ML17305A717
| ML17305A717 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/11/1990 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17305A718 | List: |
| References | |
| NUDOCS 9004300251 | |
| Download: ML17305A717 (4) | |
Text
April ll, 1990 Docket Nos. 50-528, 50-529, 50-530 Mr.
W. F.
Conway Executive Vice President, Nuclear Arizona Nuclear Power Project P. 0.
Box 52034 Phoenix, Arizona 85072-2034
Dear Mr. Conway:
Subject:
Licensed Operator Requalification Retake Examination On March 20, 1990, an NRC simulator operating requalification retake examination was administered at the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3.
The simulator operating requalification retake examination was administered in accordance with NUREG-1021, ES-601, Revision 5, "Administration of NRC Requalification Program Evaluations."
The purpose of the examination was to reexamine a licensed Senior Reactor Operator who was previously evaluated as unsatisfactory, by the NRC, in the simulator operating portion of the October 9, through November 3, 1989, NRC evaluation of the PVNGS Units 1, 2, and 3, Licensed Operator Requalification Program.
The licensed Senior Reactor Operator was required to'be reexamined, by the NRC, within six months of the initial failure notification to the Operator.
Details of the examination are contained in Examination Report, 50-528/OL-90-01, which is Enclosure 1 of this letter.
Based on the results of the simulator operating retake examination,
.the Senior Reactor Operator has been evaluated as satisfactorily passing the examination.
It is a requirement of 10 CFR 55.57 (b)(2)(iv) that all applicants for license renewal pass an NRC administered written and operating examination, during the term of a six year license, prior to the renewal of the operating license.
In accordance with 10 CFR 2.790, a copy of this letter and Enclosure 1,
Examination Report, and 4, Simulation Facility Report, will be placed in the public document room.
Enclosures 2 and 3, Requalification Results Summary Sheet and Individual Requalification Examination Report, respectively, are personal private documents and will not be placed in the public document room.
OCj04300251 J004ii pj's AOGCK 05Q<3052-V PDr
1 i
(f N
Apri 1 11, 1990 If you have any questions concerning the examination report or this examination, please contact Mr. L. F. Miller, Jr. of my staff.
Sincerely, Dennis F. Kirsch, Chief Reactor Safety Branch
Enclosures:
l.
Examination Report 50-528/OL-90-01 2.
Requalification Results Summary Sheet (ES-601, Attachment 16) 3.
Individual Requalification Examination Report (ES-601, Attachment 18) 4.
Simulation Facility Report, (ES-501, Attachment 3) cc w/enclosures I, 2, 3 and 4:
E. Firth, Training Manager,
Enclosure 2 only:
J. Lanning, LOLB Enclosure 1 and 4 only:
J. Martin, RV B. Faulkenberry, RV R. Zimmerman, RV A. Chaffee, RV D. Kirsch, RV S. Richards, RV L. Miller, RV H. Mong, RV M. Ang, RV M. Royack, RV D. Coe, RV T. Chan, Project Manager, NRR M. Davis, Project Manager, NRR K. Perkins, LOLB RV/jk
)ST COPY REQUEST Y
REQUEST Y
YES NO YES 0
YES 0
ROYACK C
LNILLER KIRSCHg 3/A9 /90 3/gf/90
$/) /90 TO PDR YE
/
NO EXCEPT ENCLOSURES 2 AND 3
I' I'