Proposed Tech Specs,Authorizing one-time Exemption from GDC 4 for Period Ending W/Completion of Second Refueling Outage or Adoption of Proposed Mod to GDC 4
ML17299A748
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/15/1985
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17299A747 List:
References
TAC-60476, NUDOCS 8511210357
Download: ML17299A748 (3)


Text

(9) Results of Pi ina Vibration Test Pro ram (Section 3.9.2, SER)

Three months following completion of the piping vibration test program performed during initial startup, APS shall submit a summary of the results which demonstrate that the vibration of piping systems is within acceptable levels.

(10) Response to Salem ATWS Event (Section 7.2, SSER 7, and Section 1. 11, S R 8 APS shall complete implemention of the requirements of Generic Letter 83-28 on a schedule which is consistent with that given in its letter dated April 19, 1985.

(ll) Su plement No. -1 to NUREG-0737 Requirements APS sha'll complete the emergency response capabilities as required by Attachment 3.

( 12) Radiochemistr Laborator (Section 7.3. 1.5(3), Emeroenct Plan)

APS shall maintain and operate the Palo Verde, Unit 2 radio-chemistry laboratory as part of the Palo Verde, Unit 1 facility C, under this Part 50 license authorization, in accordance with the commitments made by letter ANPP-30937, dated October 24, 1984, until the Unit 2 facility is issued a Part 50 license.

)The facility re qiure san exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50 (Section 6.2.6, SSER 7). This exemption is authorized by law and will not endanger life or property or the common defense and security and is 'otherwise in the public interest.

This exemption is, therefore, hereby granted pursuant to 10 CFR 50. 12.

With the granting of this exemption, the facility will operate, to the extent authorized herein, in conformitv with the application, as amended, the provisiors of the Act, and the rules and regulations of the'Comm'ission.

a APS shall fully implement and maintain in effect all.provisions of the Commission approved physical security, guard training and ouali-i~Sr.<T h fication, and safeguards contingency plans, including all amendments and revisions made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p), which are part of this license. These approved plans, which contain Safeguards Information protected under 10 CFR ?2.21, are entitled: "Palo Verde Nuclear Generating Station Security Plan,"

including a Chapter 8 contingency plan, and "Palo Verde Nuclear Generating Station Training and gualification Plan." The Palo Verde Nuclear Generating Station Safequards contingency Plan is integrated into the Physical Security Plan.

85112>o~57 8 PDR ADO'50 OOS28 PDR P

Insert A (2) The facility requires a partial exemption from those portions of General Design Criterion 4 of Appendix A to 10 CFR Part SO which require protection of structures, systems, and components against certain dynamic effects associated with postulated reactor coolant system pipe breaks.

This exemption is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest. This exemption is, therefore, hereby granted pursuant to 10 CFR S0.12 for a period ending with the completion of the second refueling outage for the facility or the adoption of the proposed rulemaking for modification of GDC 4 whichever occurs first. With the granting of this exemption, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.