Advises That Util Will Provide Response to SPDS Audit Findings by 871231 Based on Revised Action Plan
ML17303A557
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/10/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
161-00495-JGH-P, 161-495-JGH-P, TAC-56654, TAC-62796, TAC-64581, NUDOCS 8709170224
Download: ML17303A557 (8)


Text

DOCKET 05000528 05000529 05000530

SUBJECT:

Advises that util mill provide response to SPDS audit findings bg 871231 based on revised action plan.

DISTRIBUTION CODE:

A003D COPIES RECEIVED: LTR I

ENCL G SIZE:

TITLE: OR/Licensing Sub mitta 1:

Sup p 1 1 to NUREG-0737 (Gener ic Ltr 82-33)

REGULATOR INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR: 8709170224 DOC. DATE: 87/09/10 NOTARIZED:

NO FACIL:STN-50-528 Palo Verde Nuclear Stations Unit 1 *rizona Pub 1 i STN-50-529 Palo Verde Nuclear Stations Unit 2i Arizona Publi STN-50-530 Palo Verde Nuclear Stations Unit 3i Arizona Pub li AUTH. NAME AUTHOR AFFILI*TIQN HAYNES> J. G.

Arizona Nuclear Poeer Prospect (formerly Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

NOTES: Standardized plant.

Standardi zed p lant.

Standardized, plant.

05000528 05000529 05000530 RECIPIENT ID CODE/NAME PD5 L*

LICITRAiE COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD5 PD DAVIS' COP IES LTTR ENCL 7

1 INTERNAL: ARM/DAF/LFMB

/DE/EIB EXTERNAL:

LPDR NSIC 01 1.

1 1

1 1

NRR/DLPG/HFB RES DEPY GI NRC PDR NOTES:

TOT*L NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL

pe P

li II kl, ji II

Arizona Nuclear Power Project P.O. BOX 52034 o

PHOENIX, ARIZONA85072-2034 161-00495-JGH/PGN September 10, 1987 Docket Nos.

STN 50-528/529/530 U.

S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C.

20555

Reference:

(1)

Letter from J.

G. Haynes (ANPP) to NRC dated March 6, 1987 (161-00040-JGH/PGN).

Subject:

SPDS Audit Open Items.

(2)

Letter from G. E. Dick, Jr.

(NRC) to APS dated December 11, 1986.

Subject:

Audit of the SPDS.

(3)

Letter from E. A. Licitra (NRC) to E.

ED Van Brunt, Jr.

(ANPP) dated February 5, 1987.

Subject:

Evaluation of SPDS for Palo Verde Units 1, 2 and 3.

(4)

Letter from E. A. Licitra (NRC) to E. E. Van*Brunt, Jr.

(ANPP) dated May 5, 1987.

Subject:

Evaluation of SPDS for Palo Verde Units 1, 2 and 3.

Dear Sir:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3

Safety Parameter Display System (SPDS) Audit Open Items File: 87-A-056-026 The reference 1 letter advised that ANPP would respond to the SPDS audit findings and NRC comments provided in references 2

and 3

by September 30, 1987.

Subsequently, a

detailed evaluation of the SPDS was provided by reference 4,

including a more indepth discussion of the issues identified in reference 3.

ANPP has thoroughly reviewed the discussion presented in reference 4,

and as a

result we have revised our action plan for responding to the audit findings.

This is to advise you that we will provide our response to the SPDS audit findings by December 31, 1987.

8709i70224 870910.

PDR ADOCK 05000528 F'D~R

USNRC Document Control Desk Page 2

161-00495 September 10, 1987 Xf you have any questions, please call W. F. Quinn at (602) 371-4087.

Very truly yours, P. g. /Jn.y~~

J.

G. Haynes Vice President Nuclear Production JGH/PGN/ls cc:

0.

M.

E. E.

A. C.

G.

M.

E. A.

J.

R.

De Michele Van Brunt, Jr.

Gehr Knighton Licitra Ball

rv"

ggP 8

1S87 DISTRIBUTION Docket File,-='DR LPDR PD V Reading JLee (2)

DOCKET NO(S).

50-528/529/530 Mr. E. E. Van Brunt, Jr.

Executive Vice President Arizona Nuclear Power Plant Post Office Box 52034 Phoenix, Arizona 85072-2034

SUBJECT:

ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION+

UNITS l~ 2 AND 3 The following documents concerning our review of the subject facility are transmitted for

. your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating.License, date'd

~ Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No d

C id i,d d~f (3]

Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

dated Faci 1 ity Operating 'License No.",Amen dmen t No.

dated Order Extending Construction Completion Date, dated Honthly Operating Report for transmitted by letter dated

+ Annual/Semi-Annual Report-transmitted by letter dated

Enclosures:

As stated Office of Nuclear Reactor Regulation See next page aFFICE) l'URNAME) 1.

C DATE)

RS

/PDV..

. 9/.8.

7.

~

~ ~

~

~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

~

~

0 ~ ~ ~ ~ ~ ~ ~ ~ ~

NRC FORM 318 IIOIBOINRCM 0240 OFFICIAL RECORD COPY

1 T

P N "

=

~

N l

AI