Forwards Const Appraisal Team Insp Rept 50-530/86-03 on 860113-24 & 0203-14.Several Deficiencies Noted Re Adequacy of Design & Const for Masonry Block Walls.List of Potential Enforcement Actions Encl
ML17299B172
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/04/1986
From: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17299B173 List:
References
NUDOCS 8604150530
Download: ML17299B172 (9)


See also: IR 05000530/1986003

Text

~aR REay~

~o

4y

o

o

+n

gO

++*++

Docket No. 50-530

April 4,

1986

Sb04150530

8bPq04

PDR

ADOCK 05000530

8

PD~R

UNITEDSTATES

NUCLEAR REGULATORYCOMMISSION

WASHINGTON,D. C. 20555

Arizona Nuclear Power Project

ATTN:

Mr. E.

E.

Van Brunt, Jr.

Executive Vice President

P.

0.

Box 52034

Phoenix,

AZ

85072-2034

Gentlemen:

SUBJECT:

CONSTRUCTION APPRAISAL TEAM INSPECTION 50-530/86-03

Enclosed is the report of the Construction Appraisal

Team (CAT) inspection

conducted

by the Office of Inspection

and Enforcement (IE) on January 13-24

and February 3-14, 1986, at the Palo Verde Unit 3 site.

The Construction

Appraisal

Team was

composed of members of IE, Region V, and a number of consul-

tants.

The inspection

covered construction activities authorized

by NRC

Construction Permit CPPR-143.

This inspection is the fifteenth in a series of construction appraisal

inspec-

tions conducted

by the Office of Inspection

and Enforcement.

The results of

these

inspections

are being used to evaluate

the management

control of

construction activities and the quality of construction at nuclear plants.

The enclosed report identifies the areas

examined during the inspection.

Within these

areas,

the effort consisted primarily of detailed inspection of

selected

hardware

subsequent

to quality control inspections,

a review of

selected portions of your guality Assurance

Program,

examination of procedures

and records,

and observation of work activities.

Appendix A to this letter is an Executive

Summary of the results of this

inspection

and of conclus'ions

reached

by this office.

The

NRC CAT noted

no

pervasive

breakdown in meeting construction

requirements

in the samples of

installed hardware

inspected

by the team or in the licensee's

project

construction controls for managing the Palo Verde Unit 3 site.

The

NRC CAT identified a number of deficiencies

which warrant additional

management

attention.

The most significant of these

involves the adequacy of

the design

and construction for masonry block walls which provide support for

and are in proximity to safety-related

components.

Because

these walls were

not assigned

proper quality classification,

inspections

were not performed

as

intended

and the existence

and location of reinforcing steel is in question.

Our concern is that the masonry walls as constructed

may not meet their design

intent.

Me understand that the findings of this inspection will be evaluated to

determine the effects

on Palo Verde Units 1 and 2.

ZE01

Copy to

RCPB~ IE

(

,(

Arizona Nuclear Power Project

Apr:il 4,

1986

Appendix

B to this letter contains

a list of potential

enforcement actions

based

on the

NRC

CA'T inspection.

These are being reviewed by the Office 'of

'nspection

and Enforcement

and the

NRC Region V'Office for aIppropIriate action.

In addition,

Region

V will be following your corrective action foir deficien+

cies identified duringl,-this inspection.

In accordance

with:10 CFR 2.790(a)

a copy of this letter and the enclosure.

will be placed in the

NRC Public Document

Room.

No reply to this letter is

required at this .time.

You will be rIequired to respond to these

findir>gs

after a,decision is made regarding

apjpropriatJe

6nf6rcement action.,

Should you have any questions

concerningl this'nsp'ection,

please

contact

us or

the Region

V Office,.

Sincerely,

Enclosures:

l.

Appendix A, Executive

2.

Appendix B, Potential

3.

Inspection

Report

cc w/enclosures:

See next page'n

es

N Taylor/ Director

+Of ice of, In.'piiftion and Enfoccement

C~

Summary

EnforcIement Actions

Arizona Nuclear Power Project

3

April 4,

1986

cc w/enclosures:

J.

Bynum, Director

Nuclear .Operations

Arizona Nuclear

Power Project

P.O.

Box 52034

Phoenix,

AZ

85072-2034

W.

F. Quinn, Manager of Licensing

Station 4057

Arizona Nuclear Power Project

P.O.

Box 52034

Phoenix,

AZ

85072-2034

T.

D. Shriver,

Manager

Quality Systems

and Engineering

Arizona Nuclear Power Project

P.O.

Box 52034

Phoenix,

AZ

85072"2034

W.

E. Ide, Manager

Corporate

QA/QC

Arizona Nuclear

Power Project

P.O.

Box 52034

Phoenix,

AZ

85072-2034

C.

N. Russo,

Manager

QA Audits/Monitoring

Arizona Nuclear

Power Project

P.O.

Box 52034

Phoenix,

AZ

85072-2034

Jill Morrison,

PVIF

P.O.

Box 24593

Tempe,

AZ

85282

Lynne Bernabei

(Government Accountability Project)

1555 Connecticut

Avenue,

NW

Washington,

DC

20009

Duke Railsbeck

Arizona Corporation

Commission

1200

W. Washington Street

Phoenix,

AZ

85007

Arthur G. Gehr,

Esquire

Snell

8 Wi.lmer

3100 Valley. Center

Phoenix,

AZ

85073

Arizona Nuclear

Power Project

4

April 4,

1986

Distribution

DCS (Docket No. 50-530)

NRC

PDR

Local

PDR

DI Reading

RCPB Reading

JMTaylor

RVollmer

JPartlow

RSpessard

BGrimes

EJordan

JAxelrad

HThompson

TNovak

GKnighton

ELicitra

WPaton

AEOD

OELD

NMSS

RES

ACRS (10)

NSIC

NTIS

Regional Administrators

Regional Division Directors

HBoul den,

OIA

SECY

OPE

OCA (3)

VStello

HDenton

CAT Members

Resident Inspector

RHartfield

INPO

Al 1 Licensees

(Distributi on 1S)

OFC:RCPB:DI:IE::RCPB:DI:IE:OD:

. E:0: I:IE

.:0 '

p

NAME

HJWong/vj
RFHeishman

. RLSpessard

.JGPartlow

ollmer: J

y. or

DATE:038.k/86

.03/~86: 03/

/86

0

/86: 0 / ./86: 0 /N86

APPENDIX A

EXECUTIVE

SUMMARY'n

announced

NRC .Construction Appraisal

Team

(CAT) inspection

was conducted't

Arizona Public Service

Company's

Palo Verde Nuclear Generating Station

(PVNGS)

Unit 3 during the period January

13-24 and February 3-14,. 1986.

.OVERALL CONCLUSIONS

Hardware

and documentation

.for construction activities were generally in

accordance

with requirements

and licensee

commitments.

However, the

NRC CAT did

identify a number of hardware deficiencies that in most cases

have resulted

from

construction

program weaknesses.

These include:

1.

Masonry walls which support

and are adjacent to safety-related

components

were found by the

NRC CAT to have 'the reinforcing bars not placed in accord-

ance with the design drawings.

In addition, prescribed

inspection

records

were not available to document the adequacy of the masonry wall construction

process

and to support design analysis

assumptions.

This was

due in part to

the fact that the original quality classification of the masonry walls was

incorrect.

The masonry walls were classified

as Class

S which requires

no

special quality requirements

beyond industry standards.

This area will

require further review by the

NRC.

2.

In the mounting of electrical

components,

6 of 11 pieces of gC accepted

equipment

and

5 of 32 gC accepted

cable tray hangers

were found with weld

configurations that did not match specified requirements.

In addition,

the cable tray hangers

had been subject to plant wide reinspection

programs

for,previously identified attachment

design deficiencies.

3.

Based

on field observation of work activity, discussions

with site

engineering

and Westinghouse

personnel,

and

a review of data which

describes

failur'es

and detector

leakage

experienced

-on

PVGNS Units 1

and 2,

NRC CAT inspectors

concluded that the existing qual.ity verification

program was not adequate

to assure that critical ex-core termination

activities are satisfactorily accomplished.

Based

upon

NRC CAT concerns,

the applicable

gC procedure

was revised to specifically detail those

steps for which gC i'nspection is required.

Several

deficiencies in vendor

equipment were identified.

These

were vendor

deficiencies

related to terminations in the diesel

generator control panels

and soldered

connections

in the 125V

DC battery chargers

and had not been

identified during source inspection, receipt inspection,

or field installa-

tion activities.

In addition,

vendor weld deficiencies

.were found in

instrument racks.

AREAS INSPECTED

AND RESULTS

Electrical

and Instrumentation

Construction

In general,

the electrical

and instrumentation installations

examined were found

to conform to applicable

design

and installation requirements.

However, several

areas with hardware

deficiencies

were identified.

A-1

A number of raceway instal.lations

were found not meeting the required separation

criteria.

However, the major efforts of the licensee

s inspection, program for

separation

of Class lE raceway installations is not yet complete.

This area

will require additional

NRC and licensee attention.

Configuration deficiencies

were identified in some cable tray hanger connections

and the mounting welds for some electrical

panels.

Five gC accepted

cable tray

hangers

were found with weld connections

not matching the configuration of

approved designs.

A large percentage

(6 of ll panels

inspected)

of gC accepted

equipment

was found to exhibit deficient mounting configurations.

The mounting

weld configurations

were not in accordance

with the approved design

documents.

The quality of vendor terminations in the diesel

generator

control panels

and

125V dc battery chargers

was found to be inadequate;

The field gC verification of in-process

excore terminations

was found to be

inadequate

and requires additional

licensee attention.

The status of qualification for several

components

of the diesel

generator control

panels

and

some wire types in motor operated

valves requires additional

NRC and

licensee

review.

Mechanical

Construction

Preventive

maintenance

of mechanical

equipment

was found to be in conformance

with requirements

and good maintenance

practices.

Heating, ventilating and air

conditioning hardware (supports/restraints,

duct sections, fire dampers)

were

generally found to be installed in accordance

with requirements

or the deficien-

cies

found by the

NRC CAT had been, previously identified;

However, deficiencies

were identified i.n three areas:

piping, pipe supports/restraints,

and mechanical

equipment.

In the area of piping, improper material

was

used for flange bolting.

Undersized

beam attachment

load pins were used

on pipe supports/restraints.

Mounting hardware

and foundations

on

some

HVAC equipment

were found to be

fabricated

and installed improperly.

These

areas of concern require further

licensee

evaluation.

Weldin

and Nondestructive

Examination

Welding and nondestructive

examination activities were generally found to be

conducted in accordance

with the governing codes

and specifications.

However,

several

examples

were found in which completed structural

welds in pipe supports/

restraints

were smaller than that specified in the design drawings.

Some vendor

supplied tanks

and heat exchangers

were found to have undersized

weld reinforce-

ment in "nozzle to shell" and "manway to shell" joints.

In addition, deficient

welds were found in vendor supplied instrument racks.

The

NRC CAT inspectors

also found a number of vendor radiographs

which did not

have the required film quality.

In the area of Preservice

Examination activities,

the

NRC CAT identified welds which had indications that had not been recorded

as

required

by the licensee's

program.

In the review of some welding procedures,

timely information was not provided

to adequately

determine whether the procedures

properly addressed

ASME Code

provisions in the areas of impact tests of the heat affected zone,

the identi-

fication of non-essential

welding variables,

and the prohibition of peening in

certain situations.

A-2

Civil and Structural

Construction

In the area of masonry block walls, the

NRC CAT identified that prescribed

in-process

inspections

had not been performed..It

was also identified that

reinforcing bars were not positioned= as required, by the design drawings.

The design

and construction

adequacy of the block walls will require further

review by the

NRC.

Structural

steel installation was determined

to- be generally adequate.

Deficient

bolted connections

were found by, the

NRC CAT in containment

column splice

connections.

Design considerations

for thermal loading on structural

steel

members will require further review by the

NRC.

gC documentation for .concrete

placements,

mechanical

splices of reinforcing steel,

containment post-tensioned

tendons,

and structural backfill were generally deter-

mined to be adequate.

Material Traceabilit

and Control

The material traceability and control program is considered to be satisfactory.

No significant deficiencies

were identified in the sample of items selected for

review by the

NRC CAT.

Documentation

was available to indicate that materials

were installed

as specified.

Desi

n Chan

e Control

Design change control

was determined'o

be generally in conformance with

applicable

requirements.

The most significant findings were the lack of docu-

mented,

auditable justification for some safety-related

design

changes

and failure

to assure that design

changes

were

made to all affected design

documents

in a

timely manner.

Corrective Action S stems

In general

the licensee's

corrective action program was found to be acceptable.

However, in the area of cable tray support attachment configuration the licen-

see's

program

has not been effective as evidenced

by additional

examples of

configuration deficiencies

found by the

NRC CAT after several

licensee

reinspection

programs.

A-3

APPENDIX B

POTENTIAL ENFORCEMENT ACTIONS

As a result of the

NRC CAT inspection of January

13-24 and February 3-14,

1986

at the Palo Verde site, the following items are being referred to Region

V as

Potential

Enforcement Actions.

Section references

are to the detailed portion

of the inspection report.

10 CFR 50, Appendix B, Criterion III, as

implemented

by Arizona Public

Service

(APS), Palo Verde Nuclear Generating Station Final Safety

Analysis Report

(FSAR) Section

17. 1A.3, requires that measures

shall

be

established

to,assure

that applicable regulatory requirements

and design

basis

are correctly translated

into specifications,

drawings, procedures,

and instructions.

2.

Contrary to the above, at the time of this inspection,

the licensee's

program

was not adequately

implemented in that masonry block walls were incorrectly

classified

as guality Class

S for which no special

qual:ity requirements

beyond industry standards

are

needed.

Partially due to the "S" quality

classification,

in-process

inspections

were not accomplished.

As a result,

reinforcing steel

was found to be located not in accordance

with the design

drawings

and also inspection records

were not available to support design

analyses

assumptions.

Therefore,

masonry walls may not meet their design

intent.

(Section V.B.1)

10 CFR 50, Appendix B, Criterion VII, as

implemented

by the

APS

FSAR

Section 17.1A.7, requires in part that measures

shall

be established

to

assure that purchased

material,

equipment,

and services

conform to purchase

documents.

3.

Contrary to the above, at the time of this inspection,

the

NRC CAT inspec-

tors found several

deficiencies in vendor supplied

components

as follows:

a.

Several

installed Class

1E components

exhibited poor workmanship

and

inadequate

.vendor product quality.

These include inadequate

solder

connections

in the dc battery chargers

and

damaged

and broken terminal

lugs in the diesel

generator

control panels.

(Sections II'.B.2.b(4) and

II.B.3.b.(6))

b.

Instrument racks

had various weld deficiencies

such

as incomplete

fusion, missing or undersized

welds,

and weld spatter.

(Section IV.B.5)

c.

Some vendor supplied radiographs

did not have the required film quality.

(Section IV.B.11)

10 CFR 50, Appendix B, Criterion X, as

implemented

by the

APS

FSAR

Section

17. 1A.10, requires that

a program for inspection of activities

affecting quality be establ,ished

and executed to verify conformance with the

documented instructions,

procedures,

and drawings for accomplishing the

activity.

Contrary to the above, at the time of this inspection,

the licensee's

inspection

programs

were not effectively implemented in that:

B"1

a.

Four instances

of undersized

beam attachment

load pins were identified

on two- ASME Class

1 pipe supports

and, two Class

R pipe supports contrary

to design

drawings

and vendor catalogs.

(Section III.B.2)

b.

Improper bolting materials

were identified on flange connections

in

piping installations.

(Section III.B.1)

c.

Six of eleven pieces of gC accepted

Class lE equipment

mounted

by

welding had mounting configurations which were not in accordance

with

the applicable design or specified installation requirements.

In

addition,

5 of 32

gC accepted

cable tray hangers

were found with welded

connection configurations that were not in accordance

with the appli-

cable installation requirements.

(Sections II.B.l.b.(3), II.B.3.b.(4),

(6) and (7))

8-2