Inservice Insp Summary Rept for Unit 2 First Refueling.
ML17304A622
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/30/1988
From: Mary Anderson, Morrow A
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17304A621 List:
References
NUDOCS 8810070081
Download: ML17304A622 (52)


Text

Arizona Nuclear Power Project Inservice Inspection SLmmmary Report PVNGS UNIT 2 INSERVICE INSPECTION REPORT FIRST REFUELING 88goo7QOBi 050 pop ADOCN, pNU 8

PVNGS UNIT 2 INSERVICE INSPECTION REPORT FIRST REFUELING

PVNGS UNIT 2 INSERVICE INSPECTION REPORT FIRST REFUELING E

PALO VERDE NUCLEAR GENERATING STATION ARIZONA PUBLIC SERVICE, et al PVNGS P. 0. Box 52034 4 Miles South Phoenix, AZ 85072 Wintersburg, AZ 85343 Prepared By: Date: Z-3'o "Zt Date: S"-9O- ZF J'ate:

Reviewed By:

Approved Bj: ~ (> -4Q Commercial Report Service Date: September 19, 1986 Date: August 22, 1988

INDEX

1.0 INTRODUCTION

2.0 EXAMINATION

SUMMARY

3.0 EXAMINATION TECHNIQUES 4.0 ACCESSIBILITY 5.0 PERSONNEL 6.0 E}UIPMENT AND MATERIALS 7.0 REPAIRS AND REPLACEMENTS APPENDIX A INSERVICE INSPECTION

SUMMARY

REPORT APPEND1X B INSERVICE INSPECTION CODE LIMITATIONS APPENDIX C FORM NIS-1

~ 'I PVNGS UNIT 2 INSERVICE INSPECTION REPORT FIRST REFUELING

1.0 INTRODUCTION

This report is a summary of the examinations performed during the First Inservice Inspection at Palo Verde Nuclear Generating Station Unit 2.

This was the initial ISI for Interval 1 Period 1 and was conducted during the first refueling outage which occurred from February 20, 1988 thru June 22, 1988. Palo Verde Unit 2 began commercial operation on September 19, 1986.

This report identifies the components examined, the examination methods used, the examination report number and summarizes the examination results for each of the following categories of items:

1. ASME Section XI Class 1 and 2 pressure retaining components and their supports.
2. Augmented high energy piping systems in accordance with PVNGS FSAR Section 6.6.8.

j

3. Augmented examinations of CHR, RHR, and ECCS piping systems in accor-dance with 10CFR50.55a.

2.0 EXAMINATION

SUMMARY

The evaluation of the results from the inservice inspection examinations indicated the integrity of the systems has been maintained. All discrep-ancies were corrected in accordance with PVNGS work control practices and ASME Section XI. The discrepant findings are noted as follows:

DISCREPANCY 3,4 SG Manway Studs Galled Threads/Corrosion 5 PZR Manway Studs Galled Threads/Corrosion 25 SI-156-H7 Loose hanger clamp locknut 29 29-11 Linear Indications 45 SG-42-H14 Linear Indications 45 SG-42-H15 Linear Indications Indications'inear 51 51-3 51 51-4 Linear Indications 51 51-6 Linear Indications 51 51-9 Linear Indications 58 58-19 Linear Indications 60 60-8 Linear Indications

'The discrepant items in Zones 29, 45, 51, 58 and 60 were repaired by light grinding/blending. The manway studs in Zones 3,4 and 5 were all damaged during removal (galled) and were replaced with new studs and nuts. A pre-service examination was performed on all replacement items, including three snubbers.

3.0 EXAMINATION TECHNIQUES The three types of examinations utilized to perform the Inservice Examina-tions along with the actual nondestructive examination technique, are identified in the legend below:

VT-VISUAL VT-1 GENERAL CONDITION VT-2 LEAKAGE VT-3 STRUCTURAL CONDITION VT-4 OPERABILITY S-SURFACE LIQUID PENETRANT MAGNETIC PARTICLE VOL-VOLUMETRIC ULTRASONIC All of the nondestructive examinations were performed using specific tech-niques and procedures that are indicated in ASME Section XI, or alternative examinations that are demonstrated to be equivalent or superior to those identified.

4.0 ACCESSIBILITY All items were examined to the extent practical. Any code limitations encountered during the examinations are documented in Appendix B.

5.0 PERSONNEL All nondestructive examinations were performed by ANPP, and Lambert, MacGill, Thomas, Inc. (LMT) personnel. All personnel were certified in accordance with programs written to comply with the applicable requirements of ASME Section XI. Copies of all certifications are maintained on file. Kemper Group, representing ANI, provided the Authorized Inspection.

6.0 EQUIPMENT AND MATERIALS The equipment and materials utilized were certified to the requirements of ASME Section XI. Copies of all certifications are maintained on file.

7.0 REPAIRS AND REPLACEMENTS All repairs and replacements were performed to ASME Section XI requirements.

The applicable records and reports for the specific repair or replacement are maintained on file.

Page 2 of 2

APPENDIX A INSERVICE INSPECTION

SUMMARY

REPORT

APPENDIX A Definition of Terms The column headings for tabular information on the following pages are defined below:

ASME" ITEM NO: The ASME Section XI Category/Item Number as listed in the Code, Subsections IWB and INC.

ZONE NO: Area designation per PVNGS design.

COMP/SYS: Component or system descriptor.

INSP PER: Inspection Period REQD: Number of Items required to be completed in the Period.

ITEM ID: Item identification per ISI Program/Zone drawings.

REPORTS (VOL): Volumetric exam report number.

(SURF): Surface exam report number.

(VIS): Visual- exam report number.

AHE o ~ ~ ~ ~ ~ ~ ~ (Augmented Fligh Energy Systems)

FR ~ ~ ~ ~ ~ ~ ~ ~ (CFR Commitment)

INSERV ICE INSPECTION - RNNARY REPORT Palo Verde Nuc)ear 6enerating Station - Unit 2 Appendix A AQE INSP REPORTS ITBl NO IONE GNP/SYS PER REGD ITBl ID VOL SURF VIS AHE5. 11 53 STEAN TO AU)( Rl BK }B 53-11 88-2125 88%} 53-12 88-2122 88<} }} 53-13 88%}}} NO UT - INACCESS. 53-14 88<}24 88<}}} 53-}5 88-2}23 88<}}} 53-21 88-2128 88<}}} 88-2129 88-2111 53 23 88-2127 88<}}} 88-2126 88-2111 88-213B 88-21}1 AHE5,21 47 NS S61 27B Gh~ 12 47-1 88-2272 88<} }2 CIRC UT 88<}42 88-2}12 ArlAL UT 47-12 88<}B5 88-2B58 88-2186 88-2B58 47-2 88-227B 88%}}2 88-2187 88-2858 47<4 88<}43 88<} }2 88<}44 88<}}2 47-28 88-2133 88-2058 88-2134 88-2B58 47-3B ~7} 88<}}2 88-2183 88"2112 88-21B4 88~ 51 ATNS IRNP S61 ONE 11 51-1 88-2893 88M 88M4} 88-2131 51-3 88~42 88<383 88M43 88-23B3 88-225B 88-2131 51"5 88-2248 88<}3} p~g 1 0f 17

INSERVICE IHSPKTIN - QltNRY REPORT Palo Vere Nuclear 6eneratina Station - Unit 2 Apoendix A AQE INSP REPORTS ITEN NO IONA GNP/SYS PER REQD ITEN ID VOL SURF VIS AHE5. 21 51 ATMOS DlNP S81 OtK 11, 51% 88<244 88-2383 51-7 88-2245 88<131 51M 88-2246 88-2131 88-2247 88"2131 51"9 88-2249 88-2383 6B DSSCNER FM S61 OK 9 68-11 88"21B8 UT - INACCESS. 6B-12 88-21B8 NO UT " INACCESS. 68-14 88-2B99 88<IB8'O 6B-15 88<IBB 88<1 B8 88-2181 88-2188 6B-17 88<IB2 88%1B8 88-2B97 88<1 B8 88M98 88-2385 88-2188 NO UT - INAM<SS. QE 1B 66-1 88<121 88<1B9 66-2 88-2121 88-21B9 88-2119 88-21B9 88-2118 88-21B9 88<12B 88<1B9 66-4 88-2117 88-2896 88<116 88-21B9 66-7 88<115 88%1B9 88-2114 88<189 88-2113 88"2189 AHE5,31 47 NS SGI 27B 47-11 88<135 88~ 47-15 88-2137 88-2858 88-2139 88M 47-23 88-2136 88"2B58 47-27 88-214B 88M58 Parre 2 of 17

IHSERVICE INSPECTIOH " SUSQRY REPORT Palo Verde Nuciear Generatina Station - Unit 2 Apoendir A INSP RH%RTS AS'TEN NQ 2M CONP/SYS PER REQD I TB/ ID VOL SUPE VIS RBQ!P3 k'.31 47 HS S61 278 QF 7 47-3 68-2138 68~~112 47-7 SB- 141 88-2858 801.22 02 CLOSURE HEAD DhE 88-2375 68-2346 86-2373 88~~346 66-2372 86-2346 881. 30 81 REACTOR VEST~ ONr. 50$ 801. 40 02 CLOSURE HEAD SK 2-1 88-2371 SS-2346 68~~374 88-2346 88-2376 88-2346 B02. II 05 P2R Oh= 33K 88-2362 68-2343 88-2358 68-2343 88-2366 68-2343 5-8 88-2364 88-2343 68-2361 66"2343 88-2360 68-2343 B02. 31 03 S6 I ON"" I 04 SG 2 ON:- I B02. 32 03 S6 I ONE 4 $ 02.48 03 56 I 0+ I B83.098 81 REACTOR VESSEL OH= 2 B83. 118 05 P2R ONE 33'A 5-11 86-2359 88-2343 88-2365 SS-2343 68-2363 68-2343 88-2353 66<356 88-2354 B03. 128 05 P2R Oh" 2 5-11 68-2355 Itih"R RADIUS 88~~357 INH"-R RADIUS B03. 130 03 56 I Paae 3 of~

IHSERVICE INSPECTIN - SENARY REPORT Palo Verde Nuclear Generating Station - Unit 2 Apoendix A A9 INSP REPORTS ITEN NO LOW CONP/SYS PER REQD ITEN ID VOL SURF VIS B83. 138 94 SG 2 SK 1 B84. 12 82 CLOSURE HEAD OHE 8 B84. 13 81 fEt".TOR VESSEL ONE 5 B84. 28 85 PLR QJE 3 BBS. 848 28 PLR SURGE ONE 1 5-34 88-2367 88-2352 31 PLR SAFETIES ONE 1 88-2316 88-2399 BBS.138 21 SD OXX.IHG 1 OHE 1 23 SAFETY INJ 1A OHE 1 BC5.148 27 PLR SPRAY 1A ONE 1 DRAIN 1A fNE 1 8-18 88-2312 B86.818 92 CLOSURE ~ RE 18 BB6.838 82 CLOSUR:" HEAD ON"" 18 BB6.858 82 CLOSURE HEAD ONE 18 BB6.188 16 RCP 11 FLANGE STUDS SE 5 1 THRU 16 88<386 88-2382 88-2384 17 RCP 1B FLANK STUDS ONE 5 1 THRU 16 88~7 88~ 88-2385 18 RCP 2A FLANGE STUDS OHE 5 1 THRU 16 88-2393 88-&91 88-2389 19 RCP 2B FLANGE STUDS QE 5 1 THRU 16 88-2394 88-2392 88<398 BBo, 199 NA RCP 88-2486 RCP 2A B86.298 16 RCP 1A NUTS AND RING ON-" 5 1 THRU 16 88<413 17 RCP 1B NUTS AHD RING Ok~ 5 1 THRU 16 88-2414 18 RCP 2A NUTS AND RING ONE 5 1 THRU 16 88<415 19 RCP 2B NUTS AND RING OK 5 1 THRU 16 88-.2416 B87. 28 BS PlR 55NY SE N/A 1 STUD 88<412 PK 28 28 STUDS 88-2418 88<489 B97. 39 83 SG 1 NANNYS ONE 48 49 STUDS 88-2388 88<485 NIA 5 STUDS 88-2411 PSE 84 SG 2 NASNYS QK NIA 1 STUD 88-2411 PSE 48 48 STUDS 88-2388 88<485 B87. 58 31 PLR SAFETIES FLANK RE 1 88"2228 Pane 4 of 17

INSERVICE INSPECTION - SUNNRY REPORT Palo Verde Nuc}ear Generating Station - Unit 2 Appendix A ABK INSP REPORTS ITEN NG lONE CGNP/SYS PER REQD ITEN ID VOL SURF VIS 887. 5B 3} PIR NFETIES FLANSE GNE N/A PSV~ 88-23% PSE PSV~} 88M96 PSE PSV~ 88-2396 PSE PSV~ 88%396 PK 37 CHARSING FLANSE ONE 1 V435 88-2326 B87.68 16 KP }A SEAL BDLTS GNE 5 } THRU }6 88<4}7 17 RCP 1B SEAL BOLTS GNE 5 1 THRU }6 88<4}8 18 RCP 2A SEAL BOLTS ONE 5 1 THRU 16 88%4}9 19 RCP 2B SEAL BOLTS GNE 5 1 THRU 16 88-2428 B87.78 2} SD COOLING } 88-2 81 22 SD COOLING 2 0% 1 23 SI }A 0% 1 24 Sl 1B NK } 88-2}65 25 SI 2A ONE } 88-2481 26 SI 2B ONE 1 V225 88-2169 28 PIR SPRAY }B ONE 2 88-22}8 88-2218 3} PER SAFETIES 88-2228 32 DRAIN 1A 88-2328 V334 88%328 37 CHARGING ONE 1 V248 88-2221 38 DRAIN LOOP 1 ONE' 39 HPSI 1 GNE 1 B87. 88 2 CLOSURE HEAD GNE 1 B88. 28 85 PLR ONE 3> 88"2343 B88.38 B3 SG 1 ONE 3"1 B89. 11 86 KS PIPING ONE 7 28 PIR SUR6E ONE 1 28-} 2368 88-222 21 SD COGLIN6 } 0% 2 Pane of

INSERVICE INSPECTION - SUNIRY REPORT Palo Verde Nuc}ear 6enerating Station - Unit 2 Appendix A ASNE INSP REPORTS ITEN NO IONE GLOP/SYS PER REQD ITEN ID VOL SURF VIS B89.11 22 SD COOLING 2 ONE 2 23 SI }A ONE 3 25 SI 2A GNE 2 ~6 SBM98 88~7 25-29 88~9 88-2268 26 SI 2B 26-1} 88~ 88-2259 26% 88~3 88-2259 29 PIR SPRAY 29-18 88<3}8 SSM}5 29-11 SB-2319 88+377 3} PIR SAFETIES GNE 1 31" 1 88-2317 88<389 B89.21 27 PIR SPRAY 1A ONE 3 28 PIR SPRAY }B ONE 4 2S-31 68-2342 28-2 88-2342 28"39 88-2341 88-234} 38 AU% PIR SPRAY Zl-}3 88-2318 38-7 88<3}8 32 DRAIN 1A 32-1 88<3}3 88-2314 36 LETDOWN 88~8 36-X 88-2358 36-8 88<348 88-2348 37 CHARGING 37-41 88<324 88~324 37+3 88-2324 88<325 88<325 39 HPSI 1 88~} SSW9} 6 17 Pa e Page of o)

I~ ~

                                                                -   ~
                                                                                                                ~ '(
                ," ~

((

    ~                      ~      ~
    ~

I (~ r l III I ~ I I I I fl ~ ( ~ II~ ~ .p ~ ( ( ~ ( '( 'I( i ~ '

                                                                                                      ~  ~    ~      ~

I ' ~ l ~ ( (( I i ~ ) I

                                                                                 ~ ~

I ~ 4 l I' ' l

                       ~       I'                  ~                      ~  '
                                                   ~ ~             ;I   'll            ~ ~
                                                ~  ~                                                       ~,
                                                ~  '     KW:I           'l '             ~ ~
                             ~      ~

( Q( ~ ~ ~ ' '(I I ~

                                                ~  ~  'I  W:I 'll
                                                 ~  ~ '            I'II 'l   ~

II~ ~ ~ I

                                                             ~   ~ 4
                ~

II ~ ~

                                             '5 II~

I I

                ~
                  . ~ '
                        ~ ~   ~
    ~   I' I
  ~I    ~
                                  ~ ~

I II I NI ~ ~ ~ + ~ ~

INSERVICE INSPECTION - RNNRY REPORT Palo Verde Nuclear Generating Station - Unit 2 Appendix A AQE INSP Rc PORTS ITEN HO 20tK COHP/SYS PER REQD ITEN ID Vm. SURF VIS BIFF 27 PLR SPRAY IA QK 9 RC<2M& 88-2283 RCM~ 88-2284 RCM~ 88-2285 RCM~I 88"2286 RCM~ 88-2287 RCM~ 88MB& RPMM4 88-2289 28 PIR SPRAY iB RE 8 8&~ K-17'C-17+34 88-2211 K-17~ 88-2212 RC-17+3& 88~13 RC-17M 88M14 RC-17+48 88-2215 RC-17MI 8&"2216 RC-17+42 88-2217 29 PIR SPRAY EK 2 RC-18+16 88-2218 RC-18+18 88-2219 32 DRAIN 1A SL 2 RC~ 8&~56 RC~ 88-2173 SE 9 RCHJ+I 88-2351 RCHIM 88-~~4 RC+l~ 88-2179 RCRHSR 88-2188 RC<IM 88-2174 RCRHS 88-2175 RC-91M 88<176 RC 9H6 8&-2177 RC-91+1 88<178 37 CHARGING OHE H/A ~18 8&-2224 PS""

INSERVICE INSPECTION " SMEARY REPORT Palo Verde Nuclear Generating Station - Unit 2 Appendix A AQE INSP REPORTS ITEN NO IONE CNP/SYS PER REQD ITEN ID VOL SUlF VIS BIFF 37 CHARGING QK 14 CH-~ 88-2222 CH-~ 88-2'8~6 CH-~6 CH-~7 88-2227 CH-~8 88-2228 CH-~ CH-~8 88~ CH-~ BBM~38 CH-M35 86~31 C~36 88-2232 Clf&H42 86-2233 CH-~3 88-2234 CH+H44 88-2235 CH"5+AA ~ . 88-22>u 39 HPSI 1 ONE N/A SI-248+19 88-2483 PSE 4 SI<48M6 88-2181 SI-248M~7 88<182 SI-248M~8 88-2183 SI-248+38 88-2184 48 HPSI 2 Qt:- 3 C81. 18 41 SG 1 QF 1 68 REG HT EACH ONE 1 69 LETDIlN HT E)(CH ON>>" 58$ 69-1 C81. 28 41 SG 1 QK 68 REG HT EACH RE 1 C81. 38 41 SG 1 QK 5N 69 LETDM HT EACH ONE 5N 69-2 88-229 C82. 21 41 SG 1 SE 1 42 SG 2 RK 1 Page 10 of 17

IHSERVICE INSP="CTIOH SlNNRY REPORT Palo Verde Nuclear Generating Station - Unit 2 Appendix A AQE IHSP REPORTS ITEN NO IRK CNP/SYS PER REOD ITEN ID VOL SURF VIS C83. 18 41 SG 1 QK C83.28 43 l5 SG1 98 ONE 1 SG-36%17 88"2287 45 15 SP. 278 Gh>> 3 Sr~&14 88-KVs8

                                                   ~%15                  88-2378 SM 2+16               88M79 55  SG  2                ONE     1 64  BLMNNH SG1           ONE     2 65  BLMXNN SG2           ONE     2 78  LPSI SUCTIOH   1     92      2     SI<4HQI               88-2152 Si-36MI              88-2298 71  LPSI SUCTION 2       OHE     1     SI"194+14             88~

72 LPSI DISCH 1 SE 1 SI-87+11 88-2838 74 SD COOLING 1 SE 2 SI-7MI2 88<311 SI-7(H6 88-2331 75 SD COOLING 2 OHE 1 SI-72+13 88M65 76 LPSI HDR IA OK 2 SI-7lHI11 88-2153 SI-7MI6 88<153 88 CS SUCTION 1 Ore 1 SI-9-H4 88MQ5 C83.38 72 LPSI DISCH 1 K 2 72"3B 88"2836 72-3C 88-2836 88 CS SXTION 1 QF 2 88-3B 88~1 88-2881 C84.40 47 NS SG1 278 ON:- 28 V178 88-Kl 48 NS SG1 98 ONE 28 V188 88-2252 C85.11 58 AUX E FM SG1 ONE 1 58-1 88-2378 88-2349

         .59   AUX E FN SG2         RE     1                    88-2369 88-2347 C85.21     43   NS SGl  98           ONE    3         43-1       88<386 88-2287 43"2       88<328 88-2287 88-23M 88M87 page     11     og   17
                   ~
                        '    e> ~            I           ~     ~ I i   . ~
                                    ~  i '

I~

                 ~    '   ll
                                                                   ~ ~ J '
                                                                   ~ I
                                                                   ~ ~
                                                         ~ ~

I I'l o

<I Sl ~
        ~  ~

I ~ ~

                                  ~                ~

0 ~ 1 I~ I ~

                                                                            ~ ~ I ~
   ~     I   ~                       ~     ~                                ~ ~

INSERVICE INSPECTION - SUSQRY REPORT Palo Verde Nuclear Generating Station - Unit 2 Appendix A APE INSP RcPORTS ITEN N lOHc CNP/SYS PER REQD ITEN ID VOL SURF VIS CIWF 53 STEAN TO AUX FW ONE 4  %"81M 88-2379 SB-83+1 88-2878

                                                  %-83~                         88-2874 54  FM S61                OHE     6 55  FW  %2                OtE     9 58  AUX 4 FM S61          ONE     7 59  AUX  I FM S62         ON""    6       A,""++I                     88M57 SB-11+18                     88M64
                                                  %-11%11                      88-2263 SG"11+12                     88-2262 SB-1HS SG-1}M                       88-2268 68  DSNCSER    FW S61     $2      1      SB-25H6                      88-2484 62  AUX FW S61            ON""    1       fF-4+3                      88-@853 63  AUX FW S62            Oh:"   2      AF-16&i                       88<854 AF<M~                       88-2855 64  BLOWDOWN SG1          ONE     12 65  BLOWDOWN  SB2         OK      12 78  LPSI SUCTION  1       ONE    8      SI-23~3                       88-2155 61-241+12                      88<156 SI-241%14                      88-2158 SI "241+15                     88-2154 SI-241+19                      88-2185 SI-24IM1                       88"2157 SI-36~1                       88-2186 SIAM                          88-2827 71   LPSI SUCTION 2        0%     9     SI-194+12                      88"2859 SI "194+13                     88-2868 SI-194+14                      88-2861 Paae  13      of   17

INSERVICE INSPKTIGN SUNQRY REPORT Palo Verde Nuclear 6enerating Station - Unit 2 Appendix A APE INSP REPORTS ITEN NO LONE GNP/SYS PER REQD ITEN ID VOL SURr" VIS CINF 71 LPSI SUCTION 2 SK 9 SI-194M~3 88M62 SI-194M 88-2891 SI"194M 88-2892 Sl-34+1 88-2253 SI-34M 88M54 88-2255 72 LPSI DISCH 1 72-38 88-2825 72-3C 88-2825 SI-78M 88M% SI-87+11 88-2826 73 LPSI DISCH 2 ONE 2 SI-123+6 88-2841 SI-123M 88M43 74 SD COOLING 1 ONE 8 SI-7MIB 88<151 SI"7HI2 88-2158 SI-F15 88-2149 SI-7~ 88<148 Sl-87+9 88"2821 SI-8MI 88-2812 SI-8%2 88<814 SI-8%3 86<813 75 SD COOLINB 2 ONE 8 SI-I~IB 88M48 SI-12~11 88-2847 SI-1~12 86-2851 SI-72+18 88-2898 SI-72+}I 88-2878 SI-72+13 88M71 SI-72+14 88-2869 SI-72M 88-2889 76 LPSI 1A ON" 6 SI-282~ 88-2187

INSERVICE INSPECTION - 9PMRY REPORT Palo Verde Nuclear Senerating Station - Unit 2 Appendix A ASHE IHSP RB6RTS ITEN NO lONE COHP/SYS PER REQD ITEN ID VOL SURF VIS CIHF 76 LPSI 1A OHE 6 SI-282M 88<188 SI~M 88<189 SI-7MII 88-2168 SI-7MI3 88-2161 SI-7M 16 88-2159 77 LPSI IB OIF 9 SI-~18 88-2191 SI~II 88-2192 SI~I2 88-2193 SI-22M13 88-2194 SI-~14 88<195 SI-~15 88-2196 SI-22MI9 88-2197 SI-~ 88-2198 78 LPSI 2A ONE 4 SI-I ~ SI-25HH SI-1~6 88-2198 88<199 88-2288 SI"72MI BSM63 SI-72~ BS-28o4 79 LPSI 2B , OH=" 3 SI"73+1 88~67 SI-73M 88<872 SI-73+3 88-2873 88 CS PUHP SUCTION 1 OHE 3 88"3B 88-2883 88-3C BSM83 SI~ SS-2882 82 CS DISCH 1 OHE 8 SI-7 MI BSMI8 SI-7M18 88-2886 SI-7~ 88-2889 SI "7~ 88-2888 SI-7~ 88-2887 Paae 15 of 17

INSERVICE INSPECTION - SUGARY REPORT Palo Verde Nuclear Generating Station - Unit 2 Appendix A AM INSP REPORTS ITEM NO IRK CONPISYS PER REQD ITEM ID VOL SURF VIS CINF 82 CS DISCH 1 8 SI-SR7 88-2842 SI-8~ 88-2949 PSc 88-2118 SI-8&6 88-2052 83 CS DISCH 2 ON"" 6 SI-11%18 88-2858 SI-11~ 88-2945 SI-1 &9 88-2844 SI-IIM9 88~6 SI-134+11 88-2839 SI-134-H12 88-2849 FR05. 11 78 LPSI SUCTION 1 ONE 9 78-184 88-28S4 SS-2037 78-134 88"2392 88-2298 78-16 88-2152 NO UT - INAXESS. 78-17 88"2275 88<152 78-2 88-2278 88-2147 78-58 88~3 88-2837 88-2982 88-2837 88-2276 88-2152 78-85 SSM74 88-2152 72 LPSI DISCH 1 72-48 88<933 88-2824 72-5 88-2879 88-2836 72< 88-2888 88"2036 72<1 88-2831 88-2824 72-8 8S"2881 88~ 74 SD COOLING 1 ONE 7 74-108 88-2828 88-523 74-185 8S-2934 88-2815 74-19 88"2835 88-2815 74-21 88-2929 88-2815 74-44 88-2273 88-2146

                                                         ~

Pane 16 of 17

INSERVICE INSPECTION - SUNQRY REPORT Palo Verde Nuclear 6enerating Station - Unit 2 Appendix A ASNE INSP REPORTS ITEN NO 2ONE CNP/SYS PER REGD ITEN ID VP SURF VIS FRC5. 11 74 SD COOLI% 1 ONE 7 74-74 BSM 88-2823 74-87 88-2838 88-2815 76 LPSI 1A M 1 88-2277 88-2145 88 CS SUCTION 1 QK 2 88-18 88-2828 88<884 88-16 BSM16 88<884 82 CS DISCH 1 82-1 88-2818 BS-2811 82-1A 88-2819 BS-2811 82-2 88-2817 BSMII BS-2894 88~ 88~5 88-2888 FR85. 21 78 LPSI 2A 78-16 88-2269 88~ 78"45 88-2381 88-2265 78-47 88-2388 88-2265 FRQ5.31 72 LPSI SXTION 1 ONE 1 72-49A 88-2824 74 SD COOLINB 1 RE 1 74"182 88-2146 Page 17 of 17

APPENDIX B I NSERV I CE INSPECT ION CODE LIMITATIONS

INSERVICE INSPECTION CODE LIMITATIONS None identified during this outage.

APPENDIX C FORM NIS-1 0>lNERS'ATA REPORT FOR INSERVICE INSPECTION

FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS

1. OWNER Arizona Public Service Company, et al ADDRESS P. 0.* Box 52034; Phoenix, AZ PLANT Palo Verde Nuclear Generatin Station ADDRESS 4 Miles South; Wintersburg, AZ
3. UNIT NO. 2 4. OWNERS CERTIFICATE OF AUTHORIZATION N/A
5. CO~RCIAL SERVICE DATE September 19, 1986
6. COMPONENTS INSPECTED:

COMPONENT OF MANUFACTURER SERIAL STATE OR NATIONAL APPURTENANCE OR INSTALLER NESER PROVINCE BOY NO See Appendix A for a listing of the Items examined and their respective report numbers. PAGE 1 OF

      ~z zz~sg-1~         zo 6  2ua e.      z;sr   L'~vm mow           e-19-SSzo e->8-96
9. ABSTRACT OF EXA.ENATION. INCLL'D J>> ST OF ~DONATIONS AiG) A STAT"'Ji CONC RNING STATUS OF WORK R:QUIR:-D FOR CURRENT Iai ERVAL.

All Items scheduled for examination Period 1, Interval 1 are alphanumerically listed according to ASME Section XI Categories in Appendix A. The Items examined during this outage exhibit report numbers in the appropriate column(s).

10. ABSTRACT OF CONDITIONS NOTED.

Several unacceptable linear indications were detected on the outside diameter surface of various piping systems. In addition, 6 SG and 1 PZR manway studs were found to have galled threads and 1 hanger clamp locknut was loose. (See Section 2.0 "EXAMINATION

SUMMARY

" for specific Items.)

11. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN.

All linear indications were, removed by light grinding/blending and the affected area re-examined. The loose locknut was properly torqued, and the manway studs replaced. All work was performed in accordance with ASME Section XI and ANPP work control practices/procedures, and the respective documentation is maintained on file at ANPP. C"RTI"7 THAT 2E STAT?'<<~~bl~S <<AD~ ZH idiS R:"PORT A?~ CORP~ T AHD ~ M

   -"'ZNATIOHS AND CORRECTIVE MEASURES TAi~~a, COHFOP< personal injury or property damage or a loss of zny IHsp"=ciao DAT kind ar'si ~ from or co e ed with'vis inspection, J g'            ~      cOlKcslQHs 872 l i3 VIS 13 Hzt   'oar,       State, "rovince PAGE     2 0:  2

k

                                                     ~ I Arizona Nuclear Power Project NBK Summary Report I'"

I I I It I I t I I 2 STEAM GENERATOR EDDY CURRENT EXAMINATION

                                                           'NIT
                            'I 1ST KPUELING OUTAGE k

PALO VERDE NUCLEAR GENERATING STATION UNIT 2 STEAM GENERATOR EDDY CURRENT EXAMINATION 1ST'REFUELING OUTAGE ARIZONA NUCLEAR POWER PROJECT P.'. BOX 52034 PHOENIX, AZ 85072 PREPARED BY:" DATE: REVIEWED BY: DATE: C go pg APPROVED BY: DATE:: g3 COMMERCIAL SERVICE DATE: 9-19-86 REPORT DATE: 6-21-88

INDEX 1.0 Summary 2.0 Examination Results 3.0 Examination Techniques and Equipment APPENDIX A Summary Data Sheets APPENDIX B Tubesheet Maps APPENDIX C Form NIS-1

UNIT 2 STEAM GENERATOR EDDY'CURRENT EXAMINATION

1. 0

SUMMARY

On February 20, 1988, Unit 2 was shut down for its first refueling outage. A full Technical Specification examination was performed with an initial sample of approximately 2800 tubes in each steam generator. All tubes were examined from the cold leg side and all tubes were examined full length, to the extent practical, with the exception of row 1 and some row 2 tubes which were examined through the U-bed. The initial results fell into category C-2 in both steam generators. 'n additional sample of approximately 750, tubes were tested in each generator and all of the results fell into category C-1. However, due to available time, testing continued in each steam generator. A total of 10,931 tubes was tested in Steam Generator 21 and a total of 4707 tubes was tested in Steam Generator 22. 2.0 EXAMINATION RESULTS 1 The Steam Generator tubes with indications can be grouped into five categories. These categories are: ""~ Cold "leg 'corner'eggcrate-supports Central cavity batwings Outer periphery batwings Vertical supports and upper eggcrates Other indications 2.1 The examination revealed additional (from previous examination) wear indications at the lower eggcrate supports on the cold leg side of both steam generators in the low row corners of the tube bundles. SG 21: 3 degraded tubes 2 < 20X wear SG 22: 2 defective tubes 3 degraded tubes 2 < 20X wear 2.2 In the central cavity batwing wear area, a small number of degraded tubes was found. The central cavity batwing area is the area adjacent to the stay cylinder. SG 21: 1 degraded tube SG 22: 3 degraded tubes

2.3 On the outer periphery tubes some random batwing wear was found during the examination. SG 21: 1 defective tube 2 < 20X wear SG 22: 1 defective tube 3 degraded tubes 1 < 20X wear 2.4 Vertical support and upper eggcrate wear was found randomly distributed throughout the steam generator tube bundles. SG 21: 3 defective tubes 17 degraded tubes 44 < 20X wear SG 22: 1 defective tube 5 degraded tubes 31 < 20X wear 2.5 Other indications were found in tubes in the steam generator bundle which do not fit into the above categories. These indications were randomly spaced in the generator and the indications were found at different elevations in the tubes.

    '"SG 21:     1  defective tube 6 degraded tubes 21 < 20X wear SG   22:   2 defective tubes 5 degraded tubes 4 < 20X wear The summary data sheets in Appendix A        list all  of the tubes in both steam generators which showed 20X or greater        indications during the Eddy Current Testing. Several tubes with indication were examined with 8 x 1 pancake coil and roto probe. Appendix B has the tubesheet maps which show the extent tested and the location of the 0  100X indications for Steam Generator 22.

Steam Generator 21 was tested essentially 100X so Appendix B has the 0 100X indication map only. The NIS-1 Form in Appendix C lists which tubes were plugged. The following Engineering Evaluation Requests (EER) were initiated to track the examination results and subsequent plugging: 88-RC-096, 88-RC-097 and 88-RC-126. 3.0 EXAMINATION TECHNIQUES AND EQUIPMENT The eddy current examination was performed by Conam Inspection us'ing Zetec MIZ18 digital data acquisition and analysis systems. The following test frequencies were used during the examination: 550 kHz differential and Absolute 990 kHz differential and Absolute 100 kHz differential and Absolute 20 kHz differential and Absolute

The majority of the tubes in the examination were tested with Zetec manufactured 0.610" SMF/HF probes. The tubes in rows 1 through 10 were examined with a 0.590" SMF/HF probe. A modified Zetec SM-10 fixture was used for probe positioning from the cold leg manway.

Summary Data Sheets

ROW: Indicates the row number of a given tube. LIN Indicates the column number of a given tube.

                'EG:   Indicates the tube leg from which examination         was= performed;

( either the hot (H) leg or cold (C) leg. EXAM EXTENT PROGRAM: Indicates the tube length required to be examined. EXAM EXTENT ACTUAL: Indicates the tube length actually examined. REM Remarks column used for comments relating to examination.

              . REEL:  Indicates reel  number data was recorded on.

V PROBE: Indicates probe diameter and style used for examination.

        .ICATION:,".- Gives,;indication;location.-relative..to:.known .jandmarks::such as supports and batwings.

VOLTS: Indicates the peak-to-peak voltage of a given indication response. DEG: The measured phase angle of a given indication response. The percent through the tube wall of a given indication based on the measured phase angle and the calibration curve established for that particular channel. CH: Indicates the channel used to measure and evaluate a given indication.

SAMPLE CODES TO BE PUT IN THE EXAM EXTENT COLUMN OR LOCATION COLUMN OR BOTH kl Vertical Support Strap . VS1 81 Batwing . BW1 81 Support Plate in Hot Leg ~ ~ ~ ~ 01H P7 Support Plate in Cold Leg 07C Top Tube Sheet Hot Leg . TSH Top Tube Sheet Cold Leg . . TSC Tube End Hot Leg ~ ~ ~ ~ TEH Tube End Cold Leg . TEC DDA-4 ANALYSIS CODES TO BE PUT IN PERCENT COLUMN Absolute Drift . . . . . . . . . . . . ADR No Detectable discontinuity NDD Bad Data . BDA No Support Expansion NSE B ulge . BUi No Tube Sheet Expansion . . . . . . NTE Copper Deposit . CUD Partial Tube Sheet Expansion . . . PTE D ent ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . DNT Permeability Variation . PVN J)eat. With 3!ossible Indication. e.....,.SNI .Pl.ugged,. D'lng Roll Transition W/poss.'nd. e e e ~ ~ e ~ e ~ e e ~ ~ ~ ~ ~ DNG DRI Distorted Roll Transition . . . . . . DRT Obstructed . OBS Distorted Roll Trans. W/poss Ind. . . DRI Skipped Roll SKR Distorted Support Signal . . DSS Sleeved SLV Distorted Top of Tubesheet . DTS Sludge e ~ ~ ~ ~ ~ ~ ~ . SLG Expansion . EXP Squirrel SQR Expansion With Possible Indication EPI Template Obstruction

                                            . .                                          . TMO Expansion Transition Location                    ETL   Template Plug                    ~ ~  TMP Fixture                                          FIX   Tube No    Test                       TNT ID Chatter                                       IDC   Tube Number Check                  . TNC Indication Not    Found                          INF   Tube    Restricted                 . TRS Incomplete Test                                  INC   Undefined Signal                      UDS

CUMULATIVE REPORT 04/88s ARILONA PUBLIC SERVICE CO. s PALO VERDc":s UNIT 2 STEAN GENERATOR: 1 PAGE: 1 OF LOCATIO)I: ALL DATE: 85/89/8 CRITERIA: 6$ TO }68)< TINE: 13:24:4 I I I I I EXAi( EXTE)(7 I I I I I CURRENT I I 82/87 I I 12/81 I RO)I ILIN) HEAT))ILES)PROGRAM) ACTUALIREN)REEL)PROBE) LOCATION IVOLTSINILIDFGI )< ICHICH)IGIVOLTSINIL)DEB) W ICHICHNSIVOLTSINILIDEGI )< ICH I I I I I I I I I I I I I I I I I I I I I I I I I I I I 39) 41 I C ITEC-TEHITEC-TEH) I 0111618SNIVS4+ 8. 86 l. 01 I }32) 26)NI , I I I I I I 21 51 I I I I I I I I I I I I I INDDI I I I I I I C ITEC-07HITEC-87HI I 891)590SN)62C+ e.ee 8.8) 1153)(20)N4) I I I

) 221        ill      I C ITEC"TEHITEC-TEHI            I  1381610SNISIH+

0.2'.08 B. 3) 112} I (c.'0 IN) I I I I I I I I I I I I I I IB)I}+ I I I ) I I I I IDNTI I 131 121 I C ITEC-TEHITEC"TEHI I }38)6}6SN)0}H- 9.2 6. 3) 1 115)(28IN41 I I I ) I 43) 121 I C ITEC-TEHITEC-TEHI I 136)610SNIVS4- 0.8 8. 3) li}7)(20INI I I I I I I 66) 131 I C ITEC-TEHI7EC-TEHI I 1351619SNI 8}H- 8.3 8.51 1 1681(28IM4) I I I I I I 591 161 I C ITEC-TEHI7EC-TEHI I 1351616SN)81H- 8.4 0. 41 11501(2BIN41 I I I I I I I I C ITEC-TEHITEC-TEHI I }35)6}BSNIB}Cc 9.4 e.sl 11481 (28 INI I I I I I 21 171 I C ITEC-87HITEC-67HI I 6811598SNI02C+, 0. 68 0.71 I }4}I 23)NI I I I I I 1 I 181 I C ITEC<7HITEC-97HI I 9821598SN)02C+ 9. 66 1. 71 1131) 3} IN) I I I I I 711 181 I C ITEC-TEHITEC-TEHI I 13416}BSN)01H- 8.2 0. 41 )1421 (29 IN I I I I I I 731 18) I C ITEC-TEH17EC-TEHI I 13416}BSN)01H" 0.2 8.51 11631 (28)Ni41 I I I I I 881 19) I C ITEC-TEHITEC-TEHI I 134)610SNIS}H- 0.3 0. 4) 1139) (29)N I I I I I I 59) 28) I C ITEC-TEHITEC-TEHI I 135)6}BSNIB}H- 0.3 0. 5) I 1581 (28 IN) I I I I I 671 281 I,C ITEC-TEHITEC-TEHI I 13416}SSNIS}H- 0.4 0.61 )148)(20 IN I I I ) I I 711 201 I C ITEC-TEHITEC-TEHI I }34161BSNIB}H- e.2 0. 41 1139) (281N I I I I I I 75) 20) I C ITEC-TEHITEC"TEHI I 13416}BSNIB}H- 0.2 8.4) 11431(28IN41 I I I I I 781 211 I C ITEC-TEHITEC-TEHI I 133)6}BSNIVS5- 0.8 B. BI ) 128) 21)N41 I I I I I 86) 211 I C ITEC-TEHITEC-TEHI I 133)610SNIVS3- 8.8 9.51 I}261(20IM41 I I I I

)   9BI 25)           I C 17EC-TEHITEC"7EHI           I  13816}BSNIBIH"         8.2             e.4)         )1341 (28 IN)                       I                 I      I       I I   54) 27)           I C    ITEC-TEHITEC-TEHI        I  1291610SNI97C-         1.7             0.41          li}8) 25IN41                       I                 I      I        I I 721       27)       I C    ITEC-TEHITEC-TEHI        I  }29)6}BSNIVS3> 8.8                     0. 31        11261 (28          IN)              I                 I      I       I I 971 381             I C ITEC-TEHITEC-TEHI           I  1271616SNIVS2+         e.4             0. 4)        )141)(28)N41                        I                 I      I       I I 831       321       I C    ITEC-TEH)7EC-TEHI       I 077)6}BSNIVS3+           8. 68           So 8)        11611 (20)N4)                      I                 I       I       I I 831       3SI       I C    ITEC-TEHITEC-TEHI       I 874)618SNIVS3+           0. 88           S. 51        1   1571(28IM41                     I                 I      I       I I   34) 39)           I C    ITEC-TEHITEC-TEHI       I   87916}BSNIB4C+         9. SS           0.41         1147)(28)N41                       I                 I       I       I I   83) 491           I C    ITEC-TEHITEC-TEHI       I   07416}BSNIVS5-         0.68            0. 9)        1   1341 291N41                     I                 I      I,'     I 11891       44)       I C    ITEC-TEH)TEC-TEHI       I   }24)6}SSNIVS2-         0.7             0.5)         11411 (20)N4)                      I                 I       I       I I        I      I    I C     ITEC-TEHITEC"TEHI       I   }24)6}BSNIVS2+         1:0             0.71         1   1251 271N41                    I                 I               I I        I       I    I C     ITEC-TEHITEC-TEHI       I   124)6}BSNIVS3-         8.7             0.81         )   1471    (20)N I                I                 I       I       I I 981 471             I C )TEC-TEHITEC-TEHI           I   870)618SNIVS3-         1.88            0.3)         1153)(28           IN I            I                 I       I       I I 951        48)      I C ITEC-TEH)TEC-TEHI           I   078)610SNIVS3-         1.99            0. 2)        1146)(28)NI                I       I                 I

)1831 48) I C ITEC-TEH)TEC"TEHI I 1431619SNI01H- 0.2 8.31 1}35)(20)Ni41 I I I I 741 491 I C ITEC-TEH)7EC-TEHI  ! 0691610SNIBSH+ 0. 79 B. 31 l}521(20INI I I I I 761 491 I C ITEC-7EHITEC-TEHI I 669)6}BSNIVS3- 2.68 0.31 1 149)(26INi41 I I I}251 581 I C 17EC-TEHITEC-TEHI I 122)610SNI VS5- 9,9 9.31 )1431 (28) Nl I I 72) 511 I C ITEC-TEH)7EC-TEHI I 83616}BSNIVS3- 0. 80 0.5) I }55) (28 IN I I I I I 62) 53) I C ITEC"TEHITEC-TEHI I 661)6}BSNIVS3+ 8. 88 0.71 1 1361 28IN4) I I I I 641 53) I C ITEC-TEHITEC"7EHI I 6611616SNIVS3+ 0.90 6.31 )168) (2B IN I I I I 681 531 I C ITEC-TEHITEC-TEHI I 961)6}SSNI BSH+ 9. 88 0. 4) I }681 (281Ni41 I I I s l}661 53) I C 17EC-TEHITEC-TEHI I 664)6}BSN192H+ 24. 26 6. 61 I}391 26INI I I I 831 54) I C ITEC-7EHITEC-TEHI I 064)6}SSNIVS3+ 0.98 8. Bl 11561 <2elNI I I l}211 541 I C ITEC-TEHI7EC-TEHI I 121)6}BSNIVS2- 0.9 8. 51 1138) (29 IN I I I I I I I I I I I I I I I I I I I I

CUMULATIVE REPORT 64/88, ARIIONA PUBLIC SERVICE CO., PALO VERDE, UNIT 2 STEAM GENERATOR: 1 PAGE: 2 OF LOCATION: ALL DATE: SS/89/8 CRITERIA: 0$ TO 168$ TIME: 13:24:4 I I I I I ENAM E)(TENT I I I I I CURRENT I I 82/87 I I 12/81 IROMILINIHEATWILEGIPROGRANI ACTUALIREHIREELIPROBEI LOCATION IVOLTSINILIDFGt N ICHICHNGfVOLTSINILIDEGI I( ICHICHNBIVOLTSINILIDEGI X I CH I I I I I I I I I I I I I I I I I I I I I I I I I I I 11211 541 I C ITFC"TEHITEC"TEHI 121 1618SNI VS2+ 8.9 0,71 11361 <261NI I I I 781 551 I C ITEC-TEHI7EC-7EHI 035161SSNIVS3- 0. 98 8. 51 I 1591<28IN41 I I I 7SI 561 I C ITEC-TEHITEC-TEHI 835161BSNIVS3- 8.78 9.41 11521 (26 IN I I I I I 761 571 I C 17EC-TEHITEC-TEHI 035161BSNIVS3+ 8.08 9. 41 11421 20INI I I I 831 581 I C ITEC"TEHITEC-TEHI 6651618SNIVS3+ 0.78 1. 11 11341 38IM41 I I I I 721 591 I C ITEC-TEHI7EC"TEHI 8351610SNIVS3+ 8. 98 8.81 11611 <28 1 H41 I I I I 991 681 I C ITEC-TEHITEC"TEHI 8681618SNIVS2" 0.86 8.41 11431 211M41 I I I I 621 611 I C ITEC-TEHITEC-TEHIRPI I 981161BSHIVS3t 1.88 1.91 Iiiil 44IH41 I I I I 821 611 I C ITEC-TEHI7EC-TEHI I 966161BSNIVS34 0.90 8.51 I 1211 33 I H41 I I I I 841 611 I C ITEC-TEHITEC-TEHI I 6661618SNIVS3+ 0.86 8.71 11231 31IM41 I I I I 741 631 I C ITEC"TEHITEC-TEHI 83SI618SNIVS3+ 9,90 8.41 11461 (28IN41 I I I 841 631 I C ITEC-TEHITEC-TEHI M6161OSNIVS3+ 1.08 8.91 11381 21IN41 I I I I I I C ITEC-TEHITEC-TEHI 866161BSNIVSS+ B. 88 0.81 11351 23IN41 I I I 431 641 I C ITEC-TEHITEC-TEHI 6821610SNtVS4+ 8.98 0. 31 11531 (28 IN I I I 1 1091 641 I C ITEC-TEHITEC-TEHI 0361619SHI VS3- 9.98 8. 31 11431 (28 IN I I I I 991 661 I C ITEC-7EHITEC-TFHI 8371610SHIVS6+ 0.68 6.21 11371 23IM41 I I I I I I, C ITEC-TEHITEC-TEHI 0371618SNIVS6- 0.50 0. 31 1 1281 38IH41 I I I 831 781 I C ITEC-TEHITEC-TEHI 1691616SNIVS3+ 9.8 8.41 11511<201N41 I I I 361 851 I C ITEC-TEHI7EC-TEHI 8211616SNI BM1- 1.88 0. 71 11331 261NI I I 11441 851 I C 17EC"TEHITEC-TEHI 118161BSNIVS3- 8.88 8.31 1 1351(28IYi41 I I I I I I C ITEC-TEHITEC-TEHI 1181616SNIVS3+ 1. BB B. 51 11281 (28 IN I I I I 391 861 I C ITEC-TEHITEC-TEHI 8281616SNIVS4" 1.18 8.31 11411 (28 I H41 I I 11371 881 I C ITEC-TEHITEC-TEHI 1091616SHIVS7+ 6,80 0. 31 11471 (28 IN I I I 11391 881 I C tTEC-TEHI7EC-TEHI 1891616SNI91H- 0.39 0. 21 11311 (26 I N41 I I 11581 931 I C ITEC"TEHITEC-TEHI 822161BSHIVS3+ 8.50 B. 31 1149t <28tNt I I liS91 941 I C ITEC-TEHITEC-TEHI 8221616SNIBM2+ 6. 89 8.41 11481 (28 I N41 'I I 115911681 I C ITEC-TEHITEC-TEHI 6221610SNIBM2+ 1. 40 8. 31 1 1581 <281 Yi41 I I 113211831 113611851 113211111 I I C I C C ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI 1871618SNI01H-1861619SNIVS3+ ITEC-TEHITEC-TEHIRPII 195161BSNIVSi+ 0.28

0. 88 868 B. 31 0.51 0.81 11491 (28 IN 1

1 1431(28IN41 1161 481 I il I,I I I I I I I I I I I I, 112611131 I C ITEC"TEHITEC-TEHIRPII 184161BSHIVSS+ 8;58 8. 81 11161 41IH41 I I I I I I 9411151 I C ITEC-TEHITEC"TEHI 892161BSNISIH- 0,20 0. 31 11531 (28 INI I I I 111611191 I C ITEC-TEHITEC-TEHI 693161BSNIVS5- 1.58 9. 51 I 1571<28IH41 I I I 9711221 I C ITEC-TEHITEC-TEHI 643161BSNIVS2+ 1. 68 8. SI 11271 30INI I I I I 8911251 I C ITEC-TEHITEC-TEHI 8421616SHIVS3- 8.70 9. 91 1 1501(28INI I I I I 7511281 I C ITEC"TEHITEC-TEHI 8421619SMIVS3- 9. 80 0.41 I 1491 <28IH41 I I I I 7711281 I C ITEC-TEHITEC-TEHI 842161OSNIVS3- O. 98 0. 71 11581(28IM41 I I t I 7111321 I C ITEC"TEHITEC-TEHI 842161BSNISBH+ 9.60 0. 51 11491 (20 INI I I I 7411331 I C ITEC-TEHITEC-TEHI 6421616SNI67H~ B. 88 8. 41 11421 281M41 I I I I I I C ITEC"TEHITEC-TEHI 8421610SHIVS3- 8. 88 1.31 11581(2BIYi41 I I I 7111341 I C ITEC-TEHITEC-TEHI 6421618SNIVS2" 9.89 1. 31 11401 21IH41 I I I I I I I I C ITEC-7EHITEC-TEHI 6421610SNIVS3e 0.60 1.21 1 1341 25IN41 I I I I 114411351 I C ITEC-TEHITEC-TEHI 647161BSNI87H+ 0. 99 8. 51 11281 22IN41 I 'I I I I 7611371 I C ITEC-TEHITEC-TEHI 0411610SNI VS 3+ 8. 88 B. 61 1 1591(28IYi41 I I I I I I C ITEC-TEHITEC-TEHI 641 1619SNI VSS~ 0.98 0. 41 11691(28IN41 I I I I I I I I I I I I I I I I I I

CIDIULATIVE REPORT 84/88> ARIZONA PUBLIC SERVICE CO., PALO VERD.", UNIT 2 STEAN GENERATOR: 1 PAGE: 3 OF LOCATION: ALL DATE: 85/89/8 CR17ERIA: 8'l TO 188tt TINE: 13:24:4 I I I I I EXAN EXTENT I I I I I CURRENT I I 82/87 I I 12/81 IRQWILINIHEATIIILEGIPROGRANIACTUALIRENIREELIPROBEI LOCATION IVOLTSINILIDEGI tt ICHICHNGIVOLTSINILIDEGI tt lCHICHNGIVOLTSINILIDEGI tt ICH I I I I 7211411 311461 I I I C I C I I I ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI I I I 896161 I 8SNI 81H-I 8531598SNIB7C-8,38

8. 18 I

I I 8.41 e51 I I I I 11491 (28 1 N41 1 1331 38IN41 I I, I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 8311461 I C ITEC-TEHITEC-TEHI I 898161BSNIB1H- 8. 38 I 8.41 li471<28lt!4! I I I I I I I I I I 112411511 118911521 I C I C ITEC-TEHITEC-TEHI ITEC-TEHITEC-TEHI I 848161BSNIVS2-I 1611618SNI VS2+ B. 28 8.8 t I e.61 8.51 11471!28IN41 11451 28IN41 I, I I I I I I I I I I I I I I I I I I I 118111561 I C ITEC-TEHITEC-TEHI I 8481618SNIVS3+ e. 18 I 1.21 1 1461 281N41 I I I I I I I I I I 5811571 I C ITEC-TEHITEC-TEHI I 8411618SNIVS4+ 8. 78 I 8.41 11561(28IM41 I I I I I I I I I I I 8611591 I C ITEC-TEHITEC-7EHI I 1441618SIIIBIH- 8.1 I 8.41 11531{2BIN41 I I I I I I I I I I I 8411611 I C ITEC-TEHITEC-TEHI I 1511618SNIVS3+ 8.7 I 8.61 1142<<28IN41 I I I I I I I I I I I 9711681 I C ITEC-7EHITEC-TEHt I 858161BSNIVSG+ 1. 88 I 1.91 11381 32IN41 I I I I I I I I I I I 9911681 I C ITEC-TEHITEC-TEHIRPII 85BI61BSNIBMI+ 1.78 I 1.11 11181 48IN41 I I I I I I I I I I I 5111781 I C ITEC-TEHITEC-TEHI I 154!6IBSNI82H+ 3.5 TO~ 5.5 I 8.81 11341 33IN41 I I I I I I I I I I I 211731 I C ITEC-87HITEC-87HI I 838159BSNIB2C+ 8.98 I 8.51 11491<2elN41 I I I I I I I I I I I 311881 I I I I I I I I I I I I I I I I INDDI I I I I I I I I I C ITEC-7EHITEC-TEHI I 8381598SNI 82C- 8.88 I 1.11 11271 34IN41 I I I I I I I I I I I 3911861 I C ITEC-TEHITEC-TEHIRPII 8531618SNI83C- 8. 88 I 8.41 11161 42IN41 I I I I I I I I I I I I I I. I I I I I I I I I I I I I I I I I I I I I NUIIBER OF TUBES SELECTED FRON CURRENT OUTAGE: 93 NO TREND ANALYSIS REQUESTED

CL'i <ILAT1VE RiPORT 84/88! ARIlONA PUBLIC SERVICE CO,! PA' VERD UNIT 2 STEAN GENERATOR: 2 PAGE: 1 OF LOCATION: ALL DATE: 84/29/ CRITERIA: 0$ TO 190'l TDfE: 89'59 I I I I I EXAN EXTENT I I I I I CURRENT I I 02/87 I I 12/81 IROMILINIHEATIILEGIPROGRANIACTUALIRiNIREELIPROBEI LOCATION IVOLTSINILIDiGI I( ICHICHNGIVOLTSINILIDEGI I( ICHICHNGIVOLTSINILIDEGI I( IC I I I I I I I I I I I I I I I I I I I I I I I I I I I I 38I 3I I C ITEC-TEHITEC-TEHIRPII 883161BSNI VS4t 20, 79 1. 01 I 125I 42IN4l I I I I I I I 15I 4I I C ITEC-TEHITEC-TEHI I 003 I 6IBSNI03C+ 1. 10 8. SI I 135I 23IN4I I I I I I I I 2I 5I I C ITEC-97HITEC"87HIRPII 081I59BSNI02C- 1.88 1.4I 1118I 42IN4I I I I I I I I I I I I I I I I ITSC- 5.0 I I I I I 38. Bl I 13ISRRI ll I I 1I 6l I I I I I I I I I I I I INDDI I I I I I C ITEC-07HITEC<7HI I 881I59BSNI82C+ 0.08 1.8I I 143I 25IN4l I I I I 11 10I I I I I I I I I I I I INDDI I I I I I C ITEC-07HITEC-87HIRPII 881159BSNI92C+ 0 88 2.el I113I 47IN41 I I I I 81I 28I I C ITEC-TEHITEC-TEHI I 883I610SNIVS5- B. 88 9. 3l I 142I <28IN4I I I I I 77I 46I I C ITEC-TEHITEC-TEHI I 9781610SNIVS3- 1.08 9.4l I 149l<2BIN4I I I I I 501 471 I C ITEC-TEHITEC-TEHI I 0791610SNIVS4+ 0.98 0. 4I I 143 I <28 IN41 I I I I 75l 48I I C ITEC-TEHITEC-TEHI 8791610SNIBSH~ 0.78 0.5I I 122I(20IN41 I I I I 841 ae> I C ITEC-TEHITEC-TEHI 088I610SNIVS3- 0,88 e.sl 1145I(28IN4I I I I I Sel 51I I C ITEC-TEHITEC-TEHI 02716IBSNIVS3~ 0.90 9.3l I 143 I <28 IN4 I I I I I 84I 511 I C ITEC"TEHITEC-TEHI 0571618SNIVS3+ 0.89 1. 4I l 127 I 31 IN4I I I I I 77l 52l I C ITEC-TiHITEC-TEHI 8271610SNIBSHt 0.70 1.3I li42I(20IN4I I I I 91I 52l I C ITEC-TEHITEC-TEHI 057 I 610SNI BW1+ 2. 18 0. 5I I 153I(2BIN4l I I l189I 54I I C ITEC-TEHITEC-TEHI 958 I61BSNI VS6- 11. 98 0,4I I 160( <20(N4I I I I 68I 55I I C ITEC-TiHITEC-TEHI 056 I 610SNI VS3+ 9. 99 0. 51 I 161 I <28IN4 I I I I 72I 55I I C ITEC-TEHITEC-TEHI 827I610SNIVS3+ 0.98 0.81 I 1371<20IN41 I I I 61I 56I I C ITEC"TEHITEC-TEHI 056I610SNIVS3+ 16.30 3.81 I 4l (28I il I (28( I 82l 57l I C ITEC-TiHITEC-TEHI 859I61BSNIVS3- 0.90 0.7l 1148I 29IN4I I ~ I I I I I C ITEC-TEHITEC-TEHI 059I61BSNIVS3+ 9.90 0.6I I 123I 38IN4I I I I 84I 57I I C ITEC"TEHITFC-TEHI 059I619SNIBM1+ 1.88 0.91 I 161 l (20 IN4 I I I I 921 57I I C ITEC-TEHITEC-TEHI 059I61BSN108H~ 0.80 0. 4I I136I 28IN4I I li44I 57l I C ITEC-TEHITEC-TEHI 814I610SNIVS1- 9.88 0.7l 11681(28IN4I I I 109I 58I I C ITEC-TEHITEC-TEHI 05916IBSNIVS6+ 12.89 0. 31 I 155l(29IN4I I I 46I 59I I C ITEC-TEHITEC"TEHI 0571618SNIVS4t 0.78 9.91 1145I 21IN4I I I 841 63I I C ITEC-TEHITEC-TEHI 0681610SNIVS3+ 0. 98 0. 4I I 149I <28IN4I I I150l 63I I C ITEC-TEHITEC-TEHIRPll 813I61BSNIBM1+ 1. 98 1.9I 11231 41IN4I I I 98I 67I I C ITEC-TEHITEC-TEHI I 8341610SIII BSHE 29. 28 0.2l I 146I <29IN41 I l158I 91l I I I .I I I VS1- 6. 00 I I I I IDNGI I I I I C ITEC-TEHITEC"TEHI 811 I 610SNI 02C- 0. 88 0,5I I 165I <20IN4I I l159I 961 I C ITEC-TEHITEC-TEHI 011<618SNI BW2+ 1. 78 8. 7I 1132 I 31 IN4 I I I 37l }BBI I C ITEC"TEHITEC-TEHI 017 I610SNI BW2+ 1. 90 0,3I I 144l 25IN4I I I 35I184I I C ITEC-TEHITiC-TEHI 0171610SNI BM2t i. SB 8. 6I I 138I 39IM4I I I 32I107I I C ITEC"TiHITEC"TEHI 016IGIBSNIBWI- 2,88 0. Sl I1581 221N4I I I 154I1131 I C ITEC-TEHITEC-TEHI BIBIGIBSNISW2- 1.80 9.3I I 1411 <28 I Ã4 I I I I 1156I 115 I I C ITEC-TEHITEC-TEHI 010I6IBSNIDW2- 1.00 9.6l I 132I 26IN4l I I I 87I 139I I C ITEC-TFHITiC-TEHI 05316IBSNI87He 0.99 0.4i 11581 (281N41 I I I I 84I131 I I C ITEC-TEHITEC-TEHI 852I619SNIBSH+ 0. 98 1. 3I I151l (20IN4I I I I I 67I132I I C ITEC-TEHITEC-TEHI 849I619SNI07C- 1. 59 0. 9I I 157 I <20 I 1! I I 79I132I I C ITEC-TEHITEC-TEHI 039I610SNIB8H+ B. 80 0.7I I 158 I (28 I N4 I I I 91I132I I C ITEC"TEHITEC-TiHI 05216IBSNIBSH> 0.88 1.0I I 148 I (29 IN4 I I I 78I1331 I C ITEC-TEHITEC-)EHI 939I619SNIQ8H+ 0,99 B. ii I 132I 27IN4I I I I I I I I I I I I I I I I I CONAN

CUMULATIVE REPORT 04/88, ARIIONA PUBLIC SERVICE CO., PALO VERDE, UNIT 2 STEAN GENERATOR: 2 PAGi: 2 OF LOCATION: ALL DAT"": 84/29/ CRITERIA: 0% TO }981< TINE: 89:59: I I I I I EXAN EXTENT I I I I I CURRENT I I 82/87 I I 12/81 IRDNILINIHEATIIILEGIPROSRANIACTUALIRENIREELIPROBil LOCATION IVOLTSINILIDEGI W ICHICHNSIVOI.TSINILIDEGI 'A ICHICHNSIVOLTSIMILIDEGI I< IC-I I I I I I I I I I I I I I I I I I I I I I I "I I I I I 82>>331 I C ITEC-TEHITEC-TEHI I 85}16}OSNIOBH> 0.98 8.81 >>481 231M41 I I I I I I I I 84>>331 I C ITEC-TEHITEC-TEHI I 85}l6}BSNIVS3+ 8.98 0. 31 >>471 <20iN41 I I I I I I I I 86>>331 I C ITEC-7EHITEC-TEHI I 85216}BSNI88H+ 0.98 8.41 11481 (20 IM41 I I I I I I I 92>>331 I C ITEC-TEHITEC-TEHI I 8521618SNIOBH- 8.30 0.61 1 1481(29IN41 I I I I I I I I 69>>341 I C ITEC"TEHITEC-TEHI I 04916}OSNIBBHt 0. 98 0.91 >>591<28IN41 I I I I I I I i 66>>35i I C ITEC-TEHITEC-TEHI I 849161BSNIBBH- 1.38 e.6i 1 1571(28IN41 I I I I I I I I 68>>351 I C ITEC-TEHITEC-TEHI I 04916}OSNIQRHI 0,90 9. 61 11341 261N41 I I I I I I I I I 78>>351 I C ITEC-7EHITEC-TEHI I 03816}BSMIQBH+ 8,80 0. Bl >>581 (20 IN41 I I I I I I I I I I 76>>351 I C ITEC-TEHITEC-TEHI I 03816}OSNIQBH4 0.88 8. BI >>5}i <2eiN4i I I I I I I I I I I 67>>361 I C ITEC-TEHITEC-TEHI I 8481610SNI87H- 0.88 0. 41 I 1451 <20IN41 I I I 'I I I I I I I I I I I I I I I IVS}+ 0.00 I I I I I I I I I I I I IDNTI I 85>>361 I C ITEC-TEHITEC-TEHI I 05}16}QSNIB7H+ 9.88 8.71 >>621 (28 IN41 I I I I I I I I 76>>371 I C ITEC-TEHITEC-TEHI I 03816}BSNIBII}4 1.38 0. 41 >>481 (28 IM41 I I I I I I I I i I 841}371 I C ITEC"TEHITEC-TEHI I 8581619SNI8BH+ 8.08 8. 41 1 1481(28IN41 I I I I I I I I I 761i391 I C ITEC-TEHITEC-TFHI I 03816}BSNI07H4 0.88 e.4i >>481(20IN41 I I I I I I I I i I 88>>391 I C ITEC-TEHITiC-TEHI I 03816}BSNIVS3+ 8.88 1.71 >>221 37IN41 I I I I I I I I i I 8}>>421 I C ITEC-TEHITEC-TEHI I 86516}BSNIVS3- 8.70 0.51 >>521(20IM41 I I I I I I I I I 82>>431 I C ITEC-7EHITEC-TEHI I 86516}BSNI89Ht B. 18 9. 41 >>411<20IN41 I I I I I I I I I I I I C ITEC-7EHITEC-TEHI I 86516}OSNIVS3E 0.88 0.31 >>411(20IN41 I I I I I I I I I I 65>>441 I I I I I I 107H> 8.88 I I I I I I I I I I I I IDNTI I I I I I I I I IBSH+ 7.08 I I I I I I I I I I I IDNGI I I I I C ITEC-TEHITEC-TEHI I 06616}BSNIVS3- 8.90 0. 51 >>411 24 IN41 I I I I I I I I I 68>>451 I C ITEC-TEHITEC-TEHI i e66i6}eSNIVS3- B.ae 0. 41 >>601 <28 I M41 I I I I I I I l}281}491 I C ITEC-TEHITEC-TEHIRPII 84316}BSNIB}Ct 0.98 1.81 >>281 411 N41 I I I I I I I I I 118911621 I C ITEC-TEHITEC-TEHIRPII 84516}BSNIVS54 8.98 1.31 11261 421 M41 I I I I I I I I I I 3>>761 I C ITEC-TEHITEC-TEHI I 9351598SMIB2C+ 0.88 0. 31 >>421 (281N41 I I I I I I 67>>781 I C 17EC"TEHITEC-TEHI I 04616}BSNIO2H4 24.20 8.41 >>291 31IM41 I I I I I I 64>>811 I C ITEC-TEHITEC-TEHI I 0461619SNIBH2+ 0.70 0. 71 >>231 35IN41 I I I I I I 311881 I I I I I I I I I I I I I I INDDI I I I I C ITEC-TEHITEC-TEHI I 83516}BSNI82C- }.08 1. 21 >>191 37IN41 I I I I I I 5>>881 I I I I I I I I I I I I I I I INDDI I I I I C ITEC-TEHITEC-TEHI I 0351598SNIB2C- 0.80 0.91 >>571 (29 I M41 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I NUMBER OF TUBES SELEC7ED FROM CURRENT OUTAGE: 66 NO TREND A%lLYSIS REQUESTED CONAN

APPENDIX B Tubesheet Maps

04/88, ARIZONA PUBLIC SERVICE CO., PALO VERDE, UNIT 2 STEAM GENERATOR: 1 DATE: 05/09/88 PROC: 73TI9RC01 TIME: 13: 24: 47 LOCATION: ALL CRITERIA: OX TO 100% PLUGGED 45 20X TO 29X 17 40X TO 100X 5 STAYS OX TO 19X 61 30X TO 39X 10 160 150 140 130 120 110 100 90 80 70 50 40 30 20 10 10 20 30 40 50 60 70 BO 90 100 i. 10 120 130 140 150 160 170 180 CONAM

04/88, ARIZONA PUBLIC SERVICE CO., PALO VERDE, UNIT 2 STEAM GENERATOR: 2 PROC: 73TI9RCO 1 DATE: 05/05/88 LOCATION: ALL TIME: ii: 3B: 22 CRITERIA: TUBES EVALUATED COMPLETELY PER REQUIREMENTS PLUGGED 53 STAYS EVAL. COMP 4562 160 150 140 130 120 110 100 90 80 70 50 40 30 20 10 10 20 30 40 50 .60 70 80 '90 100 110 120 130 140 150 160 170 180 CONAM

04/88, ARIZONA PUBLIC SERYICE CO., PALO YERDE, UNIT 2 STEAM GENERATOR: 2 PROC: 73TI9RCO 1 OATE: 04/29/88 TIME: 09: 59: 59 LOCATION: ALL CRITERIA: OX TO 100X PLUGGEO 53 20X TO 29X 11 40X TO 100X 6 STAYS OX TO 19X 41 30X TO 39X 8 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 1Q 2Q 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 CONAM

APPENDIX C

                      ~
                          )   ~   ~

I ~

                                             ~
                                                  ~          e I

I ~

     ~  I'            ~ ~                           ~ I
                ~
                  ~                                   ~ ~

I ~ 0 ~ ~ ~ ~ )'

     ~    'I'                            ~     ~
      ~ ~     ~                                                  ~ ~
                                                                     ~
                            ~   \

I ~

 ~         ~
     ~

I ~

FORM NIS-1 (BACK

7. ESAM DATES 4~I/SS TO S~S~~ S. INST INTERVAL FROM O~IO~ TO
9. ABSTRACT OF EZQQfINATION. INCLUDE A LIST OF EXAMINATIONS AND A STATEliENT CONCERNING STATUS OF WORK REQUIRED FOR CURRENT INTERVAL.

A total of 10931 tubes were examined in Steam Generator 21 and a total of 4707 tubes were examined in Steam Generator 22.

10. ABSTRACT OF CONDITIONS NOTED.

Steam Generator 21: Five defective tubes were identified. Twenty-seven tubes were degraded and there were numerous tubes with'<20K through wall indications. Steam Generator 22: Six defective tubes were identified. Nineteen tubes were degraded and there w~e numerous tubes with <20X through wall indications. ll: ABSTRACT OF CORRECTIVE MEASURES. The tubes on the attached sheet were plugged as a result of this examination. WE CERTIFY THAT THE STATEfENTS MADE IN THIS REPORT ARE CORRECT AND THE EXAMINATIONS AND CORRECTIVE MEASURES TAKEN CONFORM 'IO 'THE RULES OF THE ASME CODE, SECTION XI. SIGNED B CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pr sure Vessel nspectors and the tate o Province of employed by of have ins cted t omponents descr ed in this OWiAl&S R PORT d ring the period I 6 t 6 &&, and state that to the best of my knowledge and belief, he Comer has performed examinations and taken corrective measures described in this OWNERS REPORT in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or impliec, concerning the examinations and corrective measures described in this OWNERS REPORT. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind aris'rom or co ne ed with this inspection. INSPECTO C~n <<~>> COIL1ISSIONS 2'93 A 8 ~73 0 Nat'l Boar , State, Province DATE Ho 9~ PAGE 2 OF

TUBES PLUGGED SG 821 SG f22 RON COL ROW COL 39 4 30 3 2 5 15 2 17 2 5 1 18 1 6 78 21 1 10 54 27 84 51 83 40 82 57 109 44 92 57 62 53 46 59 106 53 150 63 76 57 159 96 83 58 37 100 99 60 35 104 62 61 32 107 82 61 156 115 84 61 78 133 84 63 82 133 99 66 68 135 36 85 80 139 132 126 ill 113 65 144 128 149 97 122 109 162 74 133 3 176 71 134 67 178 144 135 64 181 3 146 3 188 109 152 5 188 101 156 97 168 99 168 51 170 2 173 3 180 39 186 PAGE 3 OF 3}}