JAN ~ 8
]g9O
Docket Numbers
50-528,
50-529,
50-530
Arizona Nuclear
Power Project
P.
0.
Box 52034
Phoenix,
Arizona 85072-2034
Attention:
Mr.
W.
F.
Conway
Executive Vice President,
Nuclear
Gentlemen:
C
Subject:
NRC Inspection of Palo Verde Units 1,
2 and
3
This refers to the inspection
conducted
by Messrs.
D.
Coe,
T. Polich, J.
Ringwald, J.
Sloan,
W. Wagner,
T.
Meadows,
'and
W.
Ang of this office from
November
13 through
December
17,
1989, of activities authorized
by
NRC License
Nos.
and NPF-74,
and to the discussion of our findings held by
the inspectors with members of the Arizona Nuclear
Power Project staff at, the
conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
'ased
on the results of this inspection, it appears
that several
of your
activities were not conducted
in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed
herewith
as Appendix A.
These violations appear
to reflect deficiencies
which resulted
because
personnel
did not adhere to procedures.
It appears
that work progressed
without documentation
of the completion of steps,
or instructions in work
procedures
were incorrect.
The violation involving the failure to properly
document the completion of steps of a procedure
is similar to violations
previously brought to your attention in past inspections
and requires
additional
management
attention.
In addition, the events
which occurred
during the Unit 1 refueling operations
demonstrate
the
need to improve the
communications
between your various
management
levels to assure
the prompt and
complete resolution of issues.
These
issues
were discussed
at the
December
1,
1989 meeting in your corporate offices.
Your response
to this Notice is to be submitted in accordance
with the
provisions of 10
CFR 2.201
as stated
in Appendix A, Notice of Violation.
In accordance
with 10
CFR 2.790(a),
a copy of this letter and the enclosures
wi 11
be placed in the
NRC Public Document
Room.
~
l
'
JjlfK~
The response
directed
by this letter and the accompanying
Notice are not
subject to the clearance
procedure of the Office of Management
and Budget
as
required
by the Paperwork
Reduction Act of 1980,
PL 96-511.
F
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Ãl LACll'i'l'>ie<
4'.
Zi
ecman,
gi cecton
Division of Reactor Safety
and Projects
Enclosures:
1. Appendix
2. Inspection
Report
Numbers
50-528/89-50
50-529/89-50
50-530/89-50
cc w/enclosures:
J.
M. Levine, Vice President,
Nuclear
Power Production
M.
F. quinn,
Manager,
Licensing
T. Bradish, Acting Manager,
Compliance
B. Ballard, Director, equality Assurance
R. Fullmer, Manager,
equality Audits
8 Monitoring
A.
C. Gehr,
Esq.
Ms.
L. Bernabei,
GAP
J.
Brown, Arizona Corporation
Commission
bcc w/o enclosures
LFMB
M. Smith
bcc w/encl osur es:
docket file
G.
Cook
B. Faulkenberry
~pc
J. Martin
DCoefM"lid
TPolich +~~
JRingwalf
JSloan
l I]i/90
< lf1/90
l II9/90
//ie/90
WNup~c r
I/g a /9,
RP ur/7
KOJR9y'ohnson/Blume
I /~@90
YES- /
NO
] YES /
0
YES /
0
I
YES /
ND
YES /
N
ong+gjJ
FHue
< Z<<ZW'PS.
~ g~xg
SRichards
RZim
man
i )gogo
) g~l 0
ES /
NO
]
ES /
NO
YES /
NO
YES /
NO
]
YE
/
NO
]
I
l
I
l