ML17305A302
Jump to navigation
Jump to search
| ML17305A302 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/31/1989 |
| From: | Porter K ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17305A300 | List: |
| References | |
| NUDOCS 8910240206 | |
| Download: ML17305A302 (1) | |
Text
SUi'SARY OF OPERATING EXPERIENCE FOR THE MONTH
~REVISION" DOCKET NO.
UNIT NAHE DATE COMPLETED BY TELEPHONE 50-529 PVNGS-2 09 I3 89 K. F Porter 602 3 1-4187 AUGUST 1989 08/01 0000 Unit began month operating in Mode 1, 100%
RX Power.
08/07 0235 08/22 1956 08/24 1100 08/04 0823 08/06%
0513 Turbine trip on a false RX trip signal.
Generator synchronized to grid.
Unit reached 100%
RX Power.
Commenced power reduction to 654 for feedwater pump turbine maintenance.
Unit back at 100% RX Power.
08/31 2400 Unit ended month in Mode 1, 100%
RX Power.
~- This date appeared in the August report incorrectly as 07/06 891024020b 891016 PDR ADOCN, 05000M8 R
PNU