ML17304A297

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-528/88-24 on 880705-08.Violations Noted Which Will Be Subj of Separate Correspondence.Poor Communication Concerns Discussed
ML17304A297
Person / Time
Site: Palo Verde 
Issue date: 07/15/1988
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Karner D
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17304A298 List:
References
EA-88-182, NUDOCS 8808030084
Download: ML17304A297 (5)


See also: IR 05000528/1988024

Text

ACCELERATE)

N>>>'R18VriUZ

DEMONSTR<T10N

sYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8808030084

DOC.DATE: 88/07/15

NOTARIZED:

NO

DOCKET

FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi

05000528

t

AUTH.NAME

AUTHOR AFFILIATION

MARTIN,J.B.

Region

5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

KARNER,D.B.

Arizona Nuclear

Power Project (formerly Arizona Public Serv

SUBJECT:

Forwards Insp Rept 50-528/88-24

on 880705-08.Violations

noted.

DZSTRZSUTZON CODE:

ZEOZD

COPZES

RECEZVED:LTR J

ENCL J

SZSE:

2 + (y

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Standardized

plant.

RECIPIENT

ID CODE/NAME

PD5

PD

DAVISPM

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR ll

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE

BERMANPJ

t

.G F~

02

KS

DSR DEPY

EXTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

LICITRAPE

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC 15-B-18

RES/DSIR

DEPY

RGN5

FILE

01

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

05000528

S

h

NOTES:

1

1

D

1

D

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

29

ENCL

29

JtjL

< 5

1988

EA-88-182

Docket No. 50-528

Arizona Nuclear

Power Project

P. 0.

Box 52034

Phoenix, Arizona

85072-2034

Attention:

Mr. D. B. Karner

Executive Vice President

Gentlemen:

Subject:

NRC Inspection of Palo Verde Unit

1

This refers to the special

inspection of July 5 through July 8,

1988,

conducted

by Mr. T. Polich, of activities authorized

by NRC License

No.

NPF-41

and to the discussion of our findings held with you and members of

your staff on July 8, 1988, at the conclusion of the inspection.

The

purpose of the inspection

was to review the circumstances

which resulted

in both trains of the Essential

Chilled Water System being rendered

inoperable for approximately nine days, with Unit

1 in power operation in

violation of the Technical Specifications.

Areas

examined during this inspection

are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted

of

selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Based

on the results of this inspection, it appears

that one of your

activities was not conducted

in full compliance with NRC requirements.

This violation will be the subject of separate

correspondence.

We concluded that the cause of this event

was several

consecutive

instances

of poor communication

between different members of your

operations staff, coupled with a reluctance

on the part of

the'perator

who ultimately rendered

the system inoperable to follow up

on his thoughts that 'something

was wrong.

There

have

been several

other recent events

which have reflected poorly on operator

performance,

including the early criticality at Unit

1 on May 14,

1988; the erroneous

operation of the Unit 1" main generator

motor operated

disconnect

on

April 19, 1988, which. resulted in a reactor trip; the entry into

Mode 4 at Unit 1 on February 29,

1988 without an operable

High Pressure

Safety Injection pump,

as required

by the Technical Specifications;

the

operation of Unit 2 in February,

1988, with less

than the required

number of Auxiliary Feedwater

Pumps;

and the inadvertent safety

injection at Unit 2 on February 21, 1988.

Several of the above events

contributed to a civil penalty enforcement action which was

imposed in

April, 1988.

In transmitting that enforcement

action to you, we observed

that operator

performance

and your management

expectations

were divergent.

The poor practices

which appear to have caused this event indicate that

operator

performance

remains at

a level below that desired.

8808030084

8807i5

PDR

ADOCK 05000528

8

PNU

In accordance

with 10 CFR 2.790(a),

copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

John

B. Martin

Regional Administrator

Enclosure:

Inspection

Report

No. 50-528/88-24

cc w/enclosure:

J.

G. Haynes,

Vice President,

Nuclear Production

W. F. Quinn, Manager,

Licensing

T.

D. Shriver, Manager,

Compliance

L. Papworth, Director, Quality Assurance

L. Souza,

Manager, Quality Audits 5 Monitoring

J. Kirby, Director, Site Services

A. C. Gehr,

Esq.

Ms. L. Bernabei,

GAP

D. Railsback,

Arizona Corporation

Commission

bcc w/enclosure:

docket file

G.

Cook

B. Faulkenberry

J. Martin

Resident

Inspector

Project Inspector

bcc w/o enclosure:

LFMB

M. Smith

REGION V/noack

TPolich

'Riqhards

RPa

e

7/~H/8@

7/Q/88

7/

/88

AJo nson

7/

/88

DKirs h

7/@/88

YES /

NO

C

E

/

NO

YE

/

NO

YES /

NO

S /

NO

PDR

ES

NO

5/88