Forwards Revised Unit 2 Tech Spec Schedule Consistent W/Projected Fuel Load Date of 851101.Tech Specs Incorporate Mods to Unit 1 Per Staff Request.Unit 1 License Amend Request Required to Combine Unit 1 & Unit 2 Tech Specs
ML17299A618
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/23/1985
From: Knighton G
Office of Nuclear Reactor Regulation
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8509260173
Download: ML17299A618 (6)


Text

Docket Nos.:

50-528, 50-529 and 50-530 Mr. E.

E.

Van Brunt, Jr.

Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034

Dear Mr. Van Brunt:

SEP JP.ar tlow BGrimes EJordan ACRS (16)

MLicitra 2 3 1885 DISTRIBUTION

-525/525/5 ~

NRC PDR LPDR NSIC PRC System LB83 Reading JLee SBrown MVirgilio MLey

Attorney, OELD

Subject:

Palo Verde Unit 2 Technical Specifications Schedule This letter is to confirm a telephone conversation on September 6,

1985 between our staff and Mr. Karner of your staff.

In your letter dated August 19, 1985 you projected that Palo Verde Unit 2 could be ready for receipt of an operating license and subsequent fuel load around November 1, 1985.

Mr. Karner was advised that the staff would provide you a Technical Specifications schedule consistent with your currently projected fuel load date.

The revised schedule is enclosed.

The Unit 2 Technical Specifications were developed by incorporating modifications to the Unit 1 specifications, as requested by your staff.

We have been advised by your staff that you may wish to have combined Technical Specifications for Unit 1 and Unit 2, prior to full power licensing of Unit 2.

This will require a Unit 1 license amendment request (LAR) to modify the Unit 1 specifications to make them identical to those of Unit 2, except for those differences due to design differences.

The LAR should include a supplemental analysis for each change addressing the "no significant hazards consideration" as required by 10 CFR 50.92.

Should you have any questions concerning this issue, please contact Marilyn Ley, Licensing Project Manager, at (301) 492-7792.

Sincerely,

/'g)g A

~~ 8>0923 p "

  • oooo oooooooo

( i PDR p(

Enclosure:

Unit 2 Technical Specifications Schedule 0"+>~At-Sea@ED ay George W. Knighton, Chief Licensing Branch No.

3 Division of Licensing cc:

See next page TOSB ey/

+ MVirgilio 9/ig/85 9//y /85 DL:

GW on 9/IL0/85

h C'

t P

tp

]t fj r

Mr. E.

E. Van:Brunt,"Jr.

Arizona Nuclear Power Project Palo Verde CC:

Arthur C. Gehr, Esq.

Snell 5 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.

Southern California Edison Company P. 0.

Box 800

Rosemead, California 91770 Mr. Mark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Mr. Roy Zimmerman U.S. Nuclear Regulatory Commission P. 0.

Box 239 Arlington, Arizona 85322 Ms. Patricia L'ee Hourihan 6413 S. 26th Street

Phoenix, Arizo'na 85040 Regional Administrator, Region V

- U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.

Winston 8 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 Que Street, NW Washington, DC 20009 Ms. Jill Morrison 522 E. Colgate Tempi, Arizona 85238 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue Suite 1310

Bethesda, Maryland 20814 Mr.

Ron Rayner P. O..Box 1509

Goodyear, AZ 85338

0 n

1 1t'!

II

PFVEl.oPMENT PF TEQHNlgALSPEQlFlgATIQNS FOg PALO VEROE UNlT 2 (Revised 9/9/85)

Pre-

~ptdcat r5at send SfS to apptr caral1 daysl Applicant math up STS watt plant specific re rturerr>>nts

~nd send lo NAC NIICpro-

%de ~

typed ver sion ol the Frat *ah ol TSI~

days: 1II weetts typ.

hgl SIO vhh by TSRG reviewer lo resolve noted dl.

Ierences

~nd develop Sat ol utfay

~nd NAC Items IS days!

TSRG resolve ag NRC end tality ec'rom art~

vhit and dtfsrone as

~nd fÃo posed ct>>nges IÃdaysl Rag'a5n.

NflR technkat

branches,

~nd appti cora pro.

lormal comments rpardng daysl TSRG resofve

Region, NRA lechnical branches and apdi.

cant corD n>>nts 120 days l May lectue ~ a

~ visit by TSRG lev>>wer Indepen-dera con.

sultant l>>f lorm audt revew ol TS agiinN fSAR and 5EII I

I ApgkCant fuet certify the toadf Low

~cctracy of Power the TS: in License conlor issued with manes whh TS as Ap-

FSAII, SER. as.

bust and

~afar y analyses.

OHPLETE Oct 25 I

COHPLET OHPLETE ept.

27 ct.

1 Oct.

15

! acr.

1 I

w I

-0 I

OHPLETE ct.

7 I ct.

29 M~

Ltaestone O Lhma

. OHlLESTONE NOT RE(UlREO OUPLlCATE PLANT TSRG

~eviewer review SER

~nd prepare Itt ol SER and Generic TS Acme IIS daysl TSRG revlew end marti up Fest dish ot TS; fsend lo apptcent

~nd lo lyp.

ITg daysl Apphcara a apace 5esporl res lo clues.

lions and lo aD posals lound unaccep.

table durhg NRC inhial review

~

Idavetop-ment ol fhst aahi TSRG reviewer a spare drah ol TS ~

IIOdays: I wesL lyp hgl TSAG

~ev>>wer prepare end issue Prool

~nd Review version ol TS IS days:

I weeL typ.

hgl TSRG reviewer participate in Regional Tattt force htpections IS dhysl TSRG 5elrlewer a spare end issue Final Ore h ver sasn ol TS IS days: I wee ti lyp.

ingI Protect Manager Irarlsrrlit Final Etrah lo apptr

cant, Ragen and SRI Oct.

23 TSAG reviewer 1ssotve df.

Ierences between TS. FSAR and SEA rdentifed by hdcpen dent con.

suttant IS daysl TSRG 1evewsr aapale Ap-pendia "A"

. versa5n ol TS IT daysl Mate II TS reissuect copes lor wrh Fua issuance Power with license Lfcente 1

it.

~ 1 ~ r

~ I I.INfl.r ".'.'yl C)

IC)

I/I Fyl

A 1

/ ~

C l