REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIBS)
ACCESSION NBR: 8707060641 DOC. DATE: 87/06/30 NOTARIZED:
NO F*CIL:STN'-50-528 Palo Verde Nuclear Stations Unit ii Arizona Pub li STN-50-529 Palo Verde Nuclear Stations Unit 2i Arizona Pub li STN-50-530 Palo Verde Nuclear Stations Unit 3i Arizona Pub li AUTH. NAME AUTHOR AFFILIATION KIRSCHi D. F.
Region 5i Ofc of the Director RECIP. NAME RECIPIENT AFFILIATION VAN BRUNT'. E.
Arizona Nuclear Power Prospect (formerly Arizona P
DOCKET ¹ i
05000528 05000529 05000530 ub lie Serv
SUBJECT:
Requests addi info re util 860630 8c 1027 responses to IE Bulletin 85-003'Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings.
Response
requested within 30 days of ltr date.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED: LTR f
ENCL 0 SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: Standard di zed p lant.
Standardi zed p lant.
Standardized plant.
05000528 05000529 05000530 RECIPIENT ID CODE/NAME PD5 PD DAVIS' INTERNAL: ACRS DEDRO NRR/DLPG/PEB NRR/DREP/EPB NRR/DR IS DIR L=I:E MANiJ EG FM-RGN5 FILE 01 EXTERNAL:
1 1
1 1
1 1
RECIPIENT ID CODE/NAME LICITRAiE AEOD NRR MOR ISSEAUs D NRR/DOEA DIR NRR/DREP/RPB NRR/PMAS/ILRB OGC/HDS1 RES DEPY GI NRC PDR COPIES LTTR ENCL 1
1 1
2 1
1 1
NOTES:
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 26 ENCL 26
1, 0
~ 4 I
n f
Docket Nos.
50-528 50-529 50-530 Arizona Nuclear Power Project P. 0.
Box 52034 Phoenix, Arizona 85072-2034 June 30, 1987 Attention:
E.
E.
Van Brunt, Jr.
Executive Vice President Project Director Gentlemen:
The review of your response te-8KB SS-03, ~tor-Operated Valve Common Node Failures During Plant Transients Due to Improper Switch Settings,"
dated June 30, 1986 and October 27, 1986, indicates the need for additional information before the program to assure valve operability can be approved.
The specific information requests are included in the attachment.
The information requested in the attachment should be sent within 30 days of the date of this letter to:
Richard J. Kiessel Division of Operation Events Assessment Nuclear Regulatory Commission Washington, D.C.
20555 A copy of this response should be sent to the regional office.
Sincerely,
/s/
Dennis F. Kfrsch, Director Division of Reactor Safety and Projects Region V
Enclosure:
1.
RAI for Palo Verde Units 1, 2, and 3
cc w/enclosure:
B. Falkenberry D. Kirsch J. Helfi RV/jk 70706064i 8
00528 9
PDR 2E >)
R VEST C
PY NO RE U ST COPY NO REQUEST YES NO REQUES C
PY YES NO 0
R ES NO MELFI~~
RICHARD PATE 'I SCH 6/Bo/87 6/J4/87 6/
/8 6/AI /87
l 1
f
gQ 4hgy
~o Cg
)
0 p
+**<<+
UNITED STATES NUCLEAR REGULATORY COMIVIISSION REGION V 1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596 June 30, 1987 Docket Nos.
50-528 50-529 50-530 Arizona Nuclear Power Project P. 0.
Box 52034 Phoenix, Arizona 85072-2034 Attention:
E.
E.
Van Brunt, Jr.
Executive Vice President Project Director Gentlemen:
The review of your response to IEB 85-03, "Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings,"
dated June 30, 1986 and October 27, 1986, indicates the need for additional information before the program to assure valve operability can be approved.
The specific information requests are included in the attachment.
The information requested in the attachment should be sent within 30 days of the date of this letter to:
Richard J. Kiessel Division of Operation Events Assessment Nuclear Regulatory Commission Washington, D.C.
20555 A copy of this response should be sent to the regional office.
Sincerely, Dennis F. Kirsch, Director Division of Reactor Safety and Projects Region V
Enclosure:
1.
RAI for Palo Verde Units 1, 2, and 3
cc w/enclosure:
B. Falkenberry D. Kirsch J.
Melfi
ik I
Page 1 of I REQUEST FOR ADDITIONAL INFORMATION (RAI) RE:
Reviewof Responses to Action Item e of IE Bulletin 85-03 Licensee:
Arizona Nuclear Power Project P.
O.
Box 52034
- Phoenix, Arizona 85072-2034 Unit(s): Palo Verde 1,2,3 Date of Response:
06-30-86 10-27-86 Respondent:
E.
E.
Uan Brunt, Jr.
Executive Vice President Project Director The information provided in your response to Action Item e of IE Bulletin 85-03 was found to be deficient in some areas.
Please provide the additional information necessary to resolve the following comments and questions:
1.
Has water hammer.due to valve closure been considered in the determination of pressure differentials2 If not, please explain.
- 2. Listed MOVs HV-30 through.HV-33 and HV-54 of the AFW System are 4-inch globe valves, and listed MOUs HC-321 and HC<<331 of the HPSI System are 3-inch globe valves.
We were advised recently that the MOVATS data base does not include globe valves with orifice sizes less than 1.75 or more than 2.0 inches.
Will representative samples of these three-inch and four-inch globe valves be tested at full differential pressureP
- 3. Please explain why the following MOVs in the AFW system are not included in the tables of the response of 06-30-86.
(a)
HU-1 and HV-4 are shown normally closed in a suction line from the CST to one of the motor-driven pumps, in Zone E-3 of Drawing 13-M-CTP-001, Rev 14
'b)
HV-1142 and HV-1143 are shown in parallel in a line bypassing discharge of one of the motor-driven pumps to Steam Generator 1, in zones G-14 and F-14 of Drawing 13-M-SGP-002, Rev 17.
(c) HV-1144 and HV-1145 are shown in parallel i'n a crossover line between discharge l'ines. of the motor-driven pumps, in Zone C-14 of Drawing 13-M-SGP-002, Rev 17,
- 4. Please expand the proposed program for action items b, c and d
of the bulletin to include a commitment to a training program for setting switches, maintaining valve operators, using signature testing equipment and interpreting signatures,