ML17300A882

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/87-10,50-529/87-11 & 50-530/87-12 on 870223-0404 & Notice of Violation
ML17300A882
Person / Time
Site: Palo Verde  
Issue date: 05/21/1987
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17300A883 List:
References
NUDOCS 8706050241
Download: ML17300A882 (7)


See also: IR 05000528/1987010

Text

REGULATORY INFORMATION DISTRIBUTIQN SYSTEN

(R IDS)

DOCKET 0

05000528

05000529

05000530

SUB JECT:

Fori<<iards Insp Rept s 50-528/87-10> 50-529/87-11

5 50-530/87-12

on 870223-0404

8c n oti c e

oi vio 1 a ti on.

DISTR I BUT ION CODE:

IE01D

COPIES

RFCEI VED: LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

t.

ACCESSION

NBR: 8706050241

DOC. DATE,'//05/21

NOTARIZED:

NQ

l FACIL:STN-50-528 Palo Verde Nuclear Station.

Uni t

1> Arizona

Pub li

STN-50-529 Palo Verde Nuclear Station>

Unit

2> Arizona

Pub li

STN-50-530 Palo

Verde Nuclear Station>

Unit

3> Arizona

Pub li

TH. MANE

AUTHOR AFFILIATION

CH> D. F.

Region

5>

0&Fice oi Director

CIP. MANE

RECIPIENT AFFILIATION

VANBRUNT, E. E.

Arizona Nuclear Pouer ProJect

(Formerly Arizona Public Serv

NOTES: Standardized

plant. M. Davis

NRR: 1Cg.

Standardized

plant. N. Davis. <<.lRR: 1Cg.

Standardized

plant. N. Davis

NRR: 1Cg.

05000528

05000529

05000530

RECIPIENT

ID CODE/MANE

PD5 L*

LICITRA>E

INTERNAL: ACRS

DEDRQ

llRR RQE.N. L

NRR/DREP/EPB

NRR/DRIS DIR

QGC/HDS1

RES

DEPY GI

EXTERNAL: LPDR

NSIC

CQP IES

LTTR El'CL

0

2

2

2

2

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/MANE

PD5

PD

DAVIS> N

AEOD

EN~ LIEBERNAN

MRR/DOEA

DIR

NRR/DREP/RPB

NRR/

S/ILRB

EC FI

E

i

FILE

01

NRC

PDR

COP IES

LTTR ENCL

1

2

2

1

1

1

1

2

2

1

1

1

1

1

1

1

NOTES:

1

1

I'

TOTAL 'NlJljBER OF

COP IES REQUIRED:

LT I R

26

ENCL

2 5

4

I*

HAY 2i l987

Docket Nos.

50-528

50-529

50-530

Arizona Nuclear

Power Project

P.

O.

Box 52034

Phoenix,

Arizona

85072-2034

Attention:

Mr.

E.

E.

Van Brunt Jr.,

Executive Vice President

Gentlemen:

Subject:

NRC Inspection of Palo Verde Units 1,

2 and 3.

This refers to the inspection

conducted

by Messrs.

R.

Zimmerman,

G. Fiorelli,

J. Ball,

K. Ivey and

R.

C. Sorensen

of this office on February

23, through

April 4, 1987, of activities authorized

by

NRC License

Nos.

NPF-41,

NPF-51 and

NPF-65,

and to the discussion of our findings held with yourself and other

members of your staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Our review into your corrective actions

taken following the disabling of

an engineered

safety feature

on January

20,

1987 is ongoing,

as

documented

in

paragraph

7 of the enclosed

inspection report.

Our letter to you dated

March

13,

1987 addressed

specific issues

stemming from the above event which we

deemed to have considerable

importance.

At that time,

we requested

that you

address

these

issues

as part of your overall, internal

event review.

We will

review your specific actions taken to preclude recurrence,

during a future

inspection.

This issue

remains

unresolved.

Based

on the results of this inspection, it appears

that certain of your

activities were not conducted

in full compliance with NRC requirements,

as set

forth in the Notice of Violation, enclosed

herewith

as Appendix A.

Your response

to this Notice is to be submitted in accordance

with the

provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Q70608O~~

PgOOQ528

t

z svos>>

PDR

ADOCK

PDR

The response

directed

by this letter and the accompanying

Notice are not

subject to the clearance

procedure of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this inspection,

we will be

pleased

to discuss

them with you.

Sincerely,

D. F.(/Kirsch, Dirdctor

Division of Reactor

Safety

and

projects

Enclosures:

A. Appendix

A - Notice of Violation

B. Inspection

Report Nos.

50-528/87-10,

50-529/87-11,

and 50-530/87-12

cc w/enclosures:

J.

G.

Haynes,

Vice President,

Nuclear Production

J.

R.

Bynum,

PVNGS Plant Manager

W.

F. guinn, Manager,

Licensing

T.

D. Shriver,

Manager,

Compliance

W.

E. Ide, Manager,

Corporate

gA/gC

C.

N.

Russo,

Manager,

gA Audits/Monitoring

Arthur C. Gehr,

Esq.

Ms. J. Morrison

Ms.

L. Bernabei,

GAP.

T.

Hogan, Arizona Corporation

Commission

bcc w/enclosures:

RSB/Document Control

Desk (RIDS)

Project Inspector

Resident

Inspector

G.

Cook

B. Faulkenberry

J. Martin

docket file

R.

Huey,

SONGS

Howard Wong,

OE,

ES

NN 2t I997

"3"

bcc w/o enclosure

B:

M. Smith

LFMB

REGION V/dot,

RZi

m rman

P<JBa

1

ssrGFierelli

re< KIYey~

eccsoyegseh

V .P~

RE UEST

COPY j REQUEST ~PY j REQUEST

PY ] REQUEST

COPY j fgQUEST

COPY j

ES /

NO

YES /

NOl

YES /

NO

YES / g0

(YES) /

NO

87

ear SRjchards

VEST COPY ]

ES /

NO

5/G/87

t3 87

5/~87

5 Li/87

5/l9/87

5/I>/87

RPate

DKirsch

~

A

RE UEST

COPY ]

REBOURS

PY ]

/i/dP

YES /

NO

YES /

NO

p gp

S

0

0

PDR

ES /

NO

zo/87