ML17305A302

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Aug 1989 for Palo Verde Nuclear Generating Station Unit 2
ML17305A302
Person / Time
Site: Palo Verde  
Issue date: 08/31/1989
From: Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17305A300 List:
References
NUDOCS 8910240206
Download: ML17305A302 (1)


Text

SUi'SARY OF OPERATING EXPERIENCE FOR THE MONTH

~REVISION" DOCKET NO.

UNIT NAHE DATE COMPLETED BY TELEPHONE 50-529 PVNGS-2 09 I3 89 K. F Porter 602 3 1-4187 AUGUST 1989 08/01 0000 Unit began month operating in Mode 1, 100%

RX Power.

08/07 0235 08/22 1956 08/24 1100 08/04 0823 08/06%

0513 Turbine trip on a false RX trip signal.

Generator synchronized to grid.

Unit reached 100%

RX Power.

Commenced power reduction to 654 for feedwater pump turbine maintenance.

Unit back at 100% RX Power.

08/31 2400 Unit ended month in Mode 1, 100%

RX Power.

~- This date appeared in the August report incorrectly as 07/06 891024020b 891016 PDR ADOCN, 05000M8 R

PNU