRS OR REPLACEMENTS, hs required by the provtslons ot the ASME Code Section Xf Page 1 of 4 1 ~ OWNER: FLORIDh POWER dc LIGHT CO. DhTEr June 23, 1989 P.O. Box 529100 .

Miami, Florida 33152 UNITt 301 NO. PC/Mr 228-288 C%'0 NOit 5027

2. PLANT! ST. LUCIS PLANT UNIT II P. O. Box 1200 PROCESS SHEET NO.)

Jensen Beach, Florida 34957 228-288-939 R/0 FFL/Backf it Repair Organization P~> Bosk, etc.

3. WORK PERFORMED PO 0 C68918-67619F BYi F PL F LANT CONSTRUCTION/BACKFIT P. O. Box 1400 Juno Beach, Florida 33408 Type Code Symbol Stamp N/A huthorization
0. IDENTIFICATION No. N A INTAKB COOLING WATBR/

DISCHARGB VALVE Expiration Date N/A

5. a. Applicable Construction Code SECTION i~i~Edition 1975 Winter hddenda S B Section III
b. Applicable Edition of Section XI utilized for repairs or replacementsr 1981 Winter Addenda
6. Identification of components repaired or replaced and replacement components Rep lred hSME Cod Name of Name of Mf/,'s Nat'1 BYcar Replaced Bd. 1f Mentif- "ll Starn Component Mfg. SIN /Replace- (Y~/No)

I 1 ment 30" Isolation Valve Henry Pratt D-0065- 2I-SB-6-1 N/A 21209(3) 1978 Removed No 30 " Isolation Valve Henry Pratt -58723- 21-SB-1-2 21209( 1985 eplaceme t No

FORM N5-2 Description of work> See su lemental sheet for description of work - Pg. 3 S. Tests Conducted! Hydrostatic Pneumatic Nominal OperatlnS Pressure Other X 6~i Pressure~el Test Temp. P..

9. Remarks> Attached Applicable Manufacturer's Data Report to be attached CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this Repair or Replacement conforms to Section XI of the ASME Code.

~

Signed: ~

Owner or wn 's Designee, Title Date CERTIFICATE OF INSPECTION I, the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Ycsscl Inspectors and thc State or Province of

~I9~L <<h employed by have Inspected the described In this p 8 I f yl &a dl III,hl Pl or replacement has been constructed In accordance with Section XI of thc ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described ln this report. Furthermore, neither thc Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

<<Arkwrfght Boston Insurance Co.

COMMISSION NO.

Commissions!

(State or Province, National Board

Page 3 of 4 NIS-2 SUPPLEMENThL SHEET I. OWNER! FLORIDh POSER dt LIGHT CO. OhTEt June 23, 1989 P.O. Box $ 29100 Miami, FIorlda 33152 2e PLANT! ST. LUCIS PLANT UNIT II VNITr P. O. Box 1200 Jensen Beach, Florida 34957

3. WORK 3OB NO. PC/M 228-288 PERFORMED BY: F PL PLANT CONSTRUCTION/BACKPIT P. O. Box 1400 Juno Beach, Florida 33408 CWO NO.g 5027
0. IDENTIFICATION OF SYSTEM: INTAKE COOLING VATBR/

DISCHARGE VALVE DESCRIPTION OF WORK: PROCESS SHEET NO..

228-288-939 R/0 During previous outages, inspections have revealed problems with the bonding of the rubber liner on the valve body as a result of seawater corrosion.

This PC/M (228-288D) provides for the replacement of the 2B ICV Pump Discharge Isolation Valve (rubber lined CS) with a stainless steel discharge valve.

C Page 4 ot 4 H54 SUPPLEMENTAL SHEET OWNERS'LORIDA POV ER b( LIGHT CO. DAT6! June Z3, 1989 P.O. Box f29100 Miami, Florida 331f2 UWnr 11

2. PLANT: ST. LUCIE PLANT UNIT ll JOB NO. PC/M 228-288 P. 0, Box 1200 Jensen Beach, Florida 34957 C%'0 NO.i 5027
3. WORK PERFORMED BY: FPL PLANT CONSTRUCTION/BACKFIT P. 0. Box 1400 PROCESS SHEET NO,:

Juno Beach, Florida 33408 228-288-939 R/0

0. IDENTIFICATION OF SYSTEM!

INTAKE COOLING VATER DISCHARGE VALVE 5.~ ADDITIONALMATERIAL

~

(Excluding Welding MateriaO Heat/Lot No.

or CFC or Manufacturer Specification Type 4 Description RIR/Report Henry Pratt AS ME-SA-351 Grade CF3M 30" Butterfly Valve 3R6869A ASME-SA-479 Type 316 ASME-SA-351 Grade CF8M

FORM N5-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS ha required by the provisions of the hSME Code Section Xl Page I of i I~ OVNERs

  • FLORIDA POWER LIGHT CO. DhTEs 6/23/89 P.O. Box 529l00 Miami, Florida 33152 UNITs ll JOB NO. PC/Ms C%'0 NO.s 8461
2. PLANTs ST. LUCIB PLANT UNlT II P. O. Box 1200 PROCESS SHEET NO.s Jensen Beach, Florida 349S7 8461>>928 R/3 FPL/Backf it Repair Organization PCS, 308k, etc.
3. WORK PERFORMED PO f 68918-2420ZW F PL PLANT CONSTRUCTION/BACKFlT p~

BYs P. O. Box 1400 Juno Beach, Florida 33408 Type Code Sp P lp Authorization

0. IDENTIFICATION No. N A OF SYSTEM: I COMPONENT COOLING WATER Expiration Date
e. hppiicebie Construction Code SECTION III~I97 Edition Addenda P. Spsl'. l.pp '"ll-l-Xl pl*pl--P 'PS- ASME Section lll Winter Addenda
6. Identification of components repaired or replaced and replacement components Re@ red ASME Code Name of Component Name of Mfg.

Mfg's.

S/N Nat'I Bd. 0 M Other if- r Replaced Stam

/Replace- (Yes/N )

I ti ment 3P" Isolation Valve N/A N/A N/A N/A N/A Removed No 30" Isolation Valve D-44725- Tag 0 Henry Pratt 13-1 N/A SB-21-3 1984 Replaced No

Page 2 of 4 FORM N5-2

7. Description of works Valve Chan eout
8. Tests Conductedi Hydrostattc Pneumatic Nominal Operating Pressure Dtner X (Ia~t.T Pressure~ Test Temp. F..
9. Rem arksi hppllcablc Manufacturer's Data Report to be attached CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this Repair or Replaccmcnt conforms to Section XI of'the ASME Code.

Signed:

ncr or 's Designee CERTIFICATE OF INSPECTION I, the Undersigned, holding a valid commission Issued by thc National Board of Boiler and Pressure Yessei Inspectors and the State or Province of 0 employed by p ~l9UH have Inspected thc d I b e yh g ~

described In this hEt,th or replacement has been constructed ln accordance with Section XI of thc ASME Code. By signing p&

this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report Fe thermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

  • Arkwright Boston Insurance Co.

COMMISSION NO.

Date Commlsslonsr B 77 (State or Province, National Boar

Page 9 o! 0 N5-2 SUPPLEMENTAL SHEET

1. 0%'NER> FLORIDA PO%'ER P.O. Box f29100 d( LIGHT CO. DhTEt 'une 23, 1989 Miami, Florida 331f2
2. PLANT! ST. LUCIB FLANT UNIT II UNITr F. O. Box 1200 Jensen Beach, Plorida 34957
3. WORK JOB NO. PC/M N/A PERFORMED BY: PFL FLANT CONSTRUCTION/BACKPIT F. O. Box 1400 Juno Beach, Plorlda 33408 CWO NO,! 8461
0. IDENTIFICATION OF SYSTEM: COMFONBNT COOLING VATBR
f. DESCRIPTION OF WORK: PROCESS SHEET NO 8461-928 R/3 Replacement parts for'Valve 0 2I-SB-21233 are not available.

Complete valve changeout was required.

Page 4 of I N~ SUPPLEMENT'hh, SHEI Y

1. OWNER> FLORIDA POSER d( LICHT CO. June 23, 1989 P.O. Sox $ 29100 Miami, F1orlda 331j2 UNITt II
2. PLANT! ST. LUCIB PLANT UNIT Ii 308 NO. PC/M N/A P. 0. Box 1200 Jensen Beach, Plorida 34957 CWO NO.r 8461
3. WORK PERFORMED SY: P PL PLANT CONSTRUCTION/BACKPIT P. O. Box 1400 PROCESS SHEET NO.:

Juno Beach, Plorida 33408 8461-928 R/3

0. IDENTIFICATION OF SYSTEM:

COMPONBNT COOLING VATBR ADDITIONALMATERIAL (Excluding Welding Materia0 Heat/Lot No.

or CFC or Manufacturer Specification Type 4 Description RIR/Report ASMB-SA-516-GR70 30" Butterfly Valve Henry Pratt 3R9472 ASMB<<SA-351 C(S Planged ASMB"S

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI FLORIDA POWER I LIGHT COMPANY

1. Owner Date May 5, 1989 Sheet 5. of A
2. Plant Unit 2 PO ¹ B-88633-90059 Combustion Eng. Inc.

PCM ¹: 091-288

3. Work Performed by 1000 Pros ect Hill Road PWO ¹:

Windsor CT 06095 CWO fh N/A . Process Sheet:

Repair Oreaniaaiian P.O. No., Joe No.. ero.

FPL P.O. f/B88633-90059 C.E. Job //616599 Type Code Symbol Stamp NR Authorization No. 2 Expiration Date 03-17-1990

4. Identification of System RCS Piping Construct on o e ect on ZZZ, 1977
6. Identification of Components Repaired or Replaced and Replacement Components ASME Code National Repaired, Stamped Name of Name of Manufacturer 8oafd Other Year Replaced, (Yes Component Manufacturer Serial No. No. Identification 8uilt or or No}

Replacement RTD NOZZLES: CODE NOe 772-104-17 CE N/A N/A M-9219-2 1976 REPLACED NO 772-104-19 CE N/A N/A M-9219-5 1976 REPLACED NO 772-104-16 CE N/A N/A M-9219-3 1976 REPLACED NO 772-104-15 CE N/A N/A M-9219-5 1976 REPLACED NO 772-104-13 CE N/A N/A M-9219-3 1976 REPLACED NO

FORM NIS-2 (Sack)

7. Description of Work:

Remove 5 RTD Nozzles in Hot Leg Piping and replace with Nozzles as identified.

8. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure Csher x pressure ~tg pst Test Temp. 532 'F
9. Remarks:

SECTION XZ Pressure Test = 1.02 X 2235 PSZ Operating Pressure CERTIFICATE OF COMPLIANCE We certify that the statements made In this report are correct and this REPAIR conforms to the rules of the ASME Code,Section XI.

NR Type Code Symbol Stamp:

Certificate of Authorization No.:

Signed Date Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION

~

I, the undersigned, holding a valid commission issued by the National Board of Pressure Vessel Inspectors and the State of Province of I I ~"i4+ and employed by of have inspected the components described

'P , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Ownet's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage of loss of any kind arising from or connected with this inspection.

L t, t,', ui Commissions /'

inspector's Signature National Board, State, Province and Endorsements

Page 3 of 0 NIS-2 SUPPLEMENTAL SHEET 0

l. OWNER: FLORIDA POWER 8( LIGHT CO. DATE: Hay 5, 1989 P.O. Box 529100 Miami, Florida 33152
2. PLANT: St. Lucie UNIT 2
3. WORK 3OB NO. PC/M 091-288 PERFORMED BY: Combustion Engineering CWO NO.: N/A
0. IDENTIFICATION PROCESS SHEET NO.:

OF, SYSTEM: RCS Piping 616599-001 616599-002

5. DESCRIPTION OF WORK; Remove (5) five RTD Nozzles and replace with Nozzles as identified.

Page 4 of 4 NIS-2 SUPPLEMENTAL SHEET

l. OWNER: FLORIDA POWER 4 LIGHT CO. DATE; May 5, 1989 P.O, Box 529100 Miami, Florida 33152
2. PLANT; St. Lucie, Unit /IZX UNIT! 2
3. WORK 3OB NO, PC/M 091-288 PERFORMED BY: Combustion Engineering CWO NO,: N/A IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM: RCS Pip 616599-001 616599"002

5. ADDITIONALMATERIAL (Excluding Welding Materia J)

Heat/Lot No.

or CFC or Manufacturer Specification No. Type R Description RIR/Report 772-104-R 1 RTD Nozzle J-8611-1 CE 772-104-R 2 RTD Nozzle J-8611-1 CE 772-104-R 3 RTD Nozzle J-8611-1 CE 772-104-R RTD Nozzle J-8611-1 772-104-R 5 RTD Nozzle J-8611-1 CE

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI FLOR1DA POWER 8 LlGHT COMPANY

1. Owner Date b'av 5, 1989 Sheet 1 ot
2. Plant Unit 2 PO ¹: 888633-90059 PCM ¹: 090-288
3. Work Performed by Combustion Eng. Inc.

1000 Prospect Hill Rd. PWO¹: 2513 tri nd aor cT 06095 CWOth NIA Process Sheet:

Repair Organization P.O. No., Job No., ato.

FPL P.O.  !!B88633-9005o C.E. Job !>616599 Type Code Symbol Stamp NR Authorization No. 2 Expiration Date 03-17-1990

4. IdentifioatIOn Of SyStem Pressurizer a

Construction Code Section II

8. Identification of Components Repaired or Replaced and Replacement Components ASME Code National Repaired, Stamped Name of Name of Manufacturer Board Other Year Replaced, (Yes Component Manufacturer Serial No. No. Identification Built or No)

Replacement Pressurizer CE Code No. N/A Pc. No. 1976 Replaced No Lo~er M-8918 684-108B Sampling Line Nozzle

FORM NIS-2 (Back)

7. Description of Work:

B. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure Other X Pressure 22 80 psi Test Temp. 675 'F

9. Remarks: 'section XI Pressure Test = 1. 02 x 2235 PSI Operating Pressure CERT! FICATE OF COMPLIANCE We certify that the statements made in this report are correct and this REPAIR conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: NR Certificate of Authorization No.:

Signed Date , <98~

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION

~

I, the undersigned, holding a valid commission issued by the National Board of Pressure Vessel Inspectors Q 4LDS have inspected the components described in this Owner's Report during the period to M. I'rl, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner'~,Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage of loss of any kind arising from or connected with this inspection.

( ki~. C(- inspector's Signature Commissions I National Board, State, Province and Endorsements Date "P;< 19

Page 3 of 0 NIS-2 SUPPLEMENTAL SHEET

1. OWNER: FLORIDA POWER tk LICHT CO. DATE: <av 5, lo89 P.O. Box 929100 Miami, Florida 33152
2. PLANT: St. Lucie UNIT: 2 6501 South Hwy. AlA Jensen Beach, FL 34957
3. WORK JOB NO. PC/M 090-288 PERFORMED BY; Combustion Engineering CWO NO.: N/A
0. IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM: Pressurizer Lower Sample Line 616590-003 DESCRIPTION OFVORK: Replace original Lover Sampling Line Nozzle with Nozzle identified. Pc. I/684-107-R /

Code No. J8611-1 & J-2506-1

Page i of 4 NLS-2 SUPPI.EMENTAL SHEET I. 0%NER> FLORIDA POWER 8t LIGHT CO. DATEi pay 5, 1 9 89 P.O. Box $ 29IOO Miami, Florida 33I52

2. PLANT: St. Lucie UNIT:

6501 South Hwy. A1A Jensen Beach, PL 34957

3. %0RK JOB NO. PC/M PERFORMED BY: Combustion Engineering C%0 NO.: N/A IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM: Pressurizer Lower Sample Line 616599"003

5. ADDITIONALMATERIAL (Exchjding Welding Material)

Heat/Lot No.

or CFC or Manufacturer Specification Type Bc Description RIR/Report PC. No.

Pressurizer J-8611-1 684-107-R Lower Sampling J-2506-1 C.E. Line Nozzle I

L