Fowards Insp Repts 50-528/86-30,50-529/86-29 & 50-530/86-22 on 860908-1012.No Violations or Deviations Noted.Analysis of Effectiveness of Efforts to Reduce Personnel Error Will Be Discussed at Mgt Meeting in 4-6 Wks
ML17300A624
Person / Time
Site: Palo Verde  
Issue date: 10/30/1986
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17300A625 List:
References
TAC-65606, NUDOCS 8611140007
Download: ML17300A624 (4)


See also: IR 05000528/1986030

Text

OCT 30 1S86

Docket Nos.,50-528,

50-529,

and 50-530

Arizona Nuclear Power Project

P. 0. Box 52034

Phoenix, Arizona

85072-2034

Attention:

Mr. E. E.

Van Brunt Jr.,

Executive Vice President

Gentlemen:

Subject:

NRC Inspection of Palo Verde Units 1,

2 and 3.

This refers to the inspection

conducted

by Messrs.

R.

Zimmerman,

C. Bosted,

G. Fiorelli, J. Ball and K. Ivey of this office on September

8, 1986, through

October

12,

1986 of activities authorized by NRC License Nos.

NPF-41,

NPF-51

and Construction Permit Number CPPR-143,

and to the discussion of our findings

held with members of your staff at the conclusion of the inspection.

Areas

examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Recent

cases of personnel error'iscussed

in paragraph

15 of the enclosed

report, indicate the continuing need for aggressive

management

action to

minimize personnel

errors in the future.

Previous

NRC inspection reports

have

documented

our concern regarding problems during the operational

phase

which

were attributed to instances

of personnel error, including the failure to

follow plant procedures.

Your letter to the Region V office, dated

July 7,

1986 communicated

the corrective actions undertaken

and planned to

improve plant performance in this area.

Although some

improvement

has

been

evident,,

the recent

examples

indicate that further improvement is necessary.

In our meeting 'on October 28,

1986, it was tentatively agreed to review this

.area,

among others, in another

management

meeting in Walnut Creek in about 4-6

weeks.

At that time I would appreciate

your analysis of the effectiveness

of

your efforts to reduce personnel errors.

No violations or deviations of NRC requirements

were identified within the

scope of this inspection.

In accordance

with l0 CFR 2.790(a),,

a copy of this letter and the enclosure

will be placed i.n the

NRC Public Document

Room.

I

abii140007

Sb1030

PDR

ADOCK 05000528

8

PDR

4

c

A

Arizona Public Service

Co.

-2"

~ ~

OCT 30 l986

Should you have any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

>na) Qguau

J

r gi

)obn 9 gaf

John B. Martin,

Regional Administrator

Enclosure:

Inspection Report Nos.

50-528/86-30,

50-529/86-29,

50-530/86-22

cc w/enclosure:

J.

G. Haynes,

Vice President,

Nuclear Production

J.

R. Bynum,

PVNGS Plant Manager

W.

F. Quinn, Manager, Nuclear Operations I,icensing

T.

D. Shriver,

Manager,

Compliance

W.

E. Ide, Manager,

Corporate

QA/QC

C.

N. Russo,

Manager,

QA Audits/Monitoring

Arthur C. Gehr, Esq.

Ms. J. Morrison

Ms. L. Bernabei,

GAP

4

D. Railsback,

Arizona Corporation Commission

.

bcc w/enclosure:

RSB/Document Control Desk

(RIDS)

Project Inspector

Resident Inspector

G.

Cook

B. Faulkenberry

J. Martin

bcc w/o enclosure:

IFMB

Region V

RZimmerman/norma

10/

/86

AE haffee

DFK

10/p$ /86

10/

GFiorelli

10/

/86

sch

JBMartin

/86

10/

/86

CBosted

JBall

KIvey

ilier

10/

/86

10/

/86

10/

/86

10/A/86

l,

V

ll