Provides Info Re Fuel Load Date,Tech Specs,Remaining SER Issues & Startup Testing,In Response to 850730 Request for Schedule for Completion of Licensing Review.Schedules Encl
ML17299A508
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/19/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-33234-EEVB, NUDOCS 8508230057
Download: ML17299A508 (8)


Text

REGULATORY

'DEFORMATION DISTRIBUTION SY" EM (R IDS)

ACCESSION NBR: 8508230057 DOC ~ DATE: 85/08/19 f'NOTARIZED:

NO FACIL:STN-50-529 Palo Verde Nuclear Station~

Unit 2~ Arizona Publi AUTH BYNAME AUTHOR AFFILIATION VAN BRUNTiE.E.

Arizona Public Service Co.

RECIP ~ NAME RECIPIENT AFFILIATION KNIGHTONiG ~ H ~

Licensing Branch 3

DOCKET 05000529

SUBJECT:

Pr ovides info r e fuel load date< Tech issues E,,startup testingrin response schedule for completion of licensing DISTRIBUTION CODE:

B001D COPIES RECEI YED: LTR TITLE: Licensing Submi t ta1:

PSAR/FSAR Amdts NOTES:Standardized plant ~

Specsiremaining SER to 850730 requestfor review. Schedules encl'NCL SIZE:

Related Correspondenc 05000529 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL: ACRS

<I1 ELD/HDS3 IE/DEPER/EPB 36 NRR ROEiM.L NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEBPO NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DS I/PSB 19 NRR/DSI/RSB 23 RGN5 EXTERNAL: 24X DMB/DSS (AMDTS)

NRC PDR 02 PNL GRUEL,R COPIES LTTR ENCL 1

0 1

0 6

1 0

1 1

1 1

'1 1

2 2

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1-1 1

1 3

3 RECIPIENT ID CODE/NAME NRR LB3 BC LICITRAi E 01

~okzcvwe IE FILE IE/DQAVT/QAB21 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DS I/CSB 09 NRR/DS I/METB 12 N

/RAB 22 04 RM/DDAMI/MI0 BNL(AMDTS ONLY)

LPDR 03 NSIC 05 COP IES LTTR ENCL 1

0 1

1 0

1 1

1 1

1 0

1 1

2 2

1 1

1 1

1 1

1 0

1 1

1 1

1 1

1 1

1 1

1 0

1 1

1 1

1 1

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 52 ENCL

t J

li

~

~ t

Arizona Nuclear Power Pro)ect P.o. BOX 52034

~

PHOENIX, ARIZONA85072-2034 Director of Nuclear Reactor Regulation Attention:

Mr. George W. Knighton, Chief Licensing Branch No.

3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C.

20555 August 19, 1985 ANPP-33234-EEVB/MFQ

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Schedule for Completion of Licensing Review for Palo Verde Unit 2 Docket No.

STN 50-529 File:

85-056-026 G.1.01.10

Reference:

Letter from T. Novak, NRC, to E. E. Van Brunt, APS, dated July 30, 1985.

Subject:

Schedule for Completion of Licensing Review for Palo Verde Unit 2.

Dear Mr. Knighton:

Ve have received your referenced letter which made reference to an NRR telephone call to Mr. Karner of my staff.

My response to the items discussed are as follows:

1.

Palo Verde Unit 2 Fuel Load Date APS has provided previous correspondence and telephone conversations to NRC regarding the Unit 2 schedule.

Since late 1984, the APS Unit 2 completion schedule relayed to NRC has been the last quarter of 1985 which is October 1, 1985 to December 31, 1985.

This 3 month window is used due to allowance for preoperational testing results.

Our current estimated sch'edule shows ghat PVNGS could be ready for receipt of an operating license and subsequent fuel load about November 1, 1985.

This actual schedule is within the 3 month window and will, of course, fluctuate both backward and forward as unit 2 is actually completed.

This fluctuation was experienced on Unit 1.

2.

Technical Specifications for Palo Verde Unit 2 Attachment 1 provides our schedule for review and issuance of the Unit 2 Technical Specifications.

The schedule has been reviewed by the NRR Technical Specification review and found to be timely and acceptable.

3.

Remaining SER Issues Attachment 2 provides our schedule for submittal of information on the remaining SER issues for Unit 2.

Ne also expect to be submitting some miscellaneous recently approved FSAR changes prior to September 1, 1985.

These changes have undergone a 10CFR 50.59 review for PVNGS Unit 1.

8508230057 850819 PDR ADDCK CDDOCDR9 E

PDR p>u/

I I

~

~

~r G.

W. Knighton Schedule for Completion of Licensing Review for Palo Verde Unit 2 ANPP-33234 Page 2

4.

Dual Startup Testing of Units 1 and 2

,We have been informed by the referenced letter that dual startup testing of two units has caused difficulties in the past with other multi-unit plants.

We are aware of the potential difficulties of having 2 units in testing and are evaluating the need for special precautions (i.e., administrative controls to ensure that any mode change on a unit will be done at a time the other unit is in a stable operating condition) which would be implemented in the case of,-dual testing'.

Currently dual testing for, Palo Verde Units l and 2 is expected, although the overlap is very small.

Please contact me if you have any questions.

EEVB/WFQ/slh Attachment Very truly yours, wz u~ @~X'.qp E. E.

Van Brunt, Jr.

Executive Vice President Project Director cc:

A. C. Gehr R. P.

Zimmerman E. A. Licitra M. Ley

Attachment 1

8/19 NRC to Issue Proof/Review 8/30 Send Any Comments to NRR on Proof and Review Copy 9/5 NRC Contractor to Start Review 9/15 NRC Contractor to Finish Review 9/20 9/25 Start Resolution of any Open Issues lo/1 Final Tech Specs ready to be issued with O.L.

t

(

I

Attachment 2

SER 0 en Item Current Scheduled Submittal Date a)

Guide Tube Wear Surveillance Complete.

ANPP-33200 August 12, 1985 b)

Pressurized Thermal Shock September 1, 1985 c)

Appendix R Differences in Unit 1/

Unit 2 Cable Routing for Safe Shutdown Equipment September 1, 1985 d)

Operator Experience for Unit 2 Shift Staffing September 1, 1985 e)

Preservice Inspection Program Complete FSAR Chan e Submittals All. presently identified changes to be submitted by September 1,

1985 Confirmator Item D/G and Essential Cooling Water Systems Inspection (Spray Pond Issue)

September 1, 1985