UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO.
STN 50-528 PALO VERDE NUCLEAR GENERATING STATION, UNIT I ARIZONA PUBLIC SERVICE COMPANY, ET AL.
NOTICE OF ISSUANCE OF FACILITY OPERATING LICENSE Notice is hereby given that the U.S. Nuclear Regulatory Commission (the Commission),
has issued Facility Operating License No. NPF-41, (License) to Arizona Public Service Company, Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Souther n California Public Power Authority.
This License authorizes operation of the Palo Verde Nuclear Generating Station, Unit I (facility) at reactor core power levels not in excess of 3800 megawatts thermal in accordance with the provisions of the License, the Technical Specifications and the Environmental Protection Plan.
On December 31, 1984, the Commission issued Facility Operating License No. NPF-34, which authorized operation of Palo Verde Nuclear Generating Station, Unit I at power levels not in excess of 190 megawatts thermal.
Facility Operating License No. NPF-41 supercedes Facility Operating License No. NPF-34.
Palo Verde Nuclear Generating Station, Unit I is a pressurized water reactor which utilizes a
CESSAR standard plant design and is located at the licensees site in Maricopa County, Arizona approximately 36 miles west of the city of Phoenix.
gg07i10i o 000528 g7 eSO~O>>
pgR ADOCK
>>Rg P
The application for the license, as
- amended, complies with the standards and requirements of the Atomic Energy Act of 1954, as, amended (the Act), and the Commission's regulations.
The issuance of this License has been authorized by the Atomic Safety and Licensing Board in its Initial Decision, dated December 30,
- 1982, and by the Commission at its meeting on May 30, 1985.
The Commission has made appropriate findings as required by the Act and the Commission's regulations in 10 CFR Chapter I, which are set forth in the License.
Prior public notice of the overall action involving the proposed issuance of an operating license was published in the FEDERAL REGISTER on July 11, 1980 (45 F.R. 46941) as clarified in a notice published July 25, 1980 (45 F.R. 49732).
The Commission has determined that the issuance of this License will not result in any environmental impacts other than those evaluated in the Final Environmental Statement since the activity authorized by the License is encompassed by the overall action evaluated in the Final Environmental Statement.
For further details with respect to this action, see (1) Facility Operating License No. NPF-41, with Technical Specifications (NUREG-1133) and Environmental Protection Plan; (2) the report of the Advisory Committee on Reactor Safeguards dated December 15, 1981; (3) the Commission's Safety Evaluation Report on Palo Verde dated November 1981; Supplement Nos.
1 through 8, dated February
- 1982, May 1982, September
- 1982, March 1983, November 1983, October
- 1984, December
- 1984, and May 1985, respectively; (4) the Commission's related Safety Evaluation Report on CESSAR dated November 1981; Supplement No.
1 dated March 1989; Supplement No.
2 dated September 1983; (5) the Final Safety Analysis Reports
and amendments thereto; (6) the Environmental Report and supplements thereto; (7) the Draft Environmental Statement dated October 1981; (8) the Final Environmental Statement dated March 1982; and (9) the Initial Decision issued by the Atomic Safety and Licensing Board dated December 30, 1982.
These documents are available for public inspection at the Commission's Public Document
- Room, 1717 H Street, N. W., Washington, D. C.,
and the Phoenix Public Library, Business, Science and Technology Department, 12 East McDowell
- Road, Phoenix, Arizona 85004.
A copy of Facility Operating License No.
NPF-41 may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.
C.
20555, Attention:
Director, Division of Licensing.
Copies of the Safety Evaluation Report and its Supplements 1 through 8 (NUREG-0857) and the Final Environmental Statement (NUREG-0841) may be purchased by calling (202) 275-2060 or (202) 275-2171 or by writing to the Superintendent of Documents, U.S.
Government Printing Office, Post Office Box 37082, Washington, D.C.
20013-7082.
All orders should clearly identify the NRC publication number and the requester's GPO deposit account, or VISA or Mastercard number and expiration date.
NUREG-0857 may also be purchased from the National Technical Information Service, Department of Commerce, 5285 Port Royal
- Road, Springfield, Virginia 22161.
Dated at Bethesda, Maryland, the 1st day of June,
- 1985, FOR THE NUCLEAR REGULATORY COMMISSION Harry Rood, Acting Chief Licensing Branch No.
3 Division of Licensing
\\
t t
i
gpR AEGy
~
O~
+>>*++
UNITED STATES NUCLEAR.REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket 50-528 AMENDMENT TO INDEMNITY AGREEMENT NO. B-95 END ENT N
Effective June l, 1985, Indemnity Agreement No. B-95, between Arizona Public Service
- Company, Southern California Edison Company, Salt River Project Agricultural Improvement and Power District, Public Service Company of New Mexico, El Paso Electric Company, Southern California Public Power Authority, Los Angeles Department of Water and Power and the U.S. Nuclear Regulatory Commission, dated January 26, 1983, as
- amended, is hereby further amended as follows:
Item 3 of the Attachment to the indemnity agreement is deleted in its entirety and the following substituted therefor:
Item 3 - License number or numbers SNM-1887 SNM-1922 NPF-34 (From 12:01 a.m., January 26, 1983 to 12 midnight December 30, 1984 inclusive)
(From 12:Ol a.m.,
December 19, 1983)
(From 12:01 a.m.,
December 31, 1984 to 12 midnight May 31, 1985, inclusive)
NPF-41 (From 12:01 a.m.,
June 1,
1985
)
FOR THE U. S.
NUCLEAR REGULATORY COMMISSION
. Pa<cu ca Jerome S
tzman, Assistant Director ate an Licensee Relations Office of State Programs Accepted
, 1985 Accepted
, 1985 By RIZON PUBLIC S RVICE C
MP N
By S
UTHERN C LIF RNI EDISON C
Accepted
, 1985 Accepted
, 1985 By S
R RPR R
L L
IMPROVEMENT AND POWER DISTRICT By UL SR C
PN F
NEW MEXICO Accepted
, 1985 Accepted
, 1985 By EL P
MP N
Accepted.
, 1985 By S
HRNCL F RNI PUBLI P
ER AUTHORITY By L
S NGELES DEP RTMENT OF WATER AND POWER
r
,I
PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 ISSUANCE OF FACILITY OPERATING LICENSE NPF-41 June 1,
1985 DISTRIBUTION 50-28 NRC PDR*
~
Local PDR*
NSIC*
PRC System*
LBP3 Reading JLee (25)
EALicitra*
TNNovak JSaltzman, SAB
- Attorney, OELD
- CNiles HDenton DGEisenhut JRutberg AToalsto'n WMiller, LFHB J Parti ow
- BGrimes
- EJordan LHarmon
- EButcher
- TBarnhart (4)
- IBailey *
- With Technical Specifications (NUREG-1133)
1
~P,S REOIj Cqp0 A
I O
I,h r~
+
O
++*++
It ENgE AUTHORITY FILE COP't UNITED STATES NUCLEAR.REGIJ<ATORY COMMISSION WASHINGTON, O. C. 20555-MAY 10 1985.
Docket No.:
50-528 Mr. E.
E.
Van Brunt, Jr.
Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034
Dear Mr. Van Brunt:
Subiect:
Issuance of Amendment No.
1 to Facility Operating License NPF-34 for Palo Verde Unit 1
The Commission has issued the enclosed Amendment No.
1 to Facility Operating License No.
NPF-34 for the Palo Verde Nuclear Generatinq Station, Unit 1.
The amendment consists of a change to the Technical Specifications in response to your application transmitted by letter dated April 12, 1985, and confirms the telephone notification given to Mr. D. Karner of Arizona Public Service Company on April 16, 1985, that the requested change has been granted.
The amendment revises Technical Specification 3/4.3.2, Table 3.3-5, Item 3.e, to correct the response times for the containment spray pumps.
A copy of the Safety Evaluation is also enclosed.
Notice of Issuance and Final Determination of No Significant Hazards Consideration and Opportunity for Hearing will be included in the Commission's Monthly Notice.
Sincerely,
Enclosures:
1.
Amendment No.
1 to NPF-34 2.
Safety Evaluation cc:
See next page George W. Knighton, Chief Licensing Branch No.
3 Division of Licensing
l I
e I
0 0
Palo Verde Mr. E.
E.
Van Brunt, Jr.
Executive President Arizona Nuclear Power Project P. 0.
Box 52034 Phoenix, Arizona 85072-2034 Arthur C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Counsel James A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Ms. Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Mr. Roy Zimmerman U.S. Nuclear Regulatory Commission P. 0.
Box 239 Arlington, Arizona 85322 Ms. Patricia Lee Hourihan 6413 S. 26th Street
- Phoenix, Arizona 85040 Regional Administrator - Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.
Winston 5 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Ms. Jill Morrison 522 E. Colgate Tempi, Arizona 85238 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814 Mr.
Ron Rayner P. 0.
Box 1509
- Goodyear, AZ 85338 Arizona Corporation Commission 1200 Hest Washington Phoenix, Arizona 85009 Arizona Radiation Regulatory Agency ATTN:
Ms. Clara Palovic, Librarian 925 South 52nd Street Tempe, Arizona 8528l Chairman Maricopa County Board of Supervisors 111 South Third Avenue Phoenix, Arizona 85003
~p,R Rf:CCcc Vp O~
Cy c
oO
,cc ~
+**++
t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 ARIZONA PUBLIC SERVICE COMPANY, ET AL.
DOCKET NO.
STN 50-528 PALO VERDE NUCLEAR GENERATING STATION, UNIT NO.
1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
1 License No.
NPF-34 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment, dated April 12, 1985, by the Arizona Public Service Company (APS) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric
- Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and
- Power, and Southern California Public Power Authority (licensees),
complies with standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense ahd security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No.
NPF-34 is hereby amended to read as follows:
. (2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.
1, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of April 16, 1985.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to 'the Technical Specifications Date of Issuance:
gAY g 0 F88~
George W. Knighton, Chic Licensing Branch No.
3 Division of Licensing
t
~
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. I TO FACILITY OPERATING LICENSE NO. NPF-34 DOCKET NO.
STN 50-528 Revise Appendix A as follows:
Remove Old Pa e
3/4 3-29 Insert New Paqe 3/4 3-29
I
tABLE 3.3-5 (Continued)
ENGINEERED SAFETY FEATURES
RESPONSE
TIMES INITIATING SIGNAL AND FUNCTION
RESPONSE
TIME IN SECONDS 2.
3.
5.
6.
7.
Pressurizer Pressure Low a.
Safety Injection (HPSI) b.
Safety Injection (LPSI) c.
Containment Isolation I.
CIAS actuated mini-purge valves 2.
Other CIAS actuated valves Containment Pressure
- High a.
Safety Injection (HPSI) b.
Safety Injection (LPSI) c.
Containment Isolation 1.
CIAS actuated mini-purge valves 2.
Other CIAS actuated valves d.
Hain Steam Isolation 1 ~
HSIS actuated HSIV' 2.
HSIS actuated HFIV'si e.
Containment Spray Pump Containment Pressure
- High-High a.
Containment Spray Steam Generator Pressure Low a.
Hain Steam Isolation 1.
HSIS actuated HFIV'sk Refueling Mater Tank -
Low a.
Containment Sump Recirculation Steam Generator Level -
Low a.
Auxiliary Feedwater (Motor Drive) b.
Auxiliary Feedwater (turbine drive) 30K'/30**
30%'/30'AA'
- 10. 6"/10. 6"~
31)k/3] 4')h 30*/30%A'0k'/30%%
< 10. 6"/10. 6""
3] A/31%A' 5 6 /5 6~8
< 10.6"/10.6""
< 33 A'/23K*
33 k/23*4 5 6 /5 ~ 6 AA
< 10.6"/10.6""
45)k/45K'4 46)h/23%A 30%/30%*
PALO VERDE - UNIT 1 3/4 3-29 AMENDMENT NO.
1
l.
I'e
gp,R RKgy Vp0 Cy A.
+a*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINCiTON, D. C. 20555 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. I TO FACILITY OPERATING LICENSE NO.
NPF-34 ARIZONA PUBLIC SERVICE COMPANY, ET AL.
PALO VERDE NUCLEAR GENERATING STATION, UNIT NO. I DOCKET NO.
STN 50-528 Introduction By letter dated April 12, 1985, the Arizona Public Service Company (APS) on behalf of itself, the Salt River Project Agricultural Improvement and Power District, Southern California Edison
- Company, El Paso Electric Company, Public Service Company of New Mexico, Los Angeles Department of Mater and Power, and Southern California Public Power Authority (licensees),
requested an emer-gency change to the Technical Specifications (Appendix A to Facility Operating Licensee NPF-34) for the Palo Verde Nuclear Generating Station, Unit 1.
The proposed change would revise Technical Specification 3/4.3.2, Table 3.3-5, Item 3.e, to correct an error which was identified by APS on April 9, 1985.
Discussion Palo Verde Unit I is currently completing scheduled surveillance and maintenance activities in preparation for initial entry into Mode 4 (k eff ~ 0.99, 350'F 0 T cold > 210'F).
During surveillance testing of the containment spray system, APS determined that the measured response time for the containment spray pumps to reach rated speed was greater than the 17 seconds allowed by Table 3,3-5 of the Technical Specifications.
As a result, Palo Verde Unit I cannot enter Mode 4 until the measured response time for the containment spray pumps is in conformance with the Technical Specifications.
An investigation by APS revealed that the response time value presented in the Technical Specifications is significantly less than the 23 seconds used in the accident analyses presented in FSAR Section 6.2. 1.
APS proposes to change the Technical Specifications to include containment spray pump response times which are consistent with the FSAR.
APS states that the need for a correction was not obvious prior to submitting the request since the response times in question required a calculation of timing sequences to determine the total response time.
APS states that the current schedule for entering Mode 4 during the present power ascension program is April 16, 1985.
Therefore, it has requested an
. emergency change since failure to allow;the change prior to April 16, 1985 would delay the present power ascension
'program.
APS also states that the proposed change does not involve a significant hazards consideration nor an unreviewed environmental question since the change is being made solely for the purpose of correcting an error in the Technical Specifications.
Evaluation N
This proposed change falls into the category of an emergency change since failure of the NRC to take action would result in Palo Verde Unit 1 not being able to enter Mode 4 on April 16, 1985 which, in turn, would prevent the continuation of the present power ascension program until the request is granted.
As stated in the licensees'equest, the need for the proposed action was not determined until April 9, 1985.
The sta'ff has reviewed the facts concerning the request and concludes that APS has made a timely submittal, that the power ascension program cannot proceed without NRC action, and that action by the licensees could not preclude this situation.
The action requested by the licensees is to change the containment spray pump up-to-rated-speed response times listed as Item 3.e on Table 3.3-5 in the Technical Specifications.
The licensees state that the response times should be changed from 27/17 seconds to 33/23 seconds to correct an error (the first number of each set includes a
10 second delay to account for time to start the diesel generator if off-site power is lost).
The initial values do not include time for the pumps to reach rated speed after start.
The proposed revised values include this additional time and are consistent with the accident analyses presented in Section 6.2. 1 of the Palo Verde FSAR.
The staff has reviewed the information submitted by the licensees and concludes that it is acceptable to change the response times since they are consistent with the FSAR accident analyses.
Staff approval of the change was granted to APS by telephone on April 16, 1985.
-Environmental Consideration The staff has determined that the amendment does not authorize a change in effluent types or total amounts nor an increase in power level and will not result in any significant environmental impact.
Having made this determination, the staff has further concluded that the amendment involves an action which is insignificant from the standpoint of environmental impact and, pursuant to 10 CFR Part 51.5(d)(4), that an environmental impact statement, or a negative declaration and environmental impact appraisal, need not be prepared in connection with the issuance of this amendment.
l l
f l
Final No Siqnificant Hazards Consideration Determination The State was informed by telephone on April 15, 1985 of the staff's proposed no significant hazards consideration determination.
The State contact had no comments on the proposed determination.
The Commission has provided guidance concerning the application of the standards by providing certain examples.
The proposed change matches the example cited in 48 FR 14864; i.e., the proposed change involves a purely administrative change to the Technical Specifications in "that it provides for correction of an error in the Technical Specifications.
Based on the review of the licensees'ubmittal as described
- herein, the staff has made a final determination that the licensees'mendment request does not involve a significant hazards consideration since operation of Palo Verde Unit 1 with the requested change would not
( 1) involve a significant increase in the probability or consequences of an accident previously analyzed, (2) create the possibility of a new or different kind of accident from any accident previously analyzed, or (3) involve a significant reduction in a margin of safety.
Conclusion The staff has concluded, based on the considerations discussed above, that
( 1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed
- manner, (2) such activities will be conducted in compliance with. the Commission's regulations, and (3) the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.