L-89-253, Forwards Inservice Insp Rept for Unit 2

From kanterella
(Redirected from L-89-253)
Jump to navigation Jump to search
Forwards Inservice Insp Rept for Unit 2
ML17308A480
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/17/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17223A232 List:
References
L-89-253, NUDOCS 8907260002
Download: ML17308A480 (192)


Text

Il gc CE1ZRATED'TKBUTION DE MONS AT10.'i SYSTEM DOCKET N

05000389

~ 0

)

REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RXDS)

ACCESSION NBR:8907260002 DOC.DATE: 89/07/17 NOTARIZED-NO FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power S Light Co.

AUTH.NAME AUTHOR AFFILIATION WOODY,C.O.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards inservice insp rept for Unit 2.

DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR Q ENCL SIZE: /fI TXTLE: OR Submittal: Inservice Inspection/Testing/Reli f from ASME Co e NOTES R

RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,Z INTERNAL ACRS NRR/DEST/MEB 9H NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EXB EXTERNAL: EGGG BROWN, B LPDR NSIC COPIES LTTR ENCL 1

0 1

1 6

1 0

1 9

1 0

1 e

1 1

1 1

- 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DEST/MTB 9H OC/LFMB E '1 EGGG ROCKHOLD,H NRC PDR COPIES LTTR ENCL 5

1 Xb 1

Q 1

0 1

1 1

N 1

1 D

D NOZE 'IO ALL "RIDS" R1XZPXENIS'IZASE HELP US 'IO REDUCE %!ASTE!

CGHZACI'IHE DOCUMEPZ CGNIK)L DESK ROC'l-37 (EXT. 20079)

TO EZZKGQZB %BUR NAME FMM DIPHGEPZIQN LISTS FOR DOCUMENI'8~ DONFT NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 26 ENCL D

S

Cg 4J 83QQp

~~~ ~~> >>')l~(]f"]p.' "':."~'~M( <

P.O. Box14000, Juno Boach, FL 33408-0420 JULY. 1 7 1989 L-89-253 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

St. Lucie Unit 2 Docket No. 50-389 Inservice Ins ection Re ort Please find attached the Owner's Data Report for Inservice Inspection (Forms NIS-1 and NIS-2) which is submitted in accordance with the provisions of the ASME Code,Section XI, (IWA-6230), for St. Lucie Unit 2.

Should there be any cpxestions concerning this

report, please contact us.

Very truly yours, O.

Wo Acting ior Vice President Nuclear COW/MSD/gp Attachment cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 8907260002 8907i7 PDR ADOCK 05000389 P

PDC an FPL Group company

~ 1

FLORIDA POWER

& LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST.

LUCIE NUCLEAR PLANT P.O.BOX 128 FT.PIERCE, FLORIDA 33454-UNIT 2 STEAM GENERATOR 2A

& 2B 1989 EDDY CURRENT RESULTS CUMULATIVE REPORT J.50-309 ST.

LUGIE, 2

FP&LC INSERVICE INSPECTION REPORT Rec'd. w/1tr. 7/17/89.........8907260002

COMPONENT: S/G 0 A CUMMULATIVE DISTRIBUTION

SUMMARY

ST.

LUCIE 2 02/89 Page 1 of 1 Date 04/17/89 Time: ':58 PM Examination Dates

02/09/89 thru 03/01/89 Total Number of Tubes Inspected 8203 Total Indications Between 20% and 39%

Greater than or equal to 40%

Total Tubes Plugged as Preventive Maint Total Tubes Plugged 52 6

7 13 Location Of Indications 20% to 100%

Hot TSH.5 01H -2.0 07H +2.1 DHB -3.0 Leg to 01H -2.1 to 07H +2.0 to DHB -3.1 to DCB -3.0 0

1 0

54 Cold Leg TSC -.5 to 01C -2.1 01C -2.0 to 07C +2.0 07C +2.1 to DCB -3.1

00 CONPONENT

STG ¹A PLUGGABLE TUBES LIST St. Lucie 2 02/89 Page:

1 of 1

Date 04/14/89 Time 9:53 AH

+

+

+

+

+

+

+

+

+

I I

IREQI I

TESI'ED IROMILINEIZONEIEXTILEGIEXTENT I

REEL

+

+

+

+

+

+

+

11261 481 14 I TEHI C

I TEH PC IAC121 11361 641 14 1 TEHI C

I TEH IAC124 I 941 661 16ITEHI C

ITEH PCGYIAC116 I 391 731 4ITEHI C

ITEH PCGYIAC006 I 421 761 41TEHI C

ITEH PSGYIAC006 11351 811 15ITEHI C

ITEH GYIAC064 I

501 861 6ITEHI C ITEH GYIAC069 I

I I

ITEHI"C ITEH PSGNIAC069 I 471 871 6ITEHI C

ITEH GHIAC069 I

I I

ITEHI C

ITEH GNIAC069 I

I I

ITEHI C

ITEH PSGNIAC069 I 941 901 17ITEHI C

ITEH PSGMIAC056 I 401 961 6ITEHI C

ITEH PSCNIAC069 I 501 961 6ITEHI C ITEH PSGNIAC069 11151 1291 10ITEHI C

ITEH PCIAC048 I 561 1501 BITEHI C ITEH PSGYIAC034 I

I I

CMI PROBE I

LOCATION I

I I

I I

I X IvoltsIOegI Oataset 11A-SBO SF/RH I

1IA-580 SF/RH IH 1IA 580 SF/RH 11A-580-SF/RH IH 1IA-SBO.SF/RH IH 1IA-580-SF/RH I

IIA-580 SF/RH I

1IA SBO.SF/RH I

1IA-580 SF/RH I

1IA-580-SF/RH I

1IA-580-SF/RH IH 11A.SBO.SF/RH IH 1IA.580-SF/RH IH 11A 580 SF/RH I

1IA SBO.SF/RH IH 11A-580-SF/RH I

OHT 0.0 I OHT 0,0 vs4 0.7 I

OHB 0.0 I vs3 0.5 I vs4 -0.8 I

OCT 0.0 I

OHB 0.0 I

OHT 0.0 I OCT 0.0 I

OHB 0.0 I vs3 1.0 I vs3 -0.7 I vs3 -0.7 I

TSH 14.5 I vs3 1.0 I 451 6.41110 IDECRADEO I

IPTP I 4 ~ 711301 IHPERFECT I

I 401 5.11 951IMPERFECT IPTPI 3.61120IIHPERFECT I

IPTPI 1.111081IMPERFECT IPTPI 2.51102IIHPERFECT I

IPTPI 2.41129IIHPERFECT I

IPTPI 0.5 I 1291 IHPERFECT IPTPI 0.41135IIHPERFECT I

IPTPI 2.81129IIHPERFECT I

IPI'PI 1.311261IHPERFECT I

I 401 3.21 971IHPERFECT I

I 481 2.51 9010EGRAOED I 481 1.31 9010ECRADED IU II 0.01 011-s I 431 1.81 87IBALANCE I

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

Number of Pluggable Tubes:

13 Number of Indications 16 Selection Criteria :

PerCent T.M... ~.

40 Includes ADI,NQI,OSI,OTI,DRI,LPI,TBP,TRS,PTP Codes

CUHMULATIVE EXAHI NATION REPORT St. Lucia 2 OUTAGE : 02/89 CDHPONENT :

STG ¹A DESCRIPTION : 20X TO 100X Page 1 of 2 Date 4/ 3/89 Time

12:33 PH I

(Row(L I--

I I 86(

I 92(

I 93(

I 981 I 98(

11051

( 55(

11261 I

I I 20(

I 84(

( 95(

11271 (13l (

I 191 94(

341 I 94(

I I

( 39(

I 451 I 471 11351 I 821 I 421 I 531 I 44(

I 491 I

I I 471 (135(

( 531 I 501 I 49(

( 59(

( 50(

I I

I 921 47(

I I

I 44(

I-- I-( Extent in(Leg(Req(Tst/Note(

Reel

---I. I" I"""-I"-"-

221 C

ITEHITEH PSIAC105 26(

C ITEHITEH PSIAC106 271 C

ITEHITEH PSGNIAC106 28(

C (TEH(TEH PSIAC107 301 C

ITEHITEH IAC107 33(

C ITEHITEH IAC108 37(

C ITEH(TEH GN(AC103 481 C

ITEHITEH PCIAC121 I

C ITEHITEH IAC121 521 C

ITEHITEH SSGNIACOOZ 521 C 'ITEHITEH PSIAC112 57(

C ITEHITEH IAC114 59(

C ITEHITEH IAC123 611 C

ITEHITEH IAC123 631 C

ITEHITEH GNIACOOS 64(

C ITEHITEH SS(AC115 64(

C ITEHITEH IAC124 641 C

ITEHITEH IAC124 661 C

ITEHITEH PCGYIAC116 C

(TEHITEH GM(AC116 73( C.ITEHITEH PCGYIAC006 73(

C (TEHITEH GHIAC006 731 C

ITEHITEH PSGNIAC006 73(

C ITEHITEH PSGNIAC062 741 C

ITEHITEH IAC117 76(

C ITEH(TEH PSGY(AC006 77(

C ITEHITEH GNIAC014 78(

C ITEH(TEH IAC006 79(

C ITEHITEH SSGNIAC006 I

C ITEHITEH SSGNIAC006 811 C

ITEHITEH SSGNIAC006 81(

C ITEHITEH GYIAC064 831 C

ITEHITEH GNIAC016 841 C

ITEHITEH PSGHIAC007 851 C

ITEHITEH GNIAC069 851 C

ITEHITEH PCGNIAC075 861 C

ITEHITEH PSGNIAC069 I

C ITEHITEH GYIAC06 S61 C

ITEHITEH PCGNIACOSS 87(

C ITEHITEH GNIAC069 I

C ITEHITEH PSGNIAC069 I

C ITEHITEH GHIAC069 901 C

ITEHITEH PSIAC069

--I---I-I" I-02/89 I

I

(

Probe

(

Lo

.I----.-.---- I-IA-580-SF/RH IVS3 IA-580-SDF/RMIVS4 IA.580.SOF/RHIVS4 IA.580.SF/RH IVS4 IA-580-SF/RH IVS2 IA 580 SF/RH IVSZ (A-580-SF/RH (VS3 IA-580-SF/RH IOHT IA-580-SF/RH IVS1 IA-SSO.SF/RH 106H IA 580-SF/RM IVS3 IA.SSO-SF/RM IVS2 IA-580-SF/RH IVS1 IA.SSO-SF/RH IOHI'A.580-SF/RH IVS3 IA-580-SF/RH IVSZ IA-580-SF/RH IOHT IA-580 SF/RH IDHT IA-SSO.SF/RH IVS4 IA-580-SF/RH IVS4 IA 580 SF/RH IDHB IA-SBO.SF/RH IOCB IA 580 SF/RH IVS3 IA-580-SF/RH IVS1 IA.580-SF/RH IVS1 IA 580-SF/RH IVS3 IA 580-SF/RH IOHB (A-SBO.SF/RH IOHB IA 580-SF/RH IVS3, IA-580-SF/RM IVS3 IA-580 SF/RH IVS3 IA-580-SF/RH IVS4 IA-580-SF/RH IOCB IA-580-SF/RH IDCT IA-SSO SF/RH IDHB IA-580-SF/RH IOHB IA-580-SF/RM IOHB IA 580 SF/RH IOCT IA-SSO.SF/RH IVS2 (A-580-SF/RM IDHT IA-580-SF/RH IDHB IA-SBO.SF/RH IOCT IA-580-SF/RM IDHT I"

- I-2.01112IH 11 231

.51 98IH 11 351

-.8

-1.0 2.81 97IH 11 361

.7

.91112IH 11 201

.6( 125 1

1( 28(

1.011321 11 211

-.6

.4

.3 2.0(102(H 1( 28(

6.411101 11 451 1.511131M 11 211

.5( 120(

1( 33(

2.0(127(

'll 27(

.8(106(H 1( 27(

1.1(107(H 1( 24(

.9(130(

1( 23(

.81110IH 11 271 1.81 101IH 11 321 2.811311, 11 241 4.711301 11 251

5. 1( 95 IH 1( 40(

1.31100IH 11 351 3.61 1201 11 331 1.31 1321 11 221 1.81113IH 11 241 1.21112IH 11 221 1 ~ 21 103(H 1( 29(

1.1(108(H 1( 29(

.511331 11 211 2.311311 11 231

.7(1Z4(

1( 30(

1.51 95(H 1( 36(

1.41105 IH 11 231 2.5(102(H 1( 30(

.911261 11 281 1.911341 11 221

.6(134(

1( 21(

.51134(

11 211

.511291 11 261 2.4(129(

1( 26(

~91114IH 1 I 21(

.411351 11 201 1.3(126(

1( 29(

1 ~ 0

.0

-.9 33.9 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I-I I

I I

I

.1

.8

.9

.0

-.9 1.0

~ 0

.0

.7

.2

.0

.8

.7

. 7

.5

.0

.0

.0

.6

.1.0

..8

.0

.0

.0

.0

.0

-1.0

.0

.0 2.8(129(

1( 26(

.0 I

.411311 11 241 I

I - I"-I --I--.-I-----.-.--

.0 cation (Volts(Oeg(Ch I

X (Diff(

Location

+

N/A I

(Volts(Deg(Ch I X I

---I--- -I---I-- I

.I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I

(

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

~

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I'

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I.

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

"-I-- -.I---I" I -

I

CUMMULATIVE EXAHINATIOH REPORT St. Lucie 2 OUTAGE : 02/89 CCNPOHEHT STG O'A DESCRIPTION:

20X TO 100X Page 2 of 2 Oate 4/ 3/89 time

12:33 PH

+

+

I I Extent I

02/89 M/A I

(Ro~(Lin(Leg(Req(tst/Mote(

Reel I

Probe

(

Location (Volts(Oeg(Ch I X IOiff (

Location (Volts(Oeg(Ch I X I I - -I" I - I- -I--- ----I--- ----I---"--- ---I------- -"---I-----I--I---I" I-I-.-----


I-- --I---I-"I --I I 94( 90(

C (TEHITEH PSGHIAC056 IA-580-SF/RH IVS3 1.0

(

3.2( 97(H 1( 40(

I I

I I

I I 43( 91(

C ITEHITEH PSIAC069 (A-580-SF/RH (OHB

.0

(

.6(135(

1( 20(

I I

I I

I 11091 911 C

ITEHITEN IAC056 IA.580-SF/RM ITSC 5.0 I

.911301 11 251 I

I I

I I

I I 49( 95(

C ITEH(TEH IAC069 (A-580-SF/RM (OCT

.0

(

.6(128(

1( 27(

I I

I I

I I 401 961 C

ITEHITEH PSGMIAC069 IA-580-SF/RH IVS3

.7 I

2.51 90IH 1( 48(

I I

I I

I I 421 961 C

ITEHITEH IAC069 IA-580-SF/RH IOHT

.0 I

.411351 11 201 I

I I

I I.

( 50( 96(

C (TEH(TEH PSGN(AC069 (A-580.SF/RM (VS3

-,7

(

1.3( 90(N 1( 48(

I I

I I

I

( 47( 97(

C (TEHITEH GNIAC069 IA-580-SF/RH (VS3

.6

(

1.2(109(H 1( 27(

I I

I I

I

( 53( 97(

C ITEH(TEH GN(AC077 (A-580-SF/RN (04C 26.3

(

.6(135(

1( 20(

I I

I I

I

( 43( 99('C (TEHITEH (AC069 (A.580-SF/RH (04C 11.9 I

1.'2(134(

1( 21(

I I

I I

I

( 31(101(

C ITEHITEH GNIAC070 IA-580.SF/RN (OCT

~ 0 I

.71129(

11 311 I

I I

I I

I 112611061 C

ITEHITEH GNIAC045 IA-580-SF/RH I VS1

-.9 I

.61 991M 11 351 I

I I

I I

I

( 87( 129(

C ItEHITEH PSGN(AC039 IA-580.SF/RN (VS3

.8 I

1.9(110(H 1( 24(

I I

I I

I I 93(131(

C ITEHITEH PSGM(AC040 IA-580-SF/RM IVS2

.7 I

1.8( 99(M 1( 39(

I I

I I

I

( 56(150(

C (TEH(TEH PSGY(AC034 (A.580-SF/RH IVS3 1.0

(

1.8( 87(H 1( 43(

I I

I I

I I---I" I---I-- I--.- - -I-I I

I" I "I---I" I---- I


".I-----I.--I---I--- I Nunber of INDICATIONS Selected from Current Outage:

58 Nuaber of TUBES Selected from Current Outage 52

COMPONENT: S/G 5

B CUMMULATIVE DISTRIBUTION

SUMMARY

ST.

LUCIE 2 02/89 Page 1 of 1 Date 04/17/89 Time

~

1:58 PM Examination Dates

02/09/89 thru 03/01/89 Total Number of Tubes Inspected.....:

8256 Total Indications Between 20% and 39%

Greater than or equal to 40%

Total Tubes Plugged as Preventive Maint Total Tubes Plugged Location Of Indications 20% to 100%

41 4

Hot TSH -.5 01H -2.0 07H +2.1 DHB -3.0 Leg to 01H -2.1 to 07H +2.0 to DHB -3.1 to DCB -3.0 1

0 2

40 Cold Leg TSC -.5 to 01C -2.1 01C -2.0 to 07C +2.0 07C +2.1 to DCB -3.1 1

1 0

COMPOHEHT

STG ¹8 PLUGGABLE TUBES LIST St. Lucia 2 02/89 Page 1 of 1

Oate 04/14/89 Time :

9:53 AM

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

I I

I IREQI I

TESTEO I

IROWILIHEIZOHEIEXTILEGI EXTEHT I

REEL

+

+

+

+

+

+

+

I 471 79(

4(TEHI C

ITEH PCGYIBC008

( 46(

80(

4(TEH(

C (TEH PSGY(BC008

( 56(

80(

3(TEH(

C (TEH PSGH(BC016 I 46(

82(

4(TEHI C

ITEH PCGYIBC008

( 48(

86(

6(TEH(

C (TEH PSGY(BC070

( 96(

941 17(TEHI C

ITEH SCGYIBC057 I

I I

ITEHI C

ITEH GYIBC057

( 31(

101(

6(TEH(

C (TEH SSGN(BC071 I

I I CHI PROBE

+

+

I 1(A-580-SF/RN I

1(A.SBO.SF/RH (M 1(A-580-SF/RM 1(A-580-SF/RN I

1(A.580.SF/RN 1(A 580-SF/RN IN 1(A-580.SF/RM I

1(A-580 SF/RN I

LOCATIOH I OHT 0.0 I

OHB 0.0

( VS3 0.9 I

OHB 0.0 I

OCT 0.0 I VS3 0.5

( VS2 -0.9

( OCr 0.0 I

I I

I I

( X (Volts(geg( Oataset

+

+

+

+

(PTP (

3.2(128( IMPERFECT (PTP(

2.6(131(IMPERFECT I 50(

1 ~5( 94(IMPERFECT

( 41(

3.1(117( INPERFECT I

I 46(

1.5(114(1-S

(

IPTP I 0.8(134( IMPERFEC1' IPTP I 2.4 (112( INPERFECT

(

I 46(

0.9(113( IMPERFECT I

+

+

+

+

+

Number of Pluggable Tubes:

Humber of Indications Selection Criteria :

PerCent T.W....:

40 Includes AOI,HQI,OSI,DTI,ORI,LPI,TBP,TRS,PTP Codes

CUNHULATlvE EXAHiNATioM REPORT St. Lucie 2 OUTAGE : 02/89 CDHPONENT STG ¹8 DESCRlPTIOM

20K TO 100X Page 1 of 2 Date 4/ 3/89 Time : 12:3C PH I

/Motel Reel I

I BC107 PCIBC110 GNIBC009 PSGMIBC010 PSIBC124 GNIBC PCGNIBC015 PSGNIBCOOS Pclecoos PCGYIBCOOB PCIBCOOS PSGNIBC016 PSGNISC016 PCGYIBCOOS PSGNIBC016 PCIBCOOS PCGYIBC008 I BC121 IBC070 PSGHIBC076 sslecoro PSGYIBC070 PsGMlecOr6 Pslec077 PSGHIBC057 GYIBC 5 scGYlecosr PSGNIBC057 SSGMIBC057 PSGMIBC057 PSGMIBC070 PsGNleco58 IBC058 PSGNIBC070 IBC070 SSGNIBC071 GNISC059 GMIBC081 GMIBC036 PSGHIBC047 PSGMISC038 PSGMIBC029 SSGMIBC039 I

I I Extent IRoMILinlLegIReqlTst I---I---I---I---I-I 96I 24I C

ITEHITEH I 97I Cll C

ITEHITEH I 68I 50I C

ITEHITEH I 57I 5ll C

ITEHITEH l131I 55I C

ITEHITEH I 391 69I C

ITEHITEH 52I 76I C

ITEHITEH I C3I rrl C

ITEHITEH I 50I 7SI C

ITEHITEH I 47I 79I C

ITEHITEH I 49I 79I C

ITEHITEH I 51I 79I C

ITEHITEH I 571 79I C

ITEHITEH I C6I Sol C

ITEHITEH I 56I 801 C

ITEHITEH 471 81I C

ITEHITEH 46I 82I C

ITEHITEH I 89I 83I C

ITEHITEH I 47I 85I C

I'TEHITEH I 53I 85I C

ITEHITEH I 48I 86I C

ITEHITEH I

C ITEHITEH I 52I 88l C

ITEHITEH I 54I 90I C

ITEHITEH I 87I 93I C

ITEHITEH I 96I 94I C

ITEHITEH I

I I

C ITEHITEH I 94I 96I C

ITEHITEH I 961 96I C

ITEHITEH I

I I

C ITEHITEH I 35I 97I C

ITEHITEH I 89I 971 C

ITEHITEH I 97I 97I C

ITEHITEH I 34I 98I C

ITEHITEH I 35I 99I C

ITEHITEH I 31lloll C ITEHITEH I 89I103I C

ITEHITEH I 52lllol C ITEHITEH I 96I114I C

ITEHITEH 129I115I C

ITEHITEH 94I122I C

ITEHITEH 55I125I C

ITEHITEH I 94I126I C

ITEHITEH I - I---I- -I-I I

I x lo

- I-I ll 38I ll 211 ll 25I ll 37I ll 23I ll 30I 1 I 38I ll 20I ll 23I 1 I 31I ll 28I ll 23I ll 29I ll 2SI ll 50I 11 20I 1 I 41I ll 30I 1 I 22I ll 24I 1 I 46I ll 20I ll 21I ll 24I ll 24I ll 28I ll 28I ll 30I ll 23I ll 23I ll 34I ll 21I ll 34I ll 24I 1 I 46I ll 2rl ll 25I ll 26I ll 23I ll 24I ll 34I ll 26I I

I 02/89 lvoltsloeglch


I-----I---I--

I

.9I 97IH IOBH -1.1 Ivs4

.6 IVS3

-.9 IA-580-SF/RN IA-580-SF/RN IA 580-SF/RH IA-580-SF/RH IA-580-SF/RN IA-580 SF/RH IA-580 SF/RM IA-580-SF/RM IA-580.SF/RM IA-580.SF/RH IA 580-SF/RH IA.SSO.SF/RN IA 580-SF/RM IA-580-SF/RH IA 580 SF/RH IA-580-SF/RH IA-580-SF/RH IA-580 SF/RM IA-580 SF/RM IA-580-SF/RH IA 580 SF/RH IA 580-SF/RM IA 580 SF/RH IA-580-SF/RH IA-580-SF/RN IA-SSO SF/RH IA 580 SF/RH IA-580-SF/RH IA-580-SF/RH IA.SSO-SF/RH IA-580-SF/RH IA-580-SF/RH IA-580 SF/RM IA-580-SF/RH IA 580-SF/RH IA-580.SF/RH IA-580.SF/RH IA-580 SF/RH IA-580-SF/RK IA-580-SF/RH IA.SSO-SF/RN IA-580-SF/RN IA 5SO-SF/RH I

.71140 I

.5I117IH

.BI105IK

.7I 139 I IVS3 -1.0 Ioce IVS3 IVS3 loce IOCT ID HT IOCT IDCB IDCT IOHB Ivs3 IOHT IDHS Ivs3 Ioce IDCB IOHB IOCT Ivs3 Ioce IVS3 IVS2 IVS3

.0

.9

.8

.0

.0

.0

.0

.0

.0

.0

.9

.0

.0

-.7

.0

~ 0

.0

.0

.7

.0

-.9

-.9

.5 1.1I109IH

.81107IH 1.2I139I

.4 I 136 I 3.2I128I 1.5 I 131 I

.7I 139 I 1.1 I 133 I 2.6 I 131 I 1.5I 94IH 1 ~ 7I 140 I 3.1 I 117I

1. 7I 110 IH 1.91139 I 1.0 I 131 I

.8 I137I 1 ~ 5 I114 I 1.1I110IH

.4 I 137I

.SI112IH 2.4I112IH

.BI134I 1.0lloSIH

.9I 106IH 1.7I113IH

.CI138I"

.6I103IH

.6I 140 I

.9I104IH

.6 I 137I

.9 I 113 I

~9I 1101H

~6I109IH 1.5I112IH 1.2I124IH

.5 I 114 IH 1.3I113IH

.6I114IH I

I IVS2 -1.0 IVS2 -1.0 IVS3 IOHB IVS4

.8

.0

.9 ITSH 21.6 IVS3 Ioce IOCT lvs2 IVS3 Ivs2 IOSH Ivs2 IVS3 IVs2 I-

..8

.0

.0

-.9

.5

-.8

.9

- 7

..9

-.9 I

Probe I

Location I

I I

I I

I I

I I

I I

I I

I I

I I

I I

.I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I, I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I '

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

N/A iffl Location lvoltsloegl I

I I

I I

ch I x I

-I--

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I

CUMMULATIVE EXAMINATION REPORT St. Lucie 2 OUTAGE : 02/89 COMPONENT :

STG ¹8 DESCRIPTIOH : 20X TO 100X Page 2 of 2 Date 4/ 3/89 Time : 12:34 PM J Extent I

02/89 (Roe(Lin)LegfReq[Tst/Note]

Reel f

Probe f

Location

[Volts)Deg(Ch f

I---I---I-"I"I--------I--"----I-----------I-- -" -------I----I.-.I---I

/108/136(

C (TEN[TEN

/BC041

]A-580-SF/RM /01C 31.0 J

.9/126/M 1i 12/166/

C

/TEH/TEH PSGH/BC028

/A-580.SF/RM

/TSC 27.0

/

.8/135/

1(

I"-I" I"-I---I-------I------- I

"-I----------"--I----I-I I

I X /Diff

" I----

20I 27/

I N/A I

)

Location

]Volts)Deg(Ch

/ X f

I-"-----------I----I---I---I---I I

I I

I I

I I

I I

I I

I I--------------I"-- I---I---I.--I Nuaber of INDICATIONS Selected from Current Outage 45 Nwher of TUBES Selected from Current Outage 42

FLORIDA POWER

& LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST.

LUCIE NUCLEAR PLANT P.O.BOX 128, FT.PIERCE, FLORIDA 33454 UNIT 2 1989 OUTAGE INSERVICE INSPECTION

SUMMARY

TABLES

@APL PERCENT OF EXAMINATIONS COMPLETE 1.

Owner: Florida Power and Liciht Co.

300 Universe Blvd.

Juno Bch.FL.33408

2. Plant: St.

Lucia Nuclear Power Plant P.O.Box

~128 Ft. Pierce FL. 33454 3.Plant Unit:

2 4.Owner Certificate of Authorization

~N A S.Commerical Service Date:

8 Aucuust 1983 6.Unit National Board No.

~N A EXAMINATIONS NHICH CAN NOT BE DEFERRED FOR CLASS 1,

AND ALL APPLICABLE CLASS 2 EXAMINATIONS.

CODE CATEGORY B-B B-F B-G-2 B-H C-A C-B C-C NO.

SELECTED 36 33 40*

234 31 13 33.34 32.5%

04 80 344 25%

0>

294'IRST PERIOD COMPLETED /

12 33.34 SECOND PERIOD COMPLETED /

6 504 9

60.

64'2 62.54' 504'7 67%

3 62%

1 504 11 64.5%

C-F 290 100 34%

189 654

  • This number represents the number of flanges,pumps, valves and components applicable, not the number of studs, nuts bolts examined.

Summary Table Format Inservice Inspection Summary Outage (Year)

Period Class Components Interval SYSTEM (I)

ZONE NUMBER:(J)

SUMMARY

EXAMINATIONAREA NUMBER IDENTIFICATION DWG. NO.(K)

ASME SEC.

XI CATGY NDE ITEM NO METH N I 0

S 0 N

G T TRSEH A E I 0

E REMARKS PROCEDURE T C G

M R CAL BLOCK (L)

(M).

(N)

(0)

(p)

(Q)

(R)

(S)

(W)

(T)

(U)

(A) Date of the inspection plan table was generated.

(B) The current revision number of the plan (C)

The outage number within the period (D) Year of the outage (E)'urrent period (First,

Second, Third)

(F) The current interval (First,

Second, Third, Fourth)

(G) Applicable ASME Code Class (H)

Page number of the table (I) System applicable to this table (J)

The applicable Zone number for this table (K) The applicable isometric drawing number for this table (L) Item number associated with the item (M) Component or weld identification number (N) The component or weld description (0) Elevation level (P)

ASME Code Category (Q)

ASME Code Item Number (R)

NDE Method to be used for the examination (S)

The NDE procedure used (T) Results of the NDE examinations (U) Any remarks associated with the examination results (V) Ultrasonic calibration block to be used (W) Status of exam, C = Completed

DATE:

07/07/89 VISION:

2 0

REACTOR PRESSURE VESSEL ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

ZONE NUMBER: 001 SUHMARY EXAHINATION AREA NUHBER IDEN'IIFICATION ASHE SEC.

XI CATGY EXAH ITEH NO HETNOO PROCEDURE N I 0

S ONGT T

RSEN A

E I 0 E

REMARKS T

C G H R

  • ~CALIBRATION BLOCK**

REF.

DUG.

NO. 02-001-B 000010 101.151 B-A BOT.HD. DOME-TO-PEEL SEG.

TOR. B1.21 RCB UT-0,45,60 700-11-000010 UT-50/70 700-11-000010 C

C 3-4-89 UT COHPLETE SKI CNF ¹ 001 FOR C.. -

ONE 45/60 DEGREE DETECTED INDICATION,EVALUATED ACCEPTABLE PERASME SECTION XI, IN-3510-1.

    • UT-1,UT-4**

000020 101.154-A B A UT 0(45(60 700 1 1 000020 C

C 2 27 89 UT(

COMPLETE ~

PEEL SEG..TO-PEEL SEG.

9 30o B1.22 'T-50/70 700.11-000020 C-RCB

  • ~UT-1(UT 4~*

0030 101-154-B PEEL SEG.-TO PEEL SEG. 9 90o RCB B-A UT-0(45(60 700 11 000030 C

C - - -

2-27-89 UTI COHPLETE B1.22 UT-50/70 700-11-000030 C - -.

    • UT-1,UT-4**

000040 101-154-C B-A UT-0,45,60 700-11;000040 C

C - - -

2-27-89 UT; COHPLETE PEEL SEG.-TO-PEEL SEG. 9 150o B1.22 UT-50/70 700.11.000040 C - -.

RCB

~~UT-1(UT-4~~

000050 101-154.D 8-A UT-0,45,60 700-11-000050 C

C - - -

2-27-89 UT; COHPLETE PEEL SEG.-TO.PEEL SEG.

Q 210o 81.22 UT-50/70 700.11-000050 C

RCB

    • UT-1,UT 4~~

000060 101-154-E 8-A Ul'-0(45,60 700 11 000060 C

G

~ - -

2-27-89 UTI COHPLETE PEEL SEG.-TO-PEEL SEG.

9 270o 81.22 UT-50/70 700-11-000060 C - -.

RCB

  • "UT-1(UT-4*~

~0070 101-154-F 8-A UT-0,45,60 700 11-000070 PEEL 'SEG.-TO-PEEL SEG. 9 330o B1.22 UT-50/70 700-11-000070 RCB C

C - - -

2-27-89 UT; COMPLETE C-

+*UT 1

UT 4*+

TE:

07/07/89 I SIGH 0 2

REAC'FOR PRESSURE VESSEL ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

2 ZONE NUMBER: 001

SUMMARY

EXAMINATIONAREA NUMBER IDEHTIFICATIOH ASME SEC. XI CATGY EXAM ITEM HO METHOD PROCEDURE H

I 0

S OHGT T

RSEH A

E I 0 E

REMARKS T

C G

M R>>>>CALIBRATIOH BLOCK>>>>

REF.

DUG. NO. 02-001-A 000080 201-141 8-A UT-0,45,60 700.11-000080 C

C - - -

2-26 89 UT; COMPLETE BOT.HD.-TO-LSI.SHELL GIR.'MELD 81.21 UT-50/70 700.11.000080 C

~ -.

RCB

>>>>UT-I,UT-4>>>>

REF.

DIJG.

HO. 02-001-C 000090 101-142-A 8-A UT-0,45,60 700-11-000090 C

C - - -

3-1-89 UT; COMPLETE LN. SHELL LONG MELD 9 15o 81.12 UT-50/70 700-11-000090 C - --

RCB

    • UT-1,UT-2**

00100 101.142-8 8-A UT-0,45,60 700.11-000100 C

C - - -

3-2-89 UT; COMPLETE LN. SHELL LOHG. HELD Q 135o 81.12 UT-50/70 700-11 000100 C-RCB

    • UT-1,UT-2**

000110 101-142-C 8-A UT.0,45,60 700.11.000110 C

C. -.

3.2.89 UT; COMPLETE LN. SHELL LONG. HELD 9 255o S1.12 UT-50/70 700. 11.000110 C - --

RCB

    • UT-1,UT-2**

REF.

DUG.

HO. 02-001-A 000120 101-171 8-A UT-0,45,60 700-11-000120 C

C - - -

3-1-89 UT; COMPLETE LN. SHELL-TO-INT. SHELL G.N.

B1 ~ 11 UT.50/70 700-11-000120 C-RCB

    • UT-1,UT-2**

REF.

DMG. HO. 02-001-C 00130 101.124.A 8-A UT-0,45,60 700 11-000130 C

C 3-1-89 UTI COMPLETE INT ~

SHELL LOHG. MELD 9 15o 81 ~ 12 UT ~50/70 700.11-000130 C-RCB

    • UT-1,UT-2**

DATE:

07/07/89 REVISIOH:

2 REACTOR PRESSURE VESSEL ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

3 ZONE NUMBER: 001 SUMMART EXAMIHATION AREA NUMBER IDENTIFICATION ASME SEC ~ XI CATGY EXAM ITEM HO METHOD PROCEDURE N I 0

S ONGT RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIONBLOCK~~

REF.

DWG.

HO. 02-001-C 000140 101-124-8 8-A UT-0,45,60 700-11-000140 C

C - - -

3-1-89 UT; COMPLE'TE IHT. SHELL LONG. WELD 8 135o 81.12 UT-50/70 700-11-000140 C - --

RCB

    • UT-1,UT-2~*

000150 101-124.C 8-A UT-0,45,60 700-11.000150 C

C 3-2-89 UT; COMPLETE INT. SHELL LONG.

'WELD 8 255o 81.12 UT-50/70 700-11-000150 C - --

RCB

    • UT-1)UT-2**

REF.

DWG.

HO. 02-001-A 00160 106-121 8-A UT-0,45,60 700-11.000160 IHT~ SHELL-TO-UPP.

SHELL G.W.

81.11 UT-50/70 700-11-000160 RCB C

C.. -

3-4-89 UT; COMPLETE C-

<<*UT-I,UT-2~>>

REF.

DWG.

HO. 02-001-C 000170 101-122.A UPP.

SHELL LONG ~

WELD 8 15 DEGREES RCB 8-A UT-0,45,60 700-11.000170 C

C -

~

2.28.9 UT:

COMPLETE 81.12 UT-50/70 700.11.000170 C - --

    • UT 1**

000180 101-122-B UPP.

SHELL LONG. WELD 8 135 DEGREES RCB 8-A UT-0,45,60 700 11-000180 C

C - - -

2-28-89 UT; COMPLETE 81.12 UT-50/70 700-11-000180 C. --

    • UT 1*%

000190 101.122.C 8-A UT-0,45,60 700-11-000190 C

C - -.

3.1-89 UT; COMPLETE UPP ~

SHELL LONG.

WELD 8 255o 81.12 UT-50/70 700-11-000190 C-D

~

    • UT 1**

ATE:

07/07/89 VISION:

2 REACTOR PRESSURE VESSEL ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRSI'NTERVAL CLASS 1

COMPONENTS PAGE:

4 ZONE NUMBER: 001

SUMMARY

EXAMINATION AREA HUMBER IDENTIFICATION ASME SEC.

XI CATGY EXAM ITEM NO METHOD PROCEDURE H I 0

S OHGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

  • ~CALIBRATIOH BLOCK~

REF.

DWG.

NO. 02-001-A 000200 101-121 B-A UPP.

SHELL-TO-FLANGE GIR.

WLD. 81.30 RCB UT-0,45,60 700-11-000200 C

C -. -

2-28-89 UTI COMPLETE EXAMIHED FROM THE UT-50/70 700-11-000200 C - - -

VESSEL I.D..

e*UT REF.

DWG.

NO. 02-001-8 000210 105-121-A B-D O'T-0,45,60 700-11-000210 C

C - - -

3-2-89 UT; COMPLETE OUTLET NOZZ.-TO-SHELL 8 Oo 83.90 UT-50/70 700-11-000210 C - --

RCB l*UT 1*t 00220 103-121-A INLET NOZZ.-TO-SHELL 9 60o RCB B.D UT-0,60 700-11-000220 83.90 UT.50/70 700-11-000220 UT-45 700-11-000220 C

C - - -

3-2-89 UTI COMPLETE, GEOMETRIC C

REFLECTION FROM THE SUPPORT LUG LOCATED C -

8 180 DEGREES.

    • UT I)UT-9~~

000230

.103.121-8 8 0 UT.0,45,60 700.11.000230 C

C - - -

2-12 89 UI'; COMPLETE INLET HOZZ.-TO-SHELL 9 120o

.83.90 UT-50/70 700-11-000230 C - --

RCB

    • UT.1,UT.9**

000240 105.121-8 8-D UT-0,45,60 700-11-000240 C

C - -.

3.2-89 UT; COMPLETE OUTLET HOZZ.-TO-SHELL 8 180o 83.90 UT-50/70 700.11-000240 C - --

RCB a*UT 1**

000250 103-121-C B-D UT-0,45,60 700-11-000250 C

C -

3 3 89 UT; COMPLETE INLET HOZZ.-TO-SHELL 9 240o 83.90 UT-50/70 700-11 '00250 C - --

RCB

    • UT-I,UT-9~*

0260 103-121-0 IHLET NOZZ.-TO.SHELL Q 300o RCB 8-D 83.90 UT.0,60 UT-50/70 UT.45 700.11-000260 700.11-000260 700.11-000260 C

C 3 3-89 UT; COMPLETE, 45 DEGREE GEOMETRIC C

REFLECTION FROM tHE SUPPORT LUG 9 180 C -

DEGREES.

~*UT 1,UT 9**

TE:

07/07/89 I SION:

2 REACTOR PRESSURE VESSEL ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUI'AGE 2 (1989),

SECOHD PERIOD, FIRST INTERVAL CLASS 1

COMPONEHTS PAGE:

5 ZONE NUMBER: 001

SUMMARY

EXAMIHATIOHAREA HUMBER IDENTIFICATION ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE H

I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIONBLOCK<<*

REF.

DWG. NO. 02 001-A 000280 IH-IR-A 8 0 UT-50/70 700.11-000280 C

C - - -

3-3-89 UT; COMPLETE INH. RAD. INLET NOZZ. 9 60o B3.100 RCB

    • UT 1**

000290 IH-IR-8 IHN. RAD. INLET NOZZ.

Q 120o RCB 8-D UT-50/70 700 11 000290 C

C - - -

2.22-89 UT; COMPLETE 83.100

    • UT-1<<*

~

~

~

~

310 IN-IR-C B.D UT-50/70 700-11-000310 C

C. - -

3-3-89 UT; COMPLETE INN. RAD. INLET HOZZ. 9 240o 83.100 RCB

<<*UT 000320 IH-IR.D 8-D UT-50/760 700-11-000320 C

C - - -

2-26 89 UT; COMPLETE IHH. RAD.

INLET NOZZ.

<<I 300o B3.100 RCB

    • UT 1*<<

REF.

ONG. NO.'2-001-8 000350 201-128-A INLET NOZZ.-TO-EXTEH. Q 60o RCB 8 J B9.11 UT-45 UT-50/70 UT.O 700.8-000350 700.8.000350 700.8-000350 C

C -

2-23-89 UT; COMPLETE, 45 DEGREE C. - -

GEOMETRIC REFLECTION FROM THE SUPPORT LUG 9 180 DEGREES.

0 DEGREE USED TO MOHITOR BACKHALL ONLY

<<<<IR-CS-46-SLC, UT-5**

000360 RC-112.6 8-J UT-0,45 700.8-000360 IH. NOZZ. EXT.-TO-ELBN 9 60o 89.11 UT-50/70 700.8.000360 RCB C

C -

2-23-89 UT; COMPLETE 0 DEGREE USED TO C - - -

MONITOR BACKWALL OHLY.

    • UT-5,IR-CS ~ 46-SLC*<<

DATE:

07/07/89 VISION:

2 REACTOR PRESSURE VESSEL ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOHD PERIOD, FIRSl'HTERVAL CLASS 1

COMPONENTS PAGE:

6 ZONE NUMBER: 001

SUMMARY

EXAMINATIONAREA NUMBER IDENTIFICATION ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE N

I 0

S ONGT T

RSEN A

E I 0 E

REMARKS T

C G

M R

<<*CALIBRATIOH BLOCK**

REF.

O'IJG.

NO. 02-001-B 000370 201-128-8 INLET NOZZ.-TO-EXTEN. a 120o RCB 8-J UT 0,45 700.8.000370 C

C - - -

2-22-89 UT; COMPLETE( 0 DEGREE USED TO 89.11 UT-50/70 700-8.000370 C - - -

MONITOR BACGIALL ONLY.

    • IR-CS-46-SLC(UT-5**

000380 Rc-121-6 8-J UT-45 700-8-000380 IN.HOZZ. EXT.-TO-ELBN 8 120o 89.11 UT-D 700-8.000380 RCB UT-50/70 700-8-000380 C

C -

2-22-89 UT; COMPLETE,45 DEGREE REFLECTIOH FROM THE LONG SEAM CRONHS C - - -

LOCATED 8 90 AHD 270 DEGREES.

0 DEGREE USED TO MONITOR BACGIALL OHLY.

    • UT 5, IR-CS-46-SLC*>>

~

~

~

0410 201-128-C IH. HOZZ.-TO-EXTEN. 9 240o RCB 8-J UT-0(45 700-8-000410 C

C - - -

2-23-89 UTI COMPLETE 0 DEGREE USED TO 89.11 UT.50/70 700.8 000410 C -

MONITOR BACK MALL ONLY.

  • >>IR-CS 46-SLC,UT-5**

000420 Rc-124-6 8 J UT.0,45 700-8.000420 IH.HOZZ. EXT.-TO-ELBSI 9 240o 89.11 UT-50/70 700-8.000420 RCB C

C -

~ -

2-23-89 UT; COMPLETE, 0 DEGREE USED TO C - - -

MONITOR BACOIALL ONLY.

    • UT-S,IR-CS-46-SLC**

000430 201-128.0 INL.

HOZZ ~ -TO.EXTEH. 9 300o RCB 8-J 89.11 UT.45 UT-50/70 UT 0 700.8.000430 700.8.000430 700.8.000430 C

C -

2 22-89 UT; COMPLETE, 45 DEGREE C - - -

GEOMETRIC REFLECTIOH FROM THE SUPPORT LUG 8 180 DEGREES.

0 DEGREE USED TO MONITOR BACKWALL OHLY.

    • IR-CS-46-SLC,UT-S*>>

000440 RC-115.6 8-J UT-0,45 700 8-000440 C

C - - -

2-23 89 UT'OMPLETE, 0 DEGREE USED TO IN.HOZZ. EXT.-TO-ELBN 8 300o 89.11 UT-50/70 700-8-000440 C - - -

MONITOR BACKWALL ONLY.

RCB I

  • <<UT-5, IR-CS-46-SLC**

0490 MSH-01 MAT. SURVEIL. HOLDER 9 83o RCB 8-N-2 813.10 VT 3 SL-410-003-23 C

C -

3-8-89 VT; COMPLETE,CE I.D. ¹ SC-1.

<<*N/A**

DATE:

07/07/89 VISION:

2 REACTOR PRESSURE VESSEL ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

7 ZOHE NUMBER: 001

SUMMARY

EXAM!HATIOH AREA NUMBER IOEHTIFICATIOH ASME SEC.

XI CATGY EXAM ITEH NO METMCO PROCEDURE H I 0

S OHGI' RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIONBLOCK**

REF.

DUG. NO. 02-001-8 000500 MSH-02 B-H.Z VT-3 SL.410-003.23 C

C - - -

3-8-89 VT; COMPLETE,CE I.D. ¹ SC-2.

MAT. SURVEIL. HOLDER 9 97o 813.10 RCB

    • N/A**

000510 MSH-03 B-H.2 VI'-3 SL-410-003-23 C

C - - -

3-8-89 VT; COMPLETE,CE I.DE ¹ SC-3.

NATL.SURVEIL. HOLDER 9 104o 813.10 RCB

%*H/A*4 0520 MSH-04 B-H.2 VT-3 SL.410.003-23 C

C - - -

3.8-89 VT; COMPLETE, CE I.D. ¹ SC-4, MAT. SURVEIL.

HOLDER 8 263o 813.10 NOTE:

NO CAPSULE IN HOLDER.

RCB

    • N/A~~

000530 MSH-05 B.N-2 VT-3 SL-410.003-23 C

C - - -

3-8.89 VT; COMPLETE,CE I.D. ¹ SC.S.

MAT. SURVEIL. HOLDER 9 277o 813'0 RCB

    • N/A**

000540 HSH-06 8-H-2 VT.3 SL-410.003-23 C

C - -.

3-8-89 VT; COMPLETE,CE I.D. ¹ SC-6.

MAT. SURVEIL.

HOLDER 9 284o 813 ~ 10 RCB

    • N/A**

REF.

DUG.

NO. 02-001-A 000550 101-141-A CORE STABILIZING LUG 9 Oo RCB B.N-2 VI'-3 813.10 SL-410-003.21 C

C - -

3-8-89 VT; COHPLETE,CE I.D. ¹ CS 1.SCRATCHES AND GRINDING MARKS NOTED.

    • N/A*~

560 101-141-8 CORE S'TABILIZIHG LUG 9 60o RCB B-N-2 813.10 VT-3 SL-410-003

-21 C

C - - -

3-8-89 VT; COMPLETE, CE I.D. ¹ CS-2.

    • N/A*"

DATE:

07/07/89 EVISION:

2 REACTOR PRESSURE VESSEL ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORI'UTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

8 ZOHE NUMBER: 001

SUMMARY

EXAMINATION AREA NUMBER IDEHTIFICATIOH ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE H

I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

  • ~CALIBRATIOH BLOCK**

REF.

DIJG.

HO. 02-001-A 000570 101-141-C 8-N-2 VT-3 SL-410-003-21 C

C 3 8 89 VT; COMPLETE, CE I.D. ¹ CS 3.

CORE STABILIZIHG LUG 9 120o 813 ~ 10 RCB

    • N/AP4 000580 101-141-0 8-H-2 VT-3 SL-410.003-21 C

C - -

3.8-89 VT; COMPLETE, CE I.D. ¹ CS.4, CORE STABILIZING LUG 9 180o 813.10 SCRATCHES NOTED.

RCB

  • AH/A%*

00590 101.141-E CORE STABILIZIHG LUG 9 240o RCB 8-H-2 B13.10 VT-3 SL-410-003-21 C

C - -

3-8-89 VT; COMPLETE, CE I.D. ¹ CS 5 ~ SCRATCH NOTED ~

    • H/Ak*

000600 101-141-F B-H-2 VT-3 SL-410-003-21 C

C - - -

3 8-89 VTI COMPLETEI CE I.D. ¹ CS 6.

CORE STABILIZING LUG 9 300o 813.10 RCB e*H/A~~

000610 103-151-A CORE STOP LUG 9 10 DEG.

RCB 8-H-2 VT-3 813.10 SL-410-003-19 C

C - - -

3-8-89 VT COMPLETE, CE I.D. ¹ CSL-1.

  • ON/A*%

000620 103-151-8 CORE STOP LUG Q 40 DEG.

RCB B-N-2 VT.3 SL-410.003-19 C

C - - -

3-8-89 VT; COMPLETE, CE I.D. ¹ CSL-2.

813.10

    • H/A**

000630 103.151.C CORE STOP LUG 9 85 DEG ~

RCB 8-H-2 VI'-3 813 ~ 10 SL-410.003-19 C

C - -

3-8.89 VT; COMPLETE, CE I.D. ¹ CSL-3, SCRATCHES NOTED.

    • H/A**

ATE:

07/07/89 VISION:

2 REACTOR PRESSURE VESSEL ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

9 ZONE NUMBER: 001

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY EXAM ITEM HO METHOD PROCEDURE H

I 0

S ONGT T

RSEM A

E I 0 E

REMARKS T

C G

M R

  • "CALIBRATIOHBLOCK**

REF.

DWG.

HO. 02 001 A

000640 103-151-0 CORE STOP LUG 9 135 DEG.

RCB B-N-2 VT-3 813.10 SL.410-003-19 C

C - -

3-8-89 VT; COMPLETEI CE I.D. ¹ CSL-4.

    • N/A**

000650 103-151-E CORE STOP LUG 8 160 DEG.

RCB B-N-2 VT.3 813.10 SL-410-003-19 C

C. - -

3-8.89 VT; COMPLETE, CE I.D. ¹ CSL.S.

    • N/A**

0660 103-151-F CORE STOP LUG 9 205 OEG.

RCB B-H-2 VT-3 B13.10 SL.410-003-19 C

C..

3-8.89 VT; COMPLETE,CE I.O. ¹ CSL.6.

14H/A%%

000670 103-151.G CORE STOP LUG 9 250 DEG.

RCB 8-H-2 VT-3 813.10 SL-410.003-19 C

C - - -

3-8-89 VT; COMPLETE,CE I.D. ¹ CSL-7.

    • H/A**

000680 103-151-N CORE STOP LUG 9 280 DEG ~

RCB 8-N-2 VT-3 813.10 SL-410-003-19 C

C - - -

3-8 89 VT; COMPLETE, CE I.D. ¹ CSL 8.

  • 1H/AIO 000690 103-151-1 CORE STOP LUG 9 305 DEGAS RCB B.H-2 VT-3 813.10 SL-410-003-19 C

C - - -

3-8.89 VT; COMPLETE, CE I.D. ¹ CSL.9.

    • N/A**

00700 FB-01 FLOH BAFFLE RCB B-N-2 VT-3 B13.10 SL-410 003 20 C

C 3 8-89 VT; COMPLETE,CE I ~ 0 ~

FSB-1.SCRATCHES NOTED.

    • N/A*+

DATE:

07/07/89 EVISION:

2 REACTOR PRESSURE VESSEL ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

10 ZONE HUMBER: 001

SUMMARY

EXAMINATION AREA NUMBER IDEHTIFICATIOH ASME SEC ~ XI CATGY EXAM ITEM NO METHOD PROCEDURE N

I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIOHBLOCK*>>

REF.

DWG. NO. 02-001-A 000710 CSB-01 CORE SUPPORT BARREL RCB B.N-3 VT-3 813.30 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 SLY 410-003.006 SL.410.003-007 SL.410 '03.008 SL-410.003-009 SL-410-003-010 SL-410-003-016 SL-410-003-017 C

C - - -

3-5-89 VTI COMPLETE.

C-C-

C-C

>>*N/A**

C-C-

000711 CSA CORE BARREL SHROUD RCB 8-H-3 VT-3 813.30 VT-3 SL-410.003-014 C

C 3.8.89 VT; COMPLETE,CHR ¹ 89.2-067, TWO SL.410.003-015 C

INDICATIONS IDENTIFIED, NCR 2-217 EVALUATED AS ACCEPTABLE, POSE NO OPERABILITY CONCERN.TME IHDICATIONS ARE NOT OF THE TYPE WHICH WILL PROPAGATE.

    • N/A*>>

000712 CBAK.1 TMRU CBAK-4 8 AH-3 VT-3 CORE BARREL ALIGNMENT KEYS (4) 813.30 RCB SL-410 003 005 C

C -

3 4 89 VT; COMPLETE, MINOR SCRATCH IDENTIFIED OH O.D.

SURFACE RIGHT OF 0 DEGREE/CBAK-1.

    • H/A*>>

000713 CBGL-1 THRU CBGL-4 8-H-3 VT-3 CORE BARREL GUIDE LUGS (4) 813.30 RCB SL.410-003-013 C

C - - -

3-8-89 VT; COMPLETE

~

    • N/A**

000714 SB-1 THRU SB-6 B-N-3 VT-3 CORE BARREL,SNUBBER BLOCKS (6) B13.30 RCB SL-410.003-018 C

C - - -

3-8-89 VT; COMPLETE

>>>>H/A**

000720 UGS-01 UPPER GUIDE STRUCTURE B.H-3 VT-3 813.30 VT-3 VT-3 VT-3 SL.410-003-001 C

C - - -

3-3-89 VT; COMPLETE SL.410.003.002 C

SL-410-003-003 C - --

SL-410.003-004 C-

    • N/A*>>

DATE:

07/07/89 VIS IOH:

2 REACTOR PRESSURE VESSEL ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOHD PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

11 ZONE NUMBER: 001

SUMMARY

EXAMINATION AREA NUMBER IDENT I F ICATIOH ASME SEC. XI CATGY EXAM ITEM HO METHOD PROCEDURE N I 0

S OHGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

>>*CALIBRATION BLOCK>>*

REF.

DiJG.

NO. 02-001-C 000730 AK-01 ALIGNMENT KEY 9 Oo RCB 8-H-1 VT-3 813.10 SL-410-003-012 C

C - - -

3-6 89 VT; COMPLETE, CE I.D. ¹ Kil-1.

<<*H/A*>>

000740 AK-0?

ALIGNMEHl'EY 9 90o RCB 8-N-1 B13.10 VT-3 SL-410.003.012 C

C - - -

3 6 89 VT; COMPLETE,CE I.O. ¹ KW 2.

  • <<H/A**

00750 AK-03 ALIGHMEHT KEY 9 180o RCB 8-H-1 VT.3 SL 410-003-012 C

C 3-6 89 VT; COMPLETE,CE I.D. ¹ Kil 3.

813.10

<<*N/A>>>>

000760 AK-04 ALIGNMENT KEY 9 270o RCB B-H-1 VT-3 SL-410-003-012 C

C - - -

3-6-89 VT; COMPLETE, CE I.D. ¹ KM-4.

813.10

"*H/A**

REF.

DWG.

NO. 02-001-8 000770 OH-IE-A B N-1 IHTEGRAL EXT.

MAT SURF.,HOZZLE 813.10 9 0 DEBS RCB VT-3 SL-410-003-022 C

C - - -

3-8-89; VT-3 COMPLETE SL.410-003

<<<<N/A>>>>

000780 ON-IE-B 8-N 1

INTEG. EXT MAT. SURF.,NOZZLE 9 B13 ~ 10 180 DEG.

VT-3 SL.410.003-011 C

C - - -

3-6-89 Vl'-3; COMPLETE SL-410-003

>><<H/A<<<<

DATE:

07/07/89 VIS IOH:

2 REACTOR PRESSURE VESSEL ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPOHENTS PAGE:

12 ZOHE NUMBER: 001

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE N

I 0

S OHGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

  • ~CALIBRATIOHBLOCK~*

REF.

DNG.

NO. 02-001-8 000785 RVMS REACTOR VESSEL FLANGE MATING SURFACE RCB B-N-1 VT-3 813.10 SL-410 ~ 003 ~ 11 QI.9-2 REV.12 SL-410.003 C

C 3.8-89 VT-3; COMPLETE, GOUGE 9 20 DEGREES, IDENTIFIED IN 1984, NO CHANGE.

ACCEPTABLE.

41H/Af1

DATE:

07/07/89 VISION:

2 PRESSURIZER ST.

LUCIE NUCLEAR PLAHT UNIT 2 INSERVICE INSPEC'TION

SUMMARY

REPORT OUTAGE 2 (1989),'ECOND

PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

13 ZONE NUMBER: 005

SUMMARY

EXAMINATION AREA NUMBER IDEHT IF I CATIOH ASME SEC. XI CATGY EXAM ITEM HO METHOD PROCEDURE N I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

  • ~CALIBRATIOH BLOCK~~

REF.

O'WG.

NO.02-005 001450 SVH-IR-A B.O UI'-30,70 NDE5.13 - 001 C

C - - -

2-24.89 UT; COMPLETE SFTY. VLVE. HOZZ., IH. RADIUS B3.120 RCB

    • UT.6*%

001480 RVH-IR B.D UT-30,70 HDE5.13 - 001 C

C - - -

2-24-89 UT; COMPLETED REL. VLVE. HOZZ.,

INN ~

RADIUS 83.120 RCB

  • kUT 6**

~

~

~

1500 SVN-IR-8 S.V. NOZZ.,

IHH. RADIUS RCB B.D UT-30,60 NDE5.13 - 001 C

C. - -

2-24.89 UT; COMPLETE B3.120 001530 SVH-IR-C S.V.

HOZZ.,

IHH. RADIUS RCB 8-D UT-30,70 NDE5.13 - 004 C

C - - -

2-24-89 UT; COMPLETE 83.120 i*UT 001540 503.671-C S.V.

HOZZ.-TO-FLANGE WELD RCB 8-F Ul'-45,60 NDE 5.11

- 001 C

C - - -

2-25-89 Ptg COMPLETE, THREE INDICATIOHS, 85.20 PT HDE 3.3

- 001 C - -

ACCEPTABLE. 3-3-89 UT; COMPLETE

    • Ut 17~~

001570 501-671 8-B UT-0,45,60 HDE 5.1

- 001 TOP HD.-TO.UP.

SHELL CIR.WLO.

82.11 RCB C

C - - -

3-3-89 Ut COMPLETE,SEE PRE SERVICE DATA FOR LIMITATIOHS.

    • UT4A*~

~

~

001580 101-622-A UPP.

SHELL LONG.

WELD AT Oo RCB 8-B UT-0,45(60 NDE 5.1

- 001 C

C - - -

3-3-89 UT; COMPLETE B2.12

~*UT4A~~

DATE:

07/07/89 VISION:

2 PRESSURIZER ST ~

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SUHHARY REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COHPONEHTS PAGE:

14 ZOHE NUMBER: 005 SUHHARY EXAHINATIOH AREA HUHBER IDEHTIFICATION ASHE SEC.

XI CATGY EXAH ITEN NO HETHOO PROCEDURE N

I 0

S ONGT T

RSEH A

E I 0 E REHARKS T

C G H R

    • CALIBRATIOHBLOCK**

REF.

DMG. NO.02-005 001590 101-622-B B-B UT-0,45,60 HDE 5.1 001 C

C - - -

3-3 89 UT; COHPLETE UPP.

SHELL LONG. MELD AT 180o 82.12 RCB

  • >>UT4A>>>>

001610 101-642-A 8

B UT.O(45,60 NDE 5.1

- 001 C

C - -

3 3-89 UTI COHPLETE LOM. SHELL LONG.

MELD AT 90o B2.12 RCB

    • UT4A**

1620 101-642.B B-B UT-0,45,60 NDE 5.1

- 001 C

C. - -

3.3 89 UT; COHPLETE LOM. SHELL LONG.

MELO AT 270o B2.12 RCB

    • UT4A*>>

001630 304-671 8-B UT-0 45,60 NDE 5.1 - 001 C

C - - -

3-3-89 UT; COHPLETE LOM. SHELL-TO-LOM. HEAD MELD B2.11 RCB

    • UT4A*>>

001640 103-651 8-H HT SUPPOR'I SKIRT-TO-LOM. HEAD MD. B8.20 RCB NDE 2.2 - 001 C

C - -

02-21-89 HT:

TMO LINEAR INDICATIOHS,BOTH

.15",ACCEPTABLE.

    • N/A**

DATE:

07/07/89 VISION:,2 REACTOR COOLAHT PIPING ST.

LUCIE NUCLEAR PLAHT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

15 ZOHE HUMBER: 009

SUMMARY

EXAMINATION AREA NUMBER IDEHTIFICATIOH ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE N

I 0

S ONGT T

RSEH A

E I 0 E REMARKS C

G M R

~*CALIBRATIOHBLOCK~*

LOOP A PUMP 2A2 TO REACTOR VESSEL REF.

DUG.

NO.02-009 002100 RC-115-701-771 SAFE EHD - TO - PIPE RCB 8-F UT-45,60 HDE 5.11

- 001 C

C - - -

2-21-89 PT; COMPLETE, 2-22.89 UT; 85.50 PT NDE 3.3

- 002 C

COMPLETE

    • UT 59**

002110 RC.115.103.722-LS-A PIPE LONGITUDINAL SEAM RCB 8-J UT.45,60 HDE 5.3

- 001 C

C

~ - -

2-21-89 MT: COMPLETE,2-22-89 UT 89.12 MT NDE 2.2

- 002 C - - -

COMPLETE

    • UT.6k%

02120 RC-115.103-722-LS 8

PIPE LONGITUDIHAL SEAM RCB 8-J UT.45,60 NDE 5.3 - 001 C

C - - -

2 21-89 MT;COMPLETE( 2.22 89 UT; 89.12 MT HDE 2.2 - 002 C.. -

COMPLETE

+FAUT 6**

002140 RC-115-105-742-LS-A ELBOH LONGITUDINAL SEAM RCB B-J

89. 12 Ul'-0,45 UT-50/70 700.8.002430 C

C - - -

2-23-89 UTT COMPLETE 8 CIRC WELD 700-8.002430 C - - -

RC 115 1, 0 DEGREE USED TO MONITOR SWI-NDT-700-8 BACOIALL ONLY.

    • UT-6(UT-5*>>

002150 RC-115-105-742-LS-8 ELBOH LONGITUDINAL SEAM RCB 8-J 89.12 UT-O(45 UT-50/70 700-8.002440 700-8-002440 SHRI HDT-700-8 C C-C 2.23-89 UT; COMPLETE, 9 CIRC.

MELD RGB 115.1.

0 DEGREE USED TO MOHITOR BACKWALL ONLY.

<<~UT-6,UT 5~*

DATE:

07/07/89 VISION:

2 REACTOR COOLANT PIPING ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SUMHARY REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

CCHPONENTS PAGE:

16 ZONE NUHBER: 011

SUMMARY

EXAHINATION AREA NUHBER IDENTIFICATION ASHE SEC. XI CATGY EXAH ITEM NO HETNOO PROCEDURE N I 0

S ONGT T

RSEN A

E I 0 E

REHARKS T

C G H R

    • CALIBRATIONBLOCK~*

LOOP B PUMP 281 TO REACTOR VESSEL REF.

O'MG.

NO.02-011 002420 RC-121-801-771 PIPE -

TO - ELBOJ RCB B.J UT-45,60 NDE 5;3. 002 C

C - - -

2 21-89 HT; COMPLETE, 3-3-89 UT; 89.11 MT NDE 2.2 - 003 C - - -

COHPLETE

    • UT 6**

002430 RC-121-105-742-LS-A ELBSl LONGITUDINAL SEAM RCB 8-J UT-45,60 NDE 5.3 - 002 C

C. - -

2-21-89 HT; COHPLETE, 3-3-89 UT; 89'2 HT NDE 2.2. 003 C - - -

COHPLETE 9 CIRC. VELD RC-121-801-771.

    • UT.6**

02440 RC-121-105-742-LS-B ELBSJ LONGITUDINAL SEAH RCB 8-J UT-45,60 NDE 5.3 - 002 C

C - - -

2-21-89 HT; COMPLETE, 3-3-89 UT; 89.12 HT NDE 2.2 - 003 C - - -

COHPLETE

    • UT 6**

002470 RC-121-812-771 BRAN. CONN.

SPRAY NOZZLE RCB B-J HT e9.32 NDE 2.2 - 004 C

C..

2.21.89 HT; COHPLEIE

%AN/A1*

002480 RC-121-806-771 8-J 'T BRAN. CONN.

CHARGING NOZZLE 89.32 RCB NDE 2.2. 005 C

C 2-21-89 H1';

COHPLETE

    • N/A*"

DATE:

07/07/89 EVI SION:

2 PRESSURIZER SURGE LINE ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONEHTS PAGE:

17 ZONE NUMBER: 016

SUMMARY

EXAMIHATIOH AREA NUMBER IDEHTIFICATIOH ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE N

I 0

S OHGT T

RS EH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIOHBLOCK*~

REF.

DUG.

HO.02-016 003085 H1B F-C VT-3,4 HDE 4.3. 038 C

VARIABLE SPRING CAH HANGER F-1,4 Vl'-4 RCB C

2-21-89 VT-3(4; COMPLETE, CHR ¹ 89-2-054, EVALUATION OF SPRIOISPOSITIOHEDCR ~2-204,JPE EVALUATED ACCEPTABLE AS FOUND.

<<"H/A~*

003095 H28 F-C VT-3,4 NDE 4.3. 036 C

VARIABLE SPRING CAN MANGER F-1,4 VT-4 RCB C

2.13-89 VT-3,4; COMPLETE, CNR ¹ 89.02.42,EVALUATION OF SPRING SETTINGS.NCR ¹2-199 DISPOSITIOHED ACCEPTABLE AS FOUHD.

    • H/A**

3125 H38 VARIABLE SPRING CAN HAHGER RCB F-C VT-3,4 HDE 4.3. 037 C

F-1,4 VT-4 C

2-11-89 VT-3,4; COMPLETE,CHR ¹ 89.02-43 EVALUATION OF SPRING CAH SETTINGS.

NCR ¹ 2.200 OISPOSITIOHEDACCEPl'ABLE AS FOUND.

    • H/A~*

DATE:

07/07/89 VISION:

2 0

REACTOR COOLANT PUMP 2A1 ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPOHEHTS PAGE:

18 ZONE NUMBER: 017

SUMMARY

EXAMINA1'IOH AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY EXAM ITEM NO METHOD PROCEDURE N I 0

S ONGT T

RSEM A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIOHBLOCK**

REF.

DWG.

HO.02-017 003240 02-017.008 FLYWHEEL BORE AND KEYWAY RCB H/A UT-25L HDE 5.15 - 001 C

C 2-4 89 UT; COMPLETE, REG.

GUIDE 1.14 H/A EXAM.

    • N/A**

DATE:

07/07/89 VISION:

2 REACTOR COOLANT PUMP 2A2 ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

19 ZONE HUNGER: 018

SUMMARY

EXAMINATIONAREA HUMBER IDENTIFICATION ASME SEC.

XI CATGY EXAM ITEM NO METHOD PROCFDURE H

I 0

S OHGT T

RSEM A

E I 0 E

REMARKS T

C G M R

  • ~CALIBRATIOH BLOCK**

REF.

DWG.

NO.02-018 003341 02.018.RPH-6 PUMP SUPPORT - SPRING TYPE RCB F-C VT-3/4 4.3

- 001 F-1,4 VT.3/4 4.3. 065 C

C 2-27-89 VT; CHR ¹ 89-2-059, EVALUATE C - - -

SPRING CAH SETTING.JPE EVALUATED ACCEPTABLE AS IS.

4-15-89 VTI HO'I FUNCTIONAL ~

SETT IHGS ONLY SAT ~

    • H/A**

003380 02-018.008 FLYWHEEL BORE AND KEYWAY RCB N/A UT-25L NDE 5.15 - 002 C

C - - -

2-4-89 UT; COMPLETE(

REG.

GUIDE 1.14 H/A EXAM.

++N/A+*

DATE:

07/07/89 VISION:

2 REACTOR COOLANT PUMP 281 ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE IHSPECI'ION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

20 ZONE HUMBER: 019

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE H I 0

S ON 0T RSEH A

E I 0 E REMARKS T

C G

M R

  • >>CALIBRATIOH BLOCK**

REF.

DUG. NO.02-019 003450 02-019-001 UPPER SCROLL MELO RCB 8 L-1 RT 812.10 PT HDE -

12 REV.7 C

C - - -

3-4-89 RT; COMPLETE, 97K REOUIRED COVERAGE ACHIEVED OVERALL,TORUS

'WELD INCLUDED.

    • N/A**

003460 02.019.002 LONER SCROLL WELD RCB B-L-1 RT B12.10 PT NDE -

12 REV.7 C

C - - -

3-4-89 RTI COMPLETEI 97K OF REOUIRED VOLUME ACHIEVED.

    • H/A**

3470 02-019-003 8-L-2 VT-3 PUMP CASING INTERNAL SURFACE 812.20 RCB ISI-354,REV. 3 C

C 3-2-89 VT-3 COMPLETE

    • N/A>>>>

003482 02-019.RPH-10 PUMP SUPPORI'PRIHG TYPE RCB F-C F-1.4 VT-3/4 VT-3/4 NDE 4.3 - 046 C

C 2-28 89 VT; CHR ¹ 89.02-060, EVALUATE HDE 4.3 - 067 C - - -

SPRING SETTINGS.JPE EVALUATED AS ACCEPTABLE.

4-15-89 VT; HOT FUNCTIONAL, CHECKED SETTINGS SAT.

    • H/A>>*

003492 02-019-RPH-11 PUMP SUPPORT - SPRING TYPE RCB F

C F-1.4 VT-3/4 VT-3/4 NDE 4.3

- 043 NDE 4.3 - 069 C

C 2-28-89 VT; CHR ¹ 89.02-061, EVALUATE C - - -

SPRING SETTING.

JPE EVALUATED ACCEPT AS IS.

4-15-89 VT; HOT FUNCTIONAL, CHECKED SETTING, SAT.

>>>>N/A>>>>

003502 02-019-RPH-12 PUMP SUPPORT SPRING TYPE RCB F-C F-1-4 VT-3/4 VT-3/4 HDE 4.3 - 044 NOE 4.3 - 066 C

C 2-28-89 VT; CHR ¹ 89-02-044I EVALUATE C

SPRIHG SETTINGS.

JPE EVALUATED ACCEPT AS IS.

4-15-89 VTI HOT FUHCTIONAL, CHECKED SPRIHG SETTINGS, SAT.

  • >>N/A>>>>

DATE:

07/07/89 VI SIGH:

2 REACTOR COOLAHT PUMP 2B1 ST.

LUCIE NUCLEAR PLAH'I UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

21 ZONE HUNGER: 019

SUMMARY

EXAMIHATION AREA NUMBER IDEHTIFICATIOH ASME SEC. XI CAT0Y EXAM ITEM NO METHOD PROCEDURE H I 0

S OHGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

  • ~CALIBRATIOHBLOCK**

REF.

DUG. NO.02-019 003512 02-019.RPH-9 PUMP SUPPORT - SPRING TYPE RCB F-C F-1-4 VT-3/4 VT-3/4 NDE 4.3

- 047 NDE 4.3 - 068 C

C 2-28-89 VT; CNR ¹ 89.02.063, EVALUAI'E C -

SPRING SETTINGS.

JPE EVALUATED ACCEPTABLE AS IS.

4-15.89 VT; HOT FUNCTIONAL, CHECKED SPRING SET'TING,SAT ~

    • N/A%1 003520 02.019.008 FLYHHEEL BORE AHD KEYLIAY RCB H/A UT-25L NDE 5.15. 003 C

C -

2-4 89 UTI COMPLETE, REG.

GUIDE 1.14 H/A EXAM.

4*N/A**

3540 02-019.S-001 THRU 016 B.G-1 REACTOR COOL.

PUMP STUDS (16)

B6.190 RCB UT.60 'DE 5.7

- 001 VT-1 NDE 4.1

- 001 C

C -. -

3.4-89 Vl',UT; COMPLETE C-

  • ~LATR**

003570 02-019-H-001 TO 016 B-G-1 VT-1 REACTOR COOL ~

PUMP HUTS (16)

B6.170 RCB HDE 4. 1 - 002 C

C. - -

3-4.89 VT; COMPLETE

"*H/A**

003580 2B1-LIG-01-16 B-G-1 VT-1 STUD HOLE THREADS Bt LIGAMEHT 86.170 RCB NDE 4. 1 - 003 C

C - - -

3-4.89 VT; COMPLETE

  • ON/A**

DATE:

07/07/89 VISION:

2 REACTOR COOLANT PUMP 2B2 ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE IHSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST IN'IERVAL CLASS 1

COMPONEN'TS PAGE:

22 ZONE HUMBER: 020

SUMMARY

EXAMINATIOHAREA NUMBER IDENTIFICATION ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE H I 0

S OHGT T

RSEH A

E I 0 E

REMARKS T'

G M R

  • ~CALIBRATIOH BLOCK**

REF.

DWG.

HO.02-020 003660 02-020.008 FLYMNEEL BORE AHD KEYNAY RCB H/A UT-25L HDE 5.15. 004 C

C - - -

2-3-89 UT; COMPLETE, REG.GUIDE 1.14 N/A EXAM.

4*H/At*

DATE:

07/07/89 VISION:

2 LOOP 2A2 SAFETY INJECTION PIPING ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 <1989),

SECOND PERIOD, FIRST INTERVAL CLASS

'I COMPOHEHTS PAGE:

23 ZONE NUMBER: 022

SUMMARY

EXAMINATION AREA NUMBER IDENT IF ICATION ASME SEC. XI CATGY EXAM ITEM NO METHCO PROCEDURE H I 0

S OHGT T

RSEH A

E I" 0 E

REMARKS T

C G

M R

    • CALIBRATIONBLOCK~~

INSIDE COHTAIHMENT REF.

DQG.

NO. 02 022 004150 S I -149-FII-4 VALVE (V-3217) -

TO - PIPE RCB 8-J 89.11 UT-45,60 NDE 5.4 - 001 C

C -

3-8-89 PT,UT;

COMPLETE, ROOT GEOME'IRY PT HDE 3.3 - 004 C - - -

DETECTED HITH 60 DEGREE SCAH.

saUT35e*

DATE:

07/07/89 VISION:

2 0

LOOP 281 SAFETY INJECTION PIPING ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION SUHMARY REPORI'UTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COHPONENTS PAGE:

24 ZONE HUHBER: 023 SUMHARY EXAHIHATIOH AREA HUHBER IDENTIFICATIOH ASHE SEC.

XI CATGY EXAM ITEH NO HETHOO PROCEDURE N I 0

S ONGT RSEH A

E I 0 E REMARKS T

C G

M R

    • CALIBRATIOHBLOCK**

IHSIOE CONTAINMENT REF.

OHG.

HO.02-023 004510 V-3237 VALVE INTERNAL SURFACES RCB 8-H-2 VT-3 812.40 VT.3 NDE 4.3 - 049 C

C 3-6-89 VT; COHPLETE, LIGHT PITI'ING NOTED NDE 4.3. 050 C - - -

ON SEAL FACE OF DISC AND VALVE BODY.

BORIC ACID RESIDUE BORIC ACID CLEANED OFF AREA RE-EXAHIHED,NRI.

    • H/A**

004520 V-3237 BOLTING RCB 8-G-2 VT-1 HDE 4.1

- 013 C

C. - -

3-9-89 VT-1; COHPLETE 87.70

    • M/A**

780 SI-4204-153 MELDED SUPPORT LUGS (8)

RCB B-K.1 PT 810. 10 NDE 3.3 - 005 C

C - - -

2-23-89 PT; COHPLETE

<<<<H/A**

DATE:

07/07/89 VISION:

2 LOOP 281 SPRAY LINE ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INI'ERVAL CLASS 1

COMPONENTS PAGE:

25 ZONE NUMBER! 026

SUMMARY

EXAMIHATION AREA NUMBER IOEHTIFICATIGH ASME SEC.

XI CATGY EXAM ITEH NO METHOD PROCEDURE N

I 0

S ONGT T

RSEH A

E I 0 E REHARKS T

C G

M R

    • CALIBRATIONBLOCK**

REF.

DWG. NO.02-026 005570 RC-906-771 SAFE ENO -

TO - PIPE NOZZLE RCB 8-F PT 85.51 NDE 3.3. 012 C

C - - -

2-23-89 PT; COMPLEI'E

  • "N/A**

005590 RC-109A-SW-1 ELBOW -

TO - PIPE RCB 8-J PT 89.21 NDE 3.3 - 011 C

C - - -

2-18-89 PT; COMPLETE

    • N/A**

5600 RC.109A.SW-2 PIPE -

TO -

ELBOW RCB B-J PT 89.21 NDE 3.3 - 010 C

C - - -

2-18-89 PT; COMPLETE 005660 RC-109C-SW-2 ELBOW TO PIPE RCB 8-J PT 89.21 NDE 3.3 - 009 C

C - - -

3-07.89 PT; COMPLETE

  • AN/A**

005670 RC-109-FW.903 PIPE -

TO -

ELBOW RCB 8-J PT 89.21 NDE 3.3 - 008 C

C. - -

2-18.89 PT; COMPLETE

    • N/A*"

005760 RC-109-FW.908 VALVE -

TO - PIPE RCB 8-J PT 89.21 NDE 3.3 - 007 C

C - - -

3-3-89 PT; COMPLETE

    • N/A**

005770 RC-109-FW-909 PIPE-TO-VALVE (PCV 1100 F)

RCB

~

8-J PT B9.21 NDE 3.3 - 006 C

C - - -

3-3-89 PT; COMPLETE 4*N/A**

DATE:

07/07/89 VISION:

2 PIPE SUPPORTS. LOOP 281 SPRAY LIHE ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

26 ZONE NUMBER: 026

SUMMARY

EXAMINATIONAREA NUMBER IDENTIFICATION ASME SEC. XI CATGY EXAM ITEM NO METHOD PROCEDURE H

I 0

S ONGT T

RSEM A

E I 0 E

REMARKS T

C G M R

    • CALIBRATIOHBLOCK**

REF.

DUG.

NO.02-026 005940 SPS-407 RIGID STRUT SUPPORT RCB F-C VT.3 F-123 NDE 4.3 - 003 C

C - -

~

2-27.89 VT-3; COMPLETE N/A*

006010 SPS-524 RIGID STRUT SUPPORT RCB F-C F-123 VT-3 HDE 4.3

- 004 C

C - - -

2-27.89 VT-3; COMPLETE F

    • H/A*"

06020 SPA-550 VALVE ANCHOR RCB F-8 F-2,3 VT.3'DE 4.3 - 005 C

C - - -

2-28-89 VT-3; COMPLETE

    • N/At*

DATE:

07/07/89 VISIOH:

2 LOOP 2B2 SPRAY LINE ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

27 ZONE HUMBER: 027

SUMMARY

EXAMINATIOH AREA NUMBER IDEHTIFICATIOH ASME SEC ~ XI CATGY EXAM ITEM HO METHOD PROCEDURE N

I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIONBLOCK~~

REF.

DWG. NO.02-027 006150 RC-141C-SW-1 ELBOW -

TO. PIPE RCB 8-J PT 89.21 HDE 3.3 - 018 C

C - - -

3-3-89 PT; COMPLETE

  • +N/A*a 006160 RC-141-FW-904 PIPE -

TO -

ELBOW RCB 8-J PT 89.21 NDE 3.3. 017 C

C. - -

3-3-89 PT; COMPLETE

    • H/A~>>

6170 RC-141-FW-905 VALVE -

TO - PIPE RCB 8-J PT 8'1 NDE 3.3 - 016 C

C - -.

3-3.89 PT; COMPLE'IE

    • H/A**

006180 RC-141-FW-906 8-J PT PIPE -

TO - VALVE (V-1441) 89.21 RCB RCB HDE 3.3. 015 C

C -.

3-3.89 PT; COMPLETE H/A

  • 006240 RC-141-FW.909 VALVE -

TO. PIPE RCB 8-J PT 89.21 HDE 3.3 - 014 C

C -. -

2-28.89 PT; COMPLETE

<<~N/A**

DATE:

07/07/89 PIPE SUPPORTS-LOOP 282 SPRAY LINE ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

28 ZONE NUMBER: 027

SUMMARY

EXAMINATION AREA NUMBER IDENTI F ICATION ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE N

I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIONBLOCK**

REF.

DUG.

HO.02-027 006490 SPS-127 RIGID FRAME SUPPORT RCB F-8 VT-3 NDE 4.3 - 006 C

C - - -

2-27-89 VT-3; COMPLETE F-123

>>>>N/A>>*

006500 SPS-128 RIGID STRUT SUPPORT RCB F.C VT.3 F-123 NDE 4.3. 007 C

C..

2-27.89 VT-3; COMPLETE

    • H/A>>>>

006520 SPA-180 SPRAY VALVE ANCHOR RCB F-B VT-3 HDE 4.3 - 008 C

C - - -

2-23-89 VT-3; COMPLETE F-2,3

>>>>N/A>>>>

006530 SPS-237 RIGID STRUT SUPPORT RCB F-C F-123 VT-3 VT-3 HDE 4.3 - 009 C

C 2-23 89 VT-3; CNR¹ 89.2 058(

LOOSE JAM HDE 4.3 - 057 C

HUT,MISALIGNED STRUT.NCR-2-207,SEE JPE D ISPOS I 7 ION, RE-EXAMIHED 3-16 89,SATISFACTORY.

    • H/A**

DATE:

07/07/89 VISION:

2 ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST'NTERVAL CLASS 1

COMPOHENTS PAGE:

29 SHUTDOWN COOLING 8 MOT LEG !NJECTION PIPING ZONE NUMBER: 028

SUMMARY

EXAMINATION AREA NUMBER IDEHTIFICATIOH ASME SEC. XI CATGY EXAM ITEM NO METHCO PROCEDURE N

I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

<<~CALIBRATION BLOCK*~

LOOP B

REF.

DWG.

NO. 02-028-A 007100 SI-4205-456B B-K-1 PT WELDED ATTACHMENT LUGS (8) 810.10 RCB NDE 3.3 019 C

C - -

3-3-89 PT; COMPLETE, LIMITED EXAM DUE TO CLAMP & PADS ON LUGS 1 8 2.

ROUNDED IHDICATIOHS,ACCEPTABLE

~*H/A~~

DATE:

07/07/89 VISION:

2 CHARGING LINE TO LOOP 2B1 ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONEN'TS PAGE:

30 ZONE HUMBER: 031

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASHE SEC.

XI CATGY EXAM ITEH HO METHOD PROCEDURE N

I 0

S ONGI' RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIOHBLOCK>>>>

REF.

DWG. NO. 02.031 008710 CH-148-FM-12 PIPE -

TO - ELBN RCB 8-J PT 89.40 NDE 3.3 - 020 C

C. -

2-16-89 PTI COMPLETE ROUND INDICATIOH,.35"ClJ 0(NNSTREAM 0 COUPLIHG FUSIOH LINE < F 05" DIA. ACCEPTABLE

  • <<H/A*>>

008720 CH-148-SW.13 ELBOM -

TO - PIPE RCB 8-J PT 89.40 NDE 3.3

- 021 C

C -

2-18-89 PT; COMPLETE

    • N/A**

08750 CH-148-SN.16 PIPE -

TO -

TEE RCB 8-J PT 89.40 NDE 3.3 - 022 C

C - - -

3.7-89 PT; COMPLETE

    • H/A**

008760 CH-148-SH-17 TEE -

TO -

REDUCER RCB 8-J PT 89.40 NDE 3.3

- 023 C

C -.

2.18.89 PT; COMPLETE

>><<H/A<<>>

008820 RC-150-SM-2 PIPE -

TO -

ELBOW RCB 8-J PT 89.40 HDE 3.3 - 024 C

C.- - -

2-18.89 PT; COMPLETE

<<*H/A>>*

008830 RC-150-S'M.3 ELBCM -

TO - PIPE RCB 8-J PT 89.40 NDE 3.3 - 025 C

C 2-18.89 PT; COMPLETE

<<*N/A<<*

008850 CH-904-771 CHARGING NOZZLE-TO SAFE EHD RCB 8-F PT 85.50 NDE 3.3

- 026 C

C - - -

2-23-89 PT; COMPLETE

<<H/A*>>

DATE:

07/07/89 EVISION:

2 T

PIPE SUPPORTS ~ CHARGIHG LINE TO LOOP 281 ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE IHSPECTIOH

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

31 ZONE NUMBER: 031

SUMMARY

EXAMINATION AREA NUMBER IDENTI FI CATION ASHE SEC. Xl CATGY EXAM ITEM HO METHOD PROCEDURE H

I 0

S OHGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIOHBLOCK*>>

REF.

DUG.

NO.02-031 008880 CH-108-R3 RIGID FRAME SUPPORT RCB F-8 VT 3 F-2,3 HDE 4.3 - 010 C

C - - -

2-27-89 VT-3; COMPLETE

    • H/A*>>

DATE:

07/07/89 VISION:

2 CHARGING LINE TO LOOP 2A2 ST.

LUCIE NUCLEAR PLAHT UHIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

32 ZOHE NUMBER: 032

SUMMARY

EXAMINATION AREA NUMBER IDEHTIFICATIOH ASME SEC. XI CATGY EXAM ITEM NO METHOD PROCEDURE H I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

  • >>CALIBRATIOH BLOCK*>>

REF. O'.

NO. 02-032-A 009340 CH-147.FH.9 PIPE TO -

TEE RCB 8-J PT 89.40 HDE 3.3. 027 C

C - - -

3-8-89 PT; COMPLETE

>>*H/A>>>>

009390 CH-147-SW.5 PIPE TO - COUPLING RCB 8-J PT 89.40 HDE 3.3 - 028 C

C - - -

2-18.89 PT; COHPLETE

    • H/A**

009400 CH-147. FII.4 COUPLIHG -

TO - PIPE RCB 8-J PT 89.40 NDE 3.3. 029 C

C - - -

2-18-89 PT; COMPLETE

  • >>N/A**

009440 RC-148.SH.2 VALVE -

TO - PIPE RCB 8-J P1'9.21 NDE 3.3 - 030 C

C - - -

2-18 89 PT; COMPLETE

    • H/A>>*

009460 CH-704-771 CHARGING NOZZLE-TO SAFE END RCB 8-F PT 85.50 NDE 3.3.

031 C

C - - -

3-03-89 PT; COMPLETE

    • H/A>>'>>

DATE:

07/07/89 EVISION:

2 PIPE SUPPORTS. CHARGING LINE TO LOOP 2A2 ST.

LUCIE HUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND

PERIOD, FIRST INTERVAL CLASS 1

COMPONENTS PAGE:

33 ZONE HUMBER: 032

SUMMARY

EXAMINATION AREA

'UMBER IDEHT IF ICATION ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE N

I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G M R

    • CALIBRATIOHBLOCK**

REF.

DUG.

NO. 02-032-A 009740 CH-103-R5A RIGID U-STRAP SUPPORT RCB F-C VT.3 NDE 4.3 - 011 C

C - - -

2-28.89 VT.3; COMPLETE F-2,3

    • N/A**

009750 CN-103 ~ RSB RIGID STRUT SUPPORT RCB F-C VT-3 F-123 NDE 4.3 012 C

C -

2 27 89 PTI COMPLETE f1H/A14

DATE:

07/07/89 VISION:

2 0

LOOP 281 PRIHARY DRAIN ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SUHMARY REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 1

COHPONENTS PAGE:

34 ZONE NUMBER: 035

SUMMARY

EXAHINATION AREA NUHBER IDENTIFICATION ASME SEC.

XI CATGY EXAH ITEM NO HETHOO PROCEDURE N I 0

S ONGT T

RSEM A

E I 0 E

REHARKS T

C G H R

    • CALIBRATIONBLOCK*~

REF.

DWG.

NO.02-035 010000 RC-122-FW.2 PIPE -

TO -

TEE RCB 8-J PT 89.40 NDE 3.3. 032 C

C - - -

2-23-89 PT; COHPLETE

    • N/A**

010010 RC-122-S'N.3 TEE -

TO - PIPE RCB 8-J PT 89.40 NDE 3.3 - 033 C

C 2 23-89 PT; COHPLETE

~*N/A~*

10020 RC-122-SLI.4 PIPE -

TO - VALVE (V-1450>

RCB 8-J PT 89.40 NDE 3.3

- 034 C

C -..

2 23-89 PT; COHPLETE

    • N/A*0

DATE:

07/07/89 EVISION:

2 LETDOWN LINE ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRS'I INTERVAL CLASS 1

COMPOHENTS PAGE:

35 ZONE NUMBER: 037

SUMMARY

'EXAMINATIONAREA HUMBER IDENTIFICATION ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE N

I 0

S OHGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

<<<<CALIBRATIOH BLOCK**

REF.

DUG.

HO.02-037 010220 RC.I42.SN.B PIPE

~

TO - CQUPLIHG RCB 8-J PT 89.40 HDE 3.3 - 035 C

C - - -

2.18-89 PT; COMPLETE

<<<<H/A<<<<

010230 RC.142-FII.9 COUPLING TO - PIPE RCB 8-J PT 89.40 NDE 3.3. 036 C

C. -.

2-'18.89 PT; COMPLETE

<<*H/A<<*

010240 RC-142-SH.10 PIPE -

TO - COUPLING RCB B.J PT B9.40 NDE 3.3. 037 C

C - -.

2.18.89 PT; COMPLETE N/A 010250 RC.142.FW.11 COUPLIHG -

TO - PIPE RCB BJ PT 89.40 NDE 3.3 - 038 C

C 2 18 89 PT; COMPLETE

    • H/A**

DATE:

07/07/89 VISION:

2 STEAM GENERATOR 2A ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONEHTS PAGE:

36 ZONE NUMBER: 041

SUMMARY

EXAMINATION AREA HUMBER IDENTIFICATION ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE N

I 0

S ONGT T

RSEH A

E I 0 E REMARKS T

C G M R

<<*CALIBRATIOH BLOCK**

SECONDARY SIDE REF.

DUG.

NO. 02.041 011120 SG-2A-102.221 INTER. SHELL-TO-CONE 'HELD RCB C-A UT.O(45,60 NDE 5.1

. 007 C

C.

3.6-89 Ul'; COMPLETE, 0 DEGREE SCAN C1.10 DETECTED I.D. GEOMETRY.

II t1UT25ae 011190 SG.2A-111-221-IR C.B UT. 45 NDE 5.13 - 005 C

C - - -

3-13-89 UT; COMPLETE FEEDMATER HOZZ INH. RAD. SEC.

C2.22 RCB

    • UT 254%

011220 SG-2A-103-221-8 KEY BRACKET AT 180o RCB C-C PT C3.10 NDE 3.3 - 068 C

C. -.

3-13-89 PT; COMPLETE

    • N/A*4 011240 SG-2A-105.221-A SUPPORT BRACKET AT 90o RCB C-C MT C3.10 NDE 2.2

- 007 C

C - - -

3.9-89 MT; COMPLETE

    • H/Ae*

011250 SG-2A-104-221.B CLEVIS BRACKET AT 135o RCB C-C MT C3.10 NDE 2.2 - 007 C

C -. -

3.9-89 Ml'; COMPLETE

    • H/A**

DATE:

07/07/89 EVI SION:

2 LPSI PUMP 2A DISCHARGE PIPING ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONENTS PAGE:

37 ZONE HUMBER: 043 SUMMART EXAMINATIONAREA NUMBER IDENT IF ICATION ASME SEC. Xl CATGY EXAM ITEM NO METHOD PROCEDURE H

I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

  • ~CALIBRATIONBLOCK*>>

OUTSIDE CONTAINMENT REF.

OWG.

HO. 02-043-B 011780 S I -410-I-SW-3 TEE -

TO - PIPE C-F PT C5.11 HDE 3.3. 039 C

C - - -

2-28-89 PT; COMPLETE

    • N/A**

OUTSIDE CONTAIHMEHT REF.

DWG.

HO. 02-043-C 012410 SI -129. FW-901 ELBOW -

TO - PIPE C-F C5.21 UT-45,60 PT HDE 5.4 - 002 C

C -

3.09-89 PT; COMPLETE, 3-10-89 UT; HDE 3.3 - 042 C - - -

COMPLETE, 45 8 60 DEGREE SCANS OETECTEO I.O.

GEOMETRY (ROOT)

    • UT38+*

DATE:

07/07/89 VISION:

2 ST.

LUCIE NUCLEAR PLANT UHIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONEHTS PAGE:

38 PIPE SUPPORTS-LPSI PUMP 2A DISCHARGE PIPING ZONE NUMBER: 043

SUMMARY

EXAMINATION AREA HUMBER IDENTI FI CATION ASME SEC.

XI CATGY EXAM ITEM NO METHOD PROCEDURE N

I 0

SOHGT

'T RSEM A

E I 0 E

REMARKS T

C G

M R

  • "CALIBRATIOHBLOCK**

OUTSIDE COHTAIHMEHT REF.

D'MG. HO. 02-043-C 013360 S I.2408-38 RIGID FRAME SUPPORT F.B VT-3 F-123 NDE 4.3 - 013 C

C. -.

2-27-89 VT-3; COMPLETE i*N/A**

DATE:

07/07/89

~

EVISIOH:

2 SAFETY INJECTION PIPING

'TO TANK 2A1 ST.

LUCIE NUCLEAR PLANT UNII' IHSERVICE IHSPECTIOH

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST IN'TERVAL CLASS 2 COMPONENI'S PAGE:

39 ZONE NUMBER: 046

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY EXAM ITEM HO METHOD PROCEDURE H

I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

  • "CALIBRATIONBLOCK**

INSIDE CONTAINMEHT REF.

O'LIG.

NO.02-046 016200 S I -4201-7201A SHEAR LUGS (8) T='I 1/4" C-C PT C3.40 NDE 3.3 - 044 C

C - - -

3-7-89 PT; COMPLETE

>>>>N/A>>>>

DATE:

07/07/89 V I SIGH:

2 PIPE SUPPORTS-SHUTDOWN COOLING LIHE B ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND

PERIOD, FIRST INTERVAL CLASS 2 COMPONENTS PAGE:

40 ZONE NUMBER: 052

SUMMARY

EXAMINATION AREA NUMBER IDEHTIFICATIOH ASME SEC ~ XI CATGY EXAM ITEM NO METHOD PROCEDURE N

I 0

S ONG'I T

RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIOHBLOCK~*

IHSIDE CONTAINMEHT REF.

DUG.

NO. 02-052-B 020590 SI-4205-6444 RIGID BASE SUPPORT F-B VT-3 NDE 4.3. 014 C

C - - -

2.27-89 VT-3; COMPLETE F.123

<<*N/A~~

0

DATE:

07/07/89 EVISIOH:

2 SAFETY INJECTION TANK 201 PIPING ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONENTS PAGE:

41 ZOHE NUMBER: 059

SUMMARY

EXAMIHATIOH AREA NUMBER IDENTIFICATION ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE N

I 0

S OHGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIOHBLOCK*>>

REF.

01lG.

NO.02-059 021420 SI-103-FH. I VALVE (V.3235) -

TO - PIPE C-F C5.21 UT-45.,60 HDE 5.4

- 003 PT HDE 3.3 - 045 C

C 3.3-89 PT; COMPLETE,3-13-89 UT; C - - -

COMPLETE, I.D.

GEOMETRY DETECTED BOTH 45

& 60.

'*UT35*~

DATE:

07/07/89 REVISION:

2 HPSI PUMP 2B TO HEADER B ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SUMHARY REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONENTS PAGE:

42 ZONE NUMBER: 062

SUMMARY

EXAMIHATIOH AREA NUMBER IDENTIFICATION ASHE SEC.

XI CAj'GY EXAM ITEM HO METHOD PROCEDURE N I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G M R

    • CALIBRATIONBLOCK**

REF.

DUG.

NO.02-062 022090 SI-2415.213 SUPPORT ATTACHMENT C-C PT C3.40 HDE 3.3 - 046 C

C - - -

3 9-89 PT; COMPLETE,SEE DATA SHEET FOR LIMITATIONS.

    • H/A**

DATE:

07/07/89 EVI SION:

2 MAIN STEAM LINE 2A1 ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTIOH

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 2 CCHPONENTS PAGE:

43 20HE NUMBER: 063

SUMMARY

EXAMINAl'OH AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY EXAM ITEM NO METHOD PROCEDURE N

I 0

S OHGT T

RSEH A

E I 0 E

REMARKS T

C G M R

    • CALIBRATIOHBLOCK*>>

INSIDE CONTAINMENT REF.

DWG.

NO. 02 063 022410 MS-4100.9 SHEAR LUGS (8) T=2 1/2" C-C MT C3 ~ 40 HDE 2.2

- 009 C

C - - -

3-3-89 MT; COMPLETE

>>*N/A>>I 022420 MS-4100-6079 SHEAR LUGS (4)

T=1 1/4" C.C MT C3.40 NDE 2.2.

10 C

C.. -

3-2.89 MT; COMPLETE

    • H/A*>>

DATE:

07/07/89 EVISION:

2 HAIN STEAH LINE 2B1 ST ~

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION SUHHARY REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INI'ERVAL CLASS 2 CQHPONENTS PAGE:

44 ZONE NUMBER: 064 SUHHARY EXAMINATIONAREA NUHBER IDENTIFICATION ASHE SEC. XI CATGY EXAM ITEH NO HETNOD PROCEDURE N I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G H R

    • CALIBRATIONBLOCK**

INSIDE CONTAINMENT REF.

DWG.

NO.02-064 022930 HS-4101-314 SHEAR LUGS (8) T=2 1/2" CC HT C3.40 NDE 2.2 - 012 C

C -

~ -

3-3.89 HT; COHPLETE

    • N/A*>>

023050 HS-29-FW-901-LS PIPE LONG SEAN C-F UT.45,60 NOE 5.2 - 001 C

C. - -

3-3.89 HT, UT; COHPLETE.

C5.22 HT NDE 2.2. 012 C-

    • UT45**

023070 HS.29-FW-SA PIPE -

TO -

ELBOW C.F C5.21 UT.45,60 NDE 5.2 - 001 HT NDE 2.2 - 012 C

C.

3.389 HT,UT; COMPLETE, ROOT

GEOMETRY, C. - -

LIHITED UPSTREAM SCAN,SEE DATA SHEET.

    • UT45**

023080 HS-29.FW.SAA-LS ELBOW LONG SEAM C.F UT-45,60 NDE 5.2 - 001 C

C - - -

3-3-89 UT,HT; COHPLETE C5.22 HT NDE 2.2. 0'l2 C-4*UT454*

023090 HS.29-FW-SAB-LS ELBOW LONG SEAH C-F UT.45,60 NDE 5.2

- 001 C

C -

3-3.89 UT,HT; COHPLETE C5 ~ 22 HT NDE 2.2 - 012 C - --

tiUT454*

IP

DATE:

07/07/89 REVISION:

2 0

PIPE SUPPORTS-MAIN STEAM LIME 281 ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 <1989),

SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPOHENTS PAGE:

45 ZONE HUMBER: 064

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. Xl CATGY EXAM ITEM HO METHOD PROCEDURE N

I 0

S ONGT T

RSEM A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIOHBLOCK**

INSIDE CONTAINMENT REF.

DWG. NO. 02.064 023320 MS-4101-305 F-C VT.3 4 VARIABLE SPRING SUPPORT (2)

F-1234 RCB NDE 4.3 - 016 C

C 2-25-89 VT; CNR ¹ 89-2-056, BENT RCO, EVALUATE SPRING SETTING.ACCEPT AS IS PER JPE,NCR ¹ 2-202.

1*N/A**

DATE:

OT/07/89 REVISIOH:

2 MAIN STEAM LINE 2A ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONENTS PAGE:

46 ZONE HUHBER: 065 SUHHARY EXAHIHATION AREA HUHBER IDEHI'IFI CATION ASHE SEC. XI CATGY EXAH ITEH NO HEI'HOO PROCEDURE N

I 0

S OHGT T

RS EH A

E I 0 E

REHARKS T

C G H R

    • CALIBRATIONBLOCK**

OUTSIDE COHTAINMEHT REF.

O'NG.

HO. 02 065-A 023626 MS-32-F'N-1-LS PIPE LONG SEAH AT FW 1

C-F UT-45)60 HDE 5.2 - 003 C5.31 HT HDE 2.2 - 014 C

C - -.'-28.89 HT; COHPLE'IE,3.8-89 UT; C - -.

COHPLETE, SEE DATA SHEETS FOR EXAM AREA LIMITATIONS.
    • UT44**

DATE:

07/07/89 REVISION:

2 COMBINED CS 2A B 2B FROM R'WST

,ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPOHENTS PAGE:

47 ZONE NUMBER: 070

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY EXAM ITEM NO METHOD PROCEDURE N

I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIOHBLOCK*>>

INLET PIPING REF.

OWG.

NO.02-070.B 025490 CS-2-3.SW-1 ELBOW -

TO - PIPE C-F PT C5 ~ 1'1 NDE 3.3. 066 C

C - - -

3-15-89 PT; COMPLETE

<<<<H/A*>>

025500, CS-2-3-S'W.1-LS PIPE LONG SEAM C-F PT C5.12 NDE 3.3

- 067 C

C - - -

3-15-89 PT; COMPLETE EXAMINED 2.5T AT SW-1.

    • N/A<<*

025540 CS-2-F'W-3A-LS ELBOW LONG SEAM C-F PT C5.12 NDE 3.3 - 047 C

C - - -

2-23-89 PT; COMPLETE

    • H/A**

025550 CS-2.FW-3B-LS ELBOW LONG SEAM C

F P1'5.12 NDE 3.3. 048 C

C - -.

2-23-89 PT; COMPLETE

<<<<N/A<<*

DATE:

07/07/89 REVISIOH:

2 ST.

LUCIE NUCLEAR PLAHT UHIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOO, FIRST INTERVAL CLASS 2 COMPONENTS PAGE:

48 PIPING SUPPORTS-COMB.

C.S.

2A & 2B FROM RMST ZONE NUMBER: 070

SUMMARY

EXAMINATION AREA NUMBER IDENT IF ICA'TIOH ASME SEC. Xl CATGY EXAM ITEM NO METHOO PROCEDURE N I 0

S ONGT T

RSEM A

E I 0 E REMARKS T

C G

M R

    • CALIBRATIOHBLOCK**

INLET PIPING REF. DID. NO. 02-070-B 026960 S1-2407-22 RIGID FRAME SUPPORT F-B VT-3 NOE 4.3 - 018 C

C 2 27-89 VT-3; COMPLETE F-123

    • H/A**

DATE:

07/07/89 REVISION:

2 ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE IHSPECTIOH

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPOHEHTS PAGE:

49 PIPE SUPPORTS-SHUTDOWN COOLING HEAT EXCH. 2A ZONE NUMBER: 076

SUMMARY

EXAMINATION AREA NUMBER IDENT IFI CATION ASME SEC ~ XI CATGY EXAM ITEM HO METHOD PROCEDURE N I 0

S OHGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIOHBLOCK*"

INLET PIPING REF.

DUG.

NO.02-076.A 033100 SI-2406-35 RIGID FRAME SUPPORT F.B VT-3 F-2,3 HDE4.3 - 019 C

C - - -

2-27-89 VT; COMPLETE a*N/A*1 033110 SI-2406-34 RIGID STRUT SUPPORT F-C VT-3 F-123 HOE 4.3. 020 C

C - - -

2-27-89 VT COMPLETE

    • N/A**

033120 S I -2406-33 RIGID PEHETRATIOH SUPPORT F-B VT-3 F 2,3 NDE 4.3 - 021 C

C - - -

2-27-89 VT; COMPLETE

    • N/A**

DATE:

07/07/89 ei SHUTDOHH COOLING HEAT EXCHANGER 2B ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE IHSPECTIOH

SUMMARY

REPORT OU'TAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPONENTS PAGE:

50 20HE NUMBER: 078

SUMMARY

EXAMINATION AREA NUMBER IDEHT IF ICATIOH ASME SEC. Xl CATGY EXAM ITEM NO METHOD PROCEDURE N I 0

S OHGT T

RSEH A

E I 0 E

REMARKS C

G M R

  • 'CALIBRATIOHBLOCK**

INLET PIPING REF.

DUG.

NO. 02-078-A 034630 Sl-2404-64 WELDED LUGS (8) T=1" C-C PT C3.40 NDE 3.3 - 052 C

C - - -

3-8-89 PT; COMPLETE

  • ~N/A">>

DATE:

07/07/89 REVISION:

2 SHUTDOWN COOLING HEAT EXCHANGER 2A ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 2 COMPOHENTS PAGE:

51 ZONE NUMBER: 080

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.

XI CATGY EXAM ITEM HO METHCO PROCEDURE H I 0

S ONGT T

RSEH A

E I 0 E

REMARKS

'I C

G M

R

    • CALIBRATIOHBLOCK~~

TO CONTAINMEHT SPRAY HEADER REF.

DWG.

NO. 02-080-A 035700 SI -406-3-S'W-1 FLANGE -

TO PIPE C-F PT C5.11 HDE 3.3. 053 C

C - - -

3-3 89 PT; COMPLETE

    • H/A**

036170 SI-406-9-FW.1-LS PIPE LONG SEAM C-F PT C5.12 NDE 3.3. 056 C

C - - -

3-8.89 PT; COMPLETE 1 FW-9

  • AN/A**

036180 SI-406-FW.9 PIPE.TO.VALVE (I-V-07-1514)

C-F PT C5.11 NDE 3.3 - 055 C

C - -.

3-8.89 PT; COMPLETE

    • H/A**

036260 CS-11-FW-3 VALVE -

TO - PIPE C-F P1'5.11 NDE 3.3 057 C

C -

3-8-89 PT; COMPLETE,3/16" INDICATION ON VALVE BODY, ACCEPTABLE.

AiN/A0k 036270 CS-1'I-FW-3-LS PIPE LONG SEAM C-F PT C5.12 PT HDE 3.3 - 058 C

C - - -

3-8-89 PT; COMPLETE 8 FW-3 AND FW.4.

HDE 3.3 - 060 C -.-

<<~N/A*+

036280 CS.11-FW-4 PIPE - TO - VALVE (V-7162)

C-F PT C5.11 NDE 3.3 - 059 C

C - - -

3-8.89 PT; COMPLETE

    • H/A

DATE:

07/07/89 REVISIOH:

2 OMPONEHT COOLING WATER ST.

LUCIE NUCLEAR PLANT UHIT 2 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 3 COMPONENTS PAGE:

52 ZONE NUMBER:

101

SUMMARY

EXAMIHATIOH AREA NUMBER IDENTIFICATION ASME SEC. Xl CATGY EXAM ITEM HO ME'IMOD PROCEDURE H

I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

    • CALIBRATIOHBLOCK*~

HEAT EXCHAHGERS 2A-2B DISCHARGE REF.

DWG.

HO. 02-101-A 036720 CC-2075-90 RIGID FRAME SUPPORT F-8 VT-3 F-123 HDE 4.3 - 022 C

C - - -

2-23-89 VT; COMPLETE

    • H/A**

HEAT EXCHANGERS 2A-2B DISCHARGE REF.

DWG.

NO. 02 101-B 036770 CC-2075-110 RIGID FRAME SUPPORT F-8 F-123 VT.3 VT.3 HOE 4.3 - 023 C

C 2-18-89 VT; CHR ¹ 89-2-052, HEAVY NDE 4.3 - 056 C - - -

CORROSION, CLEANED 8 RE-INSPECTED, SATISFACI'ORY. PER JPE LETTER DATED 3/6/89.

    • H/A**

6810 CC-2075.8101 RIGID FRAME ANCHOR F-B VT-3 HDE 4.3 - 024 C

C - - -

2-23 89 VT; COMPLETE F-2,3 i *+N/A**

DATE:

07/07/89 REVISION:

2 COMPONENT COOLING WATER ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 3 COMPONEN'IS PAGE:

53 ZONE NUMBER: 102

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASHE SEC. XI CATGY EXAM ITEM HO METHOD PROCEDURE N I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

  • ~CALIBRATIONBLOCK*~

SUPPLY HEADER A REF.

DWG.

NO.02-102 036940 CC-2062-183 RIGID FRAME SUPPORT F-B VT-3 F-2,3 NDE 4.3 025 C

C - - -

3-3-89 VT; COMPLETE eaH/A*i 037000 CC.2062.6220 RIGID FRAME SUPPORT F-8 VT-3 HDE 4.3 - 026 C

C - - -

3-3.89 VT; COMPLETE F-2,3

    • N/A**

037020 CC-2062-7227 RIGID STRUT SUPPORT F-C F-123 VT-3 VT-3 HDE 4.3 - 027 HDE 4.3 - 058 C

C 2-18.89 VT; CNR ¹ 89.2-051, PAINTED C - - -

SPHERICAL BEARINGS,CLEANED,REEXAHIHED 3-16.89 VT-3,COMPLETE.

t*H/A**

DATE:

07/07/89 COMPONENT COOLING 'MATER ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE IHSPECTIOH

SUMMARY

REPORT OU'TAGE 2 (1989),

SECOHD PERIOD, FIRST IHTERVAL CLASS 3 COMPONENTS PAGE:

54 ZONE NUMBER: 105

SUMMARY

EXAMINATION AREA NUMBER IDENTI F ICATION ASME SEC.

XI CATGY EXAM ITEM NO METHOD PROCEDURE N I 0

S ONGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

  • CALIBRATION BLOCK++

RETURN HEADER A REF.

DUG.

NO. 02-105-A 037260 CC.2064.7609 RIGID FRAME SUPPORT F-8 VT-3 F-123 HDE 4.3 - 028 C

C - - -

3-16-89 VT; COMPLETE

    • N/At*

037350 CC-2064.212 RIGID FRAME SUPPORT F-8 VT.3 F-123 VT-3 HDE 4.3 - 029 HDE 4.3 - 053 C

C 2-21-89 VT; CHR ¹ 89-2-050, LOOSE HUI'N C -

CLAMP.TIGHTEHED HUT PER JPE.

3.13.89 VT; COMPLETE.

    • H/A**

037370 CC-2064-58 RIGID FRAME SUPPORT F B VT-3 F-2,3, NDE 4.3 - 030 C

C - - -

2-22-89 VT; COMPLETE.

NOTE:

LOCKED ROOM teH/PP

DATE:

07/07/89 REVISION:

2 COMPONENT COOLIHG MATER ST.

LUCIE NUCLEAR PLANT UNIT 2 INSERVICE INSPECTION

SUMMARY

REPORI'UTAGE 2 (1989),

SECOND PERIOD, FIRST IN'IERVAL CLASS 3 COMPONENTS PAGE:

55 ZONE NUMBER: 107

SUMMARY

EXAMINATION AREA NUMBER IOENTIFICATIOH ASME SEC.

XI CATGY EXAM ITEM NO METHOD PROCEDURE H

I 0

S OHGT T

RSEM A

E I 0 E REMARKS T

C G

M R

  • "CALIBRATIOHBLOCK**

PUMP SUCTION HEADERS REF.

DWG. NO. 02-107-A 037810 CC-2074.61 VARIABLE SPRING SUPPORT F-B VT-3,4 F-1234 HDE 4.3. 031 C

C 2-18-89 VT; CNR ¹ 89-2 049,EVALUATE SPRING SETTINGS'CR 2.205, ACCEPT AS IS.

    • H/A**

037830 CC-2074-59 RIGID STRUI'UPPORT F-C F-123 VT-3 VT-3 HDE 4.3. 032 C

C 2-18-89 VT; CNR ¹ 89-2-049, LOOSE PARTS, NDE 4.3 - 054 C - - -

LOCKED UP SPHERICAL BEARING. CORRECTED PER LETTER, "(JPE)

ISI 89-027 DATED 3-6-89, RE-INSPECTED 3-15 89, SAT.

~~H/A~~

DATE:

07/07/89 REVISION:

2 ONDEHSATE ST.

LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 3 COMPONENTS PAGE:

56 ZONE NUMBER: 109

SUMMARY

EXAMIHATIOHAREA NUMBER IDEHTIFICATION ASME SEC. XI CATGY EXAM ITEM HO METHOD PROCEDURE N I 0

S OH 0T T

RSEH A

E I 0 E

REMARKS T

C G

M R

~*CALIBRATIOHBLOCK**

AUX. FEEDHATER PUMP 2C SUCTION REF.

DWG.

HO. 02.109-B 038I60 C-2204-60 RIGID FRAME SUPPORT F-B VT-3 F-2,3 HDE 4.3. 048 C

C 3-7-89 VT; CNR ¹ 89-2-064, CORROSIOH.

HCR ¹ 2-220,ACCEPTABLE, CLEAN 8 PRESERVE.

    • H/A*4 038180 C-2204-66 RIGID FRAME SUPPORT F-8 F-2,3 VT-3 NDE 4.3 - 033 C

C 3 7-89 VT; CHR ¹ 89-2-065, CORROSION.HCR

¹ 2-220, ACCEPT AS IS, CLEAN 8 PRESERVE.

DATE:

07/07/89 REVISION:

2 CIRCULATING MATER ST.

LUCIE NUCLEAR PLAHT UNIT 2 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 2 (1989),

SECOND PERIOD, FIRST INTERVAL CLASS 3 COMPONENTS PAGE:

57 ZONE NUMBER: 112

SUMMARY

EXAMINATIOHAREA NUMBER IOENTIFICATIOH ASME SEC.

XI CATGY EXAM ITEM HO METHOD PROCEDURE N

I 0

S OHGT T

RSEH A

E I 0 E

REMARKS T

C G

M R

  • ~CALIBRATION BLOCK~*

INTAKE C,M PUMPS 2B

&r 2C DISCHARGE HEADERS REF DWG NO, 02 112 A

038370 CH-3000-54 F-C VT-3 NDE 4.3 - 034 RIGID STRUT 8 ROO HANGER SUPP F-123 C

C 3-20-89 VTICNR ¹ 89-20-070, CORROSION(

SPHERICAL BEARING LOCKED UP.NCR ¹ 2-239, ACCEPT AS IS ~

CLEAN BEARIHG 8 LUBRICATE. CLEAN 8 PRESERVE SUPPORT.

    • H/A**

038380 CM-3000-57 SLIDIHG BASE SUPPORT F-8 VT-3 NDE 4.3 - 035 C

C -. -

2-27.89 VT; COMPLETE F-2,3

  • AH/A**

FLORIDA POWER

& LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST.

LUCIE NUCLEAR PLANT P.O.BOX 128 FT.PIERCE, FLORIDA 33454 UNIT 2 1989 OUTAGE SNUBBER FUNCTIONAL TESTING REPORT

Florida Power & Light Gompany Snubber Functional Test Results Summary St. Lucie Unit 4Q-1989 Refueling Outage TENSON COMPRESSION Taylor~

SS-1-2A N/A N/A Ng/Cap:

Serial ¹:

Mark¹:

Deviation:

NCR:

Tag:

2401 Breakaway: 898.7-0.2%,

PASS.

Initial Drag: 971.8-0.2%%d, PASS.

Activation (Mech):

Bleed Rate (Hyd): 0.50- PASS.

Test Load: 222.801 -89.1/o Final Drag: 2048.2-0.4%,

PASS 294.0-0.1%

PASS 1210.3 0.2/o, PASS.

0.11, PASS.

249,881 99.9%

2163.1 0.4%, PASS.

Tag:

Ng/Cap:

Serial ¹:

Mark¹:

Deviation:

NCR:

2402 Taylor-400 2

SS.2-2A N/A N/A Breakaway: 1281.2-0.3%, PASS.

Initial Drag: 1381.9-0.3%,

PASS.

Activation (Mech):

Bleed Rate (Hyd): 0.32-PASS.

Test Load: 219.513-87.8%

Final Drag: 1602.6-0.3%, PASS 1048.3 0.2/o, PASS.

1200.4- 0.2'/o, PASS.

0.10- PASS.

249 947-99 9o%%d 2146.3 0.4/o PASS.

Tag:

2417 Breakaway: 1052.6-2.6%, PASS.

815.7 - 2.0/o, PASS.

Mfg/Cap:

PMHW Initial Drag: 1458.9-3.6%%d,PASS.

1341.5 3.4%, PASS.

Serial ¹:

33336-1 Activation (Mech);

Mark¹;

2A1 Bleed Rate (Hyd): 11.080

~ PASS.

9.890- PASS.

Deviation:

11 Test Load."

NCR:

2-190 Peak Load: 36.1-90.2%%d, PASS.

40.0 -100%, PASS.

Devlatlon

Description:

This snubber exceeded the acceptance criteria for release rate (Bleed Rate) in both tension and com-pression.

Additionally, the snubber exceeded the specified drag load cnteria of3/4'er minute.

Disposition Summary:

The PSL Snubber Acceptance criteria will be revised to reflect the manufacturer's test criteria. While specified bteed rate is acceptable, JPE indicates that the drag loads are higher Ihan desired.

Plans to refurbish this snubber should be made for the next outage.

Tag:

2421 Breakaway: 3.0-0.9%, PASS.

Mfg/ca:

PSA-1/4 Initial Drag: 5.3-1.5%, PASS.

Serfal ¹:

38004 Activation (Mech): 0.007-PASS.

Mark¹;

RC.58-22 BleedRate(Hyd):

Deviation:

6 Test Load: 259 -73.9%

267-76.3%

NCR:

N/A Final Drag: 7.5-2.1%, PASS 8.3-2.4%, PASS.

Deviation Descrfptlon:

The snubber exceeds the acceptance cnteria in breakaway drag by 4.1¹s (1.2/o) st compression, in running drag by 4.1¹s (1.2o/o) in compression, in final drag by.5¹s (.1%) in tension and 1.3¹s (.4/) in compression which indi-cates that the snubber is perhaps degraded and should either be replaced with a spare or tracked in the future for increased deg-radation.

Dlsposltlon Summary:

Snubber drag values Irxfcate degradation but present values are stilt within limits atiowedby PSL-2 ac-ceptance criteria. Snubber was exercised to the extent necessary to restore the drag toads to ~/o. The existing snubber was retested and met the acceptance cnteria and can be used as a spare.

A Lisega hydraulic snubber was installed per PC/M.

Replacement S/N: 6121 1/69 Tag:

Mfg/Cap:

Serfal ¹:

Mark¹:

Deviation:

NCR:

2422 PSA-1/4 11896 ROW-R8 N/A N/A Breakaway: 2.8-0.8%, PASS.

Initial Drag: 4.1 -1.2/., PASS.

Activation (Mech): 0.011-PASS.

Bteed Rate (Hyd):

Test Load: 241 -68.9%

Final Drag: 4.1 -1.2o/o, PASS.

2.7 0.8%, PASS.

3.0 - 0.9%, PASS.

0.011 - PASS 248 - 70.7%

2.8 - 0.8%, PASS.

Page 2

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSON Tag:

Mfg/Cap:

Serial¹:

Matk¹ Deviation:

NCR:

2423 PSA-1/4 38017 RCW-R7 N/A N/A Breakaway:

2.6 ~ 0.7%%d, PASS.

Initial Drag: 5.7-1.6o/o, PASS Activation (Mech): 0.007-PASS.

Seed Rate (Hyd):

Test Load: 256 ~ 73.3%

Final Drag: 4.7-1.3%, PASS.

4,9 1.4%, PASS.

4.9 1.4%, PASS.

0.011 - PASS.

258 - 73.6/o 4.2 - 1.2/o, PASS.

Tag:

2424 Mfg/Cap:

PSA-1/4 Serial ¹:

11432 Mark ¹:

RCW-R7 Deviation:

N/A NCR:

N/A Breakaway:

Initial Drag:

Activation(Mech):

Seed Rate (Hyd):

Test Load:

Final Drag:

4.0 - 1.1%

49-14% PASS 0.012 - PASS.

293 - 83.8%

5.2 1 5%, PASS.

4.1 - 1.2%, PASS.

4.2 - 1.2%, PASS.

0.010 - PASS.

278 - 79.5'/o 3.1 - 0.9%, PASS.

Tag:

2425 Breakaway: 55-1.6o/o, 12¹ over, FAILI '9,2-83%, 11.7¹ over, FAILI Mfg/Cap:

PSA-1/4 initial Drag: 7.1 - 2.0'/o, PASS.

41.4-118%, 23.9¹ over, FAIL!

Serial ¹:

20284 Activation (Mech): 0.017-PASS.

0.020 - PASS.

Mark ¹:

RGB.R11 Bleed Rate (Hyd):

Deviation:

5 Test Load: 284-81.3%

281 - 80.2%

NCR:

2-170 Final Drag: 8.5 - 2.4/o, PASS.

215-6.1%,40¹over, FAlL!

Devtatlon Descrfptfon:

The snubber exceeds the acceptance criteria in breakaway drag by 12¹s (1.6/o) in tension, 11.7¹s (8.3%) in compression, in running drag by 23.9¹s (11.8%) in compression, in final drag by 4.0¹s (6.1%) in compression which in.

dicates that the snubber is perhaps degraded and should either be replaced with a spare or tracked in the future for Increased degradation.

Dlsposltfon Summary: Snubber was removed and replaced with a Lisega hydraulic snubber per PC/M 296-288.

= Teardown Results:

No teardown was performed, the snubber was scrapped prior to teardown.

Replacement SN: 6121 1/43 Tag:

Mfg/Cap:

Serial ¹:

Mark ¹;

Deviation:

NCR:

2426 PSA-1/4 38012 RGB-R14 N/A N/A Breakaway: 4.2-1.2%, PASS.

Initial Drag: 83 -2.4%, PASS.

Activation (Mech): 0.007-PASS.

Seed Rate (Hyd):

Test Load: 258-73.8%

Final Drag: 8.2-2.3/, PASS.

3.9 -1.1%, PASS.

5.7-1.6%, PASS.

0.010 - PASS.

268-76.5%

59 - 1.7%, PASS.

Tag:

2427 Breakaway: 1.7-05%, 16¹ over, FAIL!

2378 -67.9/o, 220.3¹ over, FA!L!

Mfg/Cap:

PSA-1/4 Initial Drag: 2343-671%, 2173¹ over, FAIL!

258 6-739%, 241.1¹ over, FAIL Serial ¹:

38003 Activation(Mech): 0.008 - PASS.

0.009

~ PASS.

Mark ¹:

RC-2 R5 Bleed Rate (Hyd):

Oevlatfon:

13 Test Load: 248-71.0/o 262-74.8%

NCR:

2-206 Final Drag: 255.4 - 73 0%, 237.9¹ over, FAIL!

192.9 - 55.1%, 175.4¹ over, FAIL!

Oevtatfon Oescrlptton: This snubber exhibited high drag values in tension and compression as follows: Initial Tension exceed-ed acceptance criteria by 217.3¹s, initial compression by 241.4¹s, final tension by 237.9¹s and final compression by 175.4¹s.

Dlsposltfon Summary: The snubber was removed and replaced with a Usega hydraulic snubber per PC/M 296-288D.

Teardown Results:

Normal seN!ce induced wear on alt parts except for bent shaft assembly which is a condition normally causedby overload.

Replacement SN: 6121 1/74 Page 3

PSA.1/4 380'l5 RC-2-RS N/A N/A Qfg/Cap:

Serial>>:

Mark¹:

Deviation:

NCR:

Tag; 2-028 Breakaway: 2.5.-0.7%, PASS.

Initial Drag: 3.8-1.1%', PASS.

Activation (Mech): 0.009-PASS.

Bleed Rate (Hyd):

Test Load: 244

~ 69.9%

Final Drag: 3.6-1.0'/o, PASS.

2.9- 0.8%, PASS.

4J - 1.4%, PASS.

0.008 - PASS.

276 - 79.0%

3.8-1 ~1%, PASS.

Florida Pov/er 8 Light Company Snubber Functional Test Results Summary St. Lucie Unit 42-1989 Refueling Outage TENSION COMPRESSION Tag:

Ng/Cap:

Serial ¹:

Mark¹:

Devfatlon:

NCR:

2-029 PSA-1/4 20174 RC4-R4 N/A N/A Breakaway: 6.3-1.8'/o, PASS.

Initial Drag: 8.7-2.5/o, PASS.

Activation (Mech): 0.010- PASS.

Bleed Rate (Hyd):

Test Load: 242-69.0%

Final Drag: 8.7-2.5%, PASS.

49-1.4%, PASS.

8.1 - 2.3%, PASS.

0.010- PASS.

202-57N 12.8 - 3.7%, PASS.

Tag:

2430 Breakaway: 121.3-34.7/o, 104¹ over, FAILI 4I 5-114.4%,383.0¹ over, FAIL!

NgCap:

PSA-1/4 initial Drag: 172.9-49.4%,155.4¹ over, FAILI 431.8-123.4%,414.3¹ over, FAILI Serial ¹:

38001 Activation (Mech): 0.009-PASS.

0.023-0.003g over, FAILI Mark ¹:

RC-59-R2 Bleed Rate (Hyd):

Deviation:

4 Test Load: 292-83.3/o 332-94 9%

NCR:

2-167 Final Drag: 73.3-20.9%,55.8¹ over, FAIL!

362.3-103.5%,344.8¹ over, FAILI Deviation

Description:

The snubber was received in a frozen condition.

Breakaway force was adjusted to initiate snubber movement for evaluation purposes.

Disposition Summary:

JPE determined that no adverse stress was effected on pipe. The snubber was replaced with a Usega hydraulic snubber per PC/M 296-288D.

Teardown Results:

Rust and damage evident on the torque carrier and shaft assembly housing.

Guide rods were bent.

This conditionis normally causedby vibration andharsh environment.

Replacement S/N: 6121 1/75 Tag:

Mfg/Cap:

Serial ¹:

Mark¹:

Deviation:

NCR:

2.031 PSA-1/4 26328 RC49.R7 N/A N/A Breakaway: 3.7-1.1 /, PASS.

Initial Drag: 4.1 -1.2/o, PASS.

Activation (Mech): 0.012-PASS.

Bleed Rate (Hyd):

Test Load: 193-55.1%

Final Drag: 3.5-1.0%, PASS.

14-0.4%, PASS.

2.0 0 6%, PASS.

0.014-PASS.

143-40 9%

2.7- 0.8%, PASS.

Tag:

2432 Breakaway: 2.8-0.8%, PASS.

Qfg/Cap:

PS A-1/4 Initial Drag: 3.5-1.0%, PASS.

Serial ¹:

26321 Activation (Mech): 0.014-PASS.

Mark¹:

RC-9-R12 BleedRate(Hyd):

Deviation:

17 Test Load: 110-315%

193-55,2%

NCR:

N/A Final Drag: 4.4-1.3'/o, PASS.

206.5-59.0%, 189.0¹ over, FAIL!

Deviation

Description:

This snubber exhibited excessive drag load in compression during final drag testing.

Dtspositlon Summary:

The snubber passed the as-found test, therefore no nonconformance exists.

Replaced existing snub-ber with a spare.

Teardown Summary:

Normal seivfce induced wear on all parts except for bent'shaft assembly.

This condition is normally caused by overload.

Replacement S/N: 19783 I

Page 4

Florida Power 8 Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q - 1989 Refueling Outage TENSION COMPRESSION Tag:

Mfg/Cap:

Serial ¹:

Mark¹:

Deviation:

NCR:

2433 PSA-1/4 38029 RC-18-R9 N/A N/A Breakaway:

2.4 -0.7%, PASS.

Initial Drag: 45-1.3%, PASS.

Activation (Mech): 0.011 - PASS.

Bleed Rate (Hyd):

Test Load: 237-67.8%

Final Orag: 3.4 -1.0%, PASS.

2.1 - 0.6'/o, PASS.

2.1. 0.6%, PASS.

0.011 - PASS.

239-68 4%

2.6 - 0.7%, PASS.

Tag:

2434 Breakaway: 3.7-1.1%, PASS.

Mfg/Cap:

PSA-1/4 Initial Drag: 4.4 -1.3%, PASS.

Serial ¹:

38010 Activation (Mech): 0.013 - PASS.

Mark ¹:

RC-26-R10A Bleed Rate (Hyd):

Deviation:

16 Test Load: 273-78.1%

277-79.1%

NCR:

N/A Final Drag: 5.4-1.5%, PASS.

18.8 -5.4%, 1.3¹ over, FAIL!

Deviation

Description:

Snubber exhibited high drag in compression during final drag testing.

Disposition Summary: Snubber passed as found test, however, snubber permanently removed per PC/M 147-288.

Teardown Results:

Rust on bottom of screw shaft and ball bearing. Condition is causedby harsh environment.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2435 PSA-1/4 38013 SI-73.R4 N/A N/A Breakaway: 3.4-1.0%, PASS.

Initial Drag: 5.7-1.6%, PASS.

~

Activation (Mech): 0.010- PASS.

Seed Rate (Hyd):

Test Load: 274-78.4%

Final Drag: 5.4

~ 15%, PASS.

.7- 0.5%, PASS.

55 - 1.6%, PASS.

0.008 - PASS.

215 - 61.4%

3.9 - 1.1'/, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviatfon:

NCR:

2436 PSALM 16748 SI<2054590 N/A N/A Breakaway: 17.3-0.3%, PASS.

Initial Drag: 19.4- 0.3/., PASS.

Activation (Mech): 0.006-PASS.

Seed Rate (Hyd):

Test Load: 3569-59.5%

Final Drag: 27.5 -0.5%, PASS.

75 - 0.1%, PASS.

245 - 0.4%, PASS.

0.006 - PASS.

3395-56.6%

305 - 0.5%, PASS.

Tag:

2437 Breakaway: 53.4 0.4%, PASS.

43.7- 03%, PASS.

Mfg/Cap:

PSA-10 Inibal Drag: 214.1 -1.4%, PASS.

2677.1 -173%, 1927.1¹ over, FAIL!

Serial ¹:

11388 Activation (Mech}: 0.010- PASS.

0.008 - PASS.

Mark¹:

St<205-4080 Seed Rate (Hyd):

Deviation:

15 Test Load: 11150-74.3%

11332-75.5%

NCR:

2.207 Final Drag: 28569-19.0%, 2106.9¹ over, FAILI 29215-19.5%, 21715¹ over, FAIL!

Deviation Descrfptlon:

This snubber exceeded the speciTied acceptance criteria in initial running drag by 1927.1¹s (12.8%} in compression, 2106.9¹s (17%) in fina drag tension and by 21715¹s (17.5%) in final drag compression.

Disposition Summary:

Replace with a spare PSA-10.

Disassemble the failed snubber to determine root cause of failure and repair, ifpracticaL Teardown Results:

Normal wear on all parts except that minor dents to the outer thrust bearing was observed.

This condition is usually causedby high Aration.

Replacement S/N: 12504 Page 5

0 Tag:

MfgCap:

Sertai¹;

Mark ¹:

Devlatton:

NCR:

2.038 PSA-1 19221 CH-103-R10A N/A N/A Breakaway: 6.8

~ 0.5%, PASS.

Initial Drag: 14.0-0.9%, PASS.

Activation (Mech): 0.006-PASS.

Bleed Rate (Hyd):

Test Load: 903 -60.2o/o Final Drag: 12.4- 0.8%, PASS.

102 0.7/o, PASS.

109 - 0.7%, PASS.

0.005

~ PASS.

916 - 61.0%

9.6 0.6/o, PASS.

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit 42-1989 Refueling Outage TENSON COMPRESSION Tag:

MfgCap:

Sertat ¹:

Mark¹:

Deviation:

NCR:

2-039 PSA-1/4 3&MO SI43-R3 N/A N/A Breakaway: 4.5-1.3%, PASS.

Initial Drag: 8.2-2.3%%d, PASS.

Activation (Mech): 0.007-PASS.

Bleed Rate (Hyd):

Test Load: 280-80.0%

Final Drag: 6.1 -1.Tlo, PASS.

3.8-1.1%, PASS.

6.4-1.8% PASS.

0.007 - PASS 259 -73.9%

~

&.4-2.4'lo, PASS.

Tag:

MfgCap:

mat>>:

Mark¹:

Deviation:

NCR:

2440 PSA-1/4 29179 MS-19 RSB N/A N/A Breakaway: 2.2 ~ 0.6'/o, PASS.

Inibal Drag: 2.8- 0.8%, PASS.

Activation (Mech): 0.010- PASS.

Bleed Rate (Hyd):

Test Load: 228 -65.2/.

Final Drag: 3.1 -0.9'/o, PASS.

25-0.T%%d,PASS.

2.9 0.8/o, PASS.

0.012-PASS.

236-67.3%

2.1 0.6 lo, PASS.

Tag:

MfgCap:

~at¹:

Mark¹:

Deviation:

NCR:

2.041 A/D41 1292 B.23-R1A N/A N/A Breakaway: 4.4-1.8%, PASS.

Initial Drag: 5.0-2.0o/o, PASS.

Activation (Mech):

Bleed Rate (Hyd): 32,360- PASS.

Test Load: 124-49.4%

Final Drag: 6.4-2.6%, PASS.

4.1 -1.6%%d, PASS.

4.5 - 1.8%, PASS.

32380

~ PASS.

130- 52,0%

4.S 1.9%, PASS.

Tag i MfgCap:

Sertal¹:

Mark¹ Deviation:

NCR:

2442 PSA-1/4 38008 CH-105-R2 N/A N/A Breakaway: 3.1-0.9%, PASS.

Initial Drag: 4.8-1.4%, PASS.

Activation (Mech): 0.008-PASS.

Bleed Rate (Hyd):

Test Load: 241 -689%

Final Drag: 5.5-1.6o/o, PASS.

6.4-1.8%, PASS.

6.4-1.8%, PASS.

0.009 - PASS.

234 - 67.0o/

55-1.6%, PASS.

Tag:

MfgCap:

Sertat ¹:

Mark¹:

Devfatfon:

NCR:

Tag:

MfgCap:

mat ¹ Mark¹:

Devfatlon:

NCR:

2443 PSA-1/4 26320 CH-106-R7 N/A N/A 2444 PSA-1/4 38006 CH-109-R7 N/A N/A Breakaway: 2.8-0.8%, PASS.

initial Drag: 4.2-1.2/o, PASS.

Activation (Mech): 0.011-PASS Bleed Rate (Hyd):

Test Load: 201 -575%

Final Drag: 3.6-1.0/., PASS.

Breakaway:

2.6-0.7%%d, PASS.

Initial Drag: 5.1 -1.5'Yo, PASS.

Activation (Mech): 0.006 ~ PASS.

Bleed Rate (Kyd):,

Test Load: 275 - 78.6o/o Final Drag: 5.4-1.5% PASS 43-1.2%, PASS.

4.3-1.2'/, PASS.

0.010- PASS.

197-56.3%

3.1 -0.9%, PASS.

7.1 -2.0%, PASS.

7.2-2.1%, PASS.

0.007-PASS.

264-75Bo 6.6-1.9%, PASS.

Page 6

Florida Power & Light Company Snubber Functiona! Test Results Summary St. Lucie Unit 42-1989 Refueling Outage TENSION COMPRESSION Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2445 PSA-1/4 2Q175 CH-108-R4 N/A N/A Breakaway:

2.4 -0.7%, PASS.

initial Drag: 3.4-1.0%, PASS.

Activation (Mech): Q.01Q - PASS.

Bleed Rate (Hyd):

Test Load: 226-64.7/o Final Drag: 4.7 -1.3'/, PASS.

4.0 - 1.1%, PASS.

4.4-1.3%

PASS.

0.010 - PASS.

224 - 64.1%

2.0 - 0.6%, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2446 PSA-1/4 38028 CH-108-R8 N/A N/A Breakaway: 4.6 ~ 1.3%, PASS.

Initial Drag: 8.0 - 2.3%, PASS.

Activation (Mech): 0.005 - PASS.

Bleed Rate (Hyd):

Test Load: 250-71.5%

Final Drag: 63-1.8%, PASS.

11.2 - 3.2%, PASS.

14.9 - 4.3%, PASS.

0.004

~ PASS.

267-76.4%

12.9 3.7/o, PASS, Tag'fg/Cap:

Serial ¹:

Mark¹:

Devlatfon:

NCR:

2450 PSA-10 16436 SI4201-7741 B N/A N/A Breakaway: 7Q.6- 05%, PASS.

Initial Drag: 97.0-0.6%, PASS.

Activation (Mech): 0.013 - PASS.

Seed Rate (Hyd):

Test Load: 7731 -51.5%

Final Drag; 72,2

~ 0.5/o, PASS.

62.9 - 0.4'/o, PASS.

86.4 - 0.6%, PASS.

0.010 - PASS.

7828 - 52.P/o 110.4 - 0.7%, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Matk ¹ Devfatfon:

NCR:

2451 PSA-1/4 19022 Sf<201-736B N/A N/A Breakaway: 15 -0.4%, PASS.

Initial Drag: 3.2 -0.9%, PASS.

Activation (Mech): 0.011 - PASS.

Seed Rate (Hyd):

Test Load: 226-64.6%

Final Drag: 3.1 -09%, PASS.

3.9 - 1.1%, PASS.

4.0

~ 1.1'/o, PASS.

0.012 - PASS.

244-69.6o/o 33 - 1.1%, PASS.

Tag; Mfg/Cap:

Serial ¹:

Mark ¹:

Oevlatfon:

NCR.'452 PSA-1/4 38014 SI4201-730B N/A N/A Breakaway:

2.1 -0.6%, PASS.

Initial Drag: 3.0-0.9%, PASS.

Activation (Mech): 0.008-PASS.

Bleed Rate (Hyd):

Test Load: 253-72,2%

Final Drag: 35-1.0%, PASS.

3.7 1.1%, PASS.

4.2 1 2o/o, PASS.

0.009 - PASS.

270- 77.0%

45 - 13%, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark¹:

Devlatfon:

NCR:

2453 PSALM 16749 SIA2004343B NIA N/A Breakaway: 113 -02%, PASS.

Initial Drag: 322-05%, PASS.

Activation(Mech): 0.011-PASS.

Bleed Rate (Hyd):

Test Load: 3575-59.6%

Final Drag: 21.1 -0.4%, PASS.

12.4 - 0.2%, PASS.

179 - 0.3%, PASS.

0.009 - PASS.

3408 - 56.8%

223 - 0.4%, PASS.

Tag:

Mfg/Cap Serial ¹:

Mark ¹.

Deviation:

NCR:

2454 PSALM 16760 Sl<2004343B N/A N/A Breakaway: 16.2-03%, PASS.

Initial Drag: 24.7 -0.4%, PASS.

Activation (Mech): Q.008-PASS.

Bleed Rate (Hyd):

Test Load: 3513

~ 58.5%

Final Drag: 18.7 - 03%, PASS.

4$ ~ 0.1%, PASS.

162 - 0.3%, PASS.

0.006-PASS.

3211 - 53.5'/o 178 - 0.3%, PASS.

Page 7

Tag:

MfgCap:

Sertai ¹:

Mark ¹:

Deviation:

NCR:

2455 PSALM 17709 SI42004340B N/A N/A Breakaway: 23.7-0.4'/o, PASS.

Initial Drag: 27.2-0.5%, PASS.

Activation (Mech): 0.006-PASS.

Bleed Rate (Hyd):

Test Load: 3430 -57.2/.

Final Drag: 28.0-0.5%, PASS.

21.2- 0.4%, PASS.

25.4- 0.4%, PASS.

0- 005

~ PASS.

3328

~ 555%

31.0- Q.5'/o, PASS.

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q-1989 Refueling Outage TENSION COMPRESSION Tag:

MfgCap:

Sertat>>:

Mark¹:

Deviation:

NCR:

2-056 PSALM 16765 SI42004340B N/A N/A Breakaway: 34.1-0.6%, PASS.

Initial Drag: 40.0-0.7'/o, PASS.

Activation (Mech): 0.011-PASS.

Bleed Rate (Hyd):

Test Load: 3693-615%

Final Drag: 38.2-0.6%, PASS.

7.5- 0.1%, PASS.

23.0-0.4%, PASS.

0.006-PASS.

3062 - 51.0%

23.2- 0.4%, PASS.

Tag:

MfgCap:

Sertai¹:

Mark¹:

Deviation:

NCR; 2-057 PSALM 16753 SI4200-326B N/A N/A Breakaway:

13.9-0.2%%d, PASS.

Initial Drag: 28.6-0.5%, PASS.

Activation (Mech): 0.007-PASS.

Bleed Rate (Hyd):

Test Load: 3135

~ 52.3'/o Final Ofag: 26.6 0.4%, PASS.

10.6-Q.2%, PASS.

17.3- 0.3%, PASS.

0.004-PASS.

2984 - 49.7%

18.9 - 0.3%, PASS.

Tag:

MfgCap:

Serial>>:

Mark¹:

Deviation:

NCR:

2.058 PSALM 21266 Sl<200422G N/A N/A Breakaway: 32.6-0.5%, PASS.

Initial Drag: 99.3-1.7/o, PASS.

Activation (Mech): 0.008-PASS.

Bleed Rate (Hyd):

Test Load: 3335-55.6/

Final Drag: 70.1 -1.2/o, PASS.

32.5 0.5%, PASS.

49.6- 0.8%, PASS.

0.005-PASS.

3176 - 52.9%

64.3 -1.1%, PASS.

Tag:

MfgCap:

Serfai¹:

Mark¹:

Devtation:

NCR:

2459 PSA-1/4 11848 SI4200422B N/A N/A Breakaway: 2.9-0.8%, PASS.

Initial Drag: 3.7-1.1%, PASS.

Activation (Mech): 0.010- PASS.

Bleed Rate (Hyd):

Test t.oad: 260 -74.2%

~

Final Drag: 3.3-0.9%, PASS.

3.0- 0.9%, PASS.

3.4-1.0%, PASS.

0.009-PASS 270-773%

3.7-1.1%, PASS.

Tag:

MfgCap:

. Sertal ¹:

Mark¹:

Devtatfon:

NCR:

2460 PSA-1 20362 SI4201-7111 N/A N/A Breakaway:

8.1 -0.5%, PASS.

Initial Drag: 8.5-0.6%, PASS.

Activation (Mech): 0.006-PASS.

Bleed Rate (Hyd):

Test Load: 985-65.6/o Final Drag: 9.8-0.7%, PASS.

9.8-0.7%, PASS.

11.1 - 0.7%, PASS.

0.006-PASS.

960 - 64.0%

9.4- 0.6%, PASS.

Tag:

MfgCap:

Sertal ¹:

Mark¹:

Deviation; NCR:

2461 PSA-1/4 20285 SI<2004%7 N/A N/A Breakaway: 2.7-0.8/., PASS.

Initial Drag: 4.4-1.3%, PASS.

Activation (Mech): 0.010- PASS.

Bleed Rate (Hyd):

Test Load: 236-67.6/o Final Drag: 2.9-0.8%, PASS.

2.0-0.6%,PASS.

3.1 -0.9%, PASS.

0.009 - PASS.

244-69 6%

4.6-1.3% PASS.

Page 8

Florida Power 8r, Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSION Tag:

Mfg/Cap:

Serial ¹:

Mark¹:

Deviation:

NCR:

2466 PSA-10 12505 SI4203-71 N/A N/A Breakaway:

Initial Drag:

Activation (Mech):

Seed Rate (Hyd):

Test Load:

Final Drag:

138.2 - 0.9%, PASS.

142.0 0.9%, PASS.

0.010 - PASS.

10647 71.0%

166.3 - 1.1o/o PASS 66.5

~ 0.4'/o, PASS.

87.2 0.6%, PASS.

0.009 - PASS.

10733

~ 71.6%

69.1 - 0.5%, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Devlatfon:

NCR:

2467 PSA-10 16437 SI4201-7760 N/A N/A Breakaway: 44.6-0.3%, PASS.

Initial Drag: 48.3 -0.3%, PASS.

Activation(Mech): 0.012-PASS.

Seed Rate (Hyd):

Test Load: 11493-76.6%

Final Drag: 51.2-03%, PASS.

25.1 - 0.2%, PASS.

85.6 - O.P/o, PASS.

0.009 - PASS.

11408 - 76.1%

643 -0.4'/o, PASS.

Tag:

2468 Breakaway: 242.8-2.4%, PASS.

593-0.6%, PASS.

MfglCap:

PMH-10 Initial Drag: 320.1-3.2/, PASS.

144.9 - 1.4'/o, PASS.

Serial ¹:

PD 87773-1423 Activation(Mech):

Mark ¹:

SI4201-7541 B Seed Rate (Hyd): 24.28-PASS.

24.360 - PASS.

Deviation:

19 Test Load:

NCR:

NlA Final Drag: 13531.9-96.6'/o, PASS.

13900.9 - 99.2%, PASS.

Deviation

Description:

Snubber exceeded the drag criteria identified by the PSL-2 Acceptance Criteria.

Disposition Summary:

While the drag loads did not conform with PSL-2 acceptance criteria, the results were stiil within the cri-teria speciTied in the PSL-2 Seismic Snubber List. the acceptance criteria willbe revised accordingly.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Devfatlon:

NCR:

2469 PSA-1/4 38005 S 14208-264B NlA N/A Breakaway: 6.9-2.0%, PASS.

Initial Drag: 11.1 -3.2/o, PASS.

Activation (Mech): 0006-PASS.

Seed Rate (Hyd):

Test Load: 251

~ 71.6o/o Final Drag: 11.6-33%, PASS.

72 - 2.1%, PASS.

72 - 2.1%, PASS.

0.010 - PASS.

232-66.3%

92-2.6%, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2471 PSA-1/4 38007 S 14208.266B N/A N/A Breakaway: 39 ~ 1.1%, PASS.

Initial Drag: 5.9 -1.7%, PASS.

Activation (Mech): 0.014-PASS.

Seed Rate (Hyd):

Test Load: 241 -69.0%

Final Drag: 5.7-1.6%, PASS.

6.7-1 9%, PASS.

6.7 -1.9%, PASS.

0.009 - PASS.

239-68.3%

4.6-13o%%d, PASS.

Tag:

Mfg/Cap; Serfal ¹:

Mark¹:

Deviation:

NCR:

2472 PSA-1 14878 SI42054428B N/A N/A Breakaway: 9.4-0.6%, PASS.

Initial Drag: 12.0-0$ /o, PASS.

Activation (Mech): 0.006-PASS.

Seed Rate (Hyd):

Test Load: 1162-77.5%

Final Drag: 11.4-0.8%, PASS.

9.7 O.P/o, PASS.

113 - 0.8%, PASS.

0.007-PASS.

1155 - 77.0%

13.2 - 0.9/o, PASS.

Page 9

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSION Tag:

MfgCap:

Sertai ¹:

Mark¹:

Deviation:

NCR:

2-073 PSA.1/4 38024 CH-103.A7B N/A NIA Breakaway: 2.3-0.7%, PASS.

tnitial Drag: 4.9-1.4%, PASS.

Activation (Mech): 0.010- PASS.

Bleed Rate (Hyd):

Test Load: 249-71.2/.

Final Drag: 5.7-1.6%, PASS.

4.4 1.3%, PASS.

5.9-1.7%, PASS.

0.010

~ PASS.

270

~ 77 3o 4.4 - 1.3/o, PASS.

Tag:

Ng/Cap:

Serial ¹ Mark¹:

Deviation:

NCR:

2474 PSALM 16752 SI42054713B N/A N/A Breakaway:

Initial Drag:

Activation (Mech):

Bleed Rate (Hyd):

Test Load:

Final Drag:

10.0-0.2%, PASS.

23.2- 0.4%, PASS.

0.010 - PASS.

3649 - 60 8o/o 22.6 0.4%, PASS.

9.9- 0.2%, PASS.

125- 0.2%, PASS.

0.006-PASS.

2839 - 478%

13.7-0.2%, PASS.

Tag:

MfgCap:

Serfal¹:

Mark¹:

Deviation:

NCR:

2475 PSALM 16769 SI42054713B N/A N/A Breakaway: 16.7-0.3%, PASS.

Initial Drag: 21.6-0.4'/o, PASS.

Activation (Mech): 0.010 ~ PASS.

Bleed Rate (Hyd):

Test Load: 3734-62.2%

Final Drag: 21.6-0.4'/o, PASS.

7.8 - 0.1%, PASS.

253-0.4%, PASS.

0.005-PASS.

3337-55.6%

24.0- 0.4%, PASS.

Tag:

MfgCap:

Serfat ¹:

Mark¹:

Deviation:

NCR:

2476 PSA-10 8928 SI4205456C N/A N/A Breakaway: 23.3-0.2'/o, PASS.

Initial Drag: 28.0-0.2%, PASS.

Activation (Mech): 0.009-PASS.

Bleed Rate (Hyd):

Test Load: 6750-45.0/

Final Drag: 37.3

~ 0.2%%d, PASS.

21.6 - 0.1'Yo, PASS.

32.6- 0.2%, PASS.

0.008 - PASS.

6690- 44.6%

27.7- 0.2%, PASS.

Tag:

Mfgaa:

Serfal>>

Mark¹ Deviation:

NCR:

2477 PSA-10 12596 SI4205456B N/A N/A Breakaway:

Initial Drag:

Activation (Mech):

Bleed Rate (Hyd):

Test Load:

Final Drag:

26.0 0.2%, PASS.

545-04%

PASS 0.009 - PASS.

7220 - 48.1%

53.2 ~ 0.4%, PASS.

23.1 - 0.2%, PASS.

303- 0.2%, PASS.

0.007-PASS.

7314-48.8%

40.1 0.3%, PASS.

Tag:

MfgCap:

Serfal¹:

Mark¹:

Deviation:

NCR:

2478 PSA-10 12598 SI4205456B N/A N/A Breakaway:

Initial Drag:

Activation(Mech):

Bleed Rate (Kyd):

Test Load:

Rnal Drag:

39.0- 0.3%, PASS.

111.7- 0.7Yo, PASS.

0.013 - PASS.

6622 - 44.1%

74.6-0.5%, PASS.

345- 0.2%, PASS.

809- 05%, PASS.

0.009-PASS.

6704-44.7%

55.6-0.4%, PASS.

Tag:

NgCap:

Sertal ¹:

Mark¹:

Devfatton:

NCR:

2479 PSA-1 24734 SI4205-739 B N/A N/A Breakaway: 7.7-0.5%, PASS.

Initial Drag: 13.4-0.9%, PASS.

Activation (Mech): 0.006-PASS.

Bleed Rate (Hyd):

Test Load: 937-625/o Final Drag: 10.7 - 0.T/o, PASS.

9.5 0.6/o, PASS.

10.6- 0.7%, PASS.

0.007-PASS.

899-59 9%

10.0- 0.7%, PASS.

Page 10

~ l.

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-19&9 Refueling Outage TENSION COMPRESSON Tag'fg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2480 PSA-1 20363 SI4205-642BB N/A N/A Breakaway: 7.5-0.5%, PASS.

Initial Drag: 17.4-1.2/., PASS.

Activation rMech): 0.006 - PASS.

Bleed Rate (Hyd):

Test Load: 1184-79.0%

Final Drag: 16.3 - 1.1%, PASS.

10.6-0.7/., PASS.

10.6 0.7%, PASS.

0.006 - PASS.

1158 77.2 lo 9.9

~ 0.7%, PASS.

Tag:

2486 Mfg/Cap:

PSA-1/4 Serial ¹:

38026 Mark ¹:

Sl-99-R1 Deviation:

N/A NCR:

N/A Breakaway:

2.9 -0.8%, PASS.

Initial Drag: 4.1 -1.2%%d, PASS.

Activation (Mech): 0.008 - PASS.

Seed Rate (Hyd):

Test Load: 248-70.7%

Final Drag: 3.4 ~ 1.0'/o, PASS.

2.6 - 0.7%, PASS.

2.6 - 0.7%, PASS.

0.008 - PASS.

258 - 73.8'/o 45-13%, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Devla5on:

NCR:

2488 PSA-1 20359 SI4204-1270B N/A N/A Breakaway:

13.0-0.9%, PASS.

Initial Drag: 17.0-1.1%, PASS.

Activation (Mech): 0.007-PASS.

Bleed Rate (Hyd):

Test Load: 804-53.6/o Final Drag: 14.3

~ 1.0%, PASS.

14.0 - 0.9'/o, PASS.

23.7-1.6%, PASS.

0.007-PASS.

884 - 58.9%

21.7 - 1.4%, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2489 PSA-1 26000 SI4204-1270B N/A N/A Breakaway:

11.1 -0.7%, PASS.

Initial Drag: 12.6-Q.Blo, PASS.

Activation (Mech): 0.006

~ PASS.

Bleed Rate (Hyd):

Test Load: 745

~ 49.7%%d Final Drag: 11.6-0.8%, PASS.

10 8 - 0.7/o, PASS.

fthm-0.8%,

PASS.

0.006 - PASS.

844-56.3%

13.4 - 0.9%, PASS.

Tag:

2495 Breakaway: 674.1 -0.6%, PASS.

'I21.1 0.1 lo, PASS.

Mfg/Cap; PSA-100 Initial Drag: 1002.1 -0$%, PASS.

6332.2 5.3%, 332.2¹ over, FAIL!

Serial ¹:

1206 Activa5on (Mech): ON9-PASS.

0.012 - PASS.

Mark ¹:

MS4100-16B Bleed Rate (Hyd):

Devlatfon:

12 Test Load: 63-0.1%

63-0.1%

NCR:

2-197 Rnal Drag: 10405-0.9%, PASS.

5854$ - 49/o, PASS.

Devlatfon Descrfptlon:

This snubber exhibited a load spike during initial drag (compression) which exceeds the 5% criteria by 332.2¹s. Maverage drag load was approximately 2% of the rated load of this snubber.

Disposition Summary: This snubber was replaced with a spare PSA-100 snubber. JPE evaluated the condition and found that the drag loads didnot affect the piping.

Teardown Results:

Rust and scoring on outside of support cylinder, wear on inertia spring, tangs, and top of planetary gears show rubbng. This condition is usually caused by a harsh environment and is service induced.

Replacement S/N: 2373 Tag:

Mfg/Cap:

Serial ¹:

Mark¹.

Deviation:

NCR:

2496 PSA-100 1205 MS4100-16B N/A N/A Breakaway: 629.0- 05%, PASS.

Initial Drag: 833.3 -0.7%, PASS.

Ac5va5on (Mech): ONB - PASS.

Bleed Rate (Hyd):

Test Load: 59-0.0o%%d Final Drag: 1103.7-0.9%, PASS.

8165 - 0.7%, PASS.

1432.7 - 1.2/o, PASS.

0.010 - PASS.

62-0.1%

1405.9 - 12'/o, PASS.

Page 11

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q - 1989 Refueling Outage TENSION COMPRESSION 16.6- 0.3%, PASS.

171.4 2.9%, PASS.

0.004

~ PASS Tag'497 Breakaway: 30.3-0.5%, PASS, MfgCap:

PSALM Initial Drag: 55.7 ~ 0.9%, PASS.

Sertat ¹ 29696 Activation (Mech): 0.008-PASS.

Mark¹;

SIA20349C Bleed Rate (Hyd):

Deviation:

N/A Test Load: 3711-61.9%

NCR:

N/A Final Drag: 79.5-1.3%, PASS.

3434 - 57.2'/o 63.4 - 1.1%, PASS Note: Although no nonconformance existed, the snubber was replaced with a spare due to 724our Limiting Condition require-inents.

Replacement S/N: 11Q70 Tag:

MfgCap:

Serfat¹:

Mark¹:

Devtation:

NCR:

2499 PSA-1 16143 SI420349B N/A N/A Breakaway:

Initial Drag:

Activation (Mech):

Bleed Rate (Hyd):

Test Load:

Final Drag:

5.6- 0.4'/o, PASS.

12.0

~ 0.8%, PASS.

0.008 - PASS.

1147 - 76.5%

15.2 1,0/o, PASS.

13.5-0,9%, PASS.

14.4-1.0%, PASS.

0.007-PASS.

1199 - 79.9 lo 12.1 0.8/o, PASS Tag:

MfgCap:

Sertai ¹:

Mark¹:

Deviation:

NCR:

2-100 PSA-1 20360 SI420349B N/A N/A Breakaway:

7.1 - 0.5%, PASS.

Initial Drag: 14.4 ~ 1.0o/o, PASS.

Activation (Mech): 0.007

~ PASS.

Bleed Rate (Hyd):

Test Load: 1161 -77.4%

Final Drag: 14.0-09% PASS.

1Q.O 0.7%, PASS.

14.0 - 0.9%, PASS.

0.006-PASS.

1194 - 79.6%

207-14o/o PASS Tag:

MfgCap:

Sertal ¹:

Mark ¹:

Deviation:

NCR:

2-101 PSA-1/4 26325 SI4201-7201 B N/A N/A Breakaway: 3.2-0.9/o, PASS.

Initial Drag: 3.9-1.1%, PASS.

Activation (Mech): 0.011-PASS.

Bleed Rate (Hyd):

Test Load: 219-62.7%

Final Drag: 4.1 -1.2%, PASS.

14 ~ 04o/o PAS 2.2-0.6%, PASS.

0.009 - PASS.

223-63.8%

2.0 0.6o/o, PASS.

Tag:

MfgCap; Sertat ¹:

Mark¹:

Oevtatfon:

NCR:

2-102 PSA-1 14870 SI4203-24G N/A N/A Breakaway:

17.8-1.2%%d, PASS.

Initial Drag: 32.4-2.2%, PASS.

Activabon (Mech): 0.008-PASS.

Bleed Rate (Hyd):

Test Load: 853-56.9%

Final Drag: 29.3-2.0/o, PASS.

16.0 ~ 1.1%, PASS.

22'1.5%

PASS 0.007-PASS.

892-59N 51.2 ~ 3.4%, PASS.

Tag:

MfgCap:

Sertai¹:

Mark¹.

Deviation:

NCR:

2-104 PSA-1 14876 SI4203-24B N/A N/A Breakaway: 18.7-1.2%, PASS.

Initial Drag: 31.2-2.1%, PASS.

Activation (Mech); 0.007-PASS.

Bleed Rate (Hyd):

Test Load: 932-62.1%

Final Drag: 34.3-2.3'Yo, PASS.

21.4-1.4%, PASS.

38.3-2.6%, PASS.

0.006-PASS.

944 - 62.9%

27.3-1.8%, PASS.

Page 12

Florida Power 8 Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q - 1989 Refueling Outage TENSION COMPRESSON Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2-116 PSA-1/4 12911 SI4206-6254 N/A NfA Breakaway: 4.7-1.3%, PASS.

Initial Drag: 6.4 -1.8'/., PASS.

Activation(Mech): 0.014 - PASS.

Bleed Rate (Hyd):

Test l.oad: 253-72.2%

Final Drag: 5.8-1.7%, PASS.

4.4 ~ 13% PASS.

5.0 1.4%, PASS.

0.014-PASS.

263 - 75.1'lo 4.9 - 1.4%, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2-117 PSA-1/4 38019 SI4206.6271 B N/A N/A Breakaway: 2.0-0.6'/o, PASS.

Initial Drag: 5.8 -1.7/o, PASS.

Activation(Mech): 0.011 - PASS.

Seed Rate (Hyd):

Test Load: 266-76.0%

Final Drag: 35-1.0%, PASS.

4.4

~ 1.3% PASS.

65 19/o, PASS.

0.010- PASS.

264-75.Plo 39-1.1%, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NGR:

2-124 PSA-1/4 29366 RC-98.R1 2 N/A N/A Breakaway: 2.6-0.7/o, PASS.

Initial Drag: 3.4-1.0 lo, PASS.

Activation(Mech): 0.009 - PASS.

Seed Rate (Hyd):

Test Load: 241

~ 68.8/o Final Drag: 3.4

~ 1.0/o, PASS.

2.7- 0.8%, PASS.

29 0$%, PASS.

0.008 - PASS.

271 - 77 5o/o 33 09o/o, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2.125 PSA-1/4 29332 RC-98.R4B N/A N/A Breakaway:

2.9 -0.8%, PASS.

Initial Drag: 3.0 -0.9%, PASS.

Activation(Mech): 0.011 - PASS.

Seed Rate (Hyd):

Test Load: 231 -65.9/o Final Drag: 3.0-0.9%, PASS.

3.2 09/o, PASS.

3.2 ~ 0.9'/o, PASS.

0.010

~ PASS.

238 - 68.1'lo 3.3 -0.9'/o, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR'-127 PSA-1/4 19068 MSI-13-R1 N/A N/A 2-129 PSA-1 19229 CS.2006-7115 N/A N/A Breakaway: 32-0,9o/o, PASS.

Initial Drag: 4.5

~ 1.3%, PASS.

Activation(Mech): 0.007-PASS.

Seed Rate (Hyd):

Test Load: 256-73.1%

Final Drag: 4.7 -1.3%, PASS.

Breakaway:

1Q.7-Q.7o/o, PASS, Initial Drag: 11.6-0.8/o, PASS.

Activation(Mech): 0.008 - PASS.

Seed Rate (Hyd):

Test Load: 989-65.9o/o Final Drag: 8.7-0.6/o, PASS.

4.1 1.2%, PASS.

55-1.6%, PASS.

0.012 - PASS.

278-79 5'lo 4Z - ta/., PASS.

7.1

~ 05%, PASS.

82 -05%, PASS.

0.007-PASS.

913 - 60.9%

85-0.6%, PASS.

Tag:

Mfg/Cap Serial ¹:

Mark¹:

Deviation:

NCR:

2-132 PSA-1/4 38011 MS'3B N/A N/A Breakaway: 3.6-1.0o/o, PASS.

Initial Drag". 10.7-3.1%, PASS.

Activation (Mech): 0.009 - PASS.

Seed Rate (Hyd):

Test Load: 259-74.1/o Final Drag: 8.4-2.4%, PASS.

6.0 1.7%, PASS.

10.4 - 3.0%, PASS.

0.010- PASS.

2/1 - 77.4o/

6.7 - 'l9%, PASS.

Page 13

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q - 1989 Refueling Outage TENSION COMPRESSION Tag:

Ng/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR'-133 PSA-1I4 38021 MS-33 R3B N/A N/A Breakaway: 4.3-1.2'/., PASS; Initial Drag: 7,3 2,1/o, PASS.

Activation (Mech): 0.006-PASS.

Bleed Rate (Hyd):

Test Load: 265-75.7'/o Final Drag: 6.2 ~ 1.8%, PASS.

3.8-1.1%, PASS.

5.3-1.5'Yo, PASS.

0.007-PASS.

257 - 73.3%

4.7 ~ 1 3% PASS.

Tag:

Ng/Cap:

Serial ¹:

Mark¹:

Deviation:

NCR:

2-134 PSA-1/4 29369 RC-101-RSB N/A N/A Breakaway: 4.4-1.3%, PASS.

Inmal Drag: 5.0 ~ 1.4%, PASS.

Activation (Mech): 0.0t2-PASS.

Bleed Rate (Hyd):

Test Load: 217

~ 61.9%

Final Drag: 5.2-1.5%, PASS.

3.3 0.9/o, PASS.

3.6 1 0%, PASS.

0.011-PASS.

200 - 57.1%

3.3 0.9/o, PASS.

Tag:

Ng/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2-136 PSA.1/4 11855 MS-32.R3B N/A N/A Breakaway: 2.6-0.7%, PASS.

Initial Drag: 3.9-1.1%, PASS.

Activation (Mech): 0.007

~ PASS.

Bleed Rate (Hyd):

Test Load: 282-80.55 Final Drag: 5.0-1.4% PASS.

3.3-0.9% PASS.

3.5 1.0/o, PASS.

0.008-PASS.

269 - 76.T/o 2.9 0.8%, PASS.

Tag:

Ng/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2-137 PSA-1/4 38002 MS-32-R4B N/A N/A Breakaway: 5.6-1.6%, PASS.

Initial Drag: 9.9-2.8%, PASS.

Activation (Mech): 0.009-PASS.

Bleed Rate (Hyd):

Test Load: 275-78.5/.

Final Drag: 7.9-2.3%, PASS.

5.0-1.4%, PASS.

5.7 1.6o/o, PASS.

0.011 - PASS.

t89-54.0'/.

7.1 2.0/o, PASS.

Tag:

Ng/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2-138 PSA-1/4 20198 MSI-12-R4 N/A N/A Breakaway: 2.0-0.6%, PASS.

Initial Drag: 2.2-0.6'/o, PASS.

Activation (Mech): 0.009-PASS.

Bleed Rate (Hyd):

Test Load: 225-64.2'/.

~

Final Drag: 3.6-1.0/o, PASS.

4.6-1.3% PASS.

4.9. 1.4%, PASS.

0.011

~ PASS.

189 - 54.0'/o 2.9- 0.8%, PASS.

Tag:

Ng/Cap:

Serial ¹ Mark¹:

Devlatlon:

NCR:

2-139 PSA-1/4

'9091 MSI-12-R5 N/A N/A Breakaway: 3.3-0.9/o, PASS.

Initial Drag: 5.5-1.6%, PASS.

Acttvathn (Mech): 0.007-PASS.

Bleed Rate (Hyd):

Test Load: 225-64.3%

Final Drag: 6.1 -1.7%%d, PASS.

4.4-1.3%, PASS.

5.3-1.5%, PASS.

0.008-PASS.

224 - 64.1'/o 5.7-1.6%, PASS.

Tag:

MfgCap:

Serial ¹:

Mark ¹:

Deviation; NCR:

2-144 PSA-1 16664 RC4300-15 N/A N/A Breakaway: 8.6-0.6%, PASS.

Initial Drag: 10.4

~ 0.7/o, PASS.

Activation (Mech): 0.007

~ PASS.

Bleed Rate (Hyd):

Test Load: 1181 -78.T/o Final Drag: 13.7

~ 0 9% PASS.

7.5- 0.5%, PASS.

12.0- 0.8% PASS.

0.007 - PASS.

1175 - 78.3'Yo 12.2- 0.8%, PASS.

Page 14

Florida Power 8 Light Company Snubber functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSON Tag:

Mfg/Cap:

Sertal ¹:

Mark ¹:

Deviation:

NCR:

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2.149 PSALM 16571 RC&00-27 N/A N/A 2-150 PSA-1 14880 RC400-1 25 N/A N/A Breakaway: 4.9

~ 0.1%, PASS.

Initial Drag: 17.7-0.3%, PASS.

Activation (Mech): 0.009 - PASS.

Bleed Rate (Hyd):

Test Load: 3783 - 63.1%

Final Drag: 19.7 -0.3%, PASS.

Breakaway: 6.4-0.4%, PASS.

Initial Drag: 9.7-0.6o/o, PASS.

Activation (Mech): 0.009-PASS.

Eeed Rate (Hyd):

Test Load: 1001 -66.7%

Final Drag: 9.6-0.6%%d, PASS.

15.0 02/o, PASS.

51.9 09%, PASS.

0.010- PASS.

3210

  • 53.5%

24.2 0.4%, PASS.

6.6-04o%%d PASS 10.7 - O.TYo, PASS.

0.010

~ PASS.

1076-71.8%

10.4 0.7 lo, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Oevlatlon:

NCR,'-151 PSA-1 148TT RC4300-.28 N/A N/A Breakaway: 5.7-0.4%, PASS.

Initial Drag: 8.3 -0.6'/o, PASS.

Activation(Mech): 0.007-PASS.

Bleed Rate (Hyd):

Test Load: 1165-77.7/

Final Drag: 8.8-0.6%, PASS.

8.1 -05%, PASS.

8.1 - 0.5%, PASS.

O.OM - PASS.

1187-79 1%

8.2 0.5%, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark¹:

Deviation:

NCR:

2-152 PSA-1 16141 RC4300.28 N/A N/A Breakaway: 5.2 -03%, PASS.

Initial Drag: 8.5 - 0.6o/o, PASS.

Activation (Mech): 0.009 - PASS.

Eeed Rate (Hyd):

Test Load: 1186-79.0%

Final Drag: 8.9 - 0.6'/, PASS.

17.1 - 1.1/o, PASS.

17.1 - 1.1lo, PASS.

0.009 - PASS.

1185 -79.0'/

13.0 - 09%, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Devlatfon:

NCR:

2-156 PSA-1 19227 RCW0044B N/A N/A Breakaway: 5.7 ~ 0.4'Yo, PASS.

Initial Drag: 7.4 -05%, PASS.

Activation(Mech): 0.008-PASS.

Eeed Rate (Hyd):

Test Load: 1194-79.6%

Final Drag: 7.4-05%, PASS.

9.4 - 0.6%, PASS.

11.3 0$%, PASS.

0.008 - PASS.

1184 - 78.9%

12.8 - 0.9%, PASS.

TagI Mfg/Cap:

Serial ¹:

Mark¹:

Oevlatfon:

NCR; 2-160 PSALM

. 20253 RC400-12 N/A N/A Breakaway: 18.4-03/o, PASS.

Initial Drag: 19.0-03%, PASS.,

Activation (Mech): 0.007-PASS.

Eeed Rate (Hyd):

Test Load: 3324-55A/o Final Drag: 20.7-0.3/o, PASS.

T.4-0.1%, PASS.

15.7- 03%, PASS.

0.007-PASS.

2878 - 48,0%

14.0 - 02Yo, PASS.

Tag:

Mfg/Cap:

Serfal ¹:

Mark¹:

Deviation:

NCR:

2-161 PSALM 20262 RCCOO-12 N/A N/A Breakaway: 17.2-03%, PASS.

tnitial Drag: 20.4-0.3%, PASS.

Activation (Mech): 0.012 - PASS.

Bleed Rqte (Hyd):

Test Load: 4768-79.5%

Final Drag: 18.9 -03%, PASS.

82 - 0.1%, PASS.

18.8 -03%, PASS.

0.008 - PASS.

4180

~ 69.7%

21.4 - 0.4%, PASS.

Page 15

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit¹2-1989 Refueling Outage TENSION COMPRESSION Tag:

Ng/Cap:

Serfal ¹:

Mark¹:

Deviation:

NCR:

2-163 PSA-10 8931 RC4300.157 N/A N/A Breakaway:

28.1 -0.2/o, PASS.

Initial Drag: 45.0-0.3%, PASS, Activation (Mech): 0.010- PASS.

Bleed Rate (Hyd):

Test Load: 7561 - 50.4'/.

Final Drag: 82.2-0.5%, PASS.

23.1 0.2/o, PASS.

49.8

~ 0.3%, PASS.

0.010

~ PASS.

6794-45.3%

94.9 - 0.6%, PASS.

20.2 0.2%, PASS.

140.8-1.4'/o, PASS Tag:

2-167 Breakaway: 180.3-1.8%, PASS.

Ng/Cap:

PMH.2200 Initial Drag: 278.2-2.8%, PASS.

Serfal ¹:

PD 87773-1424 Activation (Mech):

Mark¹:

RCCOQ-147 Bfeed Rate (Hyd): 25.890- PASS.

25.750- PASS.

Deviation:

14 Test Load: 13540-135.4/

14005 - 140.1%

NCR:

N/A Final Drag:

Deviation Description; Upon receipt and after removal of the protective bags, itwas identified that the snubber reservoir indica.

tor was showing red. Functional test results are similar to those of a snubber containing air.

Dlsposltlon Summary:

Snubber was leak tested with reservoir charged and examined after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

No leak-age was observed.

A pressure test at 5940 psi was also performed and no leakage was observed.

Functional test results were sabsfactory.

Replacement S/N: PO 87773.1891 Tag:

Ng/Cap:

Serfai¹:

Mark¹:

Deviation:

NCR:

2-168 PSALM 20265 RC400-154 N/A Breakaway: 22.6-Q.4'lo, PASS.

Initial Drag: 31.6-0.5%, PASS.

Activation (Mech): 0.008-pass.

Bleed Rate (Hyd):

Test Load: 4477-74.6/o Final Drag: 31.1 - Q.5%, PASS.

10,5 0.2/o, PASS.

18.0- 0.3'/o, PASS.

0.009-pass.

4172

~ 695%

17.0 ~ 0.3%, PASS.

Tag:

NgCap:

Serfai¹ Mark¹:

Devfatlon:

NCR:

2-179 PSA-1/4 12904 RC-97.R1C N/A N/A Breakaway: 7.0-2.0/., PASS.

Initial Drag: 8.6 ~ 2.5/o, PASS.

Activation (Mech): 0.012-PASS.

Bleed Rate (Hyd):

Test Load: 203 58.1 lo Final Drag: 7.9-2.3'Yo, PASS.

5.0-1.4%, PASS.

7.2-2.1%, PASS.

0.013 - PASS.

177-50.6%

6.2-1.8%, PASS.

Tag:

Nggap:

Sertaf>>:

Mark¹:

Devfatlon:

NCR:

2-181 PSA-1/2 10722 SPS&7 N/A N/A

. Breakaway:

Initial Drag:

Activation (Mech):

Bleed Rate (Hyd}:

Test Load:

Fina! Drag:

5.3 0.8%, PASS.

7.5-1.2Yo, PASS.

0.010- PASS.

436 - 67.1%

7.5-1.2'/o, PASS.

5.1 -0.8%, PASS.

6.1 -0.9%, PASS.

0.010 ~ PASS.

502-77@o 5.5-0.8%, PASS.

Tag:

Ng/Cap:

Serfai¹ Mark¹:

Devtatlon:

NCR:

2-182 PSA-1/2 11260 SPS&7 N/A N/A Breakaway: 1.9-0.3%, PASS.

Initial Drag: 3.7-0.6/., PASS.

Activation (Mech): 0.011-PASS Bleed Rate (Hyd):

Test Load: 301 -46.4'lo Final Drag: 3.6-0.6o/o, PASS.

3.4- 0.5%, PASS.

4.4- 0.7%, PASS.

0.014-PASS.

288-44.3%

4.7- 0.7%, PASS.

Page 16

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSION Tag:

MfglCap; Serial ¹:

Mark ¹:

Devfatlon:

NCR:

2-183 PSA-1 19224 RC&00-1067 N/A N/A Breakaway:

Initial Drag:

Activation (Mech):

Bleed Rate (Hyd):

Test Load:

Final Drag:

48-0.3%, PASS.

6.7-0.4%, PASS.

0.011 - PASS.

1187 - 79.1%

7.9

~ 0.5%, PASS.

6.6 - 0.4%, PASS.

7.1 -0.5'/o, PASS.

0.011 - PASS.

1186-79.0'lo 6.5 0.4%, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2-184 PSA-1 19228 RC4300-1067 N/A N/A Breakaway: 4.6-Q.3'lo, PASS.

fnitial Drag: 7.1 -0.5%, PASS.

Activation (Mech): 0.007-PASS.

Bleed Rate (Hyd):

Test Load: 1156-77.1'/o Final Drag: 7.0-05%, PASS.

10.1 O.T%, PASS.

1Q.1 0.7/o PASS.

0.008 -'ASS.

1139 - 75.9%

10.2 0.7/o, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2-190 PSA-3 29503 SPS417 N/A N/A Breakaway:

17.1 -02%, PASS.

Initial Drag: 28.7 ONo, PASS.

Activation (Mech): 0.005

~ PASS.

Bleed Rate (Hyd):

Test Load: 3089-51.5/

Fina! Drag: 33.T -0.6'/o, PASS.

21.1 0.4%, PASS.

24.9 - 0.4%, PASS.

0.004 - PASS.

3170 52.8%

29.1 - 0.5%, PASS.

Tag'fg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR; 2-199 PSA-1 16943 SI40-R9 N/A N/A Breakaway: 8.9 ~ 0.6%, PASS.

Initial Drag: 105 0.7o/o, PASS.

Activation (Mech): 0.011-PASS.

Bleed Rate (Hyd):

Test Load: 981

~ 65.4%

Final Drag: 11.6-0.8%, PASS.

5.6 - 0.4%, PASS.

95-0.6%

PASS.

0.012 - PASS.

1Q75 71.7 /o 7.7-0.5'/, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark¹ Deviation:

NCR:

Tag:

Mfg/Cap:

Serial ¹:

Mark¹:

Deviation:

NCR:

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation; NCR:

2.202 PSA-1/4 12900 SI40-RTB N/A N/A 2.204 PSA-1 19617 GC.209T-26 N/A N/A 2-205 PSALMS 8292 MS4100.9 N/A N/A Breakaway: 32- 09k, PASS.

Initial Drag: 38-1.1 l., PASS.

Activation (Mech): 0.014-PASS.

Seed Rate (Hyd):

Test Load: 230-65.8%

Final Drag: 8.0 - 2.3%, PASS.

Breakaway: 83 ~ 0.6o/, PASS.

Initial Drag: 153-1.1%, PASS.

Activation (Mech): 0.006

~ PASS.

Bleed Rate (Hyd):

Test Load: 1150-76.7%

Final Drag: 145-1.0o/o, PASS.

Breakaway: 2382 -05%, PASS.

Initial Drag: 261.1. 05%, PASS.

Activation (Mech): 0.010- PASS.

Seed Rate (Hyd):

Test Load: 27-0.1%

Final Drag: 2613 - 0.5%, PASS.

35 - 1.0%, PASS.

3.6 - 1.0'/o, PASS.

0.014 - PASS.

208-59.5%

3.1 -0.9/o, PASS.

7.7-0.5%

PASS.

9.1 - O.P/o, PASS.

0.006-PASS.

1053 - TQ.P/o 10,7 - 0.7%, PASS.

145.8 - 03%, PASS.

189.3 -0 4% PASS.

0.013 - PASS.

26-0 1%

191.4 0.4%, PASS.

Page 17

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q -1989 Refueling Outage TENSION COMPRESSION Tag:

Mfg/Cap:

Serial¹:

Mark¹ Deviation:

NCR:

2-206 PSA-1/4 19077 MS-14-R6 N/A N/A Breakaway: 6.5-1.9%, PASS.

Initial Drag: 8.1 -2.3%, PASS.

Activation (Mech): 0.010- PASS.

Bleed Rate (Hyd):

Test Load: 238-68.0/o Final Drag: 7.0 ~ 2.0%, PASS.

5.8 1.7%, PASS.

8.1 2.3%, PASS.

0.010 - PASS.

237 - 67 8ol 8.0 2.3%, PASS.

Tag:

MfgCap:

Serial¹:

Mark¹:

Deviation:

NCR:

2-207 PSA-1/4 19093 MS-13.R6 N/A N/A Breakaway: 2.6-0.7%, PASS.

Initial Drag: 4.0 ~ 1.1%, PASS.

Activaten (Mech): 0.012-PASS.

Bleed Rate (Hyd):

Test Load: 227-64.7%

Final Drag: 5.3-1.5o/o, PASS.

9.4-2.70/o, PASS.

11.0 3.1 /o, PASS.

Q.010- PASS.

261 - 74.5%

92-2.6o/o, PASS.

Tag:

MfgCap:

Serial¹:

Mark ¹:

Oevfatlon:

NCR:

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Deviation:

NCR:

2.212 PSA-1/4 38023 SI-240341 N/A N/A 2-214 PSA-1/2 10723 CH-2081-147A N/A N/A Breakaway Initial Drag Activation (Mech)

Bhed Rate (Hyd)

Test Load Final Drag Breakaway:

Initial Drag:

Activation (Mech):

Bleed Rate (Hyd):

Test Load:

Final Drag:

3.7-1.1%, PASS.

4.9-1.4'/o, PASS.

0.010

~ PASS.

251 - 71.7%

4.6-1.3%, PASS.

2.1 0.3 lo, PASS.

2.5 0.4 lo, PASS.

O.Q14-PASS.

436 67.1/o 2.9- 0.4%, PASS.

3.7 1.1 /o, PASS.

5.8-1.T/o, PASS.

0.009 - PASS.

244 ~ 69.T/o 6.6 1.9%, PASS.

2.9-0.4/o, PASS.

3.0 0.5%, PASS.

0.013-PASS.

456 70.1 /o, PASS.

2.7 0.4%, PASS.

Tag:

2-215 Breakaway: 6.9-1.1%, PASS.

3.3 0.5/o, PASS.

Mfg/Cap:

PSA-1/2

'nitial Diag: 6.9-1.1'lo, PASS.

4.1 0.6/o, PASS.

Serial¹:

160SS Activation (Mech): 0.007-PASS.

0.005-PASS.

Mark¹:

CH-2081-10QA Shed Rate (Hyd):

Devfatlon:

9 Test Load: 476-73.2%

499-76S%

NCR:

N/A Final Drag: 5.5-0.8%, PASS.

4.2 0.6%, PASS.

Oevfatlon

Description:

After passing the functional test, this snubber became frozen during IKited operability (manual stroke).

Dtsposttion Summary:

This snubber appears to be indicating erratic operation.

Although the drag values are acceptable, the snubber should be replaced with a spare PSA-1/2. Other rebuilding efforts may be taken to salvage the replaced snubber.

Replacement S/N: 20433 Tag:

MfgCap:

Serial¹:

Mark¹:

Oevtatlon:

NCR:

2-216 PSA-1

'!6663 Sl.2419-50A N/A N/A Breakaway: 10.3-0. T%%d, PASS.

initial Drag: 13.5-0.9%, PASS.

Activation (Mech): 0.007-PASS.

Shed Rate (Hyd):

Test Load: 899

~ 59.9%

Final Drag: 18.5-1.2/o, PASS.

7.6-0.5% PASS.

15.9 1.1%, PASS.

0.007-PASS.

881 -58.T/o 11.7- 0.8%, PASS.

Page 18

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit¹2-1989 Refueling Outage Tag:

Mfg/Cap:

Serial ¹:

Mark ¹:

Devlatfon; NCR:

2-217 PSA-10 16438 SI.2407-25 N/A N/A Breakaway: 44.5 -0.3%, PASS.

Initial Drag: 52.3-0.3%, PASS.

Activation (Mech): 0.012-PASS.

Seed Rate (Hyd):

Test Load: 7577-50.5%

Final Drag: 55.0 - 0.4%, PASS.

385 - 0.3/o, PASS.

39.3 - 0.3'/o, PASS.

0.009 - PASS.

7Q43 ~ 47.0%

36.7 - 0.2'/o, PASS.

Tag:

Mfg/Cap:

Serial ¹:

Mark ¹;

Devfatlon:

NCR:

Tag:

Mfg/Cap:

Serial ¹:

Mark¹:

Deviation:

NCR:

2-218 PSA-10 8937 Sl-2407-25 N/A NIA 2-219 PSA-3 20259 CC.2061-101 N/A N/A Breakaway: 24.7 -0.2o/o, PASS.

Initial Drag: 41.4 - 0.3%, PASS.

Activation (Mech): 0.010 - PASS.

Bleed Rate (Hyd):

Test Load: 7511-50.1/o Final Drag: 55.7 - 0.4%, PASS.

Breakaway: 6.0 -0.1%, PASS.

Initial Drag: 22.7- 0.4%, PASS.

Activation (Mech): 0.006-PASS.

Bleed Rate (Hyd):

Test Load: 3077-51.3%

Final Drag: 273 - 05'/o, PASS.

195. 0.1%, PASS.

39.9 - 0&o, PASS.

0.011

~ PASS.

7052-47.0%

265 - 0.2%, PASS.

22.4 0.4%, PASS.

24.4- 0.4%, PASS.

0.006-PASS.

2887-48.1%

23.0 - 0.4%, PASS.

Tag:

2-220 Breakaway: 24.7- 0.4%, PASS.

Mfg/Cap:

PSA-3 Initial Drag: 111.4 -1.9%, PASS.

Serial ¹:

20261, Activation (Mech): 0.005 - PASS.

Mark ¹:

CC 2061-101 Bleed Rate (Hyd):

Deviation:

N/A Test Load: 3089-51.5%

3262

~ 54.4%

NCR:

N/A Final Drag: 105.0-1.8%, PASS.

1847.0 -30.8%, 1547.0 over, FAIL!

Devlatlon

Description:

The snubber exhibited excessive drag load during final drag testing.

Disposition Summary:

The snubber passed the as-found test, therefore no nowmformance exists.

Replaced the existing snubber with a spare; Teardown Results:

External rust. This condition is typically causedby a harsh environment Replacement 8/N: 20625 Tag:

Mfg/Cap:

Serial ¹:

Mark¹ Deviation:

NCR:

Tag:

Mfg/Cap; Serial ¹:

Markk Deviation:

NCR; 2.224 PSA-1/2 10719 CH.2081 485B N/A N/A 2-231 PSA-1/4 19072 CH-1-R2 N/A N/A Breakaway: 2.2 -03%, PASS.

Initial Drag: 25-Q.4%, PASS.

Acbvation (Mech): 0.014-PASS.

Bleed Rate (Hyd):

Test Load: 404-62.2%

Final Drag: 4.4-0.7%, PASS.

Breakaway: 4.1 1.2'/o, PASS.

Initial Drag: 7.1 - 2.0%, PASS.

Activation (Mech): 0.007-PASS.

Bfeed Rate (Hyd):

Test Load: 264-75.5%

Final Drag: 4.6-1.3%, PASS.

25 - 0.4%, PASS.

32-05%, PASS.

0.014-PASS.

443 - 68.2%

3.2 - 0.5%, PASS.

3.1 -09%, PASS.

4.9 - 1.4%, PASS.

0.007-PASS.

250- 71.3%

4.6 13%, PASS.

Page

~19

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit 4Q - 1989 Refueling Outage TENSION COMPRESSION Tag:

2-232 Breakaway: 92.3-26.4,307.4¹ over, FAIL!

0.7-0.2%, PASS.

MfgCap:

PSA-1/4 Initial Drag: 314.4-89.8%,

296.9¹ over, FAILI 0.7-0.2%, PASS.

Serial ¹:

38009 Activation (Mech):

Mark¹:

CH-1.R3 Bleed Rate (Hyd):

Devfatlon:

10 Test Load:

NCR:

2-189 Final Drag:

Deviation

Description:

This snubber was delivered to the test facility frozen.

A drag test was attempted with the following re-sults obtained. The MSAexhibited a 92.3¹ breakaway and a 314.4¹ drag in tension. Testing was terminated at this point.

Disposition Summary: The snubber was replaced with a Usega hydraulic snubber.

Teardown Results:

Normal service induced wear on all parts except for corrosion on clutch assembly-torque carrier.

Rod and bearing assembly frozen. These conditions are typically caused by a harsh environment and overload.

Replacement S/N: 6121 1/49 Tag:

Mfg/Cap:

Serial¹:

Mark ¹:

Deviation:

NCR:

2-234 PSA-1/4 38016 CH-I.R8 N/A N/A Breakaway: 4.3-1.2/o, PASS.

initial Drag: 6.0-1.T/o, PASS.

Activation (Mech): 0.010- PASS.

Bleed Rate (Hyd):

Test Load: 246 ~ 70.4%

Final Drag: 5.2 ~ 1.5%, PASS.

4.8 1.4% PASS.

4.9 - 1.4%, PASS.

0.011 - PASS.

272 - 77.8%

5.1 - 1.5%, PASS.

Tag:

2.236 MfgCap:

PSA-1/4 Serial ¹:

23635 Mark ¹:

8-250148 Devlatlon:

N/A NCR; N/A'reakaway:

3.9 -1.1%, PASS.

Initial Drag: 9.9-2.8o/., PASS.

Activation (Mech): 0.009-PASS Bleed Rate (Hyd):

Test Load: 165-473%-

Final Drag: 9.9

~ 2.8%, PASS.

11.5-3.3%, PASS.

11.5 - 3.3'/, PASS.

0.009 - PASS.

221

~ 63.2%

11.8 ~ 3.4% PASS.

Tag:

MfgCap:

Serial¹:

Mark ¹:

Deviation:

NCR:

2.237 PSA-1/4 23634 8.2501-68 N/A N/A Breakaway:

Initial Drag:

Activation (Mech):

Bleed Rate (Kyd):

Test Load:

Final Drag:

9.5-2.7% PASS 9.6 2.7/o, PASS.

0.012 - PASS.

236 - 67.3%

8.1 - 2.3%, PASS.

3.1 0.9/o, PASS.

7.0- 2.0%, PASS.

0.013 - PASS.

183-52Z%%d 7.0- 2.0%, PASS.

Tag:

MfgCap:

Serial ¹ Mark¹:

Devfatfon:

NCR:

Tag:

Mfg/Cap:

Serial ¹:

Mark¹:

Deviation; NCR:

2-240 PSALM 16761 BF.3020-148 N/A N/A 2-241 PSA45 7809 MS-4102M N/A N/A Breakaway: 14.3-0.2/o, PASS.

lnitfal Drag: 19.1

~ 0.3%, PASS.

Activation (Mech): 0.008-PASS.

Bleed Rate (Hyd):

Test Load: 4256-70.9%

Final Drag: 21.6 - 0.4%, PASS.

Breakaway: 279.7-0.6'/o, PASS.

Inibal Drag: 344.4-0.7/., PASS.

Activation (Mech): 0.010- PASS.

, Bleed Rate (Hyd):

Test Load: 38-0.1%

Final Drag: 325.2

~ 0.7./., PASS.

13.5-0.2%, PASS.

23.0- 0.4%, PASS.

0.010 - PASS.

4012-66.9%

19.6- 0.3%, PASS.

254.9 -0.5%, PASS.

254.9- 0.5%, PASS.

0.010- PASS.

36-0.1%

262.5- 0.5%, PASS.

Page 20

Florida Power 8 Light Company Snubber Functional Test Results Summary St. Lucie Unit 42-1989 Refueling Outage TENSION COMPRESS(ON Tag; Mfg/Cap:

Serial ¹;

Mark ¹:

Devfatlon:

NCR:

2-242 PSA45 7810 MS<102-33 N/A N/A Breakaway: 270.0 - 05%, PASS.

fnitial Drag: 270.0 -0.5%, PASS.

Acbvation (Mech): 0.010- PASS.

Bleed Rate (Hyd):

Test Load: 37-0.1%

Final Drag: 240.0-0.5%, PASS.

1573 0.3/o, PASS.

199.3 - 0.4%, PASS.

0.0! 0 - PASS.

33 - 0.1'/o 712.5

~ 1.4%, PASS.

Tag:

Mfg/Cap:

Serlat ¹:

Mark¹:

Deviation:

NCR:

2.247 PSA-35 7815 MS41 02-275B N/A N/A Breakaway:

Initial Drag:

Activation (Mech):

Seed Rate (Hyd):

Test Load:

Final Drag:

2855 - 0.6%, PASS.

885$ -1.8%, PASS.

0.012 - PASS.

47-0.1%

2889 0.6/o, PASS.

79.7 0.2%, PASS.

162.3

~ 0.3 /o, PASS.

0.012 - PASS.

46-0 1%

74.2 - 0.1%, PASS.

Tag:

2-268 Breakaway: 2635 - 4.4%, PASS.

50.6 - 0.8%, PASS.

Mfg/Cap:

PSALM Initial Drag: 2316.Q -38.6'/o,2016¹ over, FAIL!

174.4

~ 2.9'/o, PASS.

Serial ¹;

29692 Activation(Mech): 0.009-PASS.

0.006-PASS.

Mark¹:

BF.4004-258 BleedRate(Hyd):

Deviation:

2 Test Load: 5240

~ 87.3'/.

5311 - 88.5%

NCR:

2-162 Final Drag: 124.9-2.1%, PASS.

48.0-0.8%, PASS.

Deviation DescrfpUon: The snubber exceeded the acceptance standardby 2016¹s in initial drag in the tension stroke.

Disposition Summary: Snubber was replaced with a spare PSA-3.

Teardown Results:

Ball screw assembly indicated type of wear due to high vibration. There was also some corrosion present.

Replacement S/N: 25578 Tag:

2-321 Breakaway: 2523-72.2/., 235¹ over, FAIL!

25td -71.8'/.,233.8¹ over, FAIL!

Mfg/Cap:

PSA-1/4 Initial Drag: 2523 -72.2/o,235¹ over, FAIL!

501.6-143.3'/o,484.1¹ over, FAIL!

Serial ¹;

20136 Activation (Mech):

Mark¹:

MS.50.R4 BteedRate(Hyd):

Deviation:

1 Test Load:

NCR:

2-163 Final Drag:

DevlaUon

Description:

This snubber could not be functionally tested due to its degraded condition. The fest bench was able to move the snubber in compression for 1.8'n extension to 1.4 in extension dixing the initial drag test. The test bench was able to move the snubber approximately 2.3'in tension.

Dlsposltfon Summary: Snubber was replaced with a Usega hydraulic snubber in accordance with PC/M 296.288D.

Teardown Results:

Rust oninner and outer tubes caused the snubber to bind during limited operability stroking. This condition is typically result of a harsh environment.

Replacement S/N: 6121 1/71 Tag:

Mfg/Cap:

Serial ¹:

Mark¹

'DevlaUon:

NCR:

2422 PSA-1/4 38022 MS-7-R2B N/A, N/A Breakaway: 1.0-0.3%, PASS.

Initial Drag: 25-0.7%, PASS.

AcUvation (Mech): 0.012-PASS.

Seed Rate (Hyd):

Test Load: 248-71.0%%d Final Drag: 3.9-1.1%, PASS.

6.3 - 1.8%, PASS.

63 - 1.8/o, PASS.

0.012 -

PASS.'31

- 66.0%

50-1.4% PASS.

Page 21

Florida Power & Light Company Snubber Functional Test Results Summary St. Lucie Unit ¹2-1989 Refueling Outage TENSION COMPRESSION 1456

~ 970%

18.9 1.3%, PASS Tag:

2.324 Breakaway: 4.8-0.3%, PASS.

0.0 Q.ty/o, PASS.

MfgCap:

PSA-1 Initial Drag: 179.5

~ 12.0/., 104.5¹ over, FAILI 14.6-1.0/o, PASS.

Serial ¹:

16946 Activation(Mech): 0.008-PASS.

0014-PASS.

Mark¹:

MS-3023.53 Bleed Rate (Hyd):

Deviation:

3 Test l.oad: 1348 -89.9%

NCR:

2-168 Final Drag: 277.9-18.5%, 202.9¹ over, FAIL!

Deviation

Description:

The snubber became frozen during the limited operability test.

Dlsposltlon Summary:

Snubber was replaced with a spare PSA-1.

Teardovm Results:

The thrust bearing retainer had backed off 1 ~1/2 turns.

This condition is typically caused by excessive vi-bration and/or load.

Replacement S/N: 26005 Tag:

MfgCap:

Seffar¹:

Mark ¹;

Deviation:

NCR'-334 A/0-41 1289 VRC.4-R3 N/A N/A Breakaway: 2.9 -0.7%, PASS.

Initial Drag: 3.6-0.9%, PASS.

Activation (Mech):

Bleed Rate (Hyd): 54.94-PASS.

Test Load: 314 - 78.6'/

Final Drag: 4.8-1.2/o, PASS.

5.0 1.2/o, PASS.

5.5-1.4%, PASS.

56.41-PASS.

'20-80.1%

5.3 1.3%, PASS.

Page 22

Q

FLORIDA POWER

& LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST.

LUCIE NUCLEAR PLANT P.O.BOX 128 FT.PIERCE, FLORIDA 33454 UNIT 2 1989 OUTAGE NSI-2 REPORTS

0 NIS-2 OWNER'S REPORT FOR REPAIRS

& REPLACEMENTS ST.

LUCIE UNIT 2 1989 SYSTEM IDENTIFICATION REACTOR COOLANT PUMP 2B1 SCOPE FLANGE REPAIR CODE CLASS REPAIR ORGANIZATION FPL MAIN STEAM SUPPLY TO AUX. FEEDWATER PUMP TURBINE 2C VALVES REPLACED FPL CCW BACKWASH SYSTEM REPAIR/REPLACED VALVE/PIPE FPL SNUBBERS REPLACED/REMOVED 1 ~ 2 ~ 3 FPL/QUALTEC'NTAKE COOLING WATER DISCHARGE VALVES REPLACED FPL/BACKFIT COMPONENT COOLING WATER REPLACED ISOLATION VALVE PRESSURIZER SAMPLE REPLACED LINE FPL/BACKFIT COMB.

ENG.

RCS PIPING RTD NOZZLES REPLACED COMB.

ENG.

FLORIDA POWER 5 LIGHTCOMPANY 0

1. Owner
2. Plant FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Date QQ~

Sheet f of Unit P

3. Work Performed by PO¹:

PCM ¹:

PWO ¹: ~4)Qp CWO¹: ~

Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

4. Identification of System Type Code Symbol Stamp ~

Authorization No.

Eh Expiration Date

5. (a) Applicable Construction Code ASME SECTION III, 1977 Edition, SUMMER 1977 Addenda.

Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, WINTER 1980 Addenda.

Code Cases N/A

6. Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer Manufacturer Serial No.

National Board No.

Other Identification Year Built

Repaired, Replaced, or Replacement ASME Code Stamped (Yes or No) 2Bt RCP BYRON JACKSON N/A N/A RCP 281 N/A REPAlREO YES

FORM NIS-2 (Back)

7. Description of Work: Indications which were found on the inner and outer gasket seating surface of 281 RCP casing were, repaired by welding in accordance with P.W.O. ¹ 4429/62 and NCR¹ 2-287.
8. Tests Conducted:

Hydrostatic /

Pneumatic Nominal Operating Pressure 1

Other Pressure 2235 psi Test Temp. ~L 'P

9. Remarks:

N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this REPAIR conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization No.:

N/A Signed wner or Owner's Designee, Title Date CERTIFICATE OF INSERYICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Pressure Vessel Inspectors and employed by K~ e. >66 I

U of gRIPr a have inspected the components described to

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

National Board, State, Province and Endorsernents By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage of loss of any kind arising from or connected with this inspection.

r Commissions

/

.v Inspector's Signature Date

NIS-2 SUPPLEMENTAL SHEET

1. Owner
2. Plant i

I Date QLQQQ Sheet Q,

of Unit

3. Work Performed by
4. Identification of System:

PO¹:

PCM ¹:

PWO ¹:

CWO¹: ~

Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

G. Description of Work:

Indications which were found on the inner and outer gasket seating surface of 2B1 RCP casing were repaired by welding in accordance with P.W.O. ¹ 4429/62 and NCR¹ 2-287.

6. Remarks:

N/A

FLORIDA POWER It LIGHT COMPANY FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS

'As Required by the Provisions of the ASME Code Section XI

1. Owner
2. Plant
3. Work Performed by
4. Identification of System I

w Date 55LQQ Sheet f of Unit g,

PO¹:

PCM ¹:

PWO¹: ~)Qg CWO¹: ~

Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

5. Additional Material (Excluding Welding Material):

Name of Manufacturer Specification Type and Description Heat/Lot No. or CFC or RIR/Report N/A

FLORIDAPOWER 8 LIGHTCOMPANY FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner
2. Plant
3. Wok Performed by Date

~13LQZ Sheet 1 of 9.

Unit 2,

PO¹:

PCM ¹:

PWO ¹:

CWO¹: ~

Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

4. Identification of System Type Code Symbol Stamp ~

Authorization No.

Expiration Date

5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda.

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, Winter 1980 Addenda.

6. Identification of Components Repaired or Replaced and Replacement Components Name of Component MV-08-12 Name of Manufacturer Pacific Valves Manufacturer Serial No.

0102-8 National Board No.

N/A Other Identification Drawing 7-601 Rev. A Year Built 1979

Repaired, Replaced, or Replacement Replaced ASME Code Stamped (Yes or No)

YES MV-08-12 Pacific Valves 0912-7 N/A Isolation Valve, 1987 Body S/N XN1674 Replacement YES MV-08-12 Pacific Valves 0103-8 N/A Drawing 7-601 Rev. A 1980 Replaced YES MV-08-13 Pacific Valves 0913-7 N/A Isolation Valve, 1987 Body S/N XN1675

~

Replacement YES MS-3023-26A FPL N/A N/A Pipe Lugs (3),

ASTMA36, HT¹ 494L0961 1987 Replacement NO

NIS-2 SUPPLEMENTAL SHEET

1. Owner
2. Plant Date

~Ugly Sheet 2 of 9.

Unit

3. Work Performed by PO¹:

PCM ¹:

PWO ¹:

CWO¹: ~

Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

identification of Components Repaired or Replaced and Replacement Components (Continued):

Name of Component MS-10WFWA MS-10-FW-5 MS-10-FW-6 MS-10-5-FW-1 MS-11-5-FW-1 MS-11-FW-6 MS-11-FW-7 MS-11-6-FW-1 Name of Manufacturer FPL FPL FPL FPL FPL FPL FPL FPL Manufacturer Serial No.

N/A N/A N/A N/A N/A N/A N/A N/A National Board No.

N/A N/A N/A N/A N/A N/A N/A N/A Other Identification Pipe-to-Pipe weld upstream MV-08-12 Pipe-to-Valve weld upstream MV-08-12 Valve-to-Pipe weld downstream MV-08-12 Pipe-to-Pipe weld downstream MV-08-12 Pipe-to-Elbow upstream MV-08-13 Pipe-to-Valve weld upstream MV-08-13 Valve-to-Pipe weld downstream MV-08-13 Pipe-to.Elbow downstream MV-08-13 Year Built 1987 1987 1987 1987 1987 1987 1987 1987

Repaired, Replaced, or Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement ASME Code Stamped (Yes or No)

NO NO Pipe Spool MS-10-5 Pipe Spool MS-10-6 HUB HUB N/A N/A N/A N/A 4" Sch. 80 SA106 1987 GR.B, HT¹ A40702 4" Sch. 80 SA1 06 1987 GR.B, HT¹ A40702 Replacement Replacement NO

NIS-2 SUPPLEMENTAL SHEET

1. Owner
2. Plant Date

~3LQZ Sheet 3,

of 9.

Unit

3. Work Performed by PO¹:

PCM ¹:

PWO ¹:

CWO¹: ~

Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

Identification of Components Repaired or Replaced and Replacement Components (Continued):

Name of Component Name of Manufacturer Manufacturer Serial No.

National Board No.

Other Identification Year Built

Repaired, Replaced, or Replacement ASME Code Stamped (Yes or No)

Pipe Spool MS-11-5 HUB N/A N/A 4" Sch.80SA106 1987 Replacement GR.B, HT¹ A40702 Pipe Spool MS-11-6 HUB N/A N/A 4" Sch. 80 SA106 GR.B, HT¹ A40702 1987 Replacement

a%350 Sacr~

~ moo ~ ~

pgyy RAN ~-1

'ATA IIKPONT RN NUCLEAR~ Qt VAL IAs Iteqrrited hY Ihe Provtelona of the~ Code, Sec@on N, Oiv. 1}

1. ~ccwedoy HCC Pacific Yalves, 320I MaJ.nut Avet)ue Long Beach, CA
90807,

~rrr.w v4 Aldreoe of asererrrceerer)

g. ~ectwedfor EIQS$ 9 Services,
Inc, 2 Rector Street
NYC, NY i0006 Ororee one ndereee or aercnow or Owner)

Florida~r ~ht Co. 5t.. Lucis Unit.2 Ft, Pierce, 5j..

Gate V> 1 Ve

. Norn)nef )n)ef Sfce I)

OotNC S incN

4) Model No..

tblManvfectwers'c) Canadian Series No.

Serial lteqistrefion id) Orawiny If)Nart Ie} Year or Type No.

No.

No. 'e) C4ee Id. No.

Irrat I1) 650"X-0-'A.X OjN:8.-

.. Alh...

2;.60 I. Rev. A 0)

HCC Pacl flc.MIves. ShoP. Job.&09838 Itea,23..

Custco)ey P,O~

NY I)22563

!terr) 20,3 I2)

Tag. No Ltl~-l3.

N/P..

I/80 s..Nuclear SteaaJ'.ofder Plant Oner eeecnorern oi ocr~ ror wrecn eqworeere wee eeoereea 985 ps 550 Preeeunl frweeeeevrnet

2. Co)d Worhinp treasure N/A pa ar 1&%.

L heeewe llecerneg p~

'p Mr verve presewe Ciees

. NlA

4) Coating body.

S/K B ~.~tN Medge ~N XN 662 XN 66))

XN666 SA 2)6 GR MCB SA 2)6 GR VCS

. $$ 2g GR VCB.

(Sne Note A)

P,S,F.

P.S.F.

P.S.F.

Heat l6F6 HeaW6f 6 Heat I)7K6

, 4 Ir)rortpnf)s NOTE A:.

P S,F,.n pacif.ic. Souther Sound r.less.Inc.

I1) For menoeay operalad vahrae onN.

~ SuppNrnencaf sheets in Iorrn of )isis, Neachea or drawinoa mey ie wed provided II)aiae ie a )c'

11. 0) )n1ormwon rn horne
1. 2 and S en <<)e deca report )e )ncarded m each"sheet.

and IS) eectr sheet ie nwnbered end nwn)rer or eheeca ie recorded ~ top of&istoneL Itf2et ttee teree IeNos2) racy he )teaiheed frere der order oerl, Apaa, sea a. e2 sc Neer Yerl4 N.Y. IIO12

SNSH 5 of 3.

Og secsan...

j......

pope...

lcl Soasng Studs:

Body-Bonnet Nuts:. Body-Bonnetl SA 193 GR 87

,SA. )94.GR 7..

Cisco C)sco idI ether Perte NONE R

S. Hvdnwtstwteet 2)75.. peL MOTE 8:

Code Case CERTlRCATK OF C~UANCE we ceitrtv lhel the stetenwnts nwde in this report sre coriea end that this pump, or velve, contorms to Ow rules ol conetruawn ol Ow ASM'ode lor studeer Po>>ei Ptent Componen~

Seaion O. Div, L '97 I.

Addende Suasser

)976

. Code Cess ItoSee. Note.S.JLbove 7

~.~ &

Osw

~ IICC Pacific Valves by m~~S etc ~~~coo sto

)2O2 to~

g

~~ 8-4-8)

~d PPVI evict CM1l%KAllONOf OfStGH Oeelanevi~cvtyeest, HCC Pacific Va)yes Ssreee eneNsis report ICtsee I oral tet ae et N/A 1

~

r Ssieee erwtysis ceitised by {1)

Pf Stele iteo. No illSityworre not coul'ietL List nenw only.

CHAlRCATE Of SHOP NCStECllOH I. the under>>oned.

holding ~ vsad convniseion rssued by the l4tionei Soeid ot So'rtei end pressure Vessel Inspeaois

~ ew stetexaaaxttststot Ca) t fortt)a..

sml empioyedby n) v) s) on

..Ldu.Stf tat.)afety.. ~ ~~ a ~ or v~. wee~

. Rye~ 0 P., end stsse tlwtto the best ol my tno>>tedoe end beliet, the Msnuteauier Iws con.

strutted pie pump. or vetve. In eccoidatce>>ith ttw ASME Code, Seaion M.

due ceitlacete. rweher Iw avLwaor nor his employer metes eny wenenty. espiessed or vnptwd. conceinin9 dw eourpmem deeaibed in %is octa lteporL Funlwnnore. neither ew Inspector nor hrs employer shee be twice ei sny or property dsmsge or e loss of eny hnd erisintr L~ or conneaed vnth thw <<wtwaion.

&L'L4s~ '.

Commieeorw gas>>, erev. sne its i

SMELT /OF g fNQC hFV-1 MANUFACTUSBtS'RATAP~ ~ NUCLEAlt~ <Xi VALVES>>

ff4 Roecserod by the Ptoytsiofso ot the~ Code. Sectors N, Dly. 1)

1. asonvtacc~by

.HCC PaCif iC,ValVeS, 3201.gailttt~yenue LCD@. Seatlba C~OZ.

oeoeae cavo 444fvaee ef eeeoeoceceea<<s

g. Marhhdoccsfred tor KBASCO. Services, (nCe 0 2 Rec<og S~~ltYC HY ) 0006 ee4 aoctfeee er fcfaeeeet ef Oeaaeft
3. Ococtorc ot bsocactaoofs F 1or 1da Sever Unit. 2. ft. Pierce ~Clda 5Neevve eaas 444foeee e fvee <<vvae oace.val.v.e..

eeeee vve cev ~..

ovv>> ee tat Model No fbi Mafssftaccwors'cl Cafsadioo Series No..

Sorsol Rogaecrscsors

{dlfooeireo ln teen.

lOlV~

or Typo No.

Ho.

No.

(Ol Ctaed Id. No.

Ossitl

=69 LEexJL.

ill 6Stu=X.W-X alO-ace fee ifi 0aviv.ae.shooJhe.s0-.00cslLSS~7 tst CmictIer.P.O IIEET 225~tea ~2 e TaOJh.M-JSS~

.HlA s.. Nuclear. Steam PosNer Plant onet Ocsereoeea ot eeraaeo rer eaavacsa eceaoceeao was eoofvcao v

ceeev v

. B85.... ve ~50 v <<vwv~ ca>>

DeA Itaesaereoger

7. Cckt WorSOOt Presswe I

pea a 1tttrf.

e. Assews ttaafeneiag Pwccs f

Mere Nov I

ta) eocafnses Body, S/N Xl166l

~fset 5/N x!.'c63 Medge~~i s<<5/N...

ZN665 SA&l(, Cr

.1KB SA 2lo GR.

VCB

..SA 21.6 GR~

(S e ltote a)

. P.S.E P.S.f'.

~SZ hea~git lieat.4Qr6 45~

XONE f

00lE.A: ~

rac ffc~cheve f uc teevlaeca osofesaoey opotoeod haeeoos Saapoterraeoaeat Otaeose 40 tsrsac Ot cist'hotctsos ar droaeecaOS easy bo uood tsrohadod 111 caro fs ~ 10' tt; ~ ifatoifraOCSOSS tfr tcecrae

1. a asad

% oca cfvas deca report to sccsadod osc sects stsoot.

Orad ot sorts etaoec oe swrdsorod efhd aaffdhor ot etaoecs es rocordod ac cop at <<eo torsaa, ill%i Tthac tsfoea tQXXOttsooy be beocfaed treoaa der Order Oeoc Assai, %el e. Oy ec reeve Vooef.N.V. 1CN1'0

0 SIN DION-S fail~.1 goehl ctQCEl'. ctf 9 kt bo&bno sody.= Sonnet.

Studs

~iLcts Sk.l33AILR7MIass

. ~ae 3i0~'od~as t 1635-.I

- MkLand L Hytboe&ocic lee&

2 D5

.. pe&.

CKRTVKAT% OF C~UAHCF.

We CetOty ONE the rte&etnen&e tnede n >>tee tepotC ete Cofl~ Ond &&lee &hie PutnP, Or VOIW, Con&Otttte lo Che nhlee Ot cottarttcciott oc ate A$QE code cor Httc&eet p~ pion& cotnoonetkL sec&ion 8, Qttr. L Edition I)B=,

a=La<<

a&dM.

aae eaa<<t<<eaeaae <<a ee<<aeee Ne J202 ae aee aae

. aaee<<<<a<<ca

&=4dll CHAlRCATlCW l& DESIGN MCC I'aclflc Valves

<<aeaa laa<<e 1 eaeyl <<a I!ac <<

Oaaeel aeaeaeae'ee eeeeae aa ala J L

Logee m Sl>>&e ELOCida CCeb. CltL 2950?

~ eneeyeie cot&tiled by l 1 1

~t sass aaee aaa.

CKR'%KATE Of~ ASFECT1OOS

~y dbtttnb >>&le ceteelceee.

net&&ter>>to Cnepec&or nOr Cde <<nployer tneeee any eetrenry, eeOteeeed or intp&ied.

~>>ttip&ttottc deecrb&ed le dtie oece hepotc. ftrtrr~re. net>>ter>>te ~re&or nor ltte etnp&oyer &neo be keble in erty

~ Cor erty pereonoc 4iwyor froper&y detnooe or ~ loco ot erty Qn4 &Nidnb 0eea o&cont~ woo& cree Inepecion

.Let..-X~

1b~~

ggP C C.C(&-

<<at>>et&et&

Co~~>> QlklF> 7 oretc oe otwa. rte. ote &&Ll c, e&e ttnder&&ccned. &te&tsnp e ee4d cottet~n lect&ed by crto cocoa&or boetd ot baler end pteewte veeeel inepwc&ote aeeeetaeae<<aae<<<<e<<

. SaLltOCnle..

<<<<e<<<<eaeeaaMivisbea.

<<.tta&attfltl~fctt a<<e aeeaeaee eae eaaeaa

<<aeaea.

alaaa<<ee I

aee oaaa lleeae <<a

'. lb75.

ond eceee d&ec &o crte beer or tny crtcn&4edoe end be&lee. dte Menttceccttter hee con If<<(Q ~

co&tered dtio en<<et>>. or whe. in ecca~>>

wtd&>>to ACME code. sec&ton R.

SECT((

N

-PAGE Si(EET g of: rL FORM NPV-1 CERTIFICATE HOLDERS'ATA REPORT FOR NUCLEAR PUMPS OR VALVES As Required by the Provisions of the ASME Code,Section III, Div. 1.

(. Manufactured and certifiedby Pa ifiC 1

e 3 01 W

n B

9 8 (name and address of N Cenificate Hoiderl

2. Manufacture~ for Florida Power 8 Li ht Co.

6501 South AlA Hi hwa Jensen Beach FL (name and address of Purchaser or Ownerl 3

L t

f '

l( t' Florida Power Itt Li ht Co.

St.

Lucie Unit 2 Ft. Pierce, Florida (name and address) 4.

Model No., Series No.. or Type Drawing 7"601

Rev, CRR~NA
5. ASME Code Section III:

1974 Summer 1976 N A

6. Pump or valve 7

Material Bod)ASME SA21 6 Gr.

WCB (a)

Cert.

Holder's Serial No.

(b)

Nat'I Board No.

(c)

Body Serial No.

Edition Addenda date it II Nominal inlet size (in.)

BonnetASME SA21 6 Disk Gr.

WCB Class Outlet size ASME SA216 Gr.

WCB

((j)

Bonnet Serial No.

Code Case no 4 ll (in.)

B,lng Studs ASME SA193 Gr.

B7 Nuts,)ASME SA194 Disk Gr.

2H Serial No.

0912-7 N/A XN1674 XN1676 XN1678 suppiementai information in the form of lists. sketches.

or drawings may be used provided (ll size is 8'h x 1 t, (2) information in items l through 4 on tius Oata Repon is inciuded on each sheet. (3l each sheet is numbered and the number of sheets is iecorded at the top of this form.

(6IB5)

ThiS fOrm (E00037)may be obtained Rom the Order DeptASME, 345 E. 47th St., New York, N.Y lOOl7

-PAGE FORM NPV-1 (back)

S)(EE'f 3.op 'I 3-7

, 9~919-7 8.

Remarks

9. Design conditions 985 550

... ~NA (pressure) 10.

Cold working pressure-

11. Hydrostatic test (temperature) psi at 100'F F

Disk differential test pressure

~585 psi CERTIFICATION OF DESIGN Ar N Design Report certified by Prof. Eng. state F1orida Reg. No, 5910 Prof. Eng. state Reg. No.

CERTIFICATE OF SHOP COMPLIANCE We certify that the statements made ln this report are correct and that this pump or valve conforms to the rules for consuuction of the ASME Code,Section III.

N Certificate of Authoritation No.

12 2 Expires

, ~9-29-8 IN Corti()cate Holder)

Sign (representeti

)

CERTIFICATE OF SHOP INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Cal ifOrnia and employed by Cal s forn1a have inspected the pump. or valve. described in this Data Report on 19~, and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump; or. valve, in accordance with the ASME Code, Section ill.

'Rpsb

~

e

'b4

'S ~WRPb"s.

By s(gn)neph)s certificate. neither tetr,(nspector no'r his employer makes any warranty, expressed or implied, concerning the epuinmsnLQpseribeotFn tsis oats Repnni Furlhemtore. neither the inspector nor his emptoyer shall be tie bte in anY manner for "be

~

anv pe) s'o ':.otiury or property damage or a It)as of any kind arising from or connected with this inspection.

Rs!e 1'9~

(Inspector)

Commissions (Net'I, (ind. endorsememsl State, Prov. end No.l e

(1) for menue))y operated valves only.

FLORIDAPOWER & LIGHTCOMPANY FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Date QLQLQQ
2. Plant Sheet 3.

of Unit

3. Work Performed by PO¹:

PCM ¹:

PWO ¹:

CWO¹: ~

Process Sheet: ~

Repair. Organization P.O. No., Job No., etc.

II

4. Identification of System Type Code Symbol Stamp ~

Authorization No.

HL6 Expiration Date

5. (a) Applicable Construction Code ANSl 831.7, 1969 Edition, N/A Addenda.

Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs. and Replacement Components 1983

Edition, SUM. 83 Addenda.

Code Cases N/A

6. Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer Manufacturer Serial No.

National Board No.

Other Identification Year Built

Repaired, Replaced, Replacement ASMF Code Stamped (Yes or No)

SCH. 40cs 4" pipe N/A N/A N/A IA"-CW-129 N/A REPLACED NO VALVE N/A N/A N/A I-SB-21-11 N/A REPLACED NO 4" C.S. FLANGE N/A N/A N/A IA"-CW-129 N/A REPLACED NO N/A N/A

FORM NIS-2 (Back)

7. Description of Work: A4"dia. pipe and valve were replaced as part of work performed to repair a thru wall leak in the piping adjacent to the flange in accordance with the referenced PWO¹ and NCR¹ 1-285.
8. Tests Conducted:

Hydrostatic

~

Pneumatic Nominal Operating Pressure Other pressure ~~ psi Test Temp.

Bhlg

'p

9. Remarks:

The required Pressure test was conducted as a bench test.

CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization No.:

N/A Signed Ow r or OwneVs Designee, Title Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Pressure Vessel Inspectors and the State of Province of l~ri and employed by r <u-'.<<6~1 s~

of

'ave inspected the components described to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage of toss of any kind arising from or connected with this inspection.

Commissions L.C Go Inspector's Signature National Board, State, Province and Endorsernents Date

,19 hQ

NIS-2 SUPPLEMENTAL SHEET

1. Owner Date QQ2LQ9
2. Plant Sheet 3,

of Unit

3. Work Performed by F

4 PO¹:

PCM ¹:

PWO ¹:

1 41 CWO¹: ~

Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

4. Identification of System:
5. Description of Work:

A 4" dia. pipe and valve were replaced as part of work performed to repair a thru wall leak in the piping adjacent to the flange in accordance with the referenced PWO¹ and NCR¹ 1-285.

6. Remarks:

The required Pressure test was conducted as a bench test.

FLORIDA POWER Ilt LIGHT COMPANY FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner
2. Plant Date QQ2LQQ Sheet f of Unit
3. Work Performed by
4. Identification of System I

i P w 1

hHw 1

PO¹:

PCM ¹:

PWO ¹:

CWO¹: ~

Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

5. Additional Material (Excluding Welding Material):

Name of Manufacturer Specification Type and Description Heat/Lot No. or CFC or RIR/Report DUBOSE STEEL ASTMA106 A&B ASME-SA-106 4-1/2o.d. X.237W SEAMLESS C.S.

PIPE N07061 CONSOL PWR SUP FLANGE C.S. R.F. 4" FLANGE 283R HENRY PRA IT SA516, GR70 4" BUTTERFLYVALVE D2867 (BODY)

FLORIDAPOWER II LIGHT COMPANY FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner
2. Plant Date Sheet 1 of Unit P
3. Work Performed by F

4 PWO ¹: JEQQ CWO¹: ~

Process Sheet: ~A Repair Organization P.O. No., Job No., etc.

4. Identification of System Type Code Symbol Stamp ~

Authorization No.

Hl'h Expiration Date

~A

5. (a) Applicable Construction Code ASME SECTION 111, 19?7 Edition, SUMMER 1977 Addenda.

Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, WINTER 1980 Addenda.

Code Cases N/A

6. Identification of Components Repaired or Replaced and Replacement Components Name of Component SEE Name of Manufacturer ATTACHMENT Manufacturer Serial No.

¹1 National Board No.

FOR REPLACED OR Other Identification REMOVED SNUBBERS.

Year Built

Repaired, Replaced, or Replacement ASME Code Stamped (Yes or No)

FORM NIS-2 (Back)

7. Description of Work: During the PSL-2, 1989 Refueling Outage the following Mechanical and Hydraulic Snubbers were replaced with new snubbers, or were deleted altogether as shown on attachment ¹1. These replacements were initiated either by functional test failures/degradation or through plant modifications.
8. Tests Conducted:

Hydrostatic Pneumatic Nominal Operating Pressure other J'ressure htgt pst Test Temp. ~

'p

9. Remarks:

Allnew snubbers were baseline functionally tested, prior to installing them into the plant.

CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this REPAIR conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp:

N/A Certificate of Authorization No.:

N/A Signed Own or Owner's Desi ee, Title ph Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Pressure Vessel Inspectors and the State of Province of (oi s

n and employed by

<4~<'~~s

~

of Wo.

have inspected the components described in this Owner's Report during the period

~r

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage of loss of any kind arising from or connected with this inspection.

Inspector's Signature Commissions 7

0 cr 3

~

D National Board, State, Province and Endorsements Date 19

NIS-2 SUPPLEMENTAL SHEET

1. Owner Date QQ5L59
2. Plant Sheet Q.

of Unit P

3. Work Performed by Hw 1

PWO ¹:

GWO¹: ~

Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

4. identification of System:
5. Description of Work:

During the PSL-2, 1989 Refueling Outage the following Mechanical and Hydraulic Snubbers were replaced with new snubbers, or were deleted altogether as shown on attachment ¹1. These replacements were initiated either by functional test failures/degradation or through plant modifications.

6. Remarks:

Allnew snubbers were baseline functionally tested, prior to installing them into the plant.

FLORIDA POWER 5 LIGHTCOMPANY FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner
2. Plant Date QLLMQ Sheet f of Unit 2
3. Work Performed by PWO ¹:

CWO¹: ~

Process Sheet: ~

Repair Organization P.O. No., Job No., etc.

4. Identification of System
5. Additional Material (Excluding Welding Material):

Name of Manufacturer Specification Type and Description Heat/Lot No. or CFC or RIR/Report

ATTACHMENT 4"'l St. Lucie Vnit 02 - February/March 1989 Snubber Inspection Replaced/Removed Snubbers PO¹ B89630-90049:

The following list of snubbers have been replaced with a new identical type of snubbber, due to either functional test failures or degradation.

The Snubber testing contractor ( Qualtec Testing Services

) performed the snubber change-out.

RC-9-R12 SI-4205-4080 CH-108-R8 S I-4208-264B MS-4100-1 6B S I-4203-69C RC-4300-147 CH-2081-100A CC-2061-101 BF-4004-258 MS-3023-53 PSA-1/4 PSA-10 PSA-1/4 PSA-1/4 PSA-100 PSA-3 PMH-2200 PSA-1/2 PSA-3 PSA-3 PSA-1 19783 12504 11832 12049 2373 11070 87773-1891 20433 20625 25578 26005 2-032 2-037 2-046 2-069 2-095 2-097 2-167 2-215 2-220 2-268 2-324 Reactor coolant Safety Inj.

Charging Safety Inj.

Main Steam Safety Inj.

Reactor coolant Charging Comp. Cooling Boiler Feed Main Steam Page1 of3

ATTACHMENT¹1 St. Lucie Unit 02 - February/March 1989 Snubber Inspection Replaced/Removed Snubbers PCIM296-2SSD:

This PC/M provided engineering and design information for replace-ment of mechanical snubbers, Model PSA-1I4 kip, with greater load rated "Lisega" hy-draulic snubbers.

The snubbers which were replaced are listed below:

f o

RC-58-22 RC-44-R7 RC-44-R7 RC-35-R11 RC-37-R14 RC-2-R5 RC-2-RS RC-59-R2 S I-73-R4 CH-108-R4 S I-4200-322 B S I-4205-266B Ms-50-R4 CH-1-R3 Lisega, Type 30-18-RF-1 N

61 21 1/69 61211/61 61 211/66 61 21 1/43 61 21 1/60 61 21 1/74 61 21 1/44 61 21 1/75 61 21 1/65 61 21 1/55 61 211/54 61 21 1/72 61 211/71 61 211/49 2-021 2-023 2-024 2-025 2-026 2-027 2-028 2-030 2-035 2-045 2-059 2-071 2-321 2-232 Reactor Coolant Reactor Coolant Reactor Coolant Reactor Coolant Reactor Coolant Reactorcoolant Reactor Coolant Reactor Coolant Safety Inj.

Charging Safety Inj.

Safety Inj.

Main Steam Charging Page 2 of 3

ATTACHME NT 4'1 St. Lucie Unit 02 - February/March 1989 Snubber inspection Replaced/Removed Snubbers E

PCIM 297-288:

Ten mechanical snubbers with small thermal movement were perma-nently removed and replaced with rigid restraints in accordance with this document.

This will eliminate the need for any further inspection and testing for the following snub-bers:

Ms-33-R38 Ms-33-R38 Ms-32-R38 MS-32-R48 S I-241 9-50 CH-1-R5 CH-1-R2 CH-1-RB 8-2501-68 8-2501-68 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2-132 2-133 2-136 2-137 2-21'6 2-230 2-231 2-234 2-236 2-237 Main Steam Main Steam Main Steam Main Steam Safety Inj.

Letdown Letdown Blowdown Slowdown Blowdown PCIM 147-288:

This package was initiated to replace the following snubbers with a rigid restraint.

RC-26-R10A N/A N/A N/A Reactor coolant Page 3 of 3

FORM N5-2 0%NER'5 REPORT FOR REPhIRS OR REPLACEMENTS, hs required by the provtslons ot the ASME Code Section Xf Page 1 of 4 1 ~

OWNER:

FLORIDh POWER dc LIGHTCO.

P.O. Box 529100 Miami, Florida 33152 DhTEr June 23, 1989 UNITt 2.

PLANT!

3.

WORK PERFORMED BYi ST. LUCIS PLANT UNITII P. O. Box 1200 Jensen Beach, Florida 34957 F PL FLANTCONSTRUCTION/BACKFIT P. O. Box 1400 Juno Beach, Florida 33408 301 NO. PC/Mr 228-288 C%'0 NOit 5027 PROCESS SHEET NO.)

228-288-939 R/0 FFL/Backfit Repair Organization P~> Bosk, etc.

PO 0 C68918-67619F Type Code Symbol Stamp N/A 0.

IDENTIFICATION INTAKBCOOLING WATBR/

DISCHARGB VALVE huthorization No.

N A Expiration Date N/A 5.

a.

Applicable Construction Code SECTION i~i~Edition 1975 Winter hddenda

b. Applicable Edition of Section XIutilized for repairs or replacementsr S

B Section III 1981 Winter Addenda 6.

Identification of components repaired or replaced and replacement components Name of Component Rep lred hSME Cod Name of Mf/,'s Nat'1 Mentif-BYcar Replaced Starn Mfg.

SIN Bd. 1f I

1 "ll

/Replace-(Y~/No) ment 30" Isolation Valve Henry Pratt D-0065-6-1 2I-SB-N/A 21209(3) 1978 Removed No 30 " Isolation Valve Henry Pratt

-58723-1-2 21-SB-21209(

1985 eplaceme t No

FORM N5-2 Description of work>

S.

Tests Conducted!

9.

Remarks>

See su lemental sheet for description of work - Pg. 3 Hydrostatic Pneumatic Nominal OperatlnS Pressure Other X 6~i Pressure~el Test Temp.

P..

Attached Applicable Manufacturer's Data Report to be attached CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this Repair or Replacement conforms to Section XIof the ASME Code.

Signed:

~

~

Owner or wn

's Designee, Title Date CERTIFICATE OF INSPECTION I, the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Ycsscl Inspectors and thc State or Province of employed by have Inspected the described In this p ~I9~L 8

I <<h f

yl

&a dl III,hl Pl or replacement has been constructed In accordance with Section XIof thc ASME Code.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described ln this report.

Furthermore, neither thc Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

<<Arkwrfght Boston Insurance Co.

COMMISSION NO.

Commissions!

(State or Province, National Board

NIS-2 SUPPLEMENThL SHEET Page 3 of 4 I.

OWNER!

FLORIDh POSER dt LIGHTCO.

P.O. Box $29100 Miami, FIorlda 33152 OhTEt June 23, 1989 2e PLANT!

ST. LUCIS PLANT UNITII P. O. Box 1200 Jensen Beach, Florida 34957 VNITr 3.

WORK PERFORMED BY:

F PL PLANT CONSTRUCTION/BACKPIT P. O. Box 1400 Juno Beach, Florida 33408 3OB NO. PC/M 228-288 0.

IDENTIFICATION OF SYSTEM:

INTAKECOOLING VATBR/

DISCHARGE VALVE CWO NO.g 5027 DESCRIPTION OF WORK:

PROCESS SHEET NO..

228-288-939 R/0 During previous outages, inspections have revealed problems with the bonding of the rubber liner on the valve body as a result of seawater corrosion.

This PC/M (228-288D) provides for the replacement of the 2B ICV Pump Discharge Isolation Valve (rubber lined CS) with a stainless steel discharge valve.

C H54 SUPPLEMENTAL SHEET Page 4 ot 4 OWNERS'LORIDA POVER b( LIGHTCO.

P.O. Box f29100 Miami, Florida 331f2 DAT6!

June Z3, 1989 2.

PLANT:

ST. LUCIE PLANT UNITll P. 0, Box 1200 Jensen Beach, Florida 34957 UWnr 11 JOB NO. PC/M 228-288 3.

WORK PERFORMED BY:

FPL PLANT CONSTRUCTION/BACKFIT P. 0. Box 1400 Juno Beach, Florida 33408 C%'0 NO.i 5027 PROCESS SHEET NO,:

228-288-939 R/0 0.

IDENTIFICATION OF SYSTEM!

INTAKECOOLING VATER DISCHARGE VALVE Manufacturer Specification

~

~

5.

ADDITIONALMATERIAL (Excluding Welding MateriaO Type 4 Description Heat/Lot No.

or CFC or RIR/Report Henry Pratt AS ME-SA-351 Grade CF3M ASME-SA-479 Type 316 ASME-SA-351 Grade CF8M 30" Butterfly Valve 3R6869A

FORM N5-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS ha required by the provisions of the hSME Code Section Xl Page I of i I ~

OVNERs 2.

PLANTs 3.

WORK PERFORMED BYs FLORIDA POWER

  • LIGHTCO.

P.O. Box 529l00 Miami, Florida 33152 ST. LUCIB PLANT UNlT II P. O. Box 1200 Jensen Beach, Florida 349S7 F PL PLANT CONSTRUCTION/BACKFlT P. O. Box 1400 Juno Beach, Florida 33408 DhTEs 6/23/89 UNITs ll JOB NO. PC/Ms C%'0 NO.s 8461 PROCESS SHEET NO.s 8461>>928 R/3 FPL/Backfit Repair Organization PCS, 308k, etc.

PO f 68918-2420ZW Type Code Sp P lp p~

0.

IDENTIFICATION OF SYSTEM:

I COMPONENT COOLING WATER Authorization No.

Expiration Date N A Winter Addenda 6.

Identification of components repaired or replaced and replacement components

e. hppiicebie Construction Code SECTION III~I97 Edition Addenda ASME Section lll P. Spsl'. l.pp '"ll-l-Xlpl*pl--P'PS-Name of Component Other Re@ red ASME Code Name of Mfg's.

Nat'I M

if-r Replaced Stam Mfg.

S/N Bd. 0 I ti

/Replace-(Yes/N )

ment 3P" Isolation Valve N/A N/A N/A N/A N/A Removed No 30" Isolation Valve Henry Pratt D-44725-13-1 N/A Tag 0 SB-21-3 1984 Replaced No

Page 2 of 4 FORM N5-2 7.

Description of works 8.

Tests Conductedi 9.

Rem arksi Valve Chan eout Hydrostattc Pneumatic Nominal Operating Pressure Dtner X (Ia~t.T Pressure~

Test Temp.

F..

hppllcablc Manufacturer's Data Report to be attached CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this Repair or Replaccmcnt conforms to Section XIof'the ASME Code.

Signed:

ncr or

's Designee CERTIFICATE OF INSPECTION I, the Undersigned, holding a valid commission Issued by thc National Board of Boiler and Pressure Yessei Inspectors and the State or Province of 0

employed by have Inspected thc described In this p

~l9UH d

I b

e yh g

~ hEt,th p&

or replacement has been constructed ln accordance with Section XIof thc ASME Code.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report Fe thermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

  • ArkwrightBoston Insurance Co.

COMMISSION NO.

Date Commlsslonsr B 77 (State or Province, National Boar

N5-2 SUPPLEMENTAL SHEET Page 9 o! 0 1.

0%'NER>

FLORIDA PO%'ER d( LIGHTCO.

P.O. Box f29100 Miami, Florida 331f2 DhTEt'une 23, 1989 2.

PLANT!

ST. LUCIB FLANT UNITII F. O. Box 1200 Jensen Beach, Plorida 34957 UNITr 3.

WORK PERFORMED BY:

PFL FLANTCONSTRUCTION/BACKPIT F. O. Box 1400 Juno Beach, Plorlda 33408 JOB NO. PC/M N/A 0.

IDENTIFICATION OF SYSTEM:

COMFONBNT COOLING VATBR CWO NO,!

8461 f.

DESCRIPTION OF WORK:

Replacement parts for'Valve 0 2I-SB-21233 are not available.

Complete valve changeout was required.

PROCESS SHEET NO 8461-928 R/3

N~ SUPPLEMENT'hh, SHEIY Page 4 of I 1.

OWNER>

FLORIDA POSER d( LICHTCO.

P.O. Sox $29100 Miami, F1orlda 331j2 UNITt II June 23, 1989 2.

PLANT!

ST. LUCIB PLANT UNITIi P. 0. Box 1200 Jensen Beach, Plorida 34957 308 NO. PC/M N/A CWO NO.r 8461 3.

WORK PERFORMED SY:

P PL PLANT CONSTRUCTION/BACKPIT P. O. Box 1400 Juno Beach, Plorida 33408 PROCESS SHEET NO.:

8461-928 R/3 0.

IDENTIFICATION OF SYSTEM:

COMPONBNT COOLING VATBR Manufacturer Specification ADDITIONALMATERIAL (Excluding Welding Materia0 Type 4 Description Heat/Lot No.

or CFC or RIR/Report Henry Pratt ASMB-SA-516-GR70 ASMB<<SA-351 ASMB"S 30" Butterfly Valve C(S Planged 3R9472

FLORIDA POWER I LIGHT COMPANY FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner
2. Plant
3. Work Performed by Combustion Eng. Inc.

1000 Pros ect Hill Road Windsor CT 06095 Date May 5, 1989 Sheet 5.

of A

Unit 2

PO ¹ B-88633-90059 PCM ¹:

091-288 PWO ¹:

CWO fh N/A.

Process Sheet:

Repair Oreaniaaiian P.O. No., Joe No.. ero.

FPL P.O.

f/B88633-90059 C.E. Job

//616599 Type Code Symbol Stamp NR Authorization No.

2 Expiration Date 03-17-1990

4. Identification of System RCS Piping Construct on o e ect on ZZZ, 1977
6. Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer Manufacturer Serial No.

National 8oafd No.

Other Identification Year 8uilt

Repaired, Replaced, or Replacement ASME Code Stamped (Yes or No}

RTD NOZZLES:

772-104-17 772-104-19 772-104-16 772-104-15 772-104-13 CE CE CE CE CE N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CODE NOe M-9219-2 M-9219-5 M-9219-3 M-9219-5 M-9219-3 1976 REPLACED 1976 REPLACED NO NO 1976 REPLACED NO 1976 REPLACED NO 1976 REPLACED NO

FORM NIS-2 (Sack)

7. Description of Work:

Remove 5 RTD Nozzles in Hot Leg Piping and replace with Nozzles as identified.

8. Tests Conducted:

Hydrostatic Pneumatic Nominal Operating Pressure Csher x

pressure

~tg pst Test Temp.

532

'F

9. Remarks:

SECTION XZ Pressure Test

= 1.02 X 2235 PSZ Operating Pressure CERTIFICATE OF COMPLIANCE We certify that the statements made In this report are correct and this REPAIR conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp:

NR Certificate of Authorization No.:

Signed Owner or Owner's Designee, Title Date CERTIFICATE

~ OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Pressure Vessel Inspectors and the State of Province of I I~"i4+

and employed by of have inspected the components described

'P

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Ownet's Report in accordance with the requirements of the ASME Code,Section XI.

National Board, State, Province and Endorsements By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage of loss of any kind arising from or connected with this inspection.

L t, t,', ui Commissions

/'

inspector's Signature

0 l.

OWNER:

2.

PLANT:

NIS-2 SUPPLEMENTAL SHEET FLORIDA POWER 8( LIGHTCO.

P.O. Box 529100 Miami, Florida 33152 St. Lucie Page 3 of 0

DATE:

Hay 5, 1989 UNIT 2

3.

WORK PERFORMED BY:

Combustion Engineering 3OB NO. PC/M 091-288 CWO NO.:

N/A 0.

IDENTIFICATION OF, SYSTEM:

RCS Piping 5.

DESCRIPTION OF WORK; Remove (5) five RTD Nozzles and replace with Nozzles as identified.

PROCESS SHEET NO.:

616599-001 616599-002

NIS-2 SUPPLEMENTAL SHEET Page 4 of 4 l.

OWNER:

2.

PLANT; FLORIDA POWER 4 LIGHT CO.

P.O, Box 529100 Miami, Florida 33152 St. Lucie, Unit /IZX DATE; May 5, 1989 UNIT!

2 Combustion Engineering 5.

ADDITIONALMATERIAL (Excluding Welding Materia J) 3.

WORK PERFORMED BY:

IDENTIFICATION OF SYSTEM:

RCS Pip 3OB NO, PC/M 091-288 CWO NO,:

N/A PROCESS SHEET NO.:

616599-001 616599"002 Manufacturer Specification Type R Description No.

Heat/Lot No.

or CFC or RIR/Report CE 772-104-R 1

RTD Nozzle J-8611-1 CE 772-104-R 2

RTD Nozzle J-8611-1 CE 772-104-R 3

RTD Nozzle J-8611-1 772-104-R RTD Nozzle J-8611-1 CE 772-104-R 5

RTD Nozzle J-8611-1

FLOR1DA POWER 8 LlGHT COMPANY FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Date b'av 5, 1989
2. Plant
3. Work Performed by Sheet 1 ot Unit 2

PO ¹:

888633-90059 PCM ¹:

090-288 Combustion Eng. Inc.

1000 Prospect Hill Rd.

PWO¹:

2513 tri nd aor cT 06095 CWOth NIA Process Sheet:

Repair Organization P.O. No., Job No., ato.

FPL P.O.

!!B88633-9005o C.E. Job

!>616599 Type Code Symbol Stamp NR Authorization No.

2 Expiration Date 03-17-1990

4. IdentifioatIOn Of SyStem Pressurizer a

Construction Code Section II

8. Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer Manufacturer Serial No.

National Board No.

Other Identification Year Built

Repaired, Replaced, Replacement ASME Code Stamped (Yes or No)

Pressurizer CE Lo~er Sampling Line Nozzle Code No.

M-8918 N/A Pc.

No.

684-108B 1976 Replaced No

FORM NIS-2 (Back)

7. Description of Work:

B. Tests Conducted:

Hydrostatic Pneumatic Nominal Operating Pressure Other X

Pressure 2 2 80 psi Test Temp.

6 7 5

'F

9. Remarks:

'section XI Pressure Test

=

1. 02 x 2235 PSI Operating Pressure CERT!FICATE OF COMPLIANCE We certify that the statements made in this report are correct and this REPAIR conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp:

NR Certificate of Authorization No.:

Signed Owner or Owner's Designee, Title Date

, <98~

CERTIFICATE ~ OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Pressure Vessel Inspectors Q

4LDS have inspected the components described in this Owner's Report during the period to M.

I'rl, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner'~,Report in accordance with the requirements of the ASME Code,Section XI.

Commissions I

National Board, State, Province and Endorsements By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage of loss of any kind arising from or connected with this inspection.

( ki~. C(-

inspector's Signature Date "P;<

19

NIS-2 SUPPLEMENTAL SHEET Page 3 of 0

1.

OWNER:

2.

PLANT:

3.

WORK PERFORMED BY; FLORIDA POWER tk LICHTCO.

P.O. Box 929100 Miami, Florida 33152 St. Lucie 6501 South Hwy. AlA Jensen

Beach, FL 34957 Combustion Engineering DATE:

<av 5, lo89 UNIT:

2 JOB NO. PC/M 090-288 CWO NO.:

N/A 0.

IDENTIFICATION OF SYSTEM:

Pressurizer Lower Sample Line PROCESS SHEET NO.:

616590-003 DESCRIPTION OFVORK:

Replace original Lover Sampling Line Nozzle with Nozzle identified.

Pc.

I/684-107-R /

Code No. J8611-1

& J-2506-1

NLS-2 SUPPI.EMENTAL SHEET Page i of 4

I.

0%NER>

2.

PLANT:

3.

%0RK PERFORMED BY:

IDENTIFICATION OF SYSTEM:

FLORIDA POWER 8t LIGHTCO.

P.O. Box $29IOO Miami, Florida 33I52 St.

Lucie 6501 South Hwy.

A1A Jensen

Beach, PL 34957 Combustion Engineering Pressurizer Lower Sample Line DATEi pay 5, 1 9 89 UNIT:

JOB NO. PC/M C%0 NO.:

N/A PROCESS SHEET NO.:

616599"003 5.

ADDITIONALMATERIAL (Exchjding Welding Material)

Manufacturer Specification Type Bc Description Heat/Lot No.

or CFC or RIR/Report I

C.E.

PC.

No.

684-107-R Pressurizer Lower Sampling Line Nozzle J-8611-1 J-2506-1

L