Confirms That Facilities Can Be Safely Shut Down to Hot Standby Condition from Outside Control Room at Moderate Power Level (10-25%).Unit 2 Remote Shutdown Panel Test Scheduled to Begin 870109
ML17300A623
Person / Time
Site: Palo Verde  
Issue date: 11/07/1986
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Harold Denton
Office of Nuclear Reactor Regulation
References
ANPP-39032-JGH, TAC-62716, NUDOCS 8611130349
Download: ML17300A623 (4)


Text

REGULATQ INFORMATION DISTRIBUTION STE}'l (R IDS)

ACCESSIQN NBR: 8611130349 DOC. DATE: 86/11/07 NOTARIZED-NO DOCKET 0 FACIL:STN-50-529 Palo Verde Nuclear Station>

Unit 2i Arizona Pub 1 i 05000529 STN-50-530 Palo Verde Nuclear Stations Unit 3i Arizona Pub 1 i 05000530 AUTH. NA}'lE AUTHOR AFFI LIATIQiV HAYNES> J. G.

Arizona Nuclear Pouer ProJect (formerly Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION DENTON, H. R.

OFFice oF Nuclear Reactor Regulationi Direc tor (post 851125

SUBJECT:

Confirms that facilities can be safelg shutdown to hot standby condition from outside control room at moderate power level (10-25/). Unit 2 remote shutdown panel test scheduled to begin 860109.

DISTRIBUTION CODE:

8021D COPIES RECEIVED: LTR ENCL Sl ZE:

TITLE: OR/Licensing Submittal:

Combined General Distribution NOTES: Standardized plant. M. Davis> NRR: 1Cg.

Standardized plant. M. Davisi NRR: 1Cg.

05000529 05000530 REClPIENT ID CODE/NAl'lE pNR-8 ADTS PNR-8 PEICSB pNR-8 PD7 L*

LICITRA>E 01 pNR-8 RSB INTERNAL'CRS '9 ELD/HDS3 NRR PWR-A ADTS NRR 0 DIR

}-

04 AMI/MIB COPIES LTTR ENCL 1

2 1

1 8

1 REC IP IENT I D CODE/NAl'1E PWR-8 EB PWR-8 FOB PWR-8 PD7 PD 05 PWR-8 PEICSB ADM/LFMB NRR BWR ADTS NRR PWR-8 ADTS NRR/GRAS RGN5 COP IES LTTR ENCL EXTERNAL: LPDR NSIC 03 06 NRC PDR PNL CRUELER 02 TOTAL NU}lBER QF COPIES REQUIRED:

LTTR 33 ENCL

>>I t*'l W

Wg t

>>" I(>

I ~

(W m qw + j,t '(

1 Il<<

tl ((

'f IW'W f

f(<W

) Wk I)"

IW4>>'Ca

( g<<,"

)

W R

<<,W

,j)-

R R

)

I I

W

Arizona Nuclear Power Project P.O. BOX 52034

~

PHOENIX, ARIZONA85072-2034 Office of Nuclear Reactor Regulation Attention:

Mr.. Har'old R. Denton, Director U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555 November 7, 1986 ANPP-39032-JGH/JMQ/98.05

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 2 and 3

Docket Nos.

STN 50-529 (License NPF-51)

STN 50-530 Testing of Remote Shutdown Capability at Palo Verde, Units 2 and 3

File:

86-056-026

Reference:

Letter from H. R. Denton, NRC, to E.

E. Van Brunt, Jr.,

ANPP, dated October 9, 1986.

Subject:

Testing of Remote Shutdown Capability at Palo Verde, Units 2 and 3.

Dear Mr. Denton:

The referenced letter requested confirmation that Palo Verde Units 2 and 3

can be safely shutdown to a hot standby condition from outside the control room at a moderate power level (10-25%).

Further, a schedule was requested for the performance of the test for Unit 2 during the power ascension test program, d"=future extended shutdown, or next refueling outage.

A schedule was also requested for the performance of the test for Unit 3 during the powex ascension testing period.

The Unit 2 remote shutdown panel test is scheduled to begin January 9,

1986 during the suxveillance testing outage.

The Unit 3 test will be performed during the power ascension testing program.

If you have any questions on this matter, please contact me.

Very truly yours, J.

G. Haynes Vice President Nuclear Production JGH/WFQ/JMQ/jmq cc:

O. M. DeMichele E.

E. Van Brunt, Jr.

E. A. Licitra R.

P.

Zimmerman A. C. Gehr Sb11130349 861107 I,,PDR

  • DOCK 05000529, P'

PDR

I L