Forwards Insp Repts 50-528/89-49,50-529/89-49 & 50-530/89-49 on 891016-1112.No Violations or Deviations Noted.Safety Sys Flow Transmitter Calibr Incorrectly Due to Communication Problems Between Util Engineering & Maint Organizations
ML17300B227
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/19/1989
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17300B228 List:
References
NUDOCS 9001040060
Download: ML17300B227 (8)


See also: IR 05000528/1989049

Text

CCELERATED DISTRIBUTION DEMONSTPA.TION SYSTEM

DOCKET

05000528

05000529

05000530

SUBJECT:

Forwards Insp Repts 50-528/89-49,50-529/89-49

& 50-530/89-49

on 891016-1112.No violations noted.

.nj- C~.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

/

05000528

-05000529

A

05000530

K

NOTES Standardized

plant.

Standardized

plant.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR:9001040060

DOC.DATE: 89/12/19

NOTARIZED: NO

FACIL:STN-50-.528 Palo Verde Nuclear Station, Unit 1, Arizona Publi

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi

STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi

AUTH.NAME

-

AUTHOR AFFILIATION

RICHARDS,S.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

CONWAY,W.F.

-Arizona Public Service

Co.

(formerly Arizona Nuclear Power

RECIPIENT

XD CODE/NAME

PD5

PD

DAVIS,M.

COPIES

RECIPXENT

LTTR ENCL

ID CODE/NAME

1

1

CHAN,T

1

1

COPIES

LTTR ENCL

1

1

INTERNAL: ACRS

AEOD/DEIIB.

DEDRO

NRR/DLPQ/LPEB10

NRR/DREP/PEPB9 D

NRR/DRIS/DIR

NRR/PMAS/ILRB12

OE LIEBERMAN,J

G

IXE+

02

RGN5

FILE . Ol

EXTERNAL: LPDR

NSIC

NOTES

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

AEOD

AEOD/TPAD

NRR SHANKMAN,S

NRR/DOEA DIR=ll

NRR/DREP/PRPB11

NRR/DST/DIR 8E2

NUDOCS-ABSTRACT

OGC/HDS 1

RES

MORXSSEAU,D

NRC PDR

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

R

D

NOTE TO ALL"RIDS" RECIPIENTS:

D

D

PLEASE HELP US TO REDUCE WASTE( CONTACT THE DOCUMENT CONTROL DESK,

ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISHUBUTION

LISIS FOR DOCUMENIS YOU DON'T NEED)

TAL NUMBER OF COPIES

REQUIRED:

LTTR

28

ENCL

28

~

Q

U

~gS ))E0y,

(4

.+<

o

~y

)~i

)

I

0

)

i!

3:

)))

')

C)

"+

~

o"

+>>**+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

DEC 19

198g

Docket Numbers 50-528,

50-529,

50-530

Arizona Nuclear

Power Project

P.

0.

Box 52034

Phoenix,

Arizona

85072-2034

Attention:

Hr.

lIJ.

F.

Conway

Executive Vice President,

Nuclear

Gentlemen:

Subject:

NRC Inspection of'alo Verde Units 1,

2 and

3

This refers to the inspection

conducted

by Messrs.

Ringwald and J.

Sloan of this office on October

16

1989, of activities authorized

by NRC License

Nos.

NPF-74,

and to the discussion of our findings held

members of the Arizona Nuclear Power Project staff

the inspection.

D. Coe,

T. Polich, J.

through November 12,

NPF-41,

NPF-51 and

by the inspectors with

at the conclusion of

Areas

examined during this inspection are described

in the enclosed

inspection report.

Within these areas,

the inspection consisted of

selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

No violations or deviations of regulatory requirements

were identified;

however two issues

discussed

in .the enclosed

report continue to raise

concern regarding your performance of technical

work.

Paragraph

8

describes

an event at Unit 1 where a safety system flow transmitter

was

calibrated incorrectly due to apparent

communication problems

between

your engineering

and maintenance

organizations.

This event appears

to be

similar to problems

encountered earlier in 1989, where incorrect

technical

information was used in procedures

for reactor coolant system

mid-loop operations.

Paragraph

10 discusses

your actions

regarding

long

term problems

encountered

with switches associated

with the plant

protective

system.

Our concern is that the priority placed

on addressing

this issue

may not have

been appropriate

considering the application of

the switches.

'n accordance

with 10 CFR 2.790(a),

a copy of this letter and the

enclosure Hill be placed in the

NRC Public Document

Room.

Should you have any questions

concerning'this

inspection,

we will be

pleased to discuss

them with you.

Sincerely,

S. Richards,

Chief

Reactor Projects

Branch

9001040060

91219

I-"IDOCI: O 00n52S

POR

9

o

OEC i >>ssS

Enclosure:

Inspection

Report

Numbers

50-528/89-49

50-529/89-49

50-530/89-49-

cc w/enclosure:

J.

M. Levine, Yice President,

Nuclear Power Production

M.

F. quinn, Manager,

Licensing

T.

D. Shriver,

Manager,

Compliance

B. Ballard, Director, equality Assurance

R. Fullmer, Manager,

equality Audits 8 Monitoring

A.

C. Gehr,

Esq.

Ms.

L. Bernabei,

GAP

J.

Brown, Arizona Corporation

Commission

DE~ i n

anny

bcc w/enclosure:

docket file

G.

Cook

B. Faulkenberry

J. Martin

Resident

Inspector

Project Inspector

bcc w/o enclosure:

J. Zollicoffer

M. Smith

REGION Y/dot

DCoe

TPolich

~a-/~9/

9

i>~/(> 89

JRingwald

in'Q/S9

JSloan

>D'S9

ES /

NO

j

ES /

NO

j YES /

0

] YES /

NO

'

AJ

n

n

/

S9

HMong+~

SRicharda

~+/89

g2/I'I/89

YES /

S /

NO

j

YES /

NO

j

YES

/NO