ML17299A888

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/85-44 & 50-529/85-45 on 851118-27.No Violations Noted
ML17299A888
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/06/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17299A889 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8512240042
Download: ML17299A888 (2)


See also: IR 05000528/1985044

Text

IV

8512240042

851206

PDR

ADOCK 05000528

G

PDR

Docket Nos. 50-528,

50 "529

Arizona Nuclear Power Project

P.

O. Box 52034

Phoenix,

Arizona

85072-2034

DEC'06 1986

Attention:

Mr. E. E. Van Brunt, Jr.

Executive Vice President

Gentlemen:

Subject:

NRC Inspection of Palo Verde Units

1 and

2

This refers to the inspection

conducted

by Mr. R.

C. Sorensen of this office

on November 18-27,

1985, of activities authorized by NRC Construction Permit

No.

CPPR-142

and

NRC Operating Iicense

No. NPF-41,

and to the discussion of

their findings held with members of your staff at the conclusion of the

inspection.

Areas

examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

No violations of NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely

ortg'inal signed

lay

D, F. girsch

D. F. Kirsch~ Acting Director

Division of Reactor Safety and Projects

Enclosure:

Inspection Report Nos. 50-528

4,

0-529/85-45

cc w/enclosure:

J.

Bynum,

ANPP; T. D. Shriver,

ANPP;

W. E. Ide,

ANPP;

C. N. Russo,

ANPP; Ms. Jill Morrison, PVIF; Lynne Bernabei,

GAP;

Duke Railsback,

ACC; Arthur C. Gehr, Esq., Snell 6 Wilmer

bcc w/enclosure:

RSB/Document Control Desk (RIDS); Mr. Martin;

Mr. Faulkenberry;

Mr. Cook; Resident Inspector; Project Inspector

bcc w/o enclousre:

IFMB

REGION V/dot,

SORENSEN

g v MILLER

12/P /gg

12/S /85

/

CHAFFEE

KIRS

12/5 /85

12/, /85

h,

t

tI

'i

4

-0