ML17305A592
| ML17305A592 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/20/1990 |
| From: | Chan T Office of Nuclear Reactor Regulation |
| To: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| References | |
| GL-89-07, GL-89-7, TAC-74706, TAC-74707, TAC-74708, NUDOCS 9003230143 | |
| Download: ML17305A592 (4) | |
Text
),
1 Docket Nos.
50-528, 50-529 and 50-530 Mr. >lilliam F.
Conway Executive Vice President Arizona Public Service Company Post Office Box '52034 Phoenix, Arizona 85072-2034
Dear Mr,
. Conway:
March 20, 1990 DISTRIBUTION RRD 1
1'DR PD5 Readi'ng J. Zwolinski C. Trammell P.
Shea T.
Chan S. Peterson OGC E. Jordan ACRS '(10)
GPA/PA L. Engle E'. Murphy B. Mendelsohn E.. Leeds
SUBJECT:
RESPONSE
TO NRC GENERIC LETTER NO. 89-07 "POWER REACTOR SAFEGUARDS CONTINGENCY PLANNING FOR SURFACE VEHICLE BOMBS" (TAC NOS. 74706, 74707 AND 74708)
On April 28, 1989, GL 89-07 was issued to all licensees and requested that action be taken to address the potential threat of radiological sabotage involving a land vehicle bomb, in their safeguards contingency plan procedures.
By letter dated November 3, 1989, Arizona Public Service Company (APS) confirmed that the requested action has been taken for Palo Verde Nuclear Generating Station (PVNGS), that procedures are in place to address such a
contingency, and that a revision to the PVNGS Security Plan has been prepared.
Based on your response, APS has fulfilled the reporting requirements of GL 89-07.
Me therefore consider this action complete.
Sincerely, original signed by cc:
See next page Terence L. Chan, Senior Project Manager Project Directorate V
Division of Reactor Projects - III IV, V and Special Projects Office of Nuclear Reactor Regulation
- See previous concurrence DRSP/PD5*
PShea 3/19/90 DRSP/PD5*
SPeterson:sg 3/19/90 DRSP/PD5 TChan 3/go/90 P/D/PD5 mmell 3/$0'90
[PV 73187/8/9j 9003230i43 900320 PDR ADOCK 0500052S PDC
Q
'I l'
Docket Nos. 50-528, 50-529 and 50-530 Mr. ililliam F.
Conway Executive Vice President Arizona Public Service Company Post Office Box 52034 Phoenix, Arizona 85072-2034
Dear Mr. Conway:
DISTRIBUTION PD5 Reading C. Trammell T. Chan OGC ACRS (10)
L. Engle B. Mendelsohn NRC Local PDRs J. Zwolinskj/
P.
Shea 1'.
Peterson E. Jordan GPA/PA/
E. Murphy E. Leeds
SUBJECT:
RESPONSE
TO NRC BULLETIN NO. 89-07 "POWER RECTOR SAFEGUARDS CONTINGENCY PLANNING FOR SURFACE VEHICLE BO fS" (TAC NOS. 74706, 74707 AND 74708)
On April 28, 1989, GL 89-07 was issued to all licensees and requested that action be taken to address the potential threatiof radiological sabotage involving a land'ehicle bomb, in their safeg ards contingency plan procedures.
By letter dated November 3, 1989, Arizona iP lic Service Company (APS) confirmed that the requested action has been taken for Palo Verde Nuclear Generating Station (PVNGS), that procedures are in place to address such a
contingency, and that a revision to the PVNGS Security Plan has been prepared.
Based on your response, APS has fully illed the reporting requirements of GL 89-07.
>le therefore consider his action complete.
Sincerely, cc:
See next p ge Terence L. Chan, Senior Project Manager Project Directorate V
Division of Reactor Projects - III IV, V and Special Projects Office of Nuclear Reactor Regulation DRSP/PD PShea 3/~
t P 73187/8/9 j DRSP/PD SPeter
.Mg 3/8/90 DRSP/PD5 TChan 3/
/90 (A)DRSP/D/PD5 CTrammell 3/
/90
II r
'l