MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] |
Text
ACCELERATED DIS>RIBUTION SYSTEM DEMONSTRATION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9108280256 DOC-DATE: 91/08/21 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION LEVINE~J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B. Region 5 (Post 820201)
SUBJECT:
~
Forwards reexam matl E exam scheduled to begin 910909.
list of operators for requalification D
DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Operator Licensing Examination Reports NOTES:STANDARDIZED PLANT 05000528
/
Standardized plant. 05000529 A Standardized plant. 05000530 D
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD5 PD 1 1 TRAMMELL,C 1 1 THOMPSON,M 1 1 INTERNAL: ACRS 2 2 NRR SHANKMAN,S 1 1 NRR-DLP FB11 1 1 NRR/DLPQ/LOLB10 1 1 LE 02 1 1 RGN5 FILE 01 1 1 EXTERNAL: NRC PDR 1 1 NSIC NOTES 1 1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WAS'ONTACT THE DOCUMENT CONTROL DESK ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAIVE FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 13
I
'I
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O BOX 52034 ~ PHOENIX. ARIZONA 85072.2034 JAMES M. LEVINE VCE PREStOENT N'JCLEAP PRODUCTION 161-04121-JML/GEC August 21, 1991 Docket Nos. STN 50-528/529/530 Mr. John B. Martin Regional Administrator, Region V U. S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368
Reference:
(A) Letter from J. M. Levine (APS) to J. B. Martin (USNRC-Region V),
dated July 5, 1991;
Subject:
Requalification Examination Material and List of Proposed Operators (B) Letter from J. M. Levine (APS) to J. B. Martin (USNRC-Region V),
dated July 31, 1991;
Subject:
Operator License Re-applications (C) Letter from J. M. Levine (APS) to J. B. Hartin (USNRC-Region V),
dated April 4, 1991;
Subject:
Operator Licensing Examination Material
Dear Mr. Martin:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Reexamination Material and List of Operators for Requalification Examination File: 91-005-419.06 Arizona Public Service Company (APS) provided, with Reference (A), a list of proposed operators (including crew composition) for the upcoming Requalification Program Evaluation scheduled to begin at PVNGS on September 9, 1991. Senior operator Steven L. Quan, who was included on the list enclosed with Reference (A), will not be examined during this evaluation visit. His position on Administrative Crew 1 will be filled by senior operator Erik M. Flodin. This change was discussed during a telephone conversation on August 1, 1991, between Mr. G. W. Johnston of your staff and representatives of the PVNGS Nuclear Training Department, and is reflected in Enclosure A.
Additionally, as requested by Mr. G. W. Johnston during the above cited telephone conversation, APS has provided to the NRC contractor, EG&G, appropriate reference material for use in developing the reexamination requested in Reference (B).
This reference material consists of the examination material previously provided to Pacific Northwest Laboratory-Battelle by copy of Reference (C), as well as 9108280256 '.01082k PDR ADOCK 05000528 lk V PDR I)
161-04121-JML/GEC August 21, 1991 Mr. John BE Martin U.S. Nuclear regulatory Commission Reexamination Material and List of Operators for Requalificati.on Examination Page Two additional examination material provided by APS to EG&G. Arrangements were made for the transfer of examination material from Pacific Northwest Laboratory Battelle to EG&G. This material was indexed in the Enclosure to Reference (C).
Additional material, indexed in Enclosure B, has been provided directly to Mr.
J. F. Hanek of EG&G by APS and includes supplementary examination material and replacement copies for those PVNGS procedures that were revised subsequent to the submittal of Reference (C). These replacement procedures should be substituted on a one-for-one basis for those previously provided by Reference (C). This material, taken together, constitutes the reference material for use in developing the reexamination.
Please call Gary Clyde at, (602) 340-4252 with any questions.
Sincerely, JML/GEC/gec Enclosures CC: W. F. Conway (9082)
Document Control Desk D. F. Kirsch L. F. Miller G. W. Johnston D. H. Coe J. F. Hanek (EG&G)
A. C. Gehr A. H. Gutterman
k ENCLOSURE A LIST OF OPERATORS, INCLUDING CREiV COMPOSITION, FOR 1991 REQUALIFICATIONEXAMINATION
LIST OF OPERATORS gDIPl'IIFIED BY DOCKIH'UMBERS),
INCLUDING CREW COMPOSITION, FOR 1991 REQUALIFICATIONI<&AMINATION Unit 1 Crew C Unit 1 Crew E David C. Burns (5$ -9063) James R. Niedermeyer (55-9077)
Paul J. Kirker (55-50189) Steven L Wackenstedt (55-50283)
Robert S, McKinney ($5-50009) Thomas E Holtzclaw ($ $ -$ 0482)
William K Myers (55-50114) James H. Graves, Jr. (55-50275)
Mark S, Johnson (55-50435) Alan M. Malley (55-50363)
Unit 2 Crew 8 Unit 3 Daniel N. Ensign (55-9103) Stephen W. Ryan (55-9075)
James A. Proctor (55-50281) Cecil A. Anderson (55-3581)
Kenneth B, Thommen (55.50352) Michael A. O'eary (55-50354)
Kelth A. Cardlllo (55-50444) Nicholas Pappas ($ 5-5036$ )
Scott J. Brzezinski (55-50360) William J, McCall, Jr. (55-50279)
Administrative Crew 1 Administrative Crew 2 Donna L Best (55-$ 0008) William J. Rudolph ($ 5-9125)
Earl R, Bethke (55-9097) Allan P. Peroutka (55-$ 847)
Thomas C. Cannon, Jr. (55-7563) Thomas E. Stahler (55-50118)
Michael R, Evans (55-9086) Walter E Stearns (55-5676)
Erik M. Flodin (55-9085) David M. Smith (55-8340)
ENCLOSURE B INDEX OF SUPPLEMENTARY AND REPLACEMENT REFERENCE MATERIAL FOR SEPTEMBER 1991 REEXAMINATION (T$ 4QlSMI~D DIRECTLY TO J. F. HANEK, EG&G)
EVALUATIO E ARI UMBER TITLE 050 TOTAL LOSS OF FEEDWATER 051 LOSS OF SECONDARY COOLANT 052 DEGRADED CONDENSER VACUUM 053 NCW/RCP MALFUNCTION/REACTOR TRIP 054 EXCESS STEAM DEMAND 055 SMALL LOCA (PRESSURIZER STEAM SPACE) 056 FEEDWATER RUPTURE OUTSIDE CONTAINMENT 057 REACTOR STARTUP 058 LARGE LOCA 059 SMALL LOCA 060 ATWS 061 FUNCTIONAL RECOVERY SMALL LOCA W/0 HPSI 062 LOSS OF FEEDWATER 063 LOSS OF FORCED CIRCULATION 064 SIT LEAK/LARGE LOCA 065 STEAM GENERATOR TUBE RUPTURE 066 STUCK OPEN SPRAY VALVE W/DROPPED CEA
CONTROL ROOM JOB PERFORMANCE MEASURES PAGE 1 OF 4 VOL ME I PM UMBER TITLE
- 1. AF008-J-C/R-01 DETERMINE THAT AUXILIARY FEEDWATER PUMP AFB-P01 AND SYSTEM IS OPERABlE
- 2. AF011-J-C/R-01 DETERMINE IF AFAS RESET IS ALLOWABLE
- 3. CD003-J-C/R-01 RESPOND TO A PARTIAL LOSS OF CONDENSER VACUUM
- 4. CH001-J-C/R-02 DILUTE THE RCS
- 5. CH002-J-C/R-01 EQUALIZE PRESSURIZER BORON CONCENTRATION WITH THAT OF THE RCS
- 6. CH003-J-C/R-04 PERFORM A BORATION OF THE RCS
- 7. CH004-J-C/R-03 EMERGENCY BORATE FROM RMT (CH-HV-536)
- 8. CH005-J-C/R-02 RESTORE LETDOWN (NO SYSTEM FAULTS)
- 9. CH006-3-C/R-01 SWITCH THE RUNNING ORDER OF CHARGING PUMPS
- 10. CP001-3-C/R-01 PLACE THE CONTAINMENT POWER ACCESS PURGE SUBSYSTEM ZN SERVICE
- 11. DG006-J-C/R-01 PERFORM DG A TESTING REQUIRED WHEN DG B IS DECLARED INOPERABLE
- 12. EM001-3-C/R-02 PERFORM SECONDARY OPERATOR SAFETY FUNCTIONS AFTER A REACTOR TRIP
V L ME I N 'o PAGE 2 OF 4 PM UMBER JELL
- 13. EM002-3-C/R-01 PERFORM PRIMARY OPERATOR IMMEDIATE ACTIONS FOR A REACTOR TRIP
- 14. EP001- J-C/R-03 PERFORM THE ACTIONS NECESSARY IF THE REACTOR FAILS TO TRIP WHEN REQUIRED (ATWS)
- 15. EP002-J-C/R-01 PERFORM IMMEDIATE ACTIONS PRIOR TO EVACUAT1NG THE CONTROL ROOM PER SHUTDOWN OUTSIDE THE CONTROL ROOM (OTHER THAN FIRE)
- 16. EP003-J-C/R-01 TAKE ALL IMMEDIATE ACTIONS PRIOR TO EVACUATING THE CONTROL ROOM DUE TO A FIRE
- 17. EP005-j-C/R-04 PERFORM ISOLATION OF EQUIPMENT TO MINIMIZE THE RELEASE TO THE ENVIRONMENT DURING A STEAM GENERATOR TUBE LEAK EVENT
- 18. EP006-J-C/R-01 RESETTING AN AUXILIARY FEEDWATER ACTUATION SIGNAL
- 19. EP007-J-C/R-01 RESTORE AUXILIARY FKEDWATER EQUIPMENT TO STANDBY AFTER AN AFAS
- 20. EP008-J-C/R-01 VERIFY RESET CRITERIA AND RESET NSIS
- 21. EP009-3-C/R-02 RESET SIAS/CIAS FOLLOWING AN ACTUATION
r VOLUME I NT'D PAGE 3 OF 4 PM UMBER TITLE
- 22. EP010- J-C/R-03 VERIFY NATURAL CIRCULATION PER 41EP-1ZZ01
- 23. EP011-J-C/R-02 RESTORE EQUIPMENT TO STANDBY FOLLOWING A CSAS
- 24. EWOQ1-3-C/R-01 RECOVER FROM CROSS-TIE OF ESSENTIAL COOLING WATER TO NUCLEAR COOLING WATER PRIORITY LOADS
- 25. FT001-3 -C/R-01 START FEEDWATER PUMP TURBINE A AND ACCELERATE TO 1,0QO RPM
- 26. FW004-J-C/R-01 RECOVER FROM A LOSS OF MAIN FEEDWATER
- 27. HF001- J -C/R-01 OPERATE THE FUEL BUILDING ESSENTIAL VENTILATION SYSTEM
- 28. HP001- J-C/R-01 PLACE THE A TRAIN HYDROGEN MONITOR IN SERVICE, DURING A LOSS OF COOLANT ACCIDENT
- 29. HP007-J-C/R-01 START UP THE TRAIN B HYDROGEN PURGE SYSTEM
- 30. MB001-J-C/R-02 TRANSFER GENERREX FROM AC TO DC MODE
- 31. MB002-J-C/R-01 TRANSFER GENERREX FROM DC BACK TO AC MODE
- 32. MBQ05-J-C/R-01 SYNCHRONIZE MAZN GENERATOR ONTO THE GRID
VOL ME I NT'o PAGE 4 OF 4 PM UMBER T1TLE
- 33. HB006-3-C/R-01 APPLY EXCITATION TO THE HAIN GENERATOR
- 34. HT010-J-C/R-01 MANUALLY TRIP THE TURBINE GENERATOR
- 35. HT013- J-C/R-01 PERFORM BACKUP TRIP TEST OF HAIN TURBINE
- 36. HT014- J-C/R-01 PERFORM OVERSPEED TRIP TEST OF HAIN TURBINE
- 37. NA001- J -C/R-02 MANUAL TRANSFER OF 13.8KV BUS TO UNZT AUXZLIARV TRANSFORMER
- 38. NCOOI-3-C/R-01 ALIGN ESSENTIAL COOLING MATER TRAIN A TO SUPPLY NUCLEAR COOLING MATER LOADS
- 39. NC002-J-C/R-01 PERFORM CONTROL ROOM ACTIONS FOR A LOSS OF NUCLEAR COOLING MATER WITHOUT CAPABILITY TO CROSS-TZE WITH EM
CONTROL ROOM JOB PERFORMANCE MEASURES PAGE 1 OF 4 V LUME II PM UMBER ITLE
- 1. RC003-3-C/R-02 RESPOND TO PRESSURIZER SPRAY MALFUNCTION
- 2. RC016-J-C/R-01 DETERMINE SUBCOOLED MARGIN WITH SUBCOOLED MARGIN HETER AND QSPDS BOTH OUT OF ORDER
- 3. RC018-J-C/R-01 PERFDRM PREssuRzzER HEATER CQNTR0L SUCCESS PATH PER 41RO-1ZZ10
- 4. RC021-J-C/R-01 RESPOND TO PRESSURIZER LEVEL CHANNEL FAILURE
- 5. RC022<<J-C/R-01 '~ DETERMINE WHETHER A SAFETY VALVE IS FULLY SEATED
- 6. RC026-J-C/R-01 DETERMINE RCS LEAK RATE FOR SUSPECTED S/G TuBE LEAK
- 7. RC028-J-C/R-00 RESPOND TO REACTOR DRAIN TANK HIGH TEMPERATURE AND EVALUATE FOR PRESSURIZER RELIEF VALVE LEAKAGE
- 8. RR001- J-C/R-01 RESPOND TO REACTOR REGULATING SYSTEM INPUT FAILURE - TCOLD FAILS HIGH
- 9. SAOOI-J-C/R-01 MANUAL ACTUATION QF ESF AT THE AUXILIARY RELAY CABINETS
- 10. SA004-J-C/R-01 MANUALLY INITIATE MSIS FR0M B05
l VOLUME I C NT'n PAGE 2 OF 4 PM MBER ~ITLE
- 11. SA005-J-C/R-01 MANUALLY INITIATE AFAS-1 AND AFAS-2 FROM B05
- 12. SA006-J-C/R-01 RESPOND TO AN INADVERTENT CSAS
- 13. SA008-3-C/R-02 RECOVERY FROM AN INADVERTENT SZAS/CIAS
- 14. SB004-J-C/R-01 REMOVE ONE INOPERABLE CEAC FROM SERVICE
- 15. SE002-J-C/R-01 RECOGNIZE AND RESPOND TO A LOSS OF POWER RANGE INSTRUMENTATION (SAFETY)
- 16. SF001-J-C/R-02 REMOVE THE REACTOR POWER CUTBACK SYSTEM FROM SERVICE
- 17. SF002-3-C/R-01 MANUALLY SELECT CEA SUBGROUP 4t FOR AUTOMATIC ACTUATION FOR A LOSS OF FEEDPUMP EVENT
- 18. SF003-J-C/R-01 STABILIZE AFTER AN RRS MALFUNCTION (TC FAZLED HIGH)
- 19. SF006-J-C/R-Ol MONITOR TURBINE RESPONSE AFTER RPCB (LOSS OF FEEDPUMP)
- 20. SF010- J-C/R-01 RESPOND TO AMP ALARM
- 21. SF011-J-C/R-02 OPERATE SBCS WITH MASTER CONTROLLER ZN MANUAL MODE (MODE,3)
- 22. SF012- J-C/R-02 PLACE THE SBCS MASTER CONTROLLER IN REMOTE AUTO MODE
YOL ME I CONT'o PAGE 3 OF 4 PM UMBER TlTLE
- 23. SF013-J-C/R-01 RESPOND TO A CONTINUOUS CEA INSERTION
- 24. SF014-J-C/R-01 RESTORE A DROPPED CEA TO ITS CORRECT POSITION
- 25. SF017-J-C/R-01 MANUALLY INITIATE CUTBACK FOR LOSS OF FEEDWATER PUMP TURBINE
- 26. SF018-3-C/R-01 PLACE REACTOR POWER CUTBACK SYSTEM ZN SERVICE (TAKE OUT OF AAOOS)
- 27. SF020-J-C/R-01 SWITCH THE SBCS MASTER CONTROLLER TO LOCAL AUTOMATIC MODE
- 28. SF025-J-C/R-01 RESET REACTOR POWER CUTBACK SYSTEM FOLLOWING LOCKUP (STALL)
- 29. SG006-J-C/R-01 MAINTAIN ADEQUATE HEAT REMOVAL THROUGH STEAM GENERATORS DURING LOSS OF FORCED CIRCULATION
- 30. SG015-3-C/R-01 MAINTAIN ADEQUATE RCS HEAT REMOVAL VZA THE S/GS DURING A PLANT BLACKOUT
- 31. SG016-3-C/R-01 MONITOR S/G OPERATZON DURING NORMAL OPERATION
- 32. SH001-3-C/R-01 OPERATE THE CORE EXIT THERMOCOUPLES DISPLAY SYSTEM. OPERATE THE QSPDS MODULE ON B04
YOLUME I ( ONT'D PAGE 4 OF 4 PM UMBER ~IT~LE
- 33. SI001-J-C/R-01 PERFORM REQUIRED ACTIONS AFTER A RAS
- 34. SI002- J-C/R-Ql PRESSURIZE A SAFETY INJECTION TANK
- 35. SI003-J-C/R-01 STOP 'SI FLOW AFTER A SIAS/CIAS THAT WAS NOT REaUIRED
- 36. SI005-J-C/R-01 THROTTLE HPSI FLOW DURING SMALL LOCA
- 37. SI013-J-C/R-01 RESET 786 LOCKOUT ON LPSI PUMP FROM CONTROL ROOM
- 38. SI014-J-C/R-01 ALIGN IODINE REMOVAL SYSTEM FOR AUTOMATIC OPERATION
- 39. SI020-J-C/R-01 DRAIN SAFETY INJECTION TANK 1B
- 40. SI021-J-C/R-01 FILL THE 1A SAFETY 1NJECTZON TANK
- 41. SIQ26-J-C/R-01 DETERMINE ZF SAFETY INJECTION FLOW ZS ADEQUATE FOR RCS PRESSURE
- 42. SI030-J-C/R-01 IN ORDER TO EMERGENCY BORATE, OPERATE HPSI PUMr S ZN LIEU OF CHARGING PUMPS
- 43. SI034-3-C/R-01 PERFORM CONTAZNMENT SPRAY PUMPS ASME SECTION XI TESTS
- 44. SI035-J-C/R-01 PERFORM QUARTERLY IODINE REMOVAL SCAP DISCHARGE PRESSURE TEST
IN PLANT JOB PERFORMANCE MEASURES PAGE 1 OF 5 PM UMBER TITLE
- 1. AF002-J-PLT-02 START AND ALIGN FEEDWATER TO BOTH STEAM GENERATORS FROM THE REMOTE SHUTDOWN PANEL t USING THE A TRAZN AUXILZARY FEEDWATER PUMP AFA-PQ1
- 2. AF003-J-PLT-02 FEED STEAM GENERATOR USING B TRAZN CLASS AUXILIARY FEEDWATER PUMPi FROM THE REMOTE SHUTDOWN PANEL
- 3. AF005-J-PLT-03 RESET ESSENTIAL AUXILIARY FEEDWATER PUMP AFA-P01 OVERSPEED TRIP DEVICE
- 4. AF006-J-PLT-03 SWITCH AUXILIARY FEEDWATER PUMPS TO BACKUP MATER SOURCE
- 5. AF009-J-PLT-02 CONTROL S/G LEVELS FROM REMOTE SHUTDOWN PANEL USING AFB-P01 PER 41A0-1ZZ44, SHUTDOWN OUTSIDE THE CONTROL ROOM DUE TO FIRE AND/OR SMOKE
- 6. AF012- J-PLT-02 OPERATE AUXILIARY FEEDWATER SYSTEM DURING SHUTDOWN OUTSIDE CONTROL ROOM DUE TO FIRE OR SMOKE - SWITCH TO RMMT AFW SOURCE
- 7. AF014- J -PLT-02 CONTROL S/G LEVELS FROM REMOTE SHUTDOWN PANEL USING AFB-P01 PER 41AO 1ZZ27i SHUTDOWN OUTSIDE THE CONTROL ROOM
PM UMBER ~TLE PAGE 2 OF 5
- 8. CD001-J-PLT-02 PERFORM ACTIONS OUTSIDE THE CONTROL ROOM FOR A STEAM GENERATOR TUBE LEAK
- 9. CH007-3-PLT-02 PERFORM OUTSIDE CONTROL ROOM ACTIONS FOR EMERGENCY BORATION OF THE RCSi USING CH-V327 TO SUCTION OF ALL CHARGING PUMPS
- 10. CHQ08-J-PLT-03 PERFORM OUTSIDE CONTROL ROOM ACTIONS FOR EMERGENCY BORATION USING SPENT FUEL POOL THRQUGH CH-HV-536
- 11. CH009-J-PLT-02 LINE UP BORATED SOURCE AND ISOLATE RMM DURING CONTROL ROOM FZRE
- 12. CH012- J-PLT-02 VENT CHARGING PUMPS
- 13. CH018- J -PLT-02 PREPARE CHARGING PUMP FOR PULSATION DAMPENER ADJUSTMENT DURING PLANT COOLDOWN
- 14. DG002-J-PLT-03 PERFORM DG PRE"START CHECKLIST PER 41ST-DG01
- 15. DG003-J-PLT-04 DZESEL GENERATOR B SEQUENCZNGi SHUTDOWN OUTszDE CQNTRQL RooM, FIRE/SMOKE
- 16. EM005-3-PLT-Ol MANUALLY LOCALLY START THE ESSENTIAL STEAM DRzvEN AuxzLzARY FEEDwATER PUMPi AFA-P01
h Ij jt t
I
PM NUMBER PAGE 3 OF 5
- 17. EM006-3-PLT-01 MANUALLY OPEN S/G DOWNCOMER UPSTREAM CONTAINMENT ISOLATION VALVE SGA-UV-172
- 18. EM007-J-PLT-01 PERFORM ALTERNATE METHOD OF SG LEVEL CONTROL BY LOCAL MANUAL START-UP OF THE NON-ESSENTIAL AUXILIARY FEED PUMP AFN-P01
- 19. EM008-J-PLT-02 MANUALLY CLOSE THE NON-ESSENTIAL AUXILIARY FEEDWATER PUMP 4.16KV BREAKER PBA-S03S
- 20. EM009-3-PLT-01 OPEN DOWNCOMER FWIV SGA-UV-172 USING THE'OLENOID VALVE BYPASS
- 21. FT002-J-PLT-02 TRIP MAIN FEED PUMPS DURING A CONTROL ROOM EVACUATION DUE TO A FIRE
- 22. HP003-J-PLT-02 LOCALLY MONITOR OPERATION OF HYDROGEN PURGE SYSTEM
- 23. MT002-3-PLT-05 TRIP MAIN TURBINE DURING A CONTROL ROOM EVACUATION DUE TO A FIRE
- 24. NC005-3-PLT-02 PERFORM LOCAL ACTIONS TO SUPPLY NUCLEAR COOLING MATER PRIORITY LOADS FROM ESSENTIAL COOLING MATER SYSTEM B
- 25. NC006-J-PLT-02 BACKUP ESSENTIAL COOLING MATER WITH NUCLEAR COOLING MATER
PM UMBER TITLE PAGE 4 OF 5
- 26. PN001-3-PLT-02 POWER UP A CLASS ZNVERTER
- 27. RC004-J-PLT-03 STARTING CHARGING PUMP B OUTSIDE THE "CONTROL ROOM
- 28. RC005- J-PLT-02 ENERGIZE B TRAZN PRESSURIZER HEATERS FROM THE REMOTE SHUTDOWN PANEL
- 29. RC006-J-PLT-02 REDUCE PRESSURIZER PRESSURE USING AUXILIARY SPRAY FROM THE REMOTE SHUTDOWN PaNEL
- 30. RC007-J-PLT-02 TRIP RCPs aND PuLL UC FusEs DURING A CONTROL ROOM EVACUATION DUE TO A FIRE
- 31. RC023-J-PLT-01 MONITOR RCS FOR SAFETY FUNCTIONS FROM REMoTE SHUTDowN PANEL - VERIFY NaTURAL CIRcuLATIDN PER APPENDIx H QF 41AO-1ZZ44t SHUTDOWN OUTSIDE CONTROL ROOM DUE TO FIRE AND/OR SMOKE
- 32. RC027-j-PLT-01 MAINTAIN SAFETY FUNCTIONS AT REMOTE SHUTDOWN PANEL - VERIFY NATURAL CIRCULATION AND ENHANCE AS REQUIRED
- 33. SF007-3-Pl T-01 PERFORM REACTOR TRIP SUCCESS PATH/
OUTSIDE THE CONTROL ROOM
- 34. SG008-J-PLT-03 OPERATE ADV FROM THE REMOTE SHUTDOWN PANEL
PM UMBER TITLE PAGE 5 OF 5
- 35. SG009-3-PLT-01 FOR SHUTDOWN OUTSIDE THE CONTROL ROOM PERFORM DUTIES OF NUCLEAR OPERATOR NO.
2, Ar PENDIx B, 41AO-1ZZ27
- 36. SG010-J-PLT-05 OPERATE THE ATMOSPHERIC DUMP VALVES (ADVS) MANUALLY
- 37. SI017-J-PLT-01 FILL SPRAY CHEMICAL ADDITION TANK
- 38. SI032- J-PLT-01 REFILL CONTAINMENT SPRAY HEADER B
- 39. SI039- J-PLT-01 VERIFY THAT A COMPONENT ZS ACTUALLY MALFUNCTIONING IN RESPONSE TO A SESS INDICATION
SIMULATQR CAPABILITIES MANUAL l
I I
l i
I
PROCEDURE HA GE LI T VOLUME I ILMBER P ED RE TITLE F E TIVE 400P-9ZZ11 MODE CHANGE CHECKLZST 08/03/93.
41AL-1RK1C PANEL BOIC ALARM RESPONSE 07/10/91 41AL-lRKSB PANEL BOSB ALARM RESPONSE 06/12/91 41AL-1RK68 PANEL 8068 ALARM RESPONSE 06/28/91 41'AL-1RK78 PANEt 807B ALARM RESPONSE 07/19/91
PROCEDURE HA GE LIST VOLUME II ggMBER PR CEDURE TITLE F T 41AO-IZZ14 EXCESSIVE RCS LEAKRATE 08/02/91 410P-IMT02 MazN TURBINE (MT) 07/20/91 410P-IPBQI 4.16KV CLASS IE PowER (PB) 07/23/91 410P-ITCOI TURBINE COOLING WATER 07/13/91 410P-IZZ01 CoLD SHUTDowN To HoT STaNDBY (MODE 5 To MODE 3) 08/03/91 410P-IZZ03 REACTOR STARTUP 08/03/91 410P-IZZ15 NUCLEAR OPERATOR AND OPERATIONS SUPPORT PERSONNEL WORK/STATIONS 08/01/91 41ST<<ICTOI CONDENSATE TRANSFER PUMP OPERABILITY 06/1&/91 41ST-1EW02 ESSENTIAL COOLING WATER PUMP OPERABILITY 4. 0. 5 07/18/91 41ST-IPBOI CLass IE PowER SUPPLY TRANsFER 4.8.1.l.l.s 07/13/91 74RM-9EF40 RADIATION MONITORING SYSTEM OPERATIONS 07/25/91
,I II 1
J f;
P lj